Responds to NRC 810601 Ltr Re Violations Noted in IE Insp Repts 50-250/81-10 & 50-251/81-10.Corrective Actions: Pressurizer Power Operated Relief Valves Opened & Q List Revised to Include Nitrogen Bottle Changeout Procedure
ML18008A019
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/30/1981
From: UHRIG R E
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17341A411 List:
References
L-81-262, NUDOCS 8108040497
Download: ML18008A019 (6)


See also: IR 05000250/1981010

Text

~~P.O.BOX 629100 MIAMI, F L 33152+@illb Bl J(L 7 All~20 FLORIDA POWER&LIGHT COMPANY June 30, 1981 L-81-262 Mr.James P.O'Reilly, Director, Region II Office of Inspection

and Enforcement

U.S.Nuclear Regulatory

Commission-

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr.O'Reilly: Re: Turkey Point Units 3 8 4 Docket Nos.50-250, 50-251 IE Ins ection Re ort 81-10 Florida Power 8 Light Company has reviewed the subject inspection

report and a response is attached.There is no proprietary

information

in the report.Very truly yours, Robert E.Uhrig Vice President Advanced Systems 8 Technology

REU/PLP/ah

Attachment

cc: Harold F.Reis, Esquire 81080yp497

81071'~ADOCK 08000250 I'D+R PEOPLE...SERVING PEOPLE

's

Re: Turkey Point Units 3 and 4 Docket Nos.50-250, 50-251 IE Inspection

Re ort 81-10 FINDING: Technical Specification 6.8.1 requires written procedures

and administrative

policies be established, implemented, and maintained

for safety-related

equipment.

Administrative

Procedure 0190.19, Control of Maintenance

on Nuclear Safety-Related

Equipment, requires that work on safety-related

equipment be accomplished

per plant work order.Contrary to the above, Administrative

Procedure 0190.19 was not followed in that on April 13, 1981, the back-up nitrogen supply system for the pressurizer

power operated relief valves was found to be isolated and a properly authorized

Plant Work Order had not been initiated for the work which apparently

caused the valves to be shut.The Unit was in a shutdown condition when the valves were found closed.RESPONSE: FPL concurs with the finding.The reason that a safety-related

Plant Work Order had not been initiated for this particular

work evolution, was that our original Q List did not have this system specified.

The isolation of the system, change out of the bottles, and restoring the system to service had been conducted through the use of blanket Plant Work Orders.Our revised Q List was approved and implemented

on April 6, 1981.Mechanical

Maintenance

Department

Supervision

had not reviewed the new Q List with all department

personnel who would have responsibility

to insure that this list be consulted prior to initiating

a Plant Work Order.As corrective

action, when this problem was discovered, the valves which had been closed to change out the N2 bottles were reopened to the system and a test was conducted to insure operability

prior to filling and venting the plant.As corrective

action to avoid further problems, all personnel in mechanical

maintenance

department

who are responsible

for reviewing the Q List to insure that work on safety related systems are accomplished

through a specific Plant Work Order have been made aware of the new revised list.Full compliance

was achieved on June 19, 1981.

~g.<~E1 IL

STATE OF FLORIDA))COUNTy OF DADE)ss0 Rob , heing first duly sworn, deposes and says: That, he is Vice President Light Company, the Licensee heres.n;of Florida Power 6 That he has executed the foregoing document;that the state-ments made in this said document are true and correct to,the best of his knowledge, information, and belief, and that he is~authorized

to execute the document on behalf of said Licensee.o ert E.U rig Subscribed