Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20092M97828 June 1984Program Plan & ScheduleSafe Shutdown
Hydrostatic
ML20093G36517 July 1984Public Version of Rev 0 to Draft Emergency Plan Implementing Procedure EP-4-010, Toxic Chemical Contingency Procedure. W/J Felton 840714 Release MemoHealth Physics Network
ML20093N54223 July 1984Revised Program Plan & Schedule for Resolution of 23 Issues Described in NRCHydrostatic
ML20095A01819 May 1984Rev 1 to Surveillance Procedure RW-2-210, Radwaste SolidificationBoric Acid
Process Control Program
ML20095A20914 August 1984NUS Project Plan for Prelicensing Issues Task Force Support GroupHydrostatic
ML20097J1867 April 1984Marked-up Rev 1 to Procedure TG-OP-902-006, Technical Guide for Loss of Main Feedwater Recovery ProcedureShutdown Margin
ML20099D6425 March 1985Public Version of Rev 7 to Emergency Plan Implementing Procedure EP-2-020 Re Contaminated Injured/Ill Personnel & Rev 4 to EP-2-052 Re Protective Action GuidelinesSafe Shutdown
Health Physics Network
ML20099F4099 November 1984Rev 0 to Administrative Procedure RW-1-210, Process Control ProgramBoric Acid
Process Control Program
ML20101B83229 May 1992EDG Reliability Program Description & Comparison W/Nrc Reg Guide 1.155,Section 1.2Boric Acid
Condition Adverse to Quality
ML20101L66131 December 1984Rev 1 to Alert/Notification Sys
ML20101Q0313 January 1985Revs 5,4 & 4 to Emergency Plan Implementing Procedures EP-2-130 Re Emergency Team assignments,EP-2-190 Re Personnel Accountability & EP-3-070 Re Emergency Communications Sys Routine Testing,Respectively.Personal Info WithheldHealth Physics Network
ML20105C7111 November 1983Rev 4 to Nuclear QA Program ManualNon-Destructive Examination
Coatings
Nondestructive Examination
ML20105C80030 June 1983Rev E to Procedure TBP-37, Piping InstallationCoatings
ML20106C5078 February 1985Draft Program to Perform Confirmatory Analyses,Nuclear Plant Island Structure Basemat at Waterford Steam Electric Station Unit 3Earthquake
ML20107B65031 October 1984Nonproprietary Revised Emergency Plan Implementing Procedures,Including EP-1-001 Re Recognition & Classification of Emergency Conditions & EP-1-010 Re Unusual EventShutdown Margin
Earthquake
ML20107J09521 February 1985Program to Perform Confirmatory Analyses,Nuclear Plant Island Structure BasematFinite Element Analysis
Earthquake
ML20112E3887 January 1985Rev 2 to Pump & Valve Inservice Test PlanBoric Acid
Stroke time
Power-Operated Valves
ML20114B60920 June 1985Rev 2 to Technical Procedure RW-2-500, Radioactive Matl Shipment
ML20114B72420 September 1986Rev 5 to Technical Procedure RW-2-200, Packaging Radioactive Solid Waste (DAW) for Dispsosal
ML20114C77112 June 1992Rev 2 to Administrative Procedure UNT-005-014, OdcmBoric Acid
Grab sample
Offsite Dose Calculation Manual
Process Control Program
Power change
ML20116B12211 December 1989Rev 2 to Nuclear Training Procedure NTP-203, Emergency Plan Training
ML20116B14417 April 1996Rev 6 to Procedure NTC-216, Emergency Plan Training Initial
ML20116B15317 April 1996Training Course Description Emergency Plan Continuing Training
ML20117A56828 July 1996Ldcr 97-0047-Location of Cabinets C-3A(B) & C-4 Outside Cvas Boundary - Rev 1Safe Shutdown
Post Accident Monitoring
Fire Protection Program
ML20117F13723 March 1983Rev B to Procedure ASP-IV-122, Site Control & Processing of Defects/Noncompliance Conditions to Louisiana Power & Light CoSafe Shutdown
ML20117F1734 October 1983Rev D to Procedure ASP-IV-70, Handling of Engineering Discrepancy Notices
ML20117F1859 December 1983Rev J to Procedure ASP-III-7, Processing of NonconformancesNondestructive Examination
ML20117F21820 May 1977Rev 0 to Sqcp 15.1-2, Nonconformance Control - Shop QC Manual
ML20117F29711 March 1981Rev 1 to Procedure AS-P-007, Nonconformances & Corrective ActionLiquid penetrant
ML20117F32227 March 1978Rev 4 to Procedure POP-N-713, Use of Discrepancy Repts
ML20117F32724 May 1978Rev 4 to Procedure POP-N-703, Nonconformance Reporting & Corrective Action
ML20117F33430 July 1981Rev F to Procedure ES-142, Nonconformance & Corrective ActionCondition Adverse to Quality
ML20117F37820 June 1983Rev 4 to Procedure for Handling of Nonconformances & Corrective Action
ML20117F39215 December 1980Rev 1 to QAP-104W3, QA Procedure for Corrective Action
ML20117F41327 January 1981Rev 3 to PR-16.0, Corrective ActionCondition Adverse to Quality
ML20117F44523 May 1978Rev B to Procedure 16, Procedure for Reporting Discrepancies-Both Safety & Nonsafety-Related
ML20117F45717 March 1981Rev F to Procedure TBP-12, Nonconformances & Discrepancies
ML20117F48618 October 1983Rev 1 to Procedure W3-6, Nonconformance & Corrective Action
ML20117F50821 September 1982Rev 6 to Procedure Pr 15.0, Nonconforming Matl or Items
ML20117J7679 May 1985Nonproprietary Revised Emergency Plan Implementing Procedures,Including EP-2-010, Notification & Communication & EP-2-061, Emergency Environ Monitoring
ML20118A71816 September 1992Rev 5 to Waterford 3 Steam Electric Station 10-Yr Inservice Insp Program,First IntervalNon-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
Dissimilar Metal Weld
ML20125C21926 September 1984Rev 1 to Procedure Qasp 19.11, Operating Procedure
ML20125C23623 October 1984Rev 1 to QA Procedure Qasp 19.13, Response Validation
ML20127B60422 September 1975Issue a to Procedure CP-203, Clam Shell Filter Blanket Test Fill
ML20127B65819 December 1975Issue C to Procedure QCIP-7, Insp of Concrete Placement, Curing & Finishing
ML20127B66524 February 1983Issue B to Procedure CP-703, Batch Plant Activities & Operations
ML20127B67116 March 1984Amend 1 to Issue C to Procedure QCIP-8, Receiving,Insp, Storage & Testing of Concrete Reinforcing Steel
ML20127B6871 April 1984Amend 1 to Issue a to Procedure CP-803, Excavation & Backfill
ML20127B69526 April 1976Rev 0 to Special Process Procedure W-SP-6, Bending & Straightening of Reinforcing Bars Partially Embedded in Concrete & Placing of Bars in Hardened Concrete
ML20127B70717 September 1975Issue a to Procedure QCIP-1, Density Control of Shell