Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20092M978 | 28 June 1984 | Program Plan & Schedule | Safe Shutdown Hydrostatic |
ML20093G365 | 17 July 1984 | Public Version of Rev 0 to Draft Emergency Plan Implementing Procedure EP-4-010, Toxic Chemical Contingency Procedure. W/J Felton 840714 Release Memo | Health Physics Network |
ML20093N542 | 23 July 1984 | Revised Program Plan & Schedule for Resolution of 23 Issues Described in NRC | Hydrostatic |
ML20095A018 | 19 May 1984 | Rev 1 to Surveillance Procedure RW-2-210, Radwaste Solidification | Boric Acid Process Control Program |
ML20095A209 | 14 August 1984 | NUS Project Plan for Prelicensing Issues Task Force Support Group | Hydrostatic |
ML20097J186 | 7 April 1984 | Marked-up Rev 1 to Procedure TG-OP-902-006, Technical Guide for Loss of Main Feedwater Recovery Procedure | Shutdown Margin |
ML20099D642 | 5 March 1985 | Public Version of Rev 7 to Emergency Plan Implementing Procedure EP-2-020 Re Contaminated Injured/Ill Personnel & Rev 4 to EP-2-052 Re Protective Action Guidelines | Safe Shutdown Health Physics Network |
ML20099F409 | 9 November 1984 | Rev 0 to Administrative Procedure RW-1-210, Process Control Program | Boric Acid Process Control Program |
ML20101B832 | 29 May 1992 | EDG Reliability Program Description & Comparison W/Nrc Reg Guide 1.155,Section 1.2 | Boric Acid Condition Adverse to Quality |
ML20101L661 | 31 December 1984 | Rev 1 to Alert/Notification Sys | |
ML20101Q031 | 3 January 1985 | Revs 5,4 & 4 to Emergency Plan Implementing Procedures EP-2-130 Re Emergency Team assignments,EP-2-190 Re Personnel Accountability & EP-3-070 Re Emergency Communications Sys Routine Testing,Respectively.Personal Info Withheld | Health Physics Network |
ML20105C711 | 1 November 1983 | Rev 4 to Nuclear QA Program Manual | Non-Destructive Examination Coatings Nondestructive Examination |
ML20105C800 | 30 June 1983 | Rev E to Procedure TBP-37, Piping Installation | Coatings |
ML20106C507 | 8 February 1985 | Draft Program to Perform Confirmatory Analyses,Nuclear Plant Island Structure Basemat at Waterford Steam Electric Station Unit 3 | Earthquake |
ML20107B650 | 31 October 1984 | Nonproprietary Revised Emergency Plan Implementing Procedures,Including EP-1-001 Re Recognition & Classification of Emergency Conditions & EP-1-010 Re Unusual Event | Shutdown Margin Earthquake |
ML20107J095 | 21 February 1985 | Program to Perform Confirmatory Analyses,Nuclear Plant Island Structure Basemat | Finite Element Analysis Earthquake |
ML20112E388 | 7 January 1985 | Rev 2 to Pump & Valve Inservice Test Plan | Boric Acid Stroke time Power-Operated Valves |
ML20114B609 | 20 June 1985 | Rev 2 to Technical Procedure RW-2-500, Radioactive Matl Shipment | |
ML20114B724 | 20 September 1986 | Rev 5 to Technical Procedure RW-2-200, Packaging Radioactive Solid Waste (DAW) for Dispsosal | |
ML20114C771 | 12 June 1992 | Rev 2 to Administrative Procedure UNT-005-014, Odcm | Boric Acid Grab sample Offsite Dose Calculation Manual Process Control Program Power change |
ML20116B122 | 11 December 1989 | Rev 2 to Nuclear Training Procedure NTP-203, Emergency Plan Training | |
ML20116B144 | 17 April 1996 | Rev 6 to Procedure NTC-216, Emergency Plan Training Initial | |
ML20116B153 | 17 April 1996 | Training Course Description Emergency Plan Continuing Training | |
ML20117A568 | 28 July 1996 | Ldcr 97-0047-Location of Cabinets C-3A(B) & C-4 Outside Cvas Boundary - Rev 1 | Safe Shutdown Post Accident Monitoring Fire Protection Program |
ML20117F137 | 23 March 1983 | Rev B to Procedure ASP-IV-122, Site Control & Processing of Defects/Noncompliance Conditions to Louisiana Power & Light Co | Safe Shutdown |
ML20117F173 | 4 October 1983 | Rev D to Procedure ASP-IV-70, Handling of Engineering Discrepancy Notices | |
ML20117F185 | 9 December 1983 | Rev J to Procedure ASP-III-7, Processing of Nonconformances | Nondestructive Examination |
ML20117F218 | 20 May 1977 | Rev 0 to Sqcp 15.1-2, Nonconformance Control - Shop QC Manual | |
ML20117F297 | 11 March 1981 | Rev 1 to Procedure AS-P-007, Nonconformances & Corrective Action | Liquid penetrant |
ML20117F322 | 27 March 1978 | Rev 4 to Procedure POP-N-713, Use of Discrepancy Repts | |
ML20117F327 | 24 May 1978 | Rev 4 to Procedure POP-N-703, Nonconformance Reporting & Corrective Action | |
ML20117F334 | 30 July 1981 | Rev F to Procedure ES-142, Nonconformance & Corrective Action | Condition Adverse to Quality |
ML20117F378 | 20 June 1983 | Rev 4 to Procedure for Handling of Nonconformances & Corrective Action | |
ML20117F392 | 15 December 1980 | Rev 1 to QAP-104W3, QA Procedure for Corrective Action | |
ML20117F413 | 27 January 1981 | Rev 3 to PR-16.0, Corrective Action | Condition Adverse to Quality |
ML20117F445 | 23 May 1978 | Rev B to Procedure 16, Procedure for Reporting Discrepancies-Both Safety & Nonsafety-Related | |
ML20117F457 | 17 March 1981 | Rev F to Procedure TBP-12, Nonconformances & Discrepancies | |
ML20117F486 | 18 October 1983 | Rev 1 to Procedure W3-6, Nonconformance & Corrective Action | |
ML20117F508 | 21 September 1982 | Rev 6 to Procedure Pr 15.0, Nonconforming Matl or Items | |
ML20117J767 | 9 May 1985 | Nonproprietary Revised Emergency Plan Implementing Procedures,Including EP-2-010, Notification & Communication & EP-2-061, Emergency Environ Monitoring | |
ML20118A718 | 16 September 1992 | Rev 5 to Waterford 3 Steam Electric Station 10-Yr Inservice Insp Program,First Interval | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
ML20125C219 | 26 September 1984 | Rev 1 to Procedure Qasp 19.11, Operating Procedure | |
ML20125C236 | 23 October 1984 | Rev 1 to QA Procedure Qasp 19.13, Response Validation | |
ML20127B604 | 22 September 1975 | Issue a to Procedure CP-203, Clam Shell Filter Blanket Test Fill | |
ML20127B658 | 19 December 1975 | Issue C to Procedure QCIP-7, Insp of Concrete Placement, Curing & Finishing | |
ML20127B665 | 24 February 1983 | Issue B to Procedure CP-703, Batch Plant Activities & Operations | |
ML20127B671 | 16 March 1984 | Amend 1 to Issue C to Procedure QCIP-8, Receiving,Insp, Storage & Testing of Concrete Reinforcing Steel | |
ML20127B687 | 1 April 1984 | Amend 1 to Issue a to Procedure CP-803, Excavation & Backfill | |
ML20127B695 | 26 April 1976 | Rev 0 to Special Process Procedure W-SP-6, Bending & Straightening of Reinforcing Bars Partially Embedded in Concrete & Placing of Bars in Hardened Concrete | |
ML20127B707 | 17 September 1975 | Issue a to Procedure QCIP-1, Density Control of Shell |