i EBASCO SEMICES INCORPORM 4
WATERFORD STEM! ELECTRIC STATION - UNIT NO 3 PROCEDURE FOR:
DENSITY CONTROL OF SHELL PROCEDURE NU DER:
OCIP-1 ISSUE StM1ARY m
AAVAT _1 ISSUE /DATE PREPARED APPROVED RCtARKS 5
l3 A/ Draft M Temchin f) hg h. O. ('e:OI.
^/'#17/78
" T***hi" 3'
'8 th 5
t:5 j
/hgh,"%)
e 4.. : ll g
(?4-000-78.
3
)LR f*
s E
i
- g ut0222 jl, 062 PDit 9
0 4D004~
FHCkDOW OF INf0HMAlg)N W. MQULST TONt 110. tal (12-12 74)
$4 4ff L[af 43
I. p 3
2 1
ISSUC A
EBASCO SERVICES INCORNRA
. WATERTORD STEMI ELECTRIC STAT J
c NO. QCIP-1 1.0 PURPOSE
- UNIT NO 3 i
PAGE:.1 CF 3 j
This procedure outlines a and compaction of the shell caterial to be placed dimeans to the final exposed plaict l
ocene e placement 2.0 clay, foundation.
rectly on top of
- SCOPE, C
The scope of the procedure t
Shell Filter Blanket to bematerial, equipment, place I
v111 cover the control and ins 5d l
placed directly on top of the fnt t excavated pleistocene clay f k
pection of Q*
3.0 oundation.
the Clam REFERENCES inal "a
$3 3.1 Ebasco SpecificationEbasco Services Incorporat d G
+
e Filter and Backfill g
LOU 1564.482 o5 d
3.2 Waterford SES - Unit #3 j
Clam Shell Filter Dianket T n
M CP-203 y!j est Till
- 3. 3 Soils ControlWaterford SES - Unit #3 QCIP-2 Q
4.0 DEFINITIONS e
- g 3
4.1 The criteria and constructi 8
Blanket,in the Construction Procedcompaction of d
s' i
ter Blanket are specifiedplacement and H
ure CP-204, installation of Sh l 3.0 iRESPON9tBILITIES n
and defined
~
e l Filter p'
d 5.1 administration direction of thThe inspection o T:
Q k
e A Quality Control Civil In e Senior Quality Control SupT Q
and record the results on RepoQuality Contr spector under the direction of er the ervisor.
rt Tora QC-93..a l perform the actual ins y
3.2 the Engineer after each shift fCopies of all inspectio on-or his technical approval. ports sha approval must be obtained pri i
mat or the installation of any i e Site Soils or to the placeeent of the coHis written 6.0
- PRoctBE5, nstrumentation.
ncrete mud 6.1 Foundetton Approvat Prior to the placement of a shall be obtained from the Sit ny clam shell, approval of th approval Fore QC-132 shall to at e Soils Ennineer.
Inspection Report form QC $3 e foundation
-\\
tached to the t.ack of soilA copy of his written 1
mew un s Construction e.e (12 17 74)
l l
'i EBASCO SERVICES INCORPOW J
If0. QCIP-1 7
ISSUE: A
_4
. WATERFORD STEA!! ELECTRIC STATION - UNIT NO 3 PACE: 2 0F 3 i
e 6.2 Material s
A visual inspection of the in place clam shell material for the twelve (12) inch filter blanket shall be performed on a per shift. basis. " tis inspection shall cover the folleving areas and results of the inspection shall be recorded on the Soils Construction Inspection Report Form QC-93.
y 6.2.1 Contamination from:
6.2.1.1 Vegitation 6.*2.1.2 organic Matter ts 5
6.2.1.3 Ruhhi.h l
'g
~6.2.1.4 Unsuitable Material (specify)
I 2
6.2.2 Moisture Content g
6.1.2.1 Too wet 6.3 Equissent eg A visual inspection of the placement and compation equipment shall be performed on a per shift basis. This inspection shall cover the
==
l following areas and results of the inspection shall be recorded on the Soils Construction Inspection Report Tora QC-93 6.3.1 Cleanliness of equipment tires h[
- e' 6.3.2 Model sad type of equipment 6.3.3 Weight of static compactors a*
6.3.4 Weight and vibration frequency of vibrating compactors 6.3.3 Ceneral operating condition of equipment N.
6.4 placement
)
A visual inspection o( the placement of the clan shell material shall be performed on a per shift basis. This inspection shall cover the following areas and the results of the inspection shall be recotded on the Soils Construction Inspection Form. QC-93:
6.4.1 thickness of lif t 6.4.2 Uniformity of lift 6.4.3 special construction operations a) Wetting 9
b) Drying l
enew wo e.,
- 17 17 74)
~~'** \\
ERASCO SERV' ICES INCORPOR/~ 1)
. WATERFORD STEMI ELECTRIC STATION - tJNIT
~
j
{020CIP-1
\\
PACE: 3 0F 3
.4.4 Pattern of equipment traffic papaction ell be performed on a per shift basis.vi val inspection of the c clea shell material iv:r the following areas and the results of thThis inspection shall rOctrded on the Soils Construction Inspecti e inspection shall
- 93 :
on Report Form 5.1 Speed of compactor
- 1. 2 Number of passes (one direction)
.3 Pass overlap
.4 Compaction pattern CO ts required by the Senior Qualit k
l>vg.,.,;,,;.sy}9&E'XlhY ection Report Form QC-93..Sito Soils Engineer shall be noted on thy C t; a.. 3.. ~.'., r:':
%wpin
- Egyv:.1';
Ig'.bd Copies of the test results shalle Soils ConstructionB=
I ttO hed to the back of Form QC 93
'4R id.;.pM[{3'p[hr.:.*
s 3 enter Quality Control Supervisor and Si prior to forwarding it to i,j$ "
te Soile Engineer.
~s Con:truction Inspection Report Fora QC 93 teils Engineer Approval Fora QC-132 4
5 I
I i
I e-F i
.e e.
1980 - 1165WATERFORD STEMt El.EdTRIC l'A G C W INSTAL 1ATION - tl NIT NO SOILS CONSTRUCTIO;4 3
l_
1 Inspoetion Rcport D*'. _
A,.. W.,k.4_
si. ire _
_ w,.ih.,_
. Avee.s. El...si at
- Dr -
si,e at sh;te J -C.nsi.. cia w.,L"/,,..ps; h,d C-
_ End of Sleile _
ee-nd Cgviem.no
__ Te e.1 t...d. _
E-x w
1 0 _
7..n of the cease,vesi Ensi
,ie.,r.,s.si,__
Orlein.i At e.,s. _
Typ..I m.t. iet, d.s.eth. (=A.n / h w
....es s e, t,. e en, s....e,...*.
sa.e.d. a.a vait.... whee....ds.t.ett.a
...e.&eal 1.Its Thiekness Reg.leed_
b
_ Aeiv.ity Pl.a.d _
M
_o,..,<.e....,.,,,
..... J...,_
eria rf-6..A.,A.-
6 A...s_
_,l
.l c a...a e 0...' t..,...u.,
te r..$. i....
..l
, 4...,, y _
i
_f
-J J
l
.6.e..e,.d.......,...,...,.,,,,
,,,,...,,,.,.a,....,..,.,,,,,,
__J y
m m N?. QCa93 (917 75)e.n-.~.. w
e e
..s,c 3 op a.
se 4
e e
=.
Unie s used, medel, coneeoctee's n umber, feequency when ch C Q u r.u g w y 4 0.
ecited, when melfunctioned sto o C L N 0, r.ncouENCY
. semediel cction token fee 7tuC resh I
F n tic UR NC Y Y tu E FACOUCNCY TIP e C Sped of Towing
' Coverages Reevese d q
e Are orcos 1,eing missed b Lift Thickness Compact (wse shve h etteched) y compactoe s ? II se, whose c
, when?. hot is compectionCovevoge s Civen _ ed E
L.
perfern? la it setisfactory? If 2
not, why t.os ?
Tests foiling not remediet stees? Wes teguest fwllilled?
ection wss vot en? When was i
she sees estested?.liow
~
men r omtre coverages were regwested? I
+)
. n what Tomseks (include noncente
,miey se speelficestens, nimes end lec ti e
y ens of ee,eh remerini hr t'
i vmber of coveeog Hweb:se of lifts pieced endes en lift portially compact s
Nua.ber of coveeoges compacted this shifted lost thift e,a., he n on lift portfolly compacted os m
end of this shift feesd. enverag,e,eched,e ec.,e.! e,ee 6e.
s needed in indieeted orese, nu d. d.on.,ece d e
-celens to end conversations with
,ndie n t.,,,i c o,,os ie e
subcontrecserfs1
., of e,e. e, end of.ws,.e.e,.,
e.
I j
\\
seiens, discus sions, decisi t
\\
ons j
~
~
steent mesters (dewesesse, e seresions, 4,edgin, pehen,ee,i M
w
.., y c seediegs, ef,,)
- w-<-
)
s
.t "e m ice QC-93
(-17-75) s,
_~ -
s s,'
q?
^, 9
,3 s.
1 N
s 3
f s
-)
4' e< < '
n -
f n
(
~~ ~ ~ ' ~
EBASCO SERVICES INCORPORATED WATERFORD SES - UNIT NO. 3 SITE SOILS ENGINEER - APPROVAL FORM Dste Location Qu'ality Control forms reviewed Approval Rejection Signature Conunents/Reconnnended Action i
1 t
Remedial Work Report QC Inspector:
Remedial Action: Accepted Rej ected Site Soils Engineer Fcrm QC-132 l
e t
..