Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217K9011999-10-18018 October 1999 Proposed Tech Specs 3.6.2.2 Loc,Allowing Plant to Operate with Two Independent Trains of Containment Cooling, Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20211F5501999-08-24024 August 1999 Proposed Tech Specs Page Xviii, Index Administrative Controls, Originally Submitted with TS Change Request NPF-38-220 ML20211F3701999-08-24024 August 1999 Proposed Tech Specs,Revising Efas,Originally Submitted on 980702 as TS Change Request NPF-38-207 ML20210M9681999-08-0404 August 1999 Existing & Proposed marked-up TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One LPSI Train Inoperable & AOT of 72 Hours Imposed for Other Conditions ML20210M9861999-08-0404 August 1999 Existing & Proposed TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One HPSI Train Inoperable & TS 3.5.3, Changing end-state to Hot Shutdown with at Least One Operable Shutdown ML20210H1771999-07-29029 July 1999 Proposed Tech Specs 3.8.1.1 Re EDG AOT Increase from 72 H to Ten Days ML20210H2371999-07-29029 July 1999 Proposed Tech Specs 3.6.2.1 Extending Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3411999-07-19019 July 1999 Proposed Tech Specs 4.5.2.f.2,increasing Performance Requirement for LPSI Pumps ML20210D0521999-07-15015 July 1999 Proposed Tech Specs Creating New TS for Feedwater Isolation Valves ML20210D1071999-07-15015 July 1999 Proposed Tech Specs Adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20209H3191999-07-15015 July 1999 Proposed Tech Specs Pages Modifying TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 EFPY ML20209D4091999-07-0707 July 1999 Proposed Tech Specs,Revising Actions 19 & 20 for Table 3.3-3 for Functional Unit 7 Emergency Feedwater, Items B & C,Per 980702 TS Change Request NPF-38-207 ML20196E9971999-05-24024 May 1999 Rev 3 to NTP-203, Emergency Plan Training ML20195B1811999-05-20020 May 1999 Proposed Tech Specs Changes to Bases B 3/4.3.1 & 3/4.3.2, B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20204H2591999-03-16016 March 1999 Rev 0 to STD-100-237, Procedure for Modification of RCS Pressure Boundary for Installation of Mechanical Nozzle Seal Assemblies (Mnsa) for Waterford Nuclear Generating Station Unit 3 ML20204H2511999-03-16016 March 1999 Rev 1 to C-NOME-EP-0189, Engineering Procedure for Installation of Mechanical Nozzle Seal Assemblies for Waterford 3 ML20203C4891999-02-0505 February 1999 Proposed Revised Tech Specs Pages 3/4 3-12a & B 3/4 3-1a Re Reactor Trip Circuit Breaker Surveillance Interval Extension ML20199D9851999-01-12012 January 1999 Proposed Tech Specs,Adding Requirement That CR Intake Monitors Be Operable & SRs Be Applicable During Movement of Irradiated Fuel ML20199E0861999-01-12012 January 1999 Proposed Tech Specs Re Rev 1 for TS Change Request NPF-38-174 ML20198G2401998-12-23023 December 1998 Proposed Tech Specs,Modifying LCO for 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20196D2181998-11-30030 November 1998 Proposed Tech Specs Pages 3/4 8-8,3/4 9-8,3/4 9-9 & B 3/4 9-2,revised for Consistency Between Action Statements & NUREG-1432,Rev 1, Std Tech Specs for CE Plants ML20154E4171998-10-0606 October 1998 Proposed Tech Specs Pages Re TS Change Request NPF-38-212, Modifying Requirement to Perform Mtc Test Near End of Each Cycle ML20154E1141998-10-0101 October 1998 Proposed Tech Specs Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Sys ML20153D5771998-09-23023 September 1998 Proposed Tech Specs Revising Description Re Reactor Power Input Used by Operating Bypass Permissive & Trip Enable of 10-4% Bistable ML20153B4441998-09-18018 September 1998 Proposed Tech Specs Modifying Notes in Tables 2.2-1 & 3.3-1 Re Reactor Protective Instrumentation ML20151W5971998-09-11011 September 1998 Proposed Tech Specs Re Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7921998-08-12012 August 1998 Proposed Tech Specs,Increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7361998-07-29029 July 1998 Proposed Tech Specs Pages Revising TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model ML20236H1501998-07-0202 July 1998 Proposed Tech Specs Section 3/4.3.2,adding Restriction on Period of Time Channel of Efas Instrumentation Can Remain in Tripped Condition ML20249C8321998-06-29029 June 1998 Proposed Tech Specs 3.7.6.1,3.7.6.2,3.7.6.3,3.7.6.4 & 3.7.6.5,revising Control Room Ventilation to Be Consistent w/NUREG-1432 ML20249C7901998-06-29029 June 1998 Proposed Tech Specs Adding Footnote to Action Statements to Allow CR Ventilation Sys to Be Unisolated Periodically Under Administrative Controls ML20249A3101998-06-12012 June 1998 Proposed Tech Specs Pages,Adding Footnote to TS Refueling Operations,Surveillance Requirements 4.9.7.2,to Effect Limited Deviation to Allow Crane Main Hook Electrical Interlocks to Be Replaced W/Administrative Controls ML20248B7611998-05-28028 May 1998 Proposed TS Pages Supporting Change to TS 3.7.1.2, Surveillance Requirement 4.7.1.2 & Bases for Emergency Feedwater Sys ML20248H7871998-05-25025 May 1998 Rev 1 to Waterford Unit 3 Second Interval ISI Plan ML20247P2431998-05-21021 May 1998 Proposed Tech Specs Re Design Feature Suppl ML20217P8411998-05-0101 May 1998 Rev TS Pages Changing Actions Required Should Channel of Recirculation Actuation Signal (RAS) Be Placed in Tripped Condition,Replacing TS Pages Submitted in 970603 Submittal ML20217L9971998-04-30030 April 1998 Small Break LOCA ECCS Performance Analysis Using Abb/Ce Suppl 2 Model ML20217D5181998-03-25025 March 1998 Proposed TS 3.9.8.1,3.9.8.2,TS Action 3.9.8.2a,3.8.1.2 & Bases 3/4.9.8 ML20198R3081998-01-21021 January 1998 Errata to Proposed TS Change Request NPF-38-196 Which Changed TS 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1.-1 by Removing Cycle Dependent B Concentration & Boration Flow Rate from Action Statements ML20198R1251998-01-21021 January 1998 Corrections to Proposed Tech Spec 3/4.1 Re Reactivity Control Sys ML20197C6431997-12-22022 December 1997 Proposed Tech Specs Page Supplementing TS Change Request NPF-38-186,by Retaining Operations Superintendent in Paragraph 6.2.2.f of Administrative Controls Section ML20202C2911997-12-0101 December 1997 Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. Page 23 of Incoming Submittal Not Included ML20199A0011997-11-13013 November 1997 Errata to Proposed Tech Specs Change Request NPF-38-193, Replacing Pages 13 Through 21 ML20199A1101997-11-13013 November 1997 Proposed Tech Specs,Modifying 6.8.4.a, Primary Coolant Sources Outside Containment to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217M0221997-10-28028 October 1997 Rev 8 to RW-001-210, Process Control Program ML20217H5931997-10-14014 October 1997 Revised Page of App B of FOL, Environ Protection Plan (Nonradiological) ML20217G2421997-10-0707 October 1997 Proposed Tech Specs Modifying 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8141997-09-25025 September 1997 Proposed Tech Specs Pages Modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G7131997-07-0707 July 1997 Proposed Tech Specs Expanding Applicability of TS 3.7.1.3 to Include Mode 4 Operational Requirements & Maintains 91 Percent Minimum Condensate Storage Pool Level Previously Requested for Modes 1,2 & 3 ML20141D8551997-06-26026 June 1997 Proposed Tech Specs Revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases 1999-08-04
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20196E9971999-05-24024 May 1999 Rev 3 to NTP-203, Emergency Plan Training ML20204H2591999-03-16016 March 1999 Rev 0 to STD-100-237, Procedure for Modification of RCS Pressure Boundary for Installation of Mechanical Nozzle Seal Assemblies (Mnsa) for Waterford Nuclear Generating Station Unit 3 ML20204H2511999-03-16016 March 1999 Rev 1 to C-NOME-EP-0189, Engineering Procedure for Installation of Mechanical Nozzle Seal Assemblies for Waterford 3 ML20248H7871998-05-25025 May 1998 Rev 1 to Waterford Unit 3 Second Interval ISI Plan ML20202C2911997-12-0101 December 1997 Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. Page 23 of Incoming Submittal Not Included ML20217M0221997-10-28028 October 1997 Rev 8 to RW-001-210, Process Control Program ML20217H5931997-10-14014 October 1997 Revised Page of App B of FOL, Environ Protection Plan (Nonradiological) ML20141B0441997-05-0808 May 1997 Performance Improvement Plan ML20138D8951996-10-0606 October 1996 Rev 5 to Odcm ML20117A5681996-07-28028 July 1996 Ldcr 97-0047-Location of Cabinets C-3A(B) & C-4 Outside Cvas Boundary - Rev 1 ML20116B1441996-04-17017 April 1996 Rev 6 to Procedure NTC-216, Emergency Plan Training Initial ML20116B1531996-04-17017 April 1996 Training Course Description Emergency Plan Continuing Training ML20138D8891996-01-11011 January 1996 Rev 7 to RW-001-210, Process Control Program ML20086C0191995-05-31031 May 1995 Basement Monitoring Program Rept 6 ML20070P8701994-02-17017 February 1994 Rev 7,change 5 to Waterford III Pump & Valve IST Plan ML20056F2061993-08-19019 August 1993 Rev 7,Change 4 of Waterford Unit 3 IST Plan for Pumps & Valves ML20118A7181992-09-16016 September 1992 Rev 5 to Waterford 3 Steam Electric Station 10-Yr Inservice Insp Program,First Interval ML20114C7711992-06-12012 June 1992 Rev 2 to Administrative Procedure UNT-005-014, Odcm ML20101B8321992-05-29029 May 1992 EDG Reliability Program Description & Comparison W/Nrc Reg Guide 1.155,Section 1.2 ML20141M4281991-06-21021 June 1991 Rev 1 to Technical Procedure UNT-005-021, Safety-Related Radioactive Matl & Radioactive Sources Purchase,Receiving, Surveying,Opening & Disposal ML20058P1191991-06-14014 June 1991 Mgt Manual Vol IV to Site Policy W1.501, Quality Reporting ML20141M4271991-05-25025 May 1991 Rev 4 to Administrative Procedure UNT-005-001, Safety- Related Waste Mgt & Control ML20141M4251991-04-25025 April 1991 Rev 7 to Technical Procedure HP-001-152, Safety-Related Marking,Handling & Storage of Radioactive Matl ML20141M4241991-01-0404 January 1991 Rev 1 to Technical Procedure HP-002-223, Waste Monitoring ML20065N7561990-08-24024 August 1990 Rev 4 to Administrative Procedure RW-001-210, Process Control Program ML20059A5631990-08-13013 August 1990 Rev 4 to 10-Yr Inservice Insp Program First Interval 1985-1995 ML20065N7481990-08-0303 August 1990 Rev 0 to UNT-005-014, Odcm ML20116B1221989-12-11011 December 1989 Rev 2 to Nuclear Training Procedure NTP-203, Emergency Plan Training ML19325E4681989-10-31031 October 1989 Summary of Change 2 to Rev 6 to Pump & Valve Inservice Test Plan. ML20246E0171989-08-0404 August 1989 Change 1 to Rev 6 of Pump & Valve Inservice Test Plan ML20245D0161989-06-19019 June 1989 Change 1 to Rev 5 of Pump & Valve Inservice Test Plan ML20082M2781989-05-0909 May 1989 Rev 3 to Administrative Procedure RW-1-210, Process Control Program ML20195H9271988-11-18018 November 1988 Rev 0 to UNT-5-013, Administrative Procedure Fire Protection Program ML20154S1941988-09-22022 September 1988 Rev 6 to Pump & Valve Inservice Test Plan ML20154B3761988-05-11011 May 1988 Rev 0 to Procedure OP-100-012, Post-Trip Review ML20238D0091987-12-0707 December 1987 Rev 2.1 to Nuclear Operations Procedure NOP-003, Records Mgt Sys ML20195G9331987-12-0101 December 1987 NSID-TB-87-11, Westinghouse Circuit Breakers Type Ds/Dsl: Welds on Breaker Pole Shaft ML20236L3341987-10-15015 October 1987 Rev 3 to 10-Yr Inservice Insp Program Waterford Steam Electric Station Unit 3 ML20082M2731987-07-10010 July 1987 Rev 2 to Administrative Procedure RW-1-210, Process Control Program ML20147D7981987-07-0707 July 1987 Rev 6 to Surveillance Procedure HP-1-230, Offsite Dose Calculation Manual ML20235G6051987-06-30030 June 1987 Functional Design Spec for SPDS Enhancement Program ML20238D0271987-06-26026 June 1987 Rev 1 to Radwaste Dept Administrative Procedure RW-1-200, Record Preparation,Filing & Storage ML20234B0171987-06-26026 June 1987 Rev 1 to Nuclear Plant Island Structure Basemat Surveillance Program ML20238D0251987-06-24024 June 1987 Rev 0 to Maint Departmental Procedure MD-1-008, Collection & Transmittal of Maint Records & Documents ML20216E8321987-06-12012 June 1987 Public Version of Emergency Plan Implementing Procedures, Including Rev 7 to EP-2-052, Protective Action Guidelines & Rev 10 to EP-2-060, Radiological Field Monitoring ML20238D0151987-01-14014 January 1987 Rev 2 to QA Procedure QAP-010, QA Records ML20114B7241986-09-20020 September 1986 Rev 5 to Technical Procedure RW-2-200, Packaging Radioactive Solid Waste (DAW) for Dispsosal ML20206D4681986-06-16016 June 1986 Rev 2 to 10-Yr Inservice Insp Program ML20151Z0521986-01-31031 January 1986 Rev 3 to CEN-39(A)-NP, CPC Protection Algorithm Software Change Procedure ML20151Z0641986-01-31031 January 1986 Rev 0 to CEN-323-NP Reload Data Block Constant Installation Guidelines 1999-05-24
[Table view] |
Text
i
.. EBASCO SEMICES INCORPORM
. 4 .
WATERFORD STEM! ELECTRIC STATION - UNIT NO 3 PROCEDURE FOR: DENSITY CONTROL OF SHELL ,
PROCEDURE NU DER:
OCIP-1 ISSUE StM1ARY m AAVAT _1 ISSUE /DATE ! PREPARED APPROVED RCtARKS 5
l3 A/ Draft M Temchin f) hg h . O . ('e:OI.
5 ^/'#17/78 " T***hi" 3' '8 th t:
5 j
g
/hgh,"%)
e 4. . : ll ' '
, (?4-000- .
3 78.
... )LR f* '
s E
i
- g ut0222 jl, 062 PDit 9 0 4D004~ FHCkDOW OF INf0HMAlg)N W. MQULST TONt 110. tal (12-12 74) $4 4ff L[af 43
I.
p ,
3 ,
2 1 .
ISSUC A .
EBASCO SERVICESJ INCORNRA c
. WATERTORD STEMI ELECTRIC STAT i NO. QCIP-1 1.0 PURPOSE - UNIT NO 3 PAGE: .1 CF 3 j _
This procedure outlines a and compaction of the l
the final exposed plaictshell caterial to be placed dimeans to 2.0 C ocene e placement SCOPE, clay, foundation. rectly on top of
, t The scope of the procedure .
I 5d Shell Filter Blanket v111 to bematerial, cover the control equipment, pection and of ins place l k excavated pleistocene clay f Q*
3.0 REFERENCES
placed oundation. directly on top inal of the fnt t the Clam "a .
$3 3.1
+
G Ebasco SpecificationEbasco e Services Incorporat d g
o Filter LOU and Backfill 1564.482 5
d 3.2 j
n M
Waterford SES - Unit #3 -
Clam Shell Filter Dianket CP-203 est Till T y!j 3. 3
- Soils ControlWaterford SES - Unit #3 QCIP-2 e
Q 4.0
- g3 4.1 .
8 The criteria and constructi d
i H
s' '. Blanket,in the Construction Procedcompaction of ,
n ter Blanket are specifiedplacement and ure CP-204, installation of Sh l d
p'
~
3.0 iRESPON9tBILITIES 5.1 -
and e l Filter defined T:
Q Q k administration direction of thThe inspection o A Quality Control Civil In e
e Senior Quality Control er the SupT y
3.2 and record the results on RepoQuality spector under the direction the of ervisor. Contr rt Tora QC- 93..a l perform the actual ins Engineer after each shift fCopies of all inspection on-i approval must be obtained mat or the installation or or his of to pri technical approval. ports any e Site Soils sha 6.0 PRoctBE5, thei placeeent of the coHis written nstrumentation. ncrete mud 6.1 Foundetton Approvat Prior to the placement of a
, shall beFore approval obtained nyfrom QC-132 clam shallshell,the to at Sit approval of th
-\ Inspection Report form eQC Soils$3 Ennineer. e foundation 1
. tached to the t.ack of soilA copy of his written mew un e.e s Construction (12 17 74)
l l 'i 7 .
EBASCO SERVICES INCORPOW J . If0. QCIP-1
_4 ISSUE: A . WATERFORD STEA!! ELECTRIC STATION - UNIT NO 3 PACE: 2 0F 3 i
e 6.2 Material s
A visual inspection of the in place clam shell material for the twelve (12) inch filter blanket shall be performed on a per shift. basis. " tis inspection shall cover the folleving areas and results of the inspection shall be recorded on the Soils Construction Inspection Report Form QC-93.
y 6.2.1 Contamination from:
6.2.1.1 Vegitation 6.*2.1.2 organic Matter ts 6.2.1.3 Ruhhi.h -
5 l 'g ~6.2.1.4 Unsuitable Material (specify)
I 2 6.2.2 Moisture Content .
g 6.1.2.1 Too wet
==
A visual inspection of the placement and compation equipment shall be performed on a per shift basis. This inspection shall cover the l following areas and results of the inspection shall be recorded on the Soils Construction Inspection Report Tora QC-93 6.3.1 Cleanliness of equipment tires ,
- e' 6.3.2 Model sad type of equipment h[
a 6.3.3 Weight of static compactors 6.3.4 Weight and vibration frequency of vibrating compactors 6.3.3 Ceneral operating condition of equipment N. 6.4 placement
) A visual inspection o( the placement of the clan shell material shall be performed on a per shift basis. This inspection shall cover the following areas and the results of the inspection shall be recotded on the Soils Construction Inspection Form. QC-93:
6.4.1 thickness of lif t 6.4.2 Uniformity of lift
, 6.4.3 special construction operations a) Wetting 9 b) Drying l
enew wo e., #17 17 74)
~~'** \ .
ERASCO SERV' ICES INCORPOR/~ 1)
> ~
j '
. \ -
{020CIP-1
. WATERFORD STEMI ELECTRIC
. PACE: 3 0F 3 STATION - tJNIT
.4.4 Pattern of equipment traffic papaction -
ell be performed on a per clea shift basis.vi val inspection of the c shell material iv:r the following areas and the results of thThis inspection shall
- rOctrded 93 : on the Soils Construction Inspecti e inspection shall on Report Form
- 1. 2 Number of passes (one direction)
.3 Pass overlap *
! .4 Compaction pattern k
CO ts required by the Senior Qualit l>vg.,.,;,,;.sy}9&E'XlhY t; a .. 3. . ~.'. , r:':
ection Report Form QC- 93..Sito Soils Engineer - shall I
%wpinbe noted*Egyv:.1'; on B= thy C s Ig'.bd ttO hed to the back ofCopies Form QC of the 93test results shalle Soils '4RConstructionid.;.pM[{3'p[hr.:.* i,j$ "
3 enter Quality Control Supervisor and Si prior to forwarding it to '
~s te Soile Engineer.
Con:truction Inspection Report Fora QC 93 -
teils Engineer Approval Fora QC-132 .
. 4 5
I I
i I
e-F i
l'A G C 1980 - 1165WATERFORD STEMt El.EdTRIC
' W INSTAL 1ATION - tl 3NIT NO SOILS CONSTRUCTIO;4 .
l_ 1 Inspoetion Rcport D*'. _
si. ire _
A,.. W.,k .4_ _ w ,.ih.,_ .
Avee.s. El...si at si ,e at sh;te - Dr - _-
w.,L"/,,..ps; h,d C- _ End of Sleile _
J -C.nsi.. cia ,
ee- nd Cgviem.no _
__ Te e.1 t...d. _
x E- __
w 1 0 _ _
7..n of the cease,vesi -
Ensi ,ie.,r.,s.si,__
Orlein .i At e.,s. _ .
Typ. .I m.t. iet, d.s.eth. (=A.n w ..
/h
....es s e, t,. e en, s.. .
..e, .. .* .sa.e.d. a.a vait.... whee ....ds.t .ett.a ...e.&eal 1.Its Thiekness Reg.leed_ -
b
_ Aeiv.ity Pl.a.d _
_o ,. . ,<.e.... ,.,, . ,. ... . J...,_ '
M eria rf-6..A.,A.- _
6
_ A...s_ - _,l
. .l c a ...a e 0. ..' t..,. ..u., ..l
- te r. .$ . i.. .. , 4. . . ,, y _ !
i
_f
-J J l
.6.e..e,.d.......,...,...,.,,,,
,,,,...,,,.,.a,....,..,.,,,,,, , , , , , , , _ '
- ' __J m
y m N?. QCa93 (917 75)e_, .n-.~.. .. ..
_ . ..- w
e e se
. .s,c 3 op a .
4 e .
=.
s used, medel, coneeoctee's n ,
umber, feequency when ch C Q u r.u g w y 4 0. ecited, when melfunctioned sto o C L N 0, r.ncouENCY . semediel cction token reshfee 7tuC I F n tic UR NC Y Y tu E FACOUCNCY
- TIP e C Sped of Towing . _
' Coverages Reevese e d _ q -
Are orcos 1,eing missed b -
c (wse shve h etteched) y compactoe s ? II se, whose Lift Thickness Compact _
E , when?. hot is compectionCovevoge s Civen _ ed L.
2 perfern? la it setisfactory? If not, why t.os ?
Tests foiling not remediet stees? Wes teguest fwllilled?
ection wss vot en? When was i
- ~
she sees estested?.liow men
+) r omtre coverages were regwested? I
. n what Tomseks (include,miey noncente se speelficestens, nimes end e lec ti .
y ens of ee,eh remerini h
_...._.. r t'
i vmber of coveeog .
s Hweb:se of lifts pieced endes en lift portially compact Nua.ber of coveeoges compacted this shifted lost thift e,a m., he n on lift portfolly compacted os "
feesd. enverag,e,eched ec.,e ,e .! e,ee 6e. end of this shift e
- s needed in indieeted orese, .
nu d . d .on.,ece e d ,
,ndie n t.,,,i c o,,os ie
-celens to end conversations with ., of e,e. e, end of .ws, subcontrecserfs1 ,
.e.e,., e.
I j
........ \
t seiens, discus sions, decisi
_ ons .
\
. . , ,, - j
. ~ ~ -
steent mesters (dewesesse, e - .
M w seresions, 4,edgin, pehen,ee,i . ., y -
c seediegs, ef,,)
- w-<-
)
s
, %' .t "e m ice QC-93
(-17-75) s s, _~ -
s ,' q? ,3 -
- ^, 9 '.' -
s .
s N
s 1
" 4' 3 f ,- -
&' -) %
n - -
f n
(
~~ ~ ~ ' ~
EBASCO SERVICES INCORPORATED WATERFORD SES - UNIT NO. 3 SITE SOILS ENGINEER - APPROVAL FORM Dste
- Location Qu'ality Control forms reviewed .
Approval Rejection Signature Conunents/Reconnnended Action -- -
i 1
t Remedial Work Report QC Inspector:
Remedial Action: Accepted Rej ected Site Soils Engineer Fcrm QC-132 .
l .
e t
, , . . . , - . - . . ..-. , , .- ..