Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML03280158115 September 2003Emergency Planning Document UpdateMet Tower
ML03318022831 October 2003Transmittal of Transmittal of Emergency Plan Implementing Procedure, IP-EP-310Deep Dose Equivalent
ML03329043918 November 2003IP-EP-120, Which Replaces IP-1024, Rev. 11 and Ic/Eals, Rev. 9
ML03330035512 November 2003Revised Emergency Plan Implementing Procedures, IP-EP-115 & IP-EP-120Unanalyzed Condition
Fitness for Duty
High Radiation Area
Earthquake
Fuel cladding
ML0335603064 December 2003Emergency Planning Document UpdateUnanalyzed Condition
Fitness for Duty
Health Physics Network
Mission time
Grab sample
Offsite Dose Calculation Manual
Met Tower
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Minimum staff
ML03360009819 February 2002Letter from Fred Dacimo to NRC, Providing Revision to Emergency Plan ProceduresFire Protection Program
Fatality
ML03360010030 August 2002Emergency Planning Document UpdateSafe Shutdown
Health Physics Network
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Safeguards Contingency Plan
Earthquake
Fuel cladding
Minimum staff
Fire Protection Program
Power change
Siren
ML04015062218 December 2003Revised Emergency Plan Implementing Procedures
ML0404001932 January 2004Revision 1 to IP-EP-630, Onsite Medical Emergency, Revision 2 to IP-EP-520, Modular Emergency Assessment & Notification System (Means), Pages 27-41, and Revision 16 to IP-1055, Fire Emergency Response.Mission time
ML04050028312 January 2004Revision 1 to IP-EP-222, Unit 2 Technical Support Center and Revision 1 to IP-EP-223, Unit 3 Technical Support Center.Severe Accident Management Guideline
ML0407609355 March 2004Rev. 8 to IP-EP-115, Emergency Plan Forms, Rev. 1 to IP-EP-212, Unit 2 Control Room, Rev. 1 to IP-EP-213, Unit 3 Control Room, Rev. 2 to IP-EP-250, Emergency Operations Facility, & Rev. 4 to IP-EP-310Unanalyzed Condition
Fitness for Duty
Health Physics Network
Met Tower
Earthquake
Deep Dose Equivalent
Minimum staff
ML07018068230 January 2006Emergency Plan Implementing Procedures, Rev. 16, 7 and 1Unanalyzed Condition
Fitness for Duty
Health Physics Network
Minimum staff
Fatality
ML08242053629 July 2008IPEC Site Emergency Plan Administrative Procedure IP-EP-AD12, Rev. 2
ML10154028626 May 2010Revision 10 to Emergency Plan Implementing Procedure IP-EP-310, Dose Assessment and Revision 5 to IP-EP-410, Protective Action RecommendationsDeep Dose Equivalent
ML10160026228 May 2010Rev. 0 to Emergency Plan Implementing Procedure, IP-EP-340, Meteorological Information and Dose Assessment System.Met Tower
Deep Dose Equivalent
ML10305019325 October 2010Rev. 18 to Emergency Plan Implementing Procedure, IP-EP-250, Emergency Operations Facility.Health Physics Network
ML1032003104 November 2010Revision 2 to Emergency Plan Implementing Procedure IP-EP-360, Core Damage Assessment.
ML10327024616 November 2010Revision 6 to Emergency Plan Implementing Procedure IP-EP-220, Technical Support Center and IP-EP-230, Operations Support Center.Severe Accident Management Guideline
ML10355025613 December 2010Revision 5 to Emergency Plan Implementing Procedure IP-EP-120, Emergency ClassificationEarthquake
Fuel cladding
ML11005013510 December 2010Revision 2 to Emergency Plan Implementing Procedure IP-EP-420, Use of Potassium Iodide by Indian Point Personnel During an EmergencyChernobyl
ML1104601234 February 2011Revision 8 to Emergency Plan Implementing Procedure IP-EP-210, Central Control RoomSevere Accident Management Guideline
Earthquake
ML1108100978 March 2011Revision 4 to Emergency Plan Implementing Procedure IP-EP-320, Radiological Field Monitoring
ML11102043031 March 2011Revision 8 to Emergency Plan Implementing Procedure IP-EP-220, Technical Support CenterSevere Accident Management Guideline
ML11140A14317 May 2005IP-EP-130, Revision 3, Emergency Notification and Mobilization.
ML11140A14518 March 2008IP-EP-251, Revision 3, Alternate Emergency Operations Facility.
ML11140A14627 May 2010IP-EP-115, Revision 26, Emergency Plan Forms.
ML11140A14817 February 2011IP-EP-430, Revision 7, Site Assembly, Accountability & Relocation of Personnel Offsite.
ML11140A14924 August 2010IP-EP-260, Revision 4, Joint Information Center.
ML11158A11929 April 20112-ECA-0.0, Rev. 7, Loss of All AC Power.Boric Acid
ML15357A00515 December 2015Revision 18 to the Emergency PlanSafe Shutdown
Health Physics Network
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Severe Accident Management Guideline
Safeguards Contingency Plan
Earthquake
Deep Dose Equivalent
Fuel cladding
Minimum staff
Fire Protection Program
Power change
Siren
ML16032A40027 January 2016Revision 14 to Emergency Plan Implementing ProceduresChernobyl
Grace period
ML16033A40626 January 2016Revision 18 to Emergency Plan Implementing Procedures, IP-EP-220, Technical Support Center.Severe Accident Management Guideline
ML16063A18211 January 2016Revision 10 to IP-EP-320, Radiological Field MonitoringTest box
ML16095A15829 February 2016Revision 10 to IP-EP-320, Radiological Field MonitoringTest box
ML16166A0596 June 2016IPEC Emergency Plan ProceduresSafe Shutdown
High winds
High Radiation Area
Severe Accident Management Guideline
Earthquake
Pressure Boundary Leakage
Grace period
ML16265A20512 September 2016IPEC E-Plan ProceduresFitness for Duty
Met Tower
Severe Accident Management Guideline
Grace period
ML17333A12614 November 2017Emergency Plan Procedure IPEC-EP 17-01, Revision 20Safe Shutdown
Offsite Dose Calculation Manual
Cyber Security
FLEX
Pressure and Temperature Limits Report
Process Control Program
Severe Accident Management Guideline
Maintenance Rule Program
Fire Protection Program
ML17353A21614 December 2017Revision to Emergency Preparedness Emergency Plan Implementing Procedure, IPEC-EP 17-02, Rev. 21Safe Shutdown
Health Physics Network
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Cyber Security
FLEX
Severe Accident Management Guideline
Safeguards Contingency Plan
Earthquake
Deep Dose Equivalent
Fuel cladding
Minimum staff
Fire Protection Program
Power change
Siren
ML18024A47012 January 2018Revision 13 to IP-EP-430, Site Assembly, Accountability & Relocation of Personnel Offsite
ML18026A62817 January 2018Revision to IPEC Emergency Plan ProceduresSafe Shutdown
Met Tower
Deep Dose Equivalent
ML18033A46822 January 2018Revision 1 to IP-EP-270, Activation and Set Up of the Alternative Technical/Operations Support Center (Tsc/Osc) Facility
ML18162A10124 May 2018Revision 12 to IP-EP-120, Emergency ClassificationSafe Shutdown
High winds
High Radiation Area
Earthquake
Fuel cladding
ML18162A10230 May 2018Revision 18 to IP-1055, Fire Emergency ResponseFire Protection Program
ML18162A10323 May 2018Revision 6 to IP-EP-420, Use of Potassium Iodide by Indian Point Personnel During and EmegencyChernobyl
ML18163A13824 May 2018Revision 19 to IP-EP-AD13, Emergency Action Level Technical BasesSafe Shutdown
High winds
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
ML18264A01312 September 2018Revision to IPEC Emergency Plan ProcedureDeep Dose Equivalent
ML18331A25817 November 2018IPEC Emergency Plan Implementing Procedures
ML18331A25915 November 2018Revision to IPEC Emergency Plan ProcedureSafe Shutdown
Offsite Dose Calculation Manual
Cyber Security
FLEX
Pressure and Temperature Limits Report
Process Control Program
Safeguards Contingency Plan
Maintenance Rule Program
Fire Protection Program
ML18338A20626 November 2018Revision 24 to IPEC Emergency Plan Procedure IP-EP-210Severe Accident Management Guideline
Grace period
ML19050A1735 February 2019Revision 7 to IP-EP-251, Alternate Emergency Operations Facility