ML18162A102

From kanterella
Jump to navigation Jump to search
Revision 18 to IP-1055, Fire Emergency Response
ML18162A102
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/30/2018
From:
Office of Nuclear Reactor Regulation
To:
Entergy Corp, Indian Point
References
Download: ML18162A102 (17)


Text

IPEC EMERGENCY PLAN DISTRIBUTION LIST Page 1 of 2

, \)1if{:t:f ft: ., c:

  • _i * '.{'

t\>* -* ,>'}(Y~'./ ,~**

\(\jP ,:f,,',:_.*, _ :~::: ' W,;~l- --- _-
  • _ --' * -* J:,; 1t; j'.;;t~ * - -.- _ <'" _.: C

,~(..

- " l*ri~l\l!~~'{*':i(,:

<5 ,, ,, .... ;\*:.. ' - -* ---

      • ~--

"COPY H~L~~1~1t -

t{'{..,,. . *., -" * - -

\"

,,;> ADDRESS \\};

\>?:itt> ,;: ;;ir:,::;, '.<-:!.\\~: ."

__ ~.!,J.IIIJBER 0~ COPl~k ,

  • Jl' -1~r:J.; .::, . . -- _ * \':::

IP3 CONTROL ROOM DELIVERED BY DOCUMENTS IP3 53FT. CCR 1 COPY OF ALL EP'S IP3 SHIFT MANAGER DELIVERED BY DOCUMENTS IP3 53FT. ELEVATION 1 COPY OF ALL EP'S I P2 CONTROL ROOM DELIVERED BY DOCUMENTS IP2 53FT. CCR 1 COPY OF ALL EP'S IPEC TSC DELIVERED BY DOCUMENTS IP2 53FT. ELEVATION 1 COPY OF ALL EP'S IP2 SIMULATOR DELIVERED BY DOCUMENTS IP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S IP2 SIMULATOR - CLASSROOM 4 DELIVERED BY DOCUMENTS IP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S 3 COPIES OF ALL EP'S IP2 SIMULATOR - CLASSROOM 5 DELIVERED BY DOCUMENTS IP2 SIMULATOR BLDG.

EXCEPT E-PLAN NRG RESIDENT INSPECTOR NRG IP2 88FT. ELEVATION 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND NRG - ROCKVILLE, MD DOC CONTROL DESK OFFSITE GENERAL RECORDS ADDRESS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRG JAMES DANNA OFFSITE GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRG DEPUTY DIRECTOR OFFSITE GENERAL RECORDS EXCEPT IP-EP-115 r**-E r-rc c;;~ri\/F I

~--i;=-c

..... 1 ** *-* Ii i LENORE TO UPDATE.*-

1 COPY OF THE FOLLOWING:

E-PLAN , IP-EP-115, 120, NEW YORK STATE OEM i ,;; r~D.,J;=ISCH WEBSITE;._

210,220,230,250,310, I

MAY J ti Lu,J ' NO MAIL COPIES: .

320,340,360,410,420,

' 430, 620 & IP-1055

.,.....,..,:,, ,~. ='~if" .....

I l_)/--\ ~ L:~ i 1 COPY OF E-PLAN, WESTCHESTER COUNTY OEM- -- - - -D'ENNIS DELBORGO OFFSITE IP-EP-310 &340 ROCKLAND COUNTY FIRE AND 1 COPY OF E-PLAN, NICHOLAS LONGO OFFSITE EMERGENCY SERVICES IP-EP-310 &340 ORANGE COUNTY EMERGENCY 1 COPY OF E-PLAN, SHANNON FISHER OFFSITE SERVICES CENTER IP-EP-310 &340 PU"(NAM COUNTY BUREAU OF 1 COPY OF E-PLAN, KEN CLAIR OFFSITE EMERGENCY SERVICES IP-EP-310 &340

  • THE FOLLOWING LOCATIONS ARE *ELECTRONIC DISTRIBUTIONS* ff. J.f5
JI-,

!jiEnte,gy Indian Point Energy Center CONTROLLED DOCUMENT Document Control 450 Broadway TRANSMITTAL Buchanan, NY 10511 TO: DISTRIBUTION DATE: May 24, 2018 FROM: IPEC DOCUMENT CONTROL -- 3RD FLOOR ADMIN BLDG PHONE#: 914-254-6835 TRANSMITTAL#: EP-18-0016 The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s).

Sign and return the receipt acknowledgement below within ten (10) working days.

AFFECTED DOCUMENT: IPEC EMERGENCY PLAN PROCEDURES DOC# I REV# I TITLE I INSTRUCTIONS THE FOLLOWING PROCEDURE IS BEING "VOIDED", PLEASE REMOVE FROM YOUR BOOKS:

MAY 30 2(H8 IP-1055 REV.18 RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S)

(IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S). ~ l-- ~

NAME (PRINT) SIGNATURE DATE COPY LOCATION l~

ATTACHMENT

  • "'"'9': . ., . *¥ .,.,,,,_

9.1 Procech.are/Document Number: ll'-1055 I Revision: 18 Equipment/facmty/OU1er: IPEC

Title:

Are Emergency Respcmse Part I. Description of Activity Being Reviewed (event or action, or series of actions that have the potential to affect the emergency plan or have the potential to affect the implementation of the emergency plan):

" Procedure being revised due lo QA CR, CR*IP2-201S.02682.

  • Added new date for approval* Revision 17 had an approval date of 6/29/1 on the front cover page. Revised the cover page to include a correct date.

" Replaced lP*SMM-DC*001 "IPEC Fire Protection Program Plan" with SEP-FPP*!P-001 "IPEC Fire Protection Program Plan".

o Replaced IP*EP-115 Form EP-6 "emergency Exposure Authorization" with EP-4-ALL "Exposure Authorization Form"

" Replaced IP-EP-115 Form EP 29 "Individuals Exposure Tracking Log" with EP-6-ALL "Team Tracking Form".

.. Reference procedures were moved to interface procedures. This better aligns the procedures' functions.

" 10CFR20 was removed from interface procedures, since this is only a reference procedure.

Part IB. Emergency Plan Sections Reviewed (List all emergency plan sections that were reviewed for this activity by number and title. IF THE ACTIVITY IN ITS ENTIRETY IS AN EMERGENCY PLAN CHANGE OR EAL OR EAL BASIS CHANGE, ENTER THE SCREENING PROCESS. NO 10 CFR 50.54(q)(2) DOCUMENTATION IS REQUIRED.

Part II Section A: Assignment of Responsibiiit>J Part II Section B: Station Emergency Response Organization Part II Section O: Emergency Classification System Part II Section E: Notification Methods and Procedures Part nSection H: Emergency facilities and Equipment Part II Section K; Radiologicaf Exposure Control Part ii Section L: Medical and Public Health Support

ATTACHMENT9.1 10 CFR 50.54(0)(2) REVIEW Procedure/!Jocumernt Number: IP-1055 Revision: 18 EquipmentJfacility/Oiher: iPEC

Title:

fire Emergency Response Part m. Ability to Maintain the Emergency Phm (Answer tho following questions related to impact on tho ability to maintain the emergency plan):

1. Do a'!l_ elements of the activity change information contained in the emergency plan (procedure section 3.0[61)?

YES U NO 125.1 IF YES, enter screening process for that element

2. Do any elements of lhe activity change an emergency classification Initiating Condition, Emergency Action Level (EAL), associated EAL note or associated EAL basis information or their underlying ca!culaUons or assumptions?

YES O NO 125.1 IF YES, enter screening proce$S for that element

3. Do any elements of ihe activity change the process or capability for alerting and notifying the public as described in the FEMA-approved Alert and Notification System design report?

YES O NO 125.1 IF YES, enter screening process for that element

4. Do Sf!l.elements of the activity change the Evacuation Time Estimate results or documentation?

YES O NO IZl IF YES, enter screening process for that element

5. Do af!l.elements of the activity change the Onshift Staffing Analysis results or documenlation?

YES U NO IZl if YES, enter screening process for that element Pari IV. Maintaining the Emergency Plan Ccmclusion The questions in Part II do not represent the sum total of all conditions that may cause a change to or impact ihe ability to maintain the emergency plan. Originator and reviewer signatures in Part IV document that a review of au elements ofthe proposed change have been considered for their impact on the ability to maintain the emergency plan and their potential to change the emergency plan.

1. Provide a brief conclusion that describes how the com.lilions as described in the emergency plan are maintained with this activity.
2. Check the box below when the 10 CFR 50.54(q)(2) review completes all actions for all elements of the activity - no 10 CFR 50.54(q)(3) screening or evaluation is required for any element. Otherwise, leave lhe checkbox blank.

0 l have completed a review ofthis activity in accordance with 10 CFR 50.54(q)(2) and determined that !he effectiveness of the emergency plan is maintained. This activily does not make any changes to the emergency plan.

No further actions are required lo screen or evaluate this activity under 10 CFR 50.54{q)(3).

AU changes are considered editorial in nature. The form changes were previously reviewed under a separate 50.540 review. A review of this activity in accordance with 10 CFR 50.54(q){2) has been completed and determined that the effectiveness of the emergency plan and the intent of the procedure is maintained. This activity does not make any changes to the IPEC Emergency Plan.

No further actions are required to screen or evaluate this activity under 10CFR 50.54(q)(3).

10 CFR 50.54(0)(2) REVIEW SHEET30F3 Proced1.1re/Oocume11t Number; IP-1055 I Revision: 18 EquipmentiFacmty/Other: IPEC rme: Fire Emergency Response Part V. Signatures:

Preparer Name (Print) Preparer Signature Date:

Rebecca A. Martin Sr. EP Project Manager tional) Reviewer Name (Print} Reviewer Signature Date:

Reviewer Name (Prinl) Reviewer Signature Date:

Timothy F. Garvey Nuclear EP Project Manager Reviewer Name (Print) Reviewer Signature Date:

Frank J. Mitchell Manager, Emergency Planning or des!gnee

Preparer Name (Print) Preparer Signature Date:

Robacca A. Martin Sr. EP Project Manager Optional) Reviewer Name {Print) Reviewer Signature ate:

Reviewer Name (Pfinl) Reviewer Signature Timothy F. Garvey Nuclear EP Pmjact Manager Reviewer Name {Print} Daw:

Frank J. Mitchell Mam.1ger. emergency Planning or designee

IPEC IMPLEMENTING PROCEDURE IP-SMM-AD-102 Rev: 15  !

PREPARATION, REVIEW, AND APPROVAL Page 35 of 43 " J

  • ---~~-----~

ATTACHMENT Procedure

Title:

Procedure No.

10.2 Fire Emergency Response Procedure .Activity (MARK Applicable)

IP-1055 Existing Rev: 17 D Converted To IPEC, Replaces:

New Rev:

IPEC PROCEDURE ReVIEW AND AffROVAL 18 ORN/EC No: DRN-18-0680 Cl NEW PROCEDURE Unit 1 Procedure No. EDITORIAL Temporary Procedure Change D GENERAL REVISION D ADVANCE Temporary Procedure Change 0 PARTIAL REVISION

!IDEDITOR!Al REVISION Unit 2 Procedure No: D CONDITIONAL Temporary Procedure Change D VOID PROCEDURE Terminating Condition:

Cl SUPERSEDED Unit 3 Procedure No;

  • ___ cument in Microsoft Word; 0 RAPID REVISION D VOID DRNfTPC No(s):

!El Yes D No

~evision Summary Editorial changes made. Updated approval date. Updated procedures/forms that were superseded procedures. moved reference procedures to interface procedures.

lmg!ementatlon Requirements Implementation Plan? !El Yes D No Formal Trainlng? 0 Yes !EINo Special Handling? 0 Yes IIDNo RPO Dept; Em~rgency Planning Writer; (Print Name/Ext/Sign): Rebecca A. Martin / x71 I Review and Approval (Per Attachment 10.1, IPEC Review And Approval Requirements)

i. D Technical Reviewer:

(Print Name/ Signature/ Date)

2. D Cross-Disciplinary Reviewers:
  • 3. ml Dept Dept RPO- Responsibiliiies/Checklisl:

Reviewer:

Reviewer:

Frank Milche!I I Print Name! Signature! Date)

(Print Name/ S!gnalure/ Date)

Cl PAD required and is complete (PAD Approver and Reviewer quallfic:ations have been verified)

!El Previous exclusion from further ll,100 Review is slill valid Cl PAD not required due to type of change as defined in 4.6

4. D Non-Intent Determination Complete:

(Print Name/ Signature/ Date}

NO change of purpose or scope tlQ change to less restrictive acceptance criteria NO reduction in the level of nuclear safety NO change to steps previously identified as commitment steps NO voiding or canceling of a procedure. unless hlQ devialion rrom the Quality Assurance Program Manual requirements are incorporated into another procedure NO change !hat may result in deviations from Technical or the need for !he procedure was eliminated Specifications, FSAR. plant design requirements,

5. D On-Shift Shift Manager/CRS:

~---- {Prlnt Name/ Signature/ Date)

6. D User Validation: User. Validator:
7. 0 Special Handling Requirements Understood:

(Print Name/ Signature/ Date)

IPEC NOM-QUAl.!TY RELATED EMERGENCY PLAN IP-EP-AD2 Revision 10 PROCEDURE

~Entergy ADMINISTRATIVE PROCEDURES REFERENCE USE 1 of 1 Attachment 9.1 Emergency Planning Document Change Checklist Form (All sections must be completed, NIA or place a check on the line where applicable}

Section 1 Doc/Procedure Type:

-*~

Doc/Procedure No:

~~~:.:...::.:.=-=-=='--_;.;.;.lm=~=!e=m=e.;,.;.nt=in.,;.,;,agc..!:,[21

_ ___;E=P..,,;;LA;,;;_,;,;,,,;N;,..,,Q=1.-...........;N;...;;.;l..;...A, O_I Doc/Procedure

Title:

Corrective Action: CR#: CR-2-18-2682 Section 2 Change Description

1. Ensure the following are completed, or are not applicable and are so marked:
a. 50.54q ~ NIA D
b. EN-FAP-OM-023 0 N/A ~

C. IP-SMM-AD-102 ~ NIA 0

d. OSRC O NIA~
2. Transmittals are completed: 0 NIA O Date:_ _
3. Ensure the proper revision is active in Merlin: D NIA D
4. Approved doc/procedure delivered to Doc. Control for distribution: D NIA D Date:
5. Position Binders updated: D N/A O Date: _ _
6. Copy of EPDCC placed in EP file: D NIA D Date: _ _
7. Supporting documentation is submitted as a general record in MERLIN: D NIA D Date: _
8. Word files are moved from working drafts folder to current revision folder in the EP drive:

D NIA O Date: _ _

Sheet 1 of 1

CONTROLLED

~

IPEC NON-QUALITY RELATED IP-1055 Revision 18

~!!!E! Fnler.oy

,J . ,J t., (~.. EMERGENCY PLAN PROCEDURE IMPLEMENTING

  • PROCEDURES REFERENCE USE Page 1 of ~

Fire Emergency Response

  • Prepared by:

Approval:

Rebecca A. Martin Print Name Frank J. Mitchell Print Name

~t~~ sl:"3\I~

/{11.,~ .d,31£.t' Effective Date: May 30, 2018 IP-1055 (Fire EmergencyResponse) R18.doc

~

IPEC NON-QUALITY RELATED IP-1055 Revision 18

~ Hnlergy!, EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page i of f1 Table of Contents 1.0 PURPOSE ............................................................................................................................................3

2.0 REFERENCES

....................................................................................................................................3 3.0 DEFINITIONS ......................................................................................................................................3 4.0 RESPONSIBILITIES .........................................................................................................................4 5.0 DETAILS ...............................................................................................................................................4 6.0 INTERFACES ......................................................................................................................................6 7.0 RECORDS ............................................................................................................................................6 8.0 REQUIREMENTS AND COMMITMENT .....................................................................................6 9.0 ATTACHMENTS .................................................................................................................................6

  • - 9.1 9.2 WATCH RP FIRE RESPONSE ........................................................................................................7 SECURITY FIRE RESPONSE ..........................................................................................................9

IPEC NON-QUALITY RELATED IP-1055 Revision 18

--"-* Entergy,, EMERGENCY PLAN PROCEDURE IMPLEMENTING

  • 1.0 PURPOSE PROCEDURES REFERENCE Use Fire Emergency Response Page ~ of ~

This procedure describes the actions to be taken by personnel who respond to a fire emergency at Indian Point Energy Center (IPEC). This procedure shall also be followed during normal plant operations and when a fire exists in the Radiological Controlled Area (RCA).

2.0 REFERENCES

2.1 IP-EP-AD13 IPEC Emergency Action Level Technical Bases 2.2 SEP-FPP-IP-001, "IPEC Fire Protection Program Plan" 2.3 2-0NOP-FP-001, "Plant Fires" 2.4 3-0NOP-FP-1, "Plant Fires" 2.5 10CFR20 3.0 DEFINITIONS 3.1 Contamination - Radioactive material where it's not wanted 3.2 Control Room Operator - Licensed individual in control room operations 3.3 Decon - process to remove contamination from a person or piece of equipment 3.4 Dosimeter - Equipment used to measure radiation and provide the wearer with a reading of accumulated exposure.

  • 3.5 Emergency Telephone Directory- lPEC telephone directory for emergency numbers and Emergency Response Organization; this is located on the Emergency Planning website.

3.6 Radiation Protection Technician - Trained individual in radiation protection and detection 3.7 NPO - Nuclear Plant Operator- non-licensed operator in the plant 3.8 Shift Manger - Licensed operator in charge of plant operations 3.9 DLR - Permanent record of an individual's radiation exposure

~

?!!~~l.,

~-:: ,!nlergy.,

IPEC NON-QUALITY RELATED IP-1055 Revision 18 EMERGENCY PLAN PROCEDURE IMPLEMENTING

  • 4.0 PROCEDURES RESPONSIBILITIES REFERENCE USE Page 1 of ~

4.1 When a fire is discovered, all personnel are responsible for notifying the Control Room (CR). Notification of a fire should be made using emergency phone extensions 5911 for both Unit 2 and Unit 3, and should include the caller's name along with the location and nature of the fire.

4.2 In accordance with 2-0NOP-FP-001, "Plant Fire" and 3-0NOP-FP-1, "Plant Fires", the CR is responsible for making the required notifications and sounding the fire alarm.

4.3 The CR is responsible for determining activation of the Emergency Plan as per the Emergency Action Levels (EALs) found in IP-EP-AD-13, "IPEC Emergency Action Level Technical Bases".

4.4 The Shift Manager (SM) or Emergency Director (ED) is authorized to allow fire fighters to exceed 10CFR20 limits. Exposure Authorization Form (EP-4-ALL) shall be used.

4.5 "Emergency Use of Potassium Iodine (Kl)", the SM or ED determines the need to issue potassium iodine (Kl) tablets by discussions with Radiological Coordinator or Radiological Assessment Coordinator.

4.6 In accordance with "Site Fire Protection" and "Fire Emergency" the Site Fire Brigade is responsible for responding to any fire emergency at IPEC and for requesting offsite fire fighting assistance, if needed. Requests for offsite assistance are made via the Unit 2 Control Room.

4.7 In accordance with the appropriate procedures, Security is responsible for directing site personnel and offsite fire assistance, and evacuating unnecessary personnel from the fire area.

4.8 In accordance with this procedure, the Watch Radiation Protection Technician/designee is responsible for responding to any fire in the Radiological Controlled Area (RCA).

5.0 DETAILS 5.1 When requested by the Fire Brigade Leader and as directed by the SM the Off-Site Fire Department will be called, from the Unit 2 Control Room for assistance.

5.2 The Control Room will notify Security of the impending arrival of the Verplanck Fire Department.

~

IPEC NON-QUALITY RELATED IP-1055 Revision 18

~Fnl<!r.

_,; , b0 y,,, EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES Page REFERENCE USE ~ of R A. IF the Emergency Response Facilities (ERFs) are staffed, THEN:

1. Via the Radiological Coordinator in the Technical Support Center (TSC), the Plant Operations Manager (POM) will assess the radiological conditions that exist at the fire scene.
2. Prior to dispatching the Fire Brigade, the POM shall assess the following conditions. (If radiological conditions exist where there is a potential to exceed the 10CFR20 limits, refer to EP-4-ALL, Exposure Authorization Form.
  • Area dose rate< 1O R/hr.:

The fire Brigade shall be dispatched from the CR to the fire scene. Notification shall then be made to the OSC to dispatch a Radiation Protection Technician to the fire scene to provide radiological guidance.

  • Area dose rate> 10 R/hr.:

The POM shall designate a briefing area (e.g., entry into the

  • RCA). Notify the OSC to dispatch a Radiation Protection Technician to the briefing location where he will provide radiological guidance. Authorize dispatch of Fire Brigade to the briefing location prior to responding to the fire scene.
3. CONDUCT a debriefing to ensure that the POM and OSC Manager are cognizant of the Fire Brigade actions.

5.4 . ENSURE Radiation Protection Technicians are performing all necessary duties as listed on Attachment 9.1, "Watch Radiation Protection Fire Response".

5.5 ENSURE Security Officers are performing all necessary duties as listed on Attachment 9.2, "Security Fire Response".

NOTE Provided full turnout gear is worn, when fighting a fire in a contaminated area, Anti-C clothing is not required to be worn by the Site Fire Brigade and offsite fire fighters.

FOR UNIT 3: Access through the Turnstile at the 4th floor Control Point may be obtained by using the key located in the glass box attached to the Turnstile.

FOR UNIT 2: Enter without use of the Turnstile

Jt1i~ IPEC NON-QUALITY RELATED IP-1055 Revision 18

~/'

  • .::::-=* ~niergy.,

EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page § of ~

6.0 INTERFACES 6.1 EN-EP-900, Emergency Preparedness Forms 6.1.1 EP-4-ALL , "Exposure Authorization Form" 6.1.2 EP-6-ALL, "Team Tracking Log" 6.2 FP-7, Fire Notification Guidelines 6.3 IP-EP-AD13, /PEG Emergency Action Level Technical Bases 7.0 RECORDS All forms and logs completed by the Emergency Response Organization during a declared emergency are Quality Records and shall be maintained for the life of the plant plus twenty (20) years.

  • 8.0 REQUIREMENTS AND COMMITMENT CROSS-REFERENCE 8.1 This procedure does not degrade any requirements or commitments 9.0 ATTACHMENTS 9.1 Watch Radiation Protection Technician Fire Response 9.2 Security Fire Response

~p

  • s J11/ergy;,

IPECSITE NON-QUALITY RELATED IP-1055 Revision18 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURE REFERENCE USE Page I of ~

Attachment 9.1 Watch Radiation Protection Fire Response Page 1 of 2

1. RESPOND to all fires in the RCA and have a Self-Contained Breathing Apparatus (SCBA) available for use if needed.
2. For communications with the CR and the Fire Brigade Leader, BRING a radio tuned to Frequency #2.
3. UPON arrival to the fire scene, NOTIFY the Fire Brigade Leader.
4. EVALUATE the location of the fire and address any radiological concerns directly to the Fire Brigade Leader at the fire scene or at a briefing designated by the POM.
5. MAKE every effort to keep exposures to fire fighters As Low As Reasonably Achievable (ALARA) .
6. When possible, CHECK all fire fighters to ensure they have the appropriate Dosimetry. If not already done, issue Dosimetry.
7. SET UP an air sampler (particulate and iodine) as close as practical to where the smoke may be venting. If available at the fire scene, use a Continuous Air Monitor (CAM) as per approved Radiation Protection procedures.
8. IF it becomes necessary for any fire fighter to exceed 10CFR20 limits, THEN notify the SM/ED/POM.
9. IF it becomes necessary for the offsite fire fighters to exceed Entergy Nuclear Northeast's radiation exposure limits (500 mRem per year) THEN notify the SM/ED/POM.
10. DURING the fire fighting operations, EVALUATE the potential for the spread of radioactive contamination from the use of water.
11. EVALUATE airborne activity through the use of the Counting Room. If the air sample activity is greater than 3E-9 µCi/cc, an isotopic analysis is required.
12. NOTIFY the Fire Brigade Leader of any restrictions you are imposing on the fire fighters.

A;i:i,.

IPEC SITE NON-QUALITY RELATED IP-1055 Revision18

':'§ h11lergy~ EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURE REFERENCE USE Page !t of i Attachment 9.1 Watch HP Fire Response Page 2 of 2

13. As directed by the SM/ED/POM or-Radiological Assessment Coordinator, ISSUE Kl.
14. When venting smoke, ADVISE the Fire Brigade Leader as to proper control of airborne activity. Depending on the heat involved, secondary fires may arise in the ventilation system/filters. The Radiation Protection Technician and the Fire Brigade Leader should consider shutting down the ventilation system if such a possibility exists.
15. EVALUATE the need for decontamination and whole body counting of perspnnel as described in approved Radiation Protection procedures.
16. DETERMINE if internal exposure should be assigned.
  • 17. AFTER the fire has been extinguished, RECORD the name of each fire fighter and their DLR number on EP-6-ALL, "Team Tracking Log". In addition, obtain a DLR Badge Request Form from Dosimetry and complete it at this time.
  • IF the SM/ED/POM has authorized an extension to receive emergency personnel exposure above 10CFR20 limits, THEN complete EP-4-ALL, "Exposure Authorization Form".
  • RETURN completed forms to the Dosimetry Office.
18. BEFORE allowing the fire fighters to leave the RCA for the last time, CHECK them, their clothing and equipment for possible contamination as per approved Radiation Protection procedures.

NOTE In order to prevent interference with fire fighting efforts, repeated exits from the RCA WITHOUT frisking is permitted.

19. All clothing and equipment which is not permitted to be removed from the RCA due to contamination should be inventoried for compensation .

~~

~}'

  • >.:.' ~ ) r, IPEC SITE NON-QUALITY RELATED IP-1055 Revision18

.,nl<.r~y,!" EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURE REFERENCE USE Page ~ of ~

Attachment 9.2 Security Fire Response Page 1 of 1

1. DIRECT responding personnel and offsite fire fighters and accompanying apparatus' through the nearest gate to the fire area.
2. IF responding to the fire, THEN wear a SCBA.
3. EVACUATE unnecessary personnel from the fire area.
4. IF fire is located in the RCA, THEN do the following:
  • ENSURE access for Fire Brigade at 4th floor HP Control Point (Unit 3)
  • ENSURE the Fire Truck is given the Fire Fighter Kit located at the Main Gate Security Station .