ML20062H502

From kanterella
Revision as of 11:45, 24 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Third Interim Deficiency Rept Re Hma Auxiliary Relays. Required Insulating Tubing for Application on Relays Received W/O Evidence of Certification of Compliance to Spec.Documentation Expected 820809.Final Rept Due by 820909
ML20062H502
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/06/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-82-0484, W3K-82-484, NUDOCS 8208160076
Download: ML20062H502 (1)


Text

r I

LOUISIANA f 242 onAnoNoe S1nar POWE A & L1G H T/ p o Box soos . NEW ORLEANS. LOUIStANA 70174 * (504) 366-2345 u7 iSN dvsi[O August 6, 1982 G. D. McLENDON Senior Voce President W3K-82-0484 Q-3-A35.07.42 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 [K@h=MH\WM'i%

Docket No. 50-382 ,s Significant Construction Deficiency No. 42  ;

g g@

"HMA Auxiliary Relays" , .

Third Interim Report L '-

i

Reference:

LP6L Letter W3K-82-0307 dated June 2, 1982.

Dear Mr. Collins:

The Final Report on Significant Construction Deficiency No. 42 was to be submitted on August 6, 1982. We are unable to meet this date. ,

The required insulating tubing for application on the HMA auxiliary relays was received on site without evidence of certification of compliance to specification. Upon receipt of the required documentation, expected by August 9, the corrective action will be accomplished in accordance with GE Service Advice 721-PSM-166.1. Completion of this corrective action will allow the Final Report on Significant Construction Deficiency No. 42 to be submitted by September 9, 1982.

If you have any questions, please advise.

Very truly yours, u/

G.D. McLendon CDMcL/LLB/grf cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director Office of Management ,,

Information and Program Control $

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (h

8208160076 820806 PDR ADOCK 05000382 S PDR