Advises That Evaluation & Response Re Tech Spec Proposals & Schedule for Study to Reduce Containment Bldg Purging,Per 850131 Request Will Not Be Completed Until 850419 Due to Extended Unit 2 Outage
ML20100B022
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/20/1985
From: Mcdonald R
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8503260348
Download: ML20100B022 (1)


Text

E Malling Address -

Alibima Power Compsny 600 Morth 18th Strtet Post Of fice Dox 2M1 Birmtrgham, Alabama 35291 Telephone 205 783-67M R. P. Mcdonald Senior wce President Flintridge Building /\lU()dilla POWCf March 20, 1985 re . ,y ,

/

Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission '

Washington, D.-C. 20555 1

4 Attention: Mr. S. A. Varga

. Joseph M. Farley Nuclear Plant - Units 1 and 2 Containment Vent and Purge Operation Gentlemen:

By letter dated January 31, 1985 the NRC requested Technical Specification proposals and a schedule for a study to reduce containment building purging. Due to the extended Unit 2 outage associated with tendon surveillance and replacement and the preparation for the Unit I refueling outage scheduled to conmence April 5,1985, the evaluation of this NRC request has been delayed. Alabama Power Company will complete its evaluation and respond to the NRC by April 19, 1985.

If there are any questions, please advise.

Yours very truly,

. ,/ -

' . P. Mc onald ' ..

1 RPM / JAR:bdy-01 cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford 1

1 8503260348 850320 '

POR ADOCK 05000348 P PDn g@\

,o L l