ML19326D870

From kanterella
Revision as of 20:45, 9 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to Action Plan Item III.D.3.4 Re Control Room Habitability.Room Meets SRP Specs & Guidance.No Mods Required
ML19326D870
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/17/1980
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8007230485
Download: ML19326D870 (1)


Text

Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 323-5341 L

"

's$oNcNr$iioe'nt Alabama Power the southem elecinc system July 17,1980 Docket No. 50-364 Director, l Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. A. Schwencer JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 2 TMI-2 ACTION PLAN ITEMS Gentlemen:

In response to Action Plan Item III.D.3.4, Alabama Power Company has conducted a review of control room habitability in accordance with Standard Review Plan Sections 2.2.1, 2.2.2, 2.2.3, and 6.4 and Regulatory Guides 1.78 and 1.95. Based upon this review, we conclude that the Farley Nuclear Plant-Unit 2 control room meets the specifications and guidance in these SRP sections and Regulatory Guides, and therefore, no modifications are required.

If you have any questions concerning this item, please advise.

Yours very truly,

'

n -

.- +

-

g .'g' da, w.w%

t ,n l F. L. Clayton, JM FLCj r/RLG:rt cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. L. L. Kintner Mr. W. H. Bradford

.

ooomo nr