ML060650389

From kanterella
Revision as of 23:20, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2006/03/02-Vermont Yankee - Letter from Sherwin E. Turk to Administrative Judges Re NRC Issuance of Amendment to Operating License for Vermont Yankee
ML060650389
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/02/2006
From: Sherwin Turk
NRC/OGC
To: Anthony Baratta, Karlin A, Rubenstein L
Atomic Safety and Licensing Board Panel
Byrdsong A T
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 11300
Download: ML060650389 (1)


Text

March 2, 2006Alex S. Karlin, ChairmanDr. Anthony J. BarattaAdministrative JudgeAdministrative Judge Atomic Safety and Licensing Board PanelAtomic Safety and Licensing Board Panel U.S. Nuclear Regulatory CommissionU.S. Nuclear Regulatory Commission Washington, DC 20555-0001Washington, DC 20555-0001Lester S. RubensteinAdministrative Judge Atomic Safety and Licensing Board Panel 4760 East Country Villa DriveTucson, AZ 85718In the Matter ofEntergy Nuclear Vermont Yankee, LLC, et al.(Vermont Yankee Nuclear Power Station)Docket No. 50-271-OLA (Extended Power Uprate)

Dear Administrative Judges:

The NRC Staff ("Staff") wishes to inform you that it has today issued an amendment to theoperating license for the Vermont Yankee Nuclear Power Station, authorizing an extendedpower uprate for the facility, increasing the maximum authorized power level from 1593megawatts thermal (MWt) to 1912 MWt. Enclosed herewith is a copy of a letter from Richard B. Ennis (NRC) to Michael Kansler (Entergy Nuclear Operations, Inc.), dated March 2, 2006,transmitting the license amendment and Final Safety Evaluation ("SE") to the licensee. In accordance with the telephone conference call held on January 24, 2006, copies of theenclosed letter and attachments are being transmitted herewith to all parties in the proceeding by overnight mail. The SE delivery date of March 3, 2006, should therefore be regarded as the "trigger date" for various actions specified in the Board's Initial Scheduling Order of February 1, 2005. See Tr. 762-63. Sincerely,/RA/Sherwin E. Turk Counsel for NRC Staff

Enclosures:

As stated cc w/Encl.: Service List