Letter to Board Advising of Some Inconsequential Cha Nges in the Confirmatory Environmentally Assisted Fatigue Analyses That Were Provided to the Parties on January 9, 2009
ML090690302
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/26/2009
From: Travieso-Diaz M
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee, Pillsbury, Winthrop, Shaw, Pittman, LLP
To: Karlin A, Wendy Reed, Richard Wardwell
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-271-LR, ASLBP 06-849-03-LR, RAS M-407
Download: ML090690302 (4)


Text

ZA-; H-4'O"7 2300 N Street, N.W. Tel 202.663.8000 Washington, D.C. 20037-1128 Fax 202.663.8007 www.pillsburylaw.coji MATIAS F. TRAVIESO-DIAZ 202-663-8142 mnatias.travieso-diaz@pillsburylaw.comn February 26, 2009 Alex S. Karlin, Esq., Chairman Administrative Judge Atomic Safety and Licensing Board Dr. William H. Reed Mail Stop T-3 F23 Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mail Stop T-3 F23 Washington, D.C. 20555-0001 .- U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 DOCKETED Administrative Judge USNRC Dr. Richard E. Wardwell Atomic Safety and Licensing Board February 26, 2009 (11:13am)

Mail Stop T-3 F23 OFFICE OF SECRETARY U.S. Nuclear Regulatory Commission RULEMAKINGS AND Washington, D.C. 20555-0001 ADJUDICATIONS STAFF In the Matter of Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc.

(Vermont Yankee Nuclear Power-Station)

Docket No. 50-271-LR; ASLBP No. 06-849-03-LR Gentlemen:

In connection with an NRC Staff audit of the confirmatory environmentally assisted fatigue (CUFen) analyses that were provided to the parties to this proceeding on January 8, 2009, Entergy identified that Table 6 of Calculation 0801038.306 for the reactor recirculation outlet (RO) nozzle utilized Alloy 600 material properties instead of those for stainless steel. A supplemental evaluation using the proper input values determined that the environmentally adjusted cumulative usage factor CUFEn at a non-limiting location in that nozzle (the safe end) increased from less than 1% of the allowable value to approximately 4% of the allowable value.

In performing this supplemental evaluation, all calculation methods have been maintained; the limiting calculated CUFen, for the RO nozzle of 0.119 remains unaffected. Therefore, the result of this finding is inconsequential.

Entergy has identified two other changes that should be made to the calculations for the RO nozzle, neither of which affects the results:

  • In Calculation 0801038.306, a stress concentration factor (SCF) was used in the analysis of the nozzle blend radius, whereas use of such a factor is only needed for the nozzle safe end. Since the SCF is greater than 1.0, its use led to increasing the conservatism of the 1)23

February 26, 2009 Page 2 CUFen calculation for the nozzle blend radius. Removing the SCF that was applied to the blend radius will have no impact to the final conclusions of the calculation.

With respect to Calculation 0801308.304, the definition of one thermal stress transient (Transient #9) is slightly different from the one used in the previous refined analysis Calculation No VY-16Q-306. Since Entergy intended to use the same thermal stress transient definitions for both sets of calculations, the definition of the transient in Calculation 0801308.304 will be modified to make it the same as for the refined calculation. Changing the definition of this thermal stress transient will have no impact on the results of the fatigue calculation for the nozzle.

In addition, Entergy identified the following editorial changes that should be made to the analysis of the reactor core spray (CS) nozzle:

Calculation 0801038.302 for the CS nozzle. The TOTAL stresses listed in Table 4 for Node 2166 at a time of 66,165 seconds are incorrect. However, the correct numbers are used in the analysis and are contained in all of the supporting computer files.

Calculation 0801038.302 for the CS nozzle. Section 4.5 includes the statement:

"The location of the nozzle loads is at 137.0625 inches [4] from the center of the RPV." The dimension of 137.0625 inches is correct; however, it cannot be found in Reference [4]. A different reference will be listed as the source of the dimension.

Calculation 0801038.303 for the CS nozzle. This calculation will be revised to update the reference contained in it for Calculation 0801038.302 from Revision 0 to Revision 1, once Calculation 08010308.302 is revised.

None of these editorial changes affect either the methodology used in the calculation or the calculation's results.

Entergy has initiated a condition report to address the above items. Upon completion of the corrective action review that will close out the condition report, the calculations of record will be revised.

As noted above, the conclusion that the CUFes for both nozzles are less than unity is not affected by the changes discussed in this letter.

Sincerely,

ýMata F. Travieso-Diaz -

Counsel for Entergy cc: Service List Pillsbury Winthrop Shaw Pittman LLP

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing letter were served on the persons listed below by deposit in the U.S. Mail, first class, postage prepaid; where indicated by an asterisk, by electronic mail; and where indicated by a double asterisk, by both overnight and electronic mail, this 2 6 th day of February, 2009.

  • Administrative Judge *Administrative Judge Alex S. Karlin, Esq., Chairman Dr. Richard E. Wardwell Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 ask2 Anrc. gov rew(ibnrc.gov
  • Administrative Judge
  • Secretary Dr. William H. Reed Att'n: Rulemakings and Adjudications Staff 1819 Edgewood Lane Mail Stop 0- 16 C I Charlottesville, VA 22902 U.S. Nuclear Regulatory Commission whrcville(-embarqmail. com Washington, DC 20555-0001 secyv(nrc.gov, hearingdocketnr'c. gov
  • Office of Commission Appellate Adjudication Atomic Safety and Licensing Board Mail Stop 0-16 C1 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 OCAAmail(anrc.gov
    • Lloyd Subin, Esq. **Sarah Hofmnann, Esq.
    • Mary Baty, Esq. Director of Public Advocacy
    • Susan L. Uttal, Esq. Department of Public Service Office of the General Counsel 112 State Street - Drawer 20 Mail Stop O-15-D21 Montpelier, VT 05620-2601 U.S. Nuclear Regulatory Commission Sarah.hofinann(Ostate.vt.us Washington, DC 20555-0001 LBS3@(,nrc.gov; mcbl (@nrc.gov; j essica.bielecki(anrc.gov; susan.uttal(anrc.gov Pillsbury Winthrop Shaw Pittman LLP
    • Anthony Z. Roisman, Esq. - **Raymond Shadis National Legal Scholars Law Firm 37 Shadis Road 84 East Thetford Road PO Box 98 Lyme, NH 03768 Edgecomb, ME 04556 aroisrnan(aZ'nationallegalscholars.com shadis(&prexar.com
  • Peter L. Roth, Esq. *Zachary Kahn, Esq.

Office of the New Hampshire Attorney General Atomic Safety and Licensing Board Panel 33 Capitol Street Mail Stop T-3 F23 Concord, NH 03301 U.S. Nuclear Regulatory Commission Peter.roth(odoj .nh.gov Washington, DC 20555-0001 zachary.kahn(nnrc.gov

  • Matthew Brock, Esq.

Assistant Attorney General Environmental Protection Division Office of the Attorney General One Ashburton Place, 18th Floor Boston, MA 02108 Matthew.Brock(d)state.ma.us Matias F. Travieso-Diaz Pillsbury Winthrop Shaw Pittman LLP