Vermont Yankee - Letter from Brooke D. Poole to Jay E. Silberg Requesting Certain Proprietary Documents Relevant to NEC Contentions 3 and 4
ML051100088
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/14/2005
From: Poole B
NRC/OGC
To: Silberg J
Pillsbury, Winthrop, Shaw, Pittman, LLP
Brooke Poole, OGC, 415-1556
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 10032
Download: ML051100088 (10)


Text

April 14, 2005 Jay E. Silberg, Esq.

Pillsbury Winthrop Shaw Pittman, LLP 2300 N St., NW Washington, DC 20037-1128 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.

(Vermont Yankee Nuclear Power Station)

Docket No. 50-271-OLA

Dear Mr. Silberg:

In the Protective Order Governing Non-Disclosure of Proprietary Information issued on March 1, 2005, in the captioned proceeding, the Licensing Board stated (at 4 n.7):

This order, and the good faith representation and designation of documents as Proprietary Documents by counsel for Entergy, serves in lieu of the requirement for marking and for an affidavit under 10 C.F.R. § 2.390(b) and allows the Staff to receive Proprietary Documents and to protect their confidentiality under [the Freedom of Information Act]. However, the Staff is not obligated to participate in this order or to obtain Proprietary Documents hereunder. The Staff may instead access the documents under the compromise position approach specified in the Staff Answer at 5,[1] or in any other way that Entergy and the Staff agree is appropriate.

We have reviewed Entergys Proprietary Privileged Document Log2 and have identified several documents relating to NEC Contentions 3 and 4 that we would like to access pursuant to the compromise position set forth in the Staff Answer, at 5. Specifically, the Staff requests 1

See NRC Staff Answer to Entergys Motion for Protective Order Governing Access to and Disclosure of Trade Secrets and Confidential Commercial or Financial Information dated January 19, 2005 (Staff Answer).

2 See Entergys Proprietary Privileged Document Log, dated March 31, 2005.

Jay E. Silberg, Esq. that the documents listed in the attachment to this letter be provided to Staff counsel pursuant to the procedures of 10 C.F.R. § 2.390.

Please contact me if you have any questions regarding this request.

Sincerely,

/RA/

Brooke D. Poole Counsel for NRC Staff

Attachment Proprietary Documents Relevant to NEC Contentions 3 and 4 Identified in Entergys Privileged Document Log and Requested for Production by the NRC Staff - April 14, 2005 Document Bates Date Document Title To From Company ID Number EPU500931 EPU 523483 - 7/19/01 Constant Pressure GE EPU 523501 Power Uprate LTR Startup Test Evaluation EPU500938 EPU 524536 - 2/1/03 Project Task Report Quinn GE EPU 524573 GE-NE-0000-0011-4860-01 Revision 0 Class III T1005 Startup Test Specifications (final)

EPU500939 EPU 524574 - 2/1/03 Project Task Report Quinn GE EPU 524611 GE-NE-0000-0011-4860-01 Revision 0 Class III T1005 Startup Test Specifications (final)

EPU500940 EPU 524612 - 2/1/03 Project Task Report Quinn GE EPU 524649 GE-NE-0000-0011-4860-01 Revision 0 Class III T1005 Startup Test Specifications (final)

EPU500946 EPU 525302 - 7/30/01 CPPU LTR Startup GE EPU 525306 Test Specifications Summary EPU500947 EPU 525307 - 7/19/01 Constant Pressure GE EPU 525325 Power Uprate LTR Startup Test Evaluation EPU500958 EPU 526429 - 7/19/01 Constant Pressure GE EPU 526447 Power Uprate LTR Startup Test Evaluation EPU500961 EPU 526520 - 2/1/03 Project Task Report Quinn GE EPU 526557 Task T1005 Startup Test Specifications

EPU500962 EPU 526558 - 2/1/03 Project Task Report Quinn GE EPU 526595 Task T1005 Startup Test Specifications EPU500963 EPU 526596 - 2/1/03 Project Task Report Quinn GE EPU 526633 Task T1005 Startup Test Specifications EPU500993 EPU 530519 - 1/1/203 Circulating Water Yasi S&W EPU 530540 System including Condenser and Cooling Tower T0703 T0605 WBS WBS 1.4.1.5 PUSAR Section 6.4.2 & 7.2 ER Draft B

EPU500997 EPU 530692 - 8/20/03 EPU Task Scoping LeFran- S&W EPU 530693 Document/Task cois; Report Comment Rainey; Form 1.4.3.1 Jonasch; Service Water Edwards; Breite EPU500998 EPU 530694 - 10/1/03 VYNPS CPPU & GE EPU 530707 MELLLA+ Startup Test Specifications (T1005)

EPU501001 EPU 530710 - 11/1/02 Task Scoping GE EPU 530718 Document T1005 (Startup Test Specification)

EPU501002 EPU 530719 - 7/1/03 Project Task Report Niggel GE EPU 530753 Task Rev 0 T0900:

Transient Analysis FTR WIP EPU501005 EPU 530996 - 2/1/03 Project Task Report Quinn; GE EPU 531033 - T1005 (Startup Copp Test Specification) 3 While it appears to be incorrect, this is the date provided in the privilege log.

EPU501006 EPU 531034 - 4/1/01 Technical Design Eckert; GE EPU 531089 Procedure - Loss of Liffen-FW flow Long-Term gren; Transient Analysis - Diaz-Rev. 1 Quiroz EPU501007 EPU 531090 - 7/1/03 Task T0900: Niggle; GE EPU 531124 Transient Analysis; Hicks FTR WIP EPU501008 EPU 531125 - 1/1/204

Title:

VYNPS CPPU GE EPU 531138 & MELLLA+ Startup Test Specifications (T1005)

EPU501016 EPU 531150 - (Attachments Re ID GE EPU 531187 # 13051 and 10361)

VY EPU T1005, Startup Test Specification, Proposed DTR Comments Resolutions & a marked-up draft of the T1005 FTR with those proposed comment resolutions EPU501018 EPU 531188 - (Attachment is ID# GE EPU 531225 10362) UPDATED VY CPPU T1005 -

Draft B of FTR.

Email Quinn to Jacobs 2/26/03. Att.

Is VY CPPU T1005 FTR Rev Draft B -

02-26-03.pdf 4

See note 3.

EPU501020 EPU 531226 - (Attachment is ID# GE EPU 531263 10362) UPDATED VY CPPU T1005 -

Draft B of FTR.

Email Quinn to Jacobs 2/26/03. Att.

Is VY CPPU T1005 FTR Rev Draft B -

02-26-03.pdf EPU501022 EPU 531264 -

Subject:

EPU DTR GE EPU 531297 T0900 Transient Analysis; Attached is EPU Draft Task Report 0900 for your review. Also attached are comment review forms and the DTR Review Checklist.

EPU501026 EPU 531298 - RE: EPU DTR GE EPU 531331 0900, attached; EPU501030 EPU 531332 - Please review the GE EPU 531339 attached EPU FTR WIP 0900 and comment responses from GE.

EPU501031 EPU 531340 - Please review the GE EPU 531374 attached EPU FTR WIP 0900 and comment responses from GE.

EPU501033 EPU 531375 -

Subject:

FW: VY GE EPU 531382 EPU T0900 Comment Resolution; No comments; EPU501034 EPU 531383 -

Subject:

FW: VY GE EPU 531417 EPU T0900 Comment Resolution; No comments;

EPU501036 EPU 531418 - VY EPU T0900 GE EPU 531425 Comment Resolution EPU501037 EPU 531426 - VY EPU T0900 GE EPU 531460 Comment Resolution EPU501039 EPU 531461 - Subject RE: VY GE EPU 531469 EPU T0900 Comment Matrix Reloaded; docs attached EPU501040 EPU 531470 - Subject RE: VY GE EPU 531504 EPU T0900 Comment Matrix Reloaded; docs attached EPU501042 EPU 531505 - E-mail attaching VY GE EPU 531516 EPU T0900 Comment Matrix and Project Task Report Task 0900:

Transient Analysis EPU501043 EPU 531517 - E-mail attaching VY GE EPU 531551 EPU T0900 Comment Matrix and Project Task Report Task 0900:

Transient Analysis EPU501045 EPU 531552 - VY EPU T0900 GE EPU 531563 Comment Matrix Reloaded EPU501046 EPU 531564 - VY EPU T0900 GE EPU 531598 Comment Matrix Reloaded EPU501048 EPU 531599 -

Subject:

FW: VY GE EPU 531607 EPU T0900 Comment Matrix Reloaded;

EPU501049 EPU 531608 -

Subject:

FW: VY GE EPU 531642 EPU T0900 Comment Matrix Reloaded; EPU501052 EPU 531647 - FW: PUSAR 6.4 & GE EPU 531648 6.4.5 SW & ACS DRAFT A WBS 1.4.3.1 EPU501054 EPU 531649 - VYNPS EPU - GE EPU 531653 Summary of Original Startup Test Specs and Generic CPPU Evaluations EPU501055 EPU 531654 - VYNPS EPU - GE EPU 531672 Summary of Original Startup Test Specs and Generic CPPU Evaluations EPU501057 EPU 531675 -

Subject:

VYNPS GE EPU 531679 EPU - Summary of Original Startup Test Specs and Generic CPPU Evaluations.

Attached are CPPU LTR Startup Test Specs. Summary &

CPPU LTR Startup Test Evaluation.

EPU501058 EPU 531680 -

Subject:

VYNPS GE EPU 531698 EPU - Summary of Original Startup Test Specs and Generic CPPU Evaluations.

Attached are CPPU LTR Startup Test Specs. Summary &

CPPU LTR Startup Test Evaluation.

EPU501075 EPU 532444 - CW/Cond ER S&W EPU 532465 Comment Responses (attachments are ID# 7632 and 7633)

Circ Water, Condenser, Cooling tower evaluation EPU501079 EPU 532467 - FW: PUSAR GE EPU532467 Comment Section 10.4, Testing EPU501081 EPU 532468 - FW: PUSAR GE EPU 532468 Comment Section 10.4, Testing EPU501091 EPU 532930 - (Attachments are S&W EPU 532931 ID#s 2582, 2583, 2584) email from Manny Bandeira to VY containing Service Water Information EPU501093 EPU 532932 - (Attachments are S&W EPU 532933 ID#s 2582, 2583, 2584) email from Manny Bandeira to VY containing Service Water Information EPU501094 EPU 532934 - (Attachments are S&W EPU 532982 ID#s 2582, 2583, 2584) email from Manny Bandeira to VY containing Service Water Information EPU501096 EPU 532983 - (Attachments are S&W EPU 533035 ID#s 2588, 2589, 2590, 2592, 2593, 2594) Service Water ER and PUSAR documentation -

Final

EPU501097 EPU 533036 - (Attachments are GE EPU 533038 ID#s 2588, 2589, 2590, 2592, 2593, 2594) Service Water ER and PUSAR documentation -

Final EPU501115 EPU 533341 - VYNPS CPPU & GE EPU 533354 MELLLA+ Startup Test Specifications (T1005)

EPU501117 EPU 533355 - Latest and Greatest GE EPU 533368 VY CPPU Transient Testing Evaluation; VYNPS CPPU &

MELLLA+ Startup Test Specifications (T1005)

EPU501119 EPU 533369 -

Subject:

RE: GE EPU 533372 Transient Selection Review; A review of the fuel cycle indicates that there is not enough rod density at MOC to support MOC limits EPU501170 EPU 533373 - 1/1/00 LICENSING Ander- GE EPU 533706 TOPICAL REPORT son;

- TRACG Cheung; QUALIFICATION Heck; Kleb-anov; Shaug; Shiralkar