1 See NRC Staff Answer to Entergys Motion for Protective Order Governing Access to and Disclosure of Trade Secrets and Confidential Commercial or Financial Information dated January 19, 2005 (Staff Answer).
2 See Entergys Proprietary Privileged Document Log, dated March 31, 2005.
April 14, 2005 Jay E. Silberg, Esq.
Pillsbury Winthrop Shaw Pittman, LLP 2300 N St., NW Washington, DC 20037-1128 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.
(Vermont Yankee Nuclear Power Station)
Docket No. 50-271-OLA
Dear Mr. Silberg:
In the Protective Order Governing Non-Disclosure of Proprietary Information issued on March 1, 2005, in the captioned proceeding, the Licensing Board stated (at 4 n.7):
This order, and the good faith representation and designation of documents as Proprietary Documents by counsel for Entergy, serves in lieu of the requirement for marking and for an affidavit under 10 C.F.R. § 2.390(b) and allows the Staff to receive Proprietary Documents and to protect their confidentiality under [the Freedom of Information Act]. However, the Staff is not obligated to participate in this order or to obtain Proprietary Documents hereunder. The Staff may instead access the documents under the compromise position approach specified in the Staff Answer at 5,[1] or in any other way that Entergy and the Staff agree is appropriate.
We have reviewed Entergys Proprietary Privileged Document Log2 and have identified several documents relating to NEC Contentions 3 and 4 that we would like to access pursuant to the compromise position set forth in the Staff Answer, at 5. Specifically, the Staff requests Jay E. Silberg, Esq.
that the documents listed in the attachment to this letter be provided to Staff counsel pursuant to the procedures of 10 C.F.R. § 2.390.
Please contact me if you have any questions regarding this request.
Sincerely,
/RA/
Brooke D. Poole Counsel for NRC Staff
Attachment Proprietary Documents Relevant to NEC Contentions 3 and 4 Identified in Entergys Privileged Document Log and Requested for Production by the NRC Staff - April 14, 2005 Document ID Bates Number Date Document Title To From Company EPU500931 EPU 523483 -
EPU 523501 7/19/01 Constant Pressure Power Uprate LTR Startup Test Evaluation GE EPU500938 EPU 524536 -
EPU 524573 2/1/03 Project Task Report GE-NE-0000-0011-4860-01 Revision 0 Class III T1005 Startup Test Specifications (final)
Quinn GE EPU500939 EPU 524574 -
EPU 524611 2/1/03 Project Task Report GE-NE-0000-0011-4860-01 Revision 0 Class III T1005 Startup Test Specifications (final)
Quinn GE EPU500940 EPU 524612 -
EPU 524649 2/1/03 Project Task Report GE-NE-0000-0011-4860-01 Revision 0 Class III T1005 Startup Test Specifications (final)
Quinn GE EPU500946 EPU 525302 -
EPU 525306 7/30/01 CPPU LTR Startup Test Specifications Summary GE EPU500947 EPU 525307 -
EPU 525325 7/19/01 Constant Pressure Power Uprate LTR Startup Test Evaluation GE EPU500958 EPU 526429 -
EPU 526447 7/19/01 Constant Pressure Power Uprate LTR Startup Test Evaluation GE EPU500961 EPU 526520 -
EPU 526557 2/1/03 Project Task Report Task T1005 Startup Test Specifications Quinn GE 3 While it appears to be incorrect, this is the date provided in the privilege log.
EPU500962 EPU 526558 -
EPU 526595 2/1/03 Project Task Report Task T1005 Startup Test Specifications Quinn GE EPU500963 EPU 526596 -
EPU 526633 2/1/03 Project Task Report Task T1005 Startup Test Specifications Quinn GE EPU500993 EPU 530519 -
EPU 530540 1/1/203 Circulating Water System including Condenser and Cooling Tower T0703 T0605 WBS WBS 1.4.1.5 PUSAR Section 6.4.2 & 7.2 ER Draft B
Yasi S&W EPU500997 EPU 530692 -
EPU 530693 8/20/03 EPU Task Scoping Document/Task Report Comment Form 1.4.3.1 Service Water LeFran-cois; Rainey; Jonasch; Edwards; Breite S&W EPU500998 EPU 530694 -
EPU 530707 10/1/03 VYNPS CPPU &
MELLLA+ Startup Test Specifications (T1005)
EPU 530718 11/1/02 Task Scoping Document T1005 (Startup Test Specification)
EPU 530753 7/1/03 Project Task Report Task Rev 0 T0900:
Transient Analysis FTR WIP Niggel GE EPU501005 EPU 530996 -
EPU 531033 2/1/03 Project Task Report
- T1005 (Startup Test Specification)
Quinn; Copp GE 4 See note 3.
EPU501006 EPU 531034 -
EPU 531089 4/1/01 Technical Design Procedure - Loss of FW flow Long-Term Transient Analysis -
Rev. 1 Eckert; Liffen-gren; Diaz-Quiroz GE EPU501007 EPU 531090 -
EPU 531124 7/1/03 Task T0900:
Transient Analysis; FTR WIP Niggle; Hicks GE EPU501008 EPU 531125 -
EPU 531138 1/1/204
Title:
VYNPS CPPU
& MELLLA+ Startup Test Specifications (T1005)
EPU 531187 (Attachments Re ID
- 13051 and 10361)
VY EPU T1005, Startup Test Specification, Proposed DTR Comments Resolutions & a marked-up draft of the T1005 FTR with those proposed comment resolutions GE EPU501018 EPU 531188 -
EPU 531225 (Attachment is ID#
10362) UPDATED VY CPPU T1005 -
Draft B of FTR.
Email Quinn to Jacobs 2/26/03. Att.
Is VY CPPU T1005 FTR Rev Draft B -
02-26-03.pdf GE EPU501020 EPU 531226 -
EPU 531263 (Attachment is ID#
10362) UPDATED VY CPPU T1005 -
Draft B of FTR.
Email Quinn to Jacobs 2/26/03. Att.
Is VY CPPU T1005 FTR Rev Draft B -
02-26-03.pdf GE EPU501022 EPU 531264 -
EPU 531297
Subject:
EPU DTR T0900 Transient Analysis; Attached is EPU Draft Task Report 0900 for your review. Also attached are comment review forms and the DTR Review Checklist.
EPU 531331 RE: EPU DTR 0900, attached; GE EPU501030 EPU 531332 -
EPU 531339 Please review the attached EPU FTR WIP 0900 and comment responses from GE.
EPU 531374 Please review the attached EPU FTR WIP 0900 and comment responses from GE.
EPU 531382
Subject:
FW: VY EPU T0900 Comment Resolution; No comments; GE EPU501034 EPU 531383 -
EPU 531417
Subject:
FW: VY EPU T0900 Comment Resolution; No comments; GE EPU501036 EPU 531418 -
EPU 531425 VY EPU T0900 Comment Resolution GE EPU501037 EPU 531426 -
EPU 531460 VY EPU T0900 Comment Resolution GE EPU501039 EPU 531461 -
EPU 531469 Subject RE: VY EPU T0900 Comment Matrix Reloaded; docs attached GE EPU501040 EPU 531470 -
EPU 531504 Subject RE: VY EPU T0900 Comment Matrix Reloaded; docs attached GE EPU501042 EPU 531505 -
EPU 531516 E-mail attaching VY EPU T0900 Comment Matrix and Project Task Report Task 0900:
Transient Analysis GE EPU501043 EPU 531517 -
EPU 531551 E-mail attaching VY EPU T0900 Comment Matrix and Project Task Report Task 0900:
Transient Analysis GE EPU501045 EPU 531552 -
EPU 531563 VY EPU T0900 Comment Matrix Reloaded GE EPU501046 EPU 531564 -
EPU 531598 VY EPU T0900 Comment Matrix Reloaded GE EPU501048 EPU 531599 -
EPU 531607
Subject:
FW: VY EPU T0900 Comment Matrix Reloaded; GE EPU501049 EPU 531608 -
EPU 531642
Subject:
FW: VY EPU T0900 Comment Matrix Reloaded; GE EPU501052 EPU 531647 -
EPU 531648 FW: PUSAR 6.4 &
6.4.5 SW & ACS DRAFT A WBS 1.4.3.1 GE EPU501054 EPU 531649 -
Summary of Original Startup Test Specs and Generic CPPU Evaluations GE EPU501055 EPU 531654 -
Summary of Original Startup Test Specs and Generic CPPU Evaluations GE EPU501057 EPU 531675 -
EPU 531679
Subject:
VYNPS EPU - Summary of Original Startup Test Specs and Generic CPPU Evaluations.
Attached are CPPU LTR Startup Test Specs. Summary &
CPPU LTR Startup Test Evaluation.
EPU 531698
Subject:
VYNPS EPU - Summary of Original Startup Test Specs and Generic CPPU Evaluations.
Attached are CPPU LTR Startup Test Specs. Summary &
CPPU LTR Startup Test Evaluation.
EPU 532465 CW/Cond ER Comment Responses (attachments are ID# 7632 and 7633)
Circ Water, Condenser, Cooling tower evaluation S&W EPU501079 EPU 532467 -
EPU532467 FW: PUSAR Comment Section 10.4, Testing GE EPU501081 EPU 532468 -
EPU 532468 FW: PUSAR Comment Section 10.4, Testing GE EPU501091 EPU 532930 -
EPU 532931 (Attachments are ID#s 2582, 2583, 2584) email from Manny Bandeira to VY containing Service Water Information S&W EPU501093 EPU 532932 -
EPU 532933 (Attachments are ID#s 2582, 2583, 2584) email from Manny Bandeira to VY containing Service Water Information S&W EPU501094 EPU 532934 -
EPU 532982 (Attachments are ID#s 2582, 2583, 2584) email from Manny Bandeira to VY containing Service Water Information S&W EPU501096 EPU 532983 -
EPU 533035 (Attachments are ID#s 2588, 2589, 2590, 2592, 2593, 2594) Service Water ER and PUSAR documentation -
Final S&W EPU501097 EPU 533036 -
EPU 533038 (Attachments are ID#s 2588, 2589, 2590, 2592, 2593, 2594) Service Water ER and PUSAR documentation -
Final GE EPU501115 EPU 533341 -
MELLLA+ Startup Test Specifications (T1005)
EPU 533368 Latest and Greatest VY CPPU Transient Testing Evaluation; VYNPS CPPU &
MELLLA+ Startup Test Specifications (T1005)
EPU 533372
Subject:
RE:
Transient Selection Review; A review of the fuel cycle indicates that there is not enough rod density at MOC to support MOC limits GE EPU501170 EPU 533373 -
EPU 533706 1/1/00 LICENSING TOPICAL REPORT
- TRACG QUALIFICATION Ander-son; Cheung; Heck; Kleb-anov; Shaug; Shiralkar GE