Vermont Yankee - Letter from Brooke D. Poole to Jay E. Silberg Requesting Proprietary Documents from Entergy'S Sixth Supplemental Disclosure
ML051780349
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 06/24/2005
From: Poole B
NRC/OGC
To: Silberg J
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee, Pillsbury, Winthrop, Shaw, Pittman, LLP
Poole B
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 10211
Download: ML051780349 (2)


Text

June 24, 2005 Jay E. Silberg, Esq.

Pillsbury Winthrop Shaw Pittman, LLP 2300 N St., NW Washington, DC 20037-1128 In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.

(Vermont Yankee Nuclear Power Station)

Docket No. 50-271-OLA

Dear Mr. Silberg:

We have reviewed the proprietary document log provided with Entergys supplemental disclosures of June 15, 2005. We have identified four additional documents relating to DPS Contentions 1 and 2 that we would like to access pursuant to the compromise position set forth in the NRC Staff Answer to Entergys Motion for Protective Order Governing Access to and Disclosure of Trade Secrets and Confidential Commercial or Financial Information, dated January 19, 2005. Specifically, the Staff requests that the documents listed in the attachment to this letter be provided to Staff counsel pursuant to the procedures of 10 C.F.R. § 2.390.

Please contact me at (301) 415-1556 if you have any questions regarding this request.

Sincerely,

/RA/

Brooke D. Poole Counsel for NRC Staff

Attachment Proprietary Documents Identified in Entergys Privileged Document Log and Requested for Production by the NRC Staff - June 24, 2005 Document ID Bates Number Document Title Company EPU004702 EPU 114980 - (Task Report T0400): GE-NE-0000-0011- GE EPU 114998 1167-01 T0400 Containment Response.

Includes GE proprietary assumptions methodology and results for Containment System Responses EPU004705 EPU 114999 - GE Transmittal letter for the Intermediate GE EPU 115000 EPU Power Level Operation with Nominal Dome Pressure at LPU Conditions. Includes GE proprietary assumptions and methodology concerning bounding conditions for EPU evaluations.

EPU004706 EPU 115001 - Project Task Report T0902: Anticipated GE EPU 115052 Transients Without Scram. Includes GE proprietary calculations and assumptions for ATWS analysis.

EPU004707 EPU 115053 - Project Task Report VYNPS Containment GE EPU 115080 Pressure/Suppression Pool Temperature Response during ATWS for NPSH Evaluation. Includes GE proprietary methodology assumptions and calculational results for containment pressure and suppression pool temperature during an ATWS.