ML120650203

From kanterella
Revision as of 17:17, 4 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
EOC Report 22
ML120650203
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/05/2012
From:
NRC/RGN-II
To:
Shared Package
ML120650169 List:
References
Download: ML120650203 (1)


Text

Inspection / Activity Plan Page 1 of 1 03/05/2012 07:42:41 Report 22 03/01/2012

-06/30/2013 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Crystal River 95001-CR3 95001 SUPPLEMENTAL INSPECTION 1 3 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 04/30/2012 05/04/2012 TI-182-TI-182 BURIED PIPING/TANK - PHASE 1 1 3 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 07/09/2012 07/13/2012 MOD-MODIFICATION INSPECTION 5 3 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/27/2012 08/31/2012 3 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 09/10/2012 09/14/2012 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 4 3 IP Exercise Evaluation 7111401 11/12/2012 11/16/2012 3 IP Emergency Action Level and Emergency Plan Changes 7111404 11/12/2012 11/16/2012 3 IP Performance Indicator Verification 71151 11/12/2012 11/16/2012 PSB1-RP-PUBLIC RADIATION PROTECTION BASELINE 4 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/26/2012 11/30/2012 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/26/2012 11/30/2012 3 IP Radiological Environmental Monitoring Program 71124.07 11/26/2012 11/30/2012 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/26/2012 11/30/2012 3 IP Performance Indicator Verification 71151 11/26/2012 11/30/2012 ISFSI-ISFSI FIRST LOADING CAMPAIGN 2 3 IP Inspec Add Security Measures for Dry Cask Storage at ISFSIs Located Within Protected Area of Op Rctr 2690/008 03/04/2013 03/08/2013 OL EXAM-INITIAL EXAM PREP 6 3 CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES V23379 03/04/2013 03/08/2013 OL EXAM-INITIAL EXAM - WEEK 1 3 3 CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES V23379 03/25/2013 03/29/2013 OL EXAM-INITIAL EXAM - WEEK 2 3 3 CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES V23379 04/01/2013 04/05/2013 CDBI-COMPONENT DESIGN BASES INSPECTION 7 3 IP Component Design Bases Inspection 7111121 05/06/2013 05/10/2013 3 IP Component Design Bases Inspection 7111121 05/20/2013 05/24/2013 3 IP Component Design Bases Inspection 7111121 06/03/2013 06/07/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.