Responds to NRC 811204 Ltr Re Violation & Deviation Noted in IE Insp Repts 50-250/81-28 & 50-251/81-28.Corrective Actions:Matl Accountability Program Will Be Implemented & Safety Evaluation of Spent Fuel Pit Doors Will Be Performed
ML17341A875
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/15/1982
From: UHRIG R E
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17341A874 List:
References
L-82-15, NUDOCS 8202160671
Download: ML17341A875 (8)


See also: IR 05000250/1981028

Text

P.O.BOX 529100 MIAMI, F L 33152 USNFlc REG'ION:I ATLANTA, GEORGIA 8p JAN l8 P l;57 FLORIDA POWER Ss LIGHT COMPANY January 15, 1982 L-82-15 Mr.James P.O'ei 1 ly Regional Administrator, Region II U.S.Nuclear Regulatory

Commission

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr.O'Reilly: Re: Turkey Points Units 3 5 4 Docket Nos.50-250, 50-251 IE In~sectio~nRe

ort 81-28 Florida Power 8 Light Company has reviewed the subject inspection

report and a response is attached.There is no proprietary

information

in the report.Very truly yours, ,z Y~rt E.Uhrig Vice President Advanced Systems 8 Technology

REU/PLP/ras

cc: Harold F.Reis, Esquire 8~02i6O67S

ea020S PDR ADOCK 05000250', 8 PDR PEOPLE...SERVING PEOPLE

~~~~I.pl h 4

1~~ATTACHMENT

RE: TURKEY POINT UNITS 3 5 4 DOCKET NOS.50-250, 50-251 IE INSPECTION

REPORT 81-28 FINDING: Technical Specification 6.8.1 requires the licensee to establi'sh

and implement procedures

that meet the requirements

and recommendations

of ANSI N18.7-1972 and Appendix"A" of Regulatory

Guide 1.33.Contrary to the above, while the reactor head was removed for refueling, the licensee did not implement two procedures

in accordance

with the requirements

of ANSI N18.7-1972.1.Operating Procedure 16200 requires items that could fa'jl into the reactor to be kept off the manipulator

crane and clear of the reactor cavity.On November 17, 1981, miscellaneous, untethered

tools and materials were observed on the manipulator

crane.2.equality Procedure 2.10 requires material accountability

to be applied when misplaced items could be detrimental

to the safety function of a system.On November 17, 1981, a system of material accountability

had not been established

for items entering the refueling area.RESPONSE: 1.FPL concurs with the finding.2.FPL did not previously, interpret equality Procedure 2.10 to require material accountability

to be necessary in the refueling area.3.The immediate problem was resolved when refueling was completed.

4.In order to pr event recurrence, FPL wi 1 1 impl ement a materi al.accountability

program as required by guality Procedure 2.10.5.Full compliance

will be achieved prior to the post steam generator repair fuel loading on Unit 3.(Which is now scheduled for February 20, 1982).FINDING: Paragraph 14.2.1 of the Final Safety Analysis Report states that assumptions

used for a fuel handling accident in the spent fuel pit are conservative

because the auxiliary building doors are closed during movement of spent fuel.Contrary to the above, during fuel handling operations

on November 17, 1981, doors which lead from the spent fuel pit directly to the outside atmosphere

were propped open.

'4l

I.E.INSPECTION

REPORT 81-28 (Continued)

~~Page 2 RESPONSE: FPL will perform a safety evaluation

of the spent fuel pit doors being open during movement of spent fuel.If the safety evaluation

demonstrates

that keeping the doors open during spent fuel movement does not involve any unrevi ewed safety questions, FPL will cunti nue our current practice.If not, we wi 11 modify our current practice to remedy the unreviewed

safety question.The doors will be closed while moving spent fuel into or out of containment

pending completion

of the safety evaluation.

c 4

STATE OF FLORIDA))COUNTY OF DADE)Jack E.Vessely being first, duly sworn, deposes and says: That he is Director of Nuclear Affairs Light Company, the heres.n;of Florida Power&That he has executed the foregoing document;that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized

to execute the document on behalf of said J ck E.Vessely I/S g~Subscribed

and sworn to before me this.<'-'/5 day of 4 n 4 I 4 19~/.,: NO.rgARY,, P,UBLI C r ,State ol Florida and for the County of Dade, My commission

expires: Notary Public, State of Florida at Large My Commhsion Expfrea October 30,-1983 Bonded thru Ma nard Bondin A enc

0 r h~E l