Corrected Copy of Commitment to Perform Guide Tube Wear Surveillance Insp Described in NUREG-0852 Section 4.2.3.1, Per NUREG-0857 Section 4.2.5 Requirement.Commitment Will Be Incorporated Into Next FSAR Amend
ML17297B735
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/06/1982
From: VAN BRUNT E E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: NOVAK T
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0852, RTR-NUREG-0857, RTR-NUREG-852, RTR-NUREG-857 ANPP-21957-WFQ, NUDOCS 8210220394
Download: ML17297B735 (3)


Text

REGULATOR NFORMATION DISTRIBUTION EM (RLDS)'AOCE'SSION NBR;8210220394 DOC~DATE: 82/10/06 NOTARI'ZED:

NO FACIL:STN 50>>.528 Palo Verde Nuclear Station~Unit 1i Arizona Publi AUTH~NAME AUTHOR AFFILIATION VAN BRUNTiE F 6'rizona Public Service Co, REiCIP INAME RECIPIENT AFFILIATION NOVAKp'T~Assistant, Director for Licensi.ng

SUBJECT:

Cor rected copy of commitment to per form'guide~tube wear surveillance insp described in NUREG 0852 Section 4t1I per NUREG 0857 Section 4.2'requirements CommiItment will be incorporated into ne~t PSAR--amends DI'STRI BUTTON CODE t 8001S;COPIES

~RKCEI VED: LTR-/ENCL/SIZE'ITLE:

Licensing'Submi t ta1: PSAR/FSAR Amdts S Related Correspondence NOTES:Standardized implant, DOCKET 05000528 05000528 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERhALt ELD/HDS3 IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/KQB 13 NRR/DK/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DSI/AE8 26 NRR/DSI/CPB 10 NRR/DSI/KTSB 12 NRR/DS I/PSB 19 NRR//RSB 23 L 04 M7'M I 8 EXTERNAL!ACRS 41 DMB/DSS (AMDTS)LPDR 03 NSIC-05 ICOP LES LTTR ENCL 1 0 1 0 i,0 1 0 3 2 1 1 1 1 1 1 1 1 1 1 e0 6 6 1 1 1 1 1 1 RECIPLENT ID CODE/NAME NRR LB3 BC LICLTRAt E~'1 IK FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28.NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DSI/CS8 09 NRR/DSI/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN5 BNL(AMDTS ONLY)FEMA REP DIV'39 NRC PDR 02 NTIS COPIES LTTR ENCL 0 1 1 1 1'3 3 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'2 2 1 1 1 1 1 1 1~TOTAL NUMBER OF COPIES REQUIRED+L~TTR 55 ENCL 49 4 O s lX (QCo)EQIHKÃFP P.Q BQX 2I666'HQENIXi ARIZONA BSQ36 October 6 1982 ANPP-21957

-WFQ/TFQ Mr.Thomas Novak Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Nashington, D.C.20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3 Docket Nos.STN-50-528/529/530 File: 82-056-026; G.1.01.10 CORRECTED COPY 4

References:

(A)NUREG-0857,"Safety Evaluation Report related.to the operation of the Palo Verde Nuclear Generating Station Units, 1, 2 and 3,"'date'd Novemb'er,1981.(B)NUREG-0852,"Safety Evaluation Report related to the Final Design Approval of the Combustion Engineering Standard Nuclear Steam Supply'System", dated, November, 1981

Dear Mr.Novak:

Section 4.2.5 of Reference (A), requires the first CESSAR System 80 applicant, PVNGS Unit 1, commit to performing the Guide Tube Surveillance Program described in Reference (B), Section 4.2.3.1.Our commitment to this item will be as follows: Ne will perform the Guide Tube Near Surveillance inspection on representative bundles of the first reload of Unit 1.If, following this inspection, no significant Guide Tube wear is observed, no subsequent inspections for Guide Tube wear will be conducted.

If, on the other hand, significant Guide Tube arrear is observed, we will perform the inspection at the next reload and eval-uate action to be taken to eliminate the problem, as well as future inspec-tion programs.This commitment will be incorporated into the PVNGS FSAR in an upcoming amendment.

Please contact me if you have any questions on this matter.Very trul you s, c~'l~82>om0i9O sa1O0S PDR ADOCK 05000528 PDR E.E.Van Brunt, Jr.APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/TFQ/sp DISTRIBUTION E.Licitra L.Bernabei P.L.Hourihan R.Meyer A.C.Gehr bcc: G.C.Andognini J.E.Kirby J.M.Allen A.'.Rogers J.Vorees lV.F.Quinn R.1(.Kramer S.R.Frost hf.D.Holohan C.Ferguson W.G.Binham G.F.Kopchinsl'i