ML17298B730

From kanterella
Revision as of 12:39, 15 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised Final Draft Tech Specs Table 3.3-7 Re Seismic Monitoring Instrumentation.Certifies That Tech Specs Accurately Reflect Plant,Fsar & SER Analysis
ML17298B730
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/26/1984
From: VAN BRUNT E E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: KNIGHTON G W
Office of Nuclear Reactor Regulation
Shared Package
ML17298B731 List:
References
ANPP-31570-WFQ, NUDOCS 8412280142
Download: ML17298B730 (8)


Text

REGULATORY NFORMATION DISTRIBUTION SALEM (RIDS)ACCESSION NBR:8412280142 DOC,DATE: 84/12/26 NOTARIZED:

YES DOCKET 0 FACIL:STN-50-528 Palo Verde Nuclear Station~Unit 1~Arizona Publi 05000528 AUTH, NAME AUTHOR AFFILIATION VAN BRUNTiE.E, Arizona Public Service Co, RECIP~NAME RECIPIENT AFFILIATION KNIGHTONg G e ll, Licensing Branch 3

SUBJECT:

Forwards revised final draft Tech Specs Table 3,3-7 re seismic monitoring instrumentationCertifies that Tech Specs accurately reflect plantiFSAR 8 SER analysis.DISTRIBUTION CODE: 8001D COPIES RECEIVED:LTR f ENCL f.SIZE:~" 4 TITLE;Licensing Submittal:

PSAR/FSAR Amdts 8, Related Correspondence NOTES;Standardized plant.05000528 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL;ACRS 41 ELD/HDS3 IE/DEPER/EPB 36 NRR ROEpM~L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/I CSB 16 NRR/DSI/PSB 19 NRR/DSI/RS8 23 RGN5 EXTERNAL: BNL(AMDTS ONLY)FEMA REP DI V 39 NRCPDR 0?NTIS COPIES LTTR ENCL 1 0 1 0 6 6 1 0 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1-1 1 1 3 3 RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAeE 01 ADM/LFMB IE F ILE IE/DQASIP/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DS I/CSB 09 NRR/DS I/METB 12 NRR DSI/RAB 22 04 RM/DAMI/MIB DMB/DSS (AMDTS)LPDR 03 NSIC 05 PNL GRUELgR COPIES LTTR ENCL'0 1 1 1 0 1 1 1 1 1 0 1 1 2 2 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 53 ENCL'5 I 1 I C-I II ll Eq ll ll jl Arizona Public Service Company Director of Nuclear Reactor Regulation Attention:

Mr.George W.Knighton, Chief Licensing Branch No.3 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 December 26, 1984 ANPP-31570 WF()/SRF

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Unit 1 Docket No.STN-50-528 PVNGS Unit 1 Final Draft Technical Specifications File: 005-419.05

References:

(A)NRC letter dated August 14, 1984, from G.W.Knighton, NRC, to E.E.Van Brunt, Jr., APS.(B)APS l.etter dated September 14, 1984, from E.E.Van Brunt, Jr., APS, to G.W.Knighton, NRC.(C)NRC letter dated November 28, 1984, from G.W.Knighton, NRC, to E.E.Van Brunt, Jr., APS.(D)APS letter dated December 3, 1984, from E.E.Van Brunt, Jr., APS, to G.W.Knighton, NRC.

Dear Mr.Knighton:

The purpose of this letter is to provide our certification of the PVNGS"Final Draft" Technical Specifications dated December 21, 1984.The above referenced letters provide the documentation of the process, proposed changes and negotiated changes as agreed upon by the NRC and APS in developing the PVNGS Technical Specifications.

In performing our final review using the December 21, 1984"Final Draft" Technical Specifications, we found one item that needs to be changed.On Page 3/4 3-43 Item 3a and b, setpoints are reversed and need to be changed.(See attached).

Upon completion of this change, I certify that to the best of my knowledge, the December 21, 1984"Final Draft" Technical Specifications accurately reflect the plant, the FSAR and the SER analysis.cz osooosa8 Hosea 841226 pDR ADO pDR~A EEVBJr/SRF/no Attachments cc: E.A.Licitra G.Fiorelli J.B.Martin A.C.Gehr R.P.Zimmerman Very truly your , F.$Qcu~nLLA E.E.Van Brunt, Jr.APS Vice President Nuclear Production ANPP Project Director gol C!H 1 December 26, 1984 ANPP-31570 STATE OF ARIZONA))ss.COUNTY OF NARICOPA)I, Edwin E.Van Brunt, Jr., represent that I am Vice President, Nuclear Production of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.Edwin E.Van Brunt, Jr.Sworn to before me this~day of 1984.iotary Public key.,Commission Expires: My Comralssion Expires April 6, 1987/~g~'

I ,I ll I'W t%O o4 o~t)I o g'I'Pg"~'l,y~p' Mr.'eorge PVNGS Unit ANPP-31570 Page 2 bcc: T.G.D.B.A.C.E.C,.W.E.B.F.D.W.W.F.S.R.K.W.J.R.J.E.J.M.D.B.J.G.D.R.R.K.O.J.W.Knighton 1 Final Draft Technical Specifications Woods Karner Rogers Sterling Ide Godwin Holmes Quinn Frost Gross Bynum Kirby Allen Fasnacht Sel f Canady Nelson Zeringue 0't II il I Cr I(