MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] Category:TEST REPORT
MONTHYEARML18102B3491997-05-28028 May 1997 Readiness for Restart,Overview of Key Initiatives. ML18096B0061992-09-0303 September 1992 Test Rept A28173 for Project, Fuel Oil Spills,Crane & Filter. ML18096B0051992-09-0303 September 1992 Test Rept A28173 for Project, Fuel Oil Spills,Crane & Filter. ML18096A9091992-06-28028 June 1992 Suppl to Test Rept A27611, Well House 5 Spill. ML18096A7991992-06-23023 June 1992 Reactor Containment Bldg Integrated Leak Rate Test. ML18096A9081992-06-12012 June 1992 Test Rept A27611, Well House 5 Spill. ML18096A1231991-07-0303 July 1991 Ninety-Day Containment Integrated Leak Rate Test Rept Ninth Refueling Outage Salem Generating Station Unit 1. W/910703 Ltr ML20059E7901990-01-22022 January 1990 ASTM E-72 Load Testing of 2-h Solid Stud Wall ML18093A7671987-12-31031 December 1987 Reactor Containment Bldg Third/Final Inservice Integrated Leak Rate Test,First 10-Yr Insp Interval & Type B & C Surveillance Tests. ML18092B4611987-03-13013 March 1987 Second Inservice Integrated Leak Rate Test & Type B & C Surveillance Test, Rept for Nov 1986 ML20215E4621986-11-30030 November 1986 Voltage Study for Split Group Bus Configuration ML18092A3701984-08-31031 August 1984 Reactor Containment Bldg Second Inservice Integrated Leak Rate Test & Types B & C Surveillance Test. ML20094G5731984-07-30030 July 1984 Revised Pages 6 & 7 to Salem,Unit 2 Cycle 2 Startup Test Rept ML18092A2101984-05-15015 May 1984 Cycle 2 Startup Test Rept. W/840613 Ltr ML18094A4091984-04-13013 April 1984 Simulated 40-Yr Svc Life Test for PSA-3 Shock Arrestor W/2 to 3% Friction. ML20081C3751983-09-15015 September 1983 Rept of Exams,Insps & Tests Conducted During 1983 First Refueling of Salem 2 ML18089A3291983-08-22022 August 1983 Cycle 5,Startup Test Rept. W/830822 Ltr ML18089A1791983-06-0303 June 1983 Analysis of Valve/Operator Interface Hardware for Containment Pressure & Vacuum Relief Valves 1 & 2 VC 5. ML18089A4221983-05-31031 May 1983 Reactor Containment Bldg First Inservice Integrated Leak Rate Test & Type B & C Surveillance Test. ML18086B6141982-08-0303 August 1982 Cycle 4 Startup Test Rept. ML18086B3431982-01-31031 January 1982 X 17 Fuel Assembly Guide Thimble Tube Wear Exam Rept. ML20040E7921982-01-29029 January 1982 Startup Test Rept,Part 2. ML18086B1381981-12-0303 December 1981 Feedwater Hammer Test,Number 21 Feedwater Piping,Salem Generating Station. ML18086A9971981-08-14014 August 1981 Steam Driven Auxiliary Feed Pump Endurance Test, Special Tests 21,22 & 23 ML18086A8381981-07-31031 July 1981 Tech Specs 3/4.6.3 for Containment Sys ML18086A3571981-04-28028 April 1981 Startup Test Rept. ML18086A2671981-04-0909 April 1981 Cycle 3,Startup Test Rept. ML18086B2731981-01-31031 January 1981 Experimental Evaluation of Flow Patterns in RHR Sump W/ Simulation of Screen Blockage Salem Nuclear Generating Station. ML18082B1711980-09-0808 September 1980 Natural Circulation Tests. ML19329F9951980-07-0808 July 1980 Addendum to Rept for Reactor Containment Integrated Leak Rate Test First Retest - Aug 1979. ML18082A2951980-05-0101 May 1980 Cycle 2 Startup Test Rept. ML18082A1491980-04-0303 April 1980 Refueling Water Storage Tank Vortex Test. ML18082A1221979-08-31031 August 1979 Reactor Containment Integrated Leak Rate Test,First Retest - Aug 1979. ML18079A7931979-08-0808 August 1979 Corrected Startup Test Power Coefficients for Cycle 2 Reload Originally Submitted 790803 ML20114E8611979-05-17017 May 1979 Qualification of Electrical Connection Terminal Blocks/Junction Boxes in Containment Environ of LOCA or Steam Line Break Accident ML18078B1611979-02-26026 February 1979 Structural Integrity Test of Containment. ML18078A9801979-02-0808 February 1979 Qualification Tests of Solenoid Valves by Environ Exposure to Elevated Temp,Radiation,Seismic Simulation,Vibration Endurance,Accident Radiation & LOCA Simulation ML18078A9811978-09-0505 September 1978 Namco EA-180 Limit Switch Qualification Rept. ML20210T4841977-09-29029 September 1977 Startup Test Rept ML18086A8371975-10-24024 October 1975 Seismic Vibration of (1)10 Inch,(1)20 Inch & (1)36 Inch Butterfly Valves for Masoneilan Intl,Inc. 1997-05-28
[Table view] |
Text
'. CONTAINMENT SYSTEMS 3/4.6.3 CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3 The containment.isolation valves specified in Table 3.6-1 shall be OPERABLE with isolation times as shown in Table 3.6-1. APPLICABILITY:
MODES 1, 2, 3 and 4. ACTION: With one or more of the isolation valve(s) specified in Table 3.6-1 inoperable, maintain at least one isolation valve OPERABLE in each affected penetration that*is open and either: a. Restore the inoperable valve(s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or , b. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least *one deactivated automatic valve secured in the isolation position, or c. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve or blind flange; or d. Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. SURVEILLANCE REQUIREMENTS 4.6.3. 1 The isolation valves specified in Table 3.6-1 shall be demonstrated OPERABLE prior to. returning the valve to service after maintenance, repair or r-. rep 1 acement work is performed on the va 1 ve or its associated actuator, contro 1 or power circuit by performance of a cycling test and verification of isolation time. 3/4 6-14
.. CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.6.3.2 Each isolation valve specified in Table 3.6-1 shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by: a. Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to its isolation position.
- b. Verifying that on a Phase B containment isolation test signal, each Phase B isolation valve actuates to its isolation position.
- c. Verifying that on a feedwater isolation test signal, each feedwater isolation valve actuates to its isolation position.
- d. Verifying that on a Containment Purge and Pressure-Vacuum Relief isolation test signal, each Purge and Pressure-Vacuum Relief valve actuates to its isolation position.
4.6.3.3 At least once per 18 verify that on a main steam isolation test signal, each main steam isolation valve specified in Table 3.6-1 actuates to its-isolation
- 4.6.3.4 The isolation time of each power operated or automatic valve of Table 3.6-1 shall be determined to be within its limit when tested pursuant to , Specification 4.0.5. 4.6.3.5 Each containment purge isolation valve shall be demonstrated OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after each closing of the valve, except. when the valve is being used for multiple cyclings, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying that when the measured leakage rate is added to the leakage rates determined pursuant to Specification 4.6.l.2d.
for all other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60La. SALEM -UNIT 2 3/4 6-15
... .\ tn TABLE 3.6-l (Continued)
- . ,. )> I rn CONTAINMENT ISOLATION .VALVES 3: .1 c I . :z VALVE NUMBER FUNCTION ISOLATION TIME (Seconds) -4 N . c. MAIN STEAM ISOLATION
- l. 21 MS 7# Main Steam Drain lO Sec. 2. 22 MS 7# Main Steam Drain lO Sec. 3. 23 MS 7# Main Steam Drain lO Sec. 4. 24 MS 7# Main Steam Drain lO Sec. e* 5. 21 MS 18# Main Steam Bypass lO Sec. 6. 22 MS 18# Main Steam Bypass lO Sec. 7. 23 MS 18# Main Steam Bypass 10 Sec. 8. 24 MS 18# Main Steam Bypass lO Sec. w 0. FEEOWATER ISOLATION
......... en 1. 21 BF 19# Main Feedwater Isolation 5 Sec. I 2. 22 BF 19# Main Feedwater Isolation 5 Sec . ..... ex> 3. 23 BF 19# Main Feedwater Isolation 5 Sec. 4. 24 BF 19# Main Feedwater Isolation 5 Sec. 5. 21 BF 40# Main Feedwater Isolation 5 sec. 6. 22 BF 40# Main Feedwater Isolation 5 Sec. 7. 23 BF 40# Main Feedwater Isolation 5 Sec. 8. 24 BF 40# Main Feedwater Isolation 5 Sec. E. CONTAINMENT PURGE ANO PRESSURE-VACUUM RELIEF e 2 vc l Purge Supply . 2 Sec. 2 vc 2# Purge Supply 2 Sec. 2 vc 3# Purge Exhaust 2 Sec. 2 vc 4 Purge Exhaust 2 Sec. 2 vc 5* Pressure-Vacuum Relief 2 Sec. 2 vc 6#* Pressure-Vacuum Relief 2 Sec.
,.* SYSTEM YENTlLATlON COHTAINMENT Cyc) 0 I ,,-) DRAWING N0. _
_______ PAGE Page 83 of 91 "'* ,... ' ; M I z VALVE VALVE E-4 REMARKS ..... NUMBER Cl) CATEGORY H (NOT TO BE USED FOR RELIEF BASIS) e § rJ' , H Cl) A B c D E .. lVCl 2 El x 36 BFY A* c 1,3, YES <2 Sec. Cont. Purge -4
- 1VC2 2 El x 36 BFY .A c 1,3 YES e 4 1VC3 2 E2 x 36 BFY A c 1;3 YES 4 1VC4 2 El x 36 BFY A c 1,3, YES <2 Sec. cont. Purge -4 lVCS 2 Dl x 10 .BFY A c 1,3 YES <2 Sec. Cont. Press/Vac.
Relief -4 1VC6 2 Dl x 10 BFY A c 1,3 YES .. 4 1VC7 2 C2 x 0.75 GL A AUTO 1,3, YES <2 -
Cont. Atmos. Sample 4 lVCB 2 Cl x 0.75 GL A AUTO 1,3, YES <2 -Sec. Cont. Atmos. Sample 4 1VC9 2 C2 x 0.75 GL A c 3,4 YES lVClO 2 Cl x 0.75 GL A c 3,4 YES e lVCll 2 B2 x 0.75 GL A AUTO 1,3, YES <2 Sec. Cont. Atmos. Sample -4 1VC12 2 Bl x 0.75 GL A AUTO 1,3, YES <2 Sec. Cont. Atmos. Sample --4 . 1VC13 2 B2 x 0.75 GL A c 3,4 YES 1VC14 2 Bl x 0.75 GL A c 3,4 YES
-. **-* __________
.-....;;;
______ _ *;\ " c lVCl, 1V0 CATEGORY:
A CLASS: 2 FUNCTION:
Containment Isolation for Containment Purqe. TEST REQUIREMENTS:
Leak Rate Testinq less than each 24 months1 Stroke Time Measurement each three months; Fail Safe Testing each three months. BASIS FOR RELIEF: a) Valves are passive durinq PoWer Operation.
These valves cannot be opened during Power Operation per commitment to NRC in LER 50-272/79-55/0lT.
b) Because the safety-related function of these valves is containment isolation, they will be leak tested in accordance with Technical Specifications a.nd lOCFRSO, Appendix J. Thi.a test meets the intent of the ASME B&PV Code,Section XI for cateqory A valves used for containment isolation.
ALTERNATE TESTING: a) valves will be stroke timed and exercised at Cold Shutdown and Refuelinq.
b) Leak Rate Test per Technical Specification 4.6.l.2.d.
@VE: "7vc2, lvci) CATEGORY:
A 2 FUNCTION:
Containment Isolation (inside containment) for Containment Purge. TEST REQUIREMENTS:
Leak Rate Testing*less than 24 months1 Stroke Time Measurement each three months; Fail*safe Testing each three months. BASIS FOR RELIEF: a) These valves are passive during Power Operation.
They cannot be per commitment to NRC in LER 50-272/79-55/0lT.
b) Due to the physical arrangement of these valves, a test in the direction of accident flow is not possible.
Also, because the safety-related function of these valves is containment isolation, they will be leak tested in accordance with Technical Specifications and lOCFRSO, Appendix J. This test meets the intent of the ASME Code,Section XI for category A valves used for containment isolation
- . ALTERNATE TESTING: a) Valves will be stroke timed and exercised during Cold Shutdown and Refueling.
b) They will be tested in the opposite direction of flow when the lVCl and 1VC4 are tested in accordance with Technical Specification 4.6.1.2.d. (VllVE: lvCD CATEGORY:
A CLASS: 2 FUNCTION:
Containment Isolation for Containment Pressure/Vacuum Relief. TEST REQUIREMENTS:
Leak Rate Testing less than each 24 months. BASIS FOR RELIEF: Because the safety-related function of this valve is containment isolation, it will be leak tested in accordance with Technical Specifications and lOCFRSO, Appendix J. This test meets the intent of the ASME B&PV Code,Section XI for category A valves used for containment isolation.
ALTERNATE TESTING:*
Leak Rate Test per .Technical Specification 4.6.1.2.d.
Page 84 of 91 ***-------*-*-----*-*-------------
. --*--. ----------=----------
....
lvcQ CATEGORY:
A { CLASS: 2 ' c:* FUNCTION:
COntaimnent Isolation (inside containment) for Containment Pressure/Vacuum Relief. TEST REQUIREMENTS:
Leak Rate Testing less than 24 months. BASJ:S FOR RELIEF-: Due to the physica1 arrangement of this valve, a test in the direction of accident flow is not possible.
A1so, because the safety-related function of this valve is containment iso1ation, it will be leak tested in accordance with Technical Specifications and lOCFR.50, Appendix J. This test meets the intent of the ASME Bi.PV Code, Section n for category A valves used for tainment isolation.
ALTERNATE TESTJ:NG:
The valve will be*tested in the opposite direction of flow when the lVCS is tested in accordance with Technical Specification 4.6.1.2.d.
VALVE: 1VC7, lVCS, lVCll and 1VC12 CATEGORY:
A CLASS: 2 FUNCTION:
containment Isolation for containment Atmospheric Sampling.
TEST REQUIREMENTS:
Leak Rate Testing less than each 24 months. BASIS FOR RELIEF: Because the safety-related function of these valves is containment isolation, they will be leak tested in accordance with Technical Specifications and lOCFRSO, Appendix J. This test meets the intent of the ASME B&PV Code, Section XJ: for category A valves used for containment isolation.
TESTJ:NG:
Leak ;Rate Test per Technical Specification 4.6.1.2.d.
'* VALVE: 1VC9, lVClO, 1VC13 and 1VC14. CATEGORY:
A CLASS: 2 FUNCTJ:ON:
containment J:solation*for containment Atmospheric Sampling.
TEST REQUIREMENTS:
Leak Rat_e Testing less than each 24 months. BASJ:S FOR RELIEF: These valves are normally closed and are only opened under administrative .control in the event of an accident for containment atmospheric sampling.
Table 3.6-1 excludes _these valves from type c leakage tests. ALTERNATE TESTJ:NG:
None Page BS of 91