Startup Test Program Description Salem Unit 1 Cycle 2 Test Power Coefficient Initial Conditions:
Reactor power is not changing.
The Xenon concentration is within 3% of its equilibrium value.
This test is run twice during the startup program.
First at 50% power, then at 100%.
Test
Description:
Take a heat balance.
Change turbine power be-tween 2% and 4% with the control rods in manual.
The Tavg andilT recorders will monitor changes in these parameters as a function of time.
Acceptance Criteria:
Design:
Design value ~ 30%
FSAR/T.S.
Must fall between upper and lower curve assumed in FSAR accident analysis.