 Issue dateTitleTopic
ML18102B34928 May 1997Readiness for Restart,Overview of Key Initiatives.Safe Shutdown
Commercial Grade Dedication
Temporary Modification
Foreign Material Exclusion
Operability Determination
ML18096B0063 September 1992Test Rept A28173 for Project, Fuel Oil Spills,Crane & Filter.
ML18096B0053 September 1992Test Rept A28173 for Project, Fuel Oil Spills,Crane & Filter.
ML18096A90928 June 1992Suppl to Test Rept A27611, Well House 5 Spill.
ML18096A79923 June 1992Reactor Containment Bldg Integrated Leak Rate Test.
ML18096A90812 June 1992Test Rept A27611, Well House 5 Spill.
ML18096A1233 July 1991Ninety-Day Containment Integrated Leak Rate Test Rept Ninth Refueling Outage Salem Generating Station Unit 1. W/910703 Ltr
ML20059E79022 January 1990ASTM E-72 Load Testing of 2-h Solid Stud Wall
ML18093A76731 December 1987Reactor Containment Bldg Third/Final Inservice Integrated Leak Rate Test,First 10-Yr Insp Interval & Type B & C Surveillance Tests.
ML18092B46113 March 1987Second Inservice Integrated Leak Rate Test & Type B & C Surveillance Test, Rept for Nov 1986
ML20215E46230 November 1986Voltage Study for Split Group Bus Configuration
ML18092A37031 August 1984Reactor Containment Bldg Second Inservice Integrated Leak Rate Test & Types B & C Surveillance Test.
ML20094G57330 July 1984Revised Pages 6 & 7 to Salem,Unit 2 Cycle 2 Startup Test Rept
ML18092A21015 May 1984Cycle 2 Startup Test Rept. W/840613 LtrShutdown Margin
ML18094A40913 April 1984Simulated 40-Yr Svc Life Test for PSA-3 Shock Arrestor W/2 to 3% Friction.
ML20081C37515 September 1983Rept of Exams,Insps & Tests Conducted During 1983 First Refueling of Salem 2
ML18089A32922 August 1983Cycle 5,Startup Test Rept. W/830822 Ltr
ML18089A1793 June 1983Analysis of Valve/Operator Interface Hardware for Containment Pressure & Vacuum Relief Valves 1 & 2 VC 5.
ML18089A42231 May 1983Reactor Containment Bldg First Inservice Integrated Leak Rate Test & Type B & C Surveillance Test.
ML18086B6143 August 1982Cycle 4 Startup Test Rept.Shutdown Margin
ML18086B34331 January 1982X 17 Fuel Assembly Guide Thimble Tube Wear Exam Rept.
ML20040E79229 January 1982Startup Test Rept,Part 2.Boric Acid
Fire Barrier
ML18086B1383 December 1981Feedwater Hammer Test,Number 21 Feedwater Piping,Salem Generating Station.
ML18086A99714 August 1981Steam Driven Auxiliary Feed Pump Endurance Test, Special Tests 21,22 & 23
ML18086A83831 July 1981Tech Specs 3/4.6.3 for Containment SysStroke time
ML18086A35728 April 1981Startup Test Rept.Boric Acid
Shutdown Margin
Emergency Lighting
ML18086A2679 April 1981Cycle 3,Startup Test Rept.Shutdown Margin
ML18086B27331 January 1981Experimental Evaluation of Flow Patterns in RHR Sump W/ Simulation of Screen Blockage Salem Nuclear Generating Station.
ML18082B1718 September 1980Natural Circulation Tests.
ML19329F9958 July 1980Addendum to Rept for Reactor Containment Integrated Leak Rate Test First Retest - Aug 1979.
ML18082A2951 May 1980Cycle 2 Startup Test Rept.Shutdown Margin
Power change
ML18082A1493 April 1980Refueling Water Storage Tank Vortex Test.
ML18082A12231 August 1979Reactor Containment Integrated Leak Rate Test,First Retest - Aug 1979.
ML18079A7938 August 1979Corrected Startup Test Power Coefficients for Cycle 2 Reload Originally Submitted 790803
ML20114E86117 May 1979Qualification of Electrical Connection Terminal Blocks/Junction Boxes in Containment Environ of LOCA or Steam Line Break AccidentBoric Acid
ML18078B16126 February 1979Structural Integrity Test of Containment.
ML18078A9808 February 1979Qualification Tests of Solenoid Valves by Environ Exposure to Elevated Temp,Radiation,Seismic Simulation,Vibration Endurance,Accident Radiation & LOCA Simulation
ML18078A9815 September 1978Namco EA-180 Limit Switch Qualification Rept.
ML20210T48429 September 1977Startup Test Rept
ML18086A83724 October 1975Seismic Vibration of (1)10 Inch,(1)20 Inch & (1)36 Inch Butterfly Valves for Masoneilan Intl,Inc.