Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18102B349 | 28 May 1997 | Readiness for Restart,Overview of Key Initiatives. | Safe Shutdown Commercial Grade Dedication Temporary Modification Foreign Material Exclusion Operability Determination |
ML18096B006 | 3 September 1992 | Test Rept A28173 for Project, Fuel Oil Spills,Crane & Filter. | |
ML18096B005 | 3 September 1992 | Test Rept A28173 for Project, Fuel Oil Spills,Crane & Filter. | |
ML18096A909 | 28 June 1992 | Suppl to Test Rept A27611, Well House 5 Spill. | |
ML18096A799 | 23 June 1992 | Reactor Containment Bldg Integrated Leak Rate Test. | |
ML18096A908 | 12 June 1992 | Test Rept A27611, Well House 5 Spill. | |
ML18096A123 | 3 July 1991 | Ninety-Day Containment Integrated Leak Rate Test Rept Ninth Refueling Outage Salem Generating Station Unit 1. W/910703 Ltr | |
ML20059E790 | 22 January 1990 | ASTM E-72 Load Testing of 2-h Solid Stud Wall | |
ML18093A767 | 31 December 1987 | Reactor Containment Bldg Third/Final Inservice Integrated Leak Rate Test,First 10-Yr Insp Interval & Type B & C Surveillance Tests. | |
ML18092B461 | 13 March 1987 | Second Inservice Integrated Leak Rate Test & Type B & C Surveillance Test, Rept for Nov 1986 | |
ML20215E462 | 30 November 1986 | Voltage Study for Split Group Bus Configuration | |
ML18092A370 | 31 August 1984 | Reactor Containment Bldg Second Inservice Integrated Leak Rate Test & Types B & C Surveillance Test. | |
ML20094G573 | 30 July 1984 | Revised Pages 6 & 7 to Salem,Unit 2 Cycle 2 Startup Test Rept | |
ML18092A210 | 15 May 1984 | Cycle 2 Startup Test Rept. W/840613 Ltr | Shutdown Margin |
ML18094A409 | 13 April 1984 | Simulated 40-Yr Svc Life Test for PSA-3 Shock Arrestor W/2 to 3% Friction. | |
ML20081C375 | 15 September 1983 | Rept of Exams,Insps & Tests Conducted During 1983 First Refueling of Salem 2 | |
ML18089A329 | 22 August 1983 | Cycle 5,Startup Test Rept. W/830822 Ltr | |
ML18089A179 | 3 June 1983 | Analysis of Valve/Operator Interface Hardware for Containment Pressure & Vacuum Relief Valves 1 & 2 VC 5. | |
ML18089A422 | 31 May 1983 | Reactor Containment Bldg First Inservice Integrated Leak Rate Test & Type B & C Surveillance Test. | |
ML18086B614 | 3 August 1982 | Cycle 4 Startup Test Rept. | Shutdown Margin |
ML18086B343 | 31 January 1982 | X 17 Fuel Assembly Guide Thimble Tube Wear Exam Rept. | |
ML20040E792 | 29 January 1982 | Startup Test Rept,Part 2. | Boric Acid Fire Barrier |
ML18086B138 | 3 December 1981 | Feedwater Hammer Test,Number 21 Feedwater Piping,Salem Generating Station. | |
ML18086A997 | 14 August 1981 | Steam Driven Auxiliary Feed Pump Endurance Test, Special Tests 21,22 & 23 | |
ML18086A838 | 31 July 1981 | Tech Specs 3/4.6.3 for Containment Sys | Stroke time |
ML18086A357 | 28 April 1981 | Startup Test Rept. | Boric Acid Shutdown Margin Emergency Lighting |
ML18086A267 | 9 April 1981 | Cycle 3,Startup Test Rept. | Shutdown Margin |
ML18086B273 | 31 January 1981 | Experimental Evaluation of Flow Patterns in RHR Sump W/ Simulation of Screen Blockage Salem Nuclear Generating Station. | |
ML18082B171 | 8 September 1980 | Natural Circulation Tests. | |
ML19329F995 | 8 July 1980 | Addendum to Rept for Reactor Containment Integrated Leak Rate Test First Retest - Aug 1979. | |
ML18082A295 | 1 May 1980 | Cycle 2 Startup Test Rept. | Shutdown Margin Power change |
ML18082A149 | 3 April 1980 | Refueling Water Storage Tank Vortex Test. | |
ML18082A122 | 31 August 1979 | Reactor Containment Integrated Leak Rate Test,First Retest - Aug 1979. | |
ML18079A793 | 8 August 1979 | Corrected Startup Test Power Coefficients for Cycle 2 Reload Originally Submitted 790803 | |
ML20114E861 | 17 May 1979 | Qualification of Electrical Connection Terminal Blocks/Junction Boxes in Containment Environ of LOCA or Steam Line Break Accident | Boric Acid |
ML18078B161 | 26 February 1979 | Structural Integrity Test of Containment. | |
ML18078A980 | 8 February 1979 | Qualification Tests of Solenoid Valves by Environ Exposure to Elevated Temp,Radiation,Seismic Simulation,Vibration Endurance,Accident Radiation & LOCA Simulation | |
ML18078A981 | 5 September 1978 | Namco EA-180 Limit Switch Qualification Rept. | |
ML20210T484 | 29 September 1977 | Startup Test Rept | |
ML18086A837 | 24 October 1975 | Seismic Vibration of (1)10 Inch,(1)20 Inch & (1)36 Inch Butterfly Valves for Masoneilan Intl,Inc. |