ML100070554

From kanterella
Revision as of 17:44, 19 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Kewaunee Power Station 2009 Inservice Inspection Summary Report
ML100070554
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 01/04/2010
From: Price J A
Dominion, Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
09-723
Download: ML100070554 (109)


Text

Dominion Energy Kewaunee, Inc.5000 Dominion Boulevard, Glen Allen, VA 23060 ominion January 4, 2010 ATTN: Document Control Desk Serial No.09-723 U. S. Nuclear Regulatory Commission LIC/NW/RO Washington, DC 20555-0001 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION 2009 INSERVICE INSPECTION

SUMMARY

REPORT As required by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section Xl, 10 CFR 50.55a, and Wisconsin Administrative Code, Department of Commerce, Comm 41.55(3), various inservice inspection (ISI)examinations were performed during the 2009 refueling outage at the Kewaunee Power Station (KPS). The 2009 refueling outage took place from September 26, 2009 through October 22, 2009. This letter transmits the Inservice Inspection Summary Report as required by paragraph IWA-6230 of ASME Section XI.Two separate ASME Section Xl inservice inspection programs are implemented at KPS.One program is for pressure retaining piping/vessels and component supports, and the other program is for the metal containment.

The 2009 refueling outage inservice inspections met the requirements of these two distinct inspection programs as identified below: a. Class 1, Class 2, and Class 3 component inspections were performed for the second inspection outage of the second period of the fourth interval.

These inspections met the requirements of ASME Boiler and Pressure Vessel Code Section XI, 1998 Edition, 2000 Addenda with implementation in accordance with the KPS Fourth Ten-Year Inservice Inspection (ISI) Program 2004-2014.

b. Class MC component inspections were performed for the second inspection outage of the first period of the second interval.

These inspections met the requirements of ASME Boiler and Pressure Vessel Code Section Xl, 2001 Edition, 2003 Addenda with implementation in accordance with the KPS Second Ten-Year Inservice Inspection (ISI) Class MC Program 2006-2016.

The following examinations and tests were performed for Class 1, Class 2, and Class 3 components and their supports:* Reactor vessel upper and lower internals* Pressurizer circumferential and longitudinal welds* Pressurizer surge nozzle to safe end Serial No.09-723 Page 2 of 3* Pressurizer integrally welded attachment

  • Steam generator primary nozzle'to safe end welds o Class 1, Class 2, and Class 3 piping and component supports and hangers* Class 1 and Class 2 steam generator primary manway bolting, pressurizer manway bolting, flange bolting, and valve bonnet bolting* Class 1 and Class 2 preservice of safety injection and residual heat removal piping, supports and gas collection chamber* Letdown heat exchanger circumferential weld and integrally welded attachments o Residual heat exchanger circumferential weld* Seal water injection filter circumferentialweld 0 Class 1 system leakage test o -Class 2 and Class 3 system leakage tests The following items were examined for the Class MC reactor building containment vessel:-Accessible surface areas* Moisture barriers* Bolted connections Hydraulic snubbers were examined as required by KPS Technical Specification 4.14,"Testing and Surveillance of Shock Suppressors (Snubbers)." Documentation summarizing the inservice inspection activities performed during the KPS 2009 refueling outage and associated results is provided in attachments 1-9 of this letter. The final reports for each of these examinations are maintained in the Quality Assurance/Quality Control Records Vault at KPS. Attachment 9 includes Form OAR-i and Form NIS-2A. These forms are submitted in addition to -Forms NIS-1, "Owner's Report for Inservice Inspection Class 1, Class 2 and Class 3 Components for Fourth Ten-Year Interval," and Forms NIS-2, "Owner's Repair/Replacement Activities." It is expected that as KPS approaches the end of the Fourth Ten-Year Interval'and prepares for the Fifth Ten-Year Interval, the site will cease to submit Forms NIS-1 and NIS-2.The next refueling outage at KPS is tentatively scheduled for the spring of 2011.If you have questions or require additional information, please feel free to contact Mr.Craig Sly at 804-273-2784.

Very truly yours, Yresident

-Nuclear Engineering Serial No.09-723 Page 3 of 3 Attachments:

1. Summary of Recordable Indications (RIs) and Disposition
2. Summary of Class 1 and Class 2 Repair/Replacement Activities for Components 1-Inch in Diameter or Smaller 3. "Form NIS-1 Owner's Report for Inservice Inspections," Class 1, Class 2, and Class 3 Components, Fourth Ten-Year Interval 4. '.'Form NIS-1 Owner's Report for Inservice Inspections," Class MC Components, Second Ten-Year Interval 5. "Form NIS-2 Owner's Report for Repair/Replacement Activities" (33 Total)6. Examination Summary, Class 1, Class 2, and Class 3 Inservice Inspection Program, Fourth Ten-Year Interval 7. Examination Summary, Class MC Program Inservice Inspection, Second Ten-Year Interval.8. Summary of Examinations that were Limited by Geometric, Metallurgical, or Design/Access Restrictions and Associated Data Sheets (10 Total)9. "Form OAR-1 Owner's Activity Report," Table 1 and "Form NIS-2A Repair/Replacement Certification Record," Table 2 Commitments made by this letter: NONE cc: Regional Administrator U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. P. S. Tam Sr. Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-H4A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station Serial No.09-723 ATTACHMENT 1 2009 INSERVICE INSPECTION

SUMMARY

REPORT

SUMMARY

OF RECORDABLE INDICATIONS (RIs) AND DISPOSITION KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.r Serial No.09-723 Docket No. 50-305 Attachment 1 Page 1 of 2

SUMMARY

OF RECORDABLE INDICATIONS (RIs) AND DISPOSITION Type Or Location Of Recordable Examination No. Ris Indication (RI) Method (Description)

1. Reactor Building Containment Vessel General Visual 1 (Plate Moisture Barrier)2. Reactor Vessel Upper Internals VT-3 1 (Conduit)3. Seal Water Injection Filter Ultrasonic 1 (Weld-Ultrasonic Indications)
4. Gas Collection Chamber Liquid Penetrant 1 (Weld)5. Piping Supports and Hangers Visual (VT-3) 1 (Support)6. Valve Bonnet Bolting, Reactor Coolant Pump Bolting, Flange Bolting Visual (VT-3) 10 (Items)and Pressurizer Manway Bolting 7. System Leakage Pressure Tests Visual (VT-2) 41 (Items)Dispositioning of Class 1, Class 2, and Class 3 indications has been completed in accordance with the rules of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI, 1998 Edition, 2000 Addenda for Fourth Ten-Year Interval examinations.

Dispositioning of Class MC components has been completed in accordance with the rules of ASME Boiler and Pressure Vessel Code Section Xl, 2001 Edition, 2003 Addenda for Second Ten-Year Interval examinations.

Applicable codes, standards, and engineering criteria were used to disposition indications associated with the non-code-required examinations.

Recordable indications for Class 1, Class 2, Class 3, and Class MC components have been summarized with disposition as noted below: 1. General visual indications consisting of two separations in the moisture barrier of Plate 67. The moisture barrier was repaired under Work Order KW100588970, reexamined and accepted.2. Recordable indication was recorded on'the reactor vessel upper internals upper support plate thermocouple conduit at location C-3. The separated conduit cable was previously recorded in 1995, 2004, and 2006. The separated conduit at location C-3 showed no noticeable change in separation and was previously acceptable under the Kewaunee Power Station (KPS) Corrective Action Program.I Serial No.09-723 Docket No. 50-305 Attachment 1 Page 2 of 2 3. Ultrasonic 00 and 600 indications were recorded on the seal water injection filter 1A head circumferential weld AFSI-W2. These indications were acceptable per ASME Boiler and, Pressure Vessel Code Section Xl, 1998 Edition, 2000 Addenda, T~able IWB-3514-2 and IWC-3510-2.

The 0' indications were typical of the flaws recorded on seal water injection filters 1A and lB during refueling outages 1982, 1986, 1988, 1992, 1998, and 2001.4. One linear indication (2.5" in length) was recorded on the gas collection chamber 6" circumferential weld SI-W6'03.

The linear indication was unacceptable per ASME Boiler and Pressure Vessel Code Section Xl, 1998 Edition, 2000 Addenda, Table IWB-3514-2.

The linear indication was removed by buffing, reexamined, and acceptable to ASME Boiler and Pressure Vessel Code Section Xl, 1998 Edition, 2000 Addenda Standards.

5. Visual (VT-3) indication recorded on 16" feedwater piping support FDW-H1 16 was evaluated and accepted by KPS Engineering and Inservice Inspection (ISI) personnel and reviewed by the Authorized Nuclear Inservice Inspector.
6. Visual (VT-3) indications recorded on valve bonnet bolting (five valves), reactor coolantpump bolting (main flange and No. 1 seal housing bolting), flange bolting (two flanges) and pressurizer manway bolting (one manway) were (1) evaluated and accepted, or (2) repaired, reexamined, and accepted by KPS Engineering or ISI personnel.

All dispositioned indications were and reviewed by the Authorized Nuclear Inservice Inspector.

7. Visual (VT-2) indications recorded during system leakage pressure tests (41 items).These indications were (1) evaluated and accepted, or (2) repaired, reexamined, and accepted by KPS Engineering or ISI personnel.

All dispositioned indications were reviewed by the Authorized Nuclear Inservice Inspector.

Serial No.09-723 ATTACHMENT 2 2009 INSERVICE INSPECTION

SUMMARY

REPORT

SUMMARY

OF CLASS 1 AND CLASS 2 REPAIR/REPLACEMENT ACTIVITIES FOR COMPONENTS I-INCH IN DIAMETER OR SMALLER KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

Serial No.09-723 Docket No. 50-305 Attachment 2 Page 1 of 1

SUMMARY

OF CLASS 1 AND CLASS 2 REPAIR/REPLACEMENT ACTIVITIES FOR COMPONENTS 1 INCH IN DIAMETER OR SMALLER The following summarizes the repairs and replacements performed following the 2008 refueling outage and during the 2009 refueling outage by grinding, buffing, filing, cutting, or welding on the Class 1 and Class 2 pressure boundaries.

These repairs and replacements are in addition to those itemized on the enclosed forms, "NIS-2 Owner's Report for Repair/Replacement Activity" and "NIS-2A Repair/Replacement Certification Record." Component Class Reference Repair/Replacement Method Drawing Three 3/4" welded plugs 2 XK-100-28 Welding in three 3/4" pipe plugs 3/4" valve SI-39A 2 XK-100-28 Welding in replacement 3/4" valve 1" welds by SI-1 O0A 2 XK-100-28 Welding in 1" welds by SI-1OA 1" valve SI-1O0A 2 XK-100-28 Welding in new 1" valve SI-100A 1" valve SI-1 OB 2 XK-100-28 Welding in new 1" valve SI-1 OOB 1/2" valve SI-301A-1 2 XK-100-29 Welding in new-1/2" valve 3/4" valve SI-301 B-1 2 XK-100-29 Welding in new 3/4" valve 3/4" valve SI-4A-1 2 XK-100-29 Welding in new 3/4" valve 3/4" valve SI-4B-1 2 XK-100-29 Welding in new 3/4" valve 3/4" valve MS-23001-1 2 M-203 Welding in replacement 3/4" valve 3/4" valve MS-23001-2 2 M-203 Welding in replacement 3/4" valve 3/4" valve MS-23002-1 2 M-203 Welding in replacement 3/4" valve 3/4" valve MS-23002-2 2 M-203 Welding in replacement 3/4" valve 3/4" valve MS-23005-1 2 M-203 Welding in replacement 3/4" valve 3/4" valve MS-23005-2 J 2 M-203 Welding in replacement 3/4" valve 3/4" valve MS-23007-1 2 M-203 Welding in replacement 3/4" valve 3/4" valve MS-23007-2 2 M-203 Welding in replacement 3/4" valve Serial No.09-723 ATTACHMENT 3 (2009 INSERVICE INSPECTION

SUMMARY

REPORT"FORM NIS-1, OWNER'S REPORT FOR INSERVICE INSPECTIONS" CLASS 1, CLASS 2, AND CLASS 3 COMPONENTS FOURTH TEN-YEAR INTERVAL KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

Page 1 of 10 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. OWNER-DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

2. PLANT -KEWAUNEE POWER STATION, N490 HWY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16, 1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCE Reactor Vessel RV Replacement Reactor Vessel Closure Head Pressurizer PZR Steam Generator SG-1A Steam Generator SG-1B Excess Letdown Heat Exchanger AHEL-1A Excess Letdown Heat Exchanger AHEL-IB Class 1 Piping Reactor Coolant Pump RCP-1A MANUFACTURER OR INSTALLER MANUFACTURER OR INSTALLER SERIAL NO.STATE OR PROVINCE NO;NATIONAL BOARD NO.Combustion Engineering Mitsubishi Heavy Industries Westinghouse Westinghouse/

Ansaldo Energia Milano Westinghouse/

Ansaldo Energia Milano Sentry Sentry Texas Pipe Bending CE69202 B-VH-N06 1151 1141/0202 1142/0201 3996-5E 3996-6E U11480 U11480 U11402 U11400 U11401 U11407 U11408 21010 5845 68-23 68-28/151 68-29/150 364 365 Westinghouse 1A-1-618J871-GO1 Page 2 of 10 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. OWNER -DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

2. PLANT- KEWAUNEE POWER STATION, N490 HWY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16, 1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCE Reactor Coolant Pump RCP-1B Residual Heat Exchanger AHRSI-IA Residual Heat Exchanger AHRS2-1B Charging Pump Pulsation'Dampener APD-1A Charging Pump Pulsation Dampener APD-1B Charging Pump Pulsation Dampener APD-1C Volume Control Tank VCT MANUFACTURER OR INSTALLER MANUFACTURER OR INSTALLER SERIAL NO.1B-2-618J871-G02 STATE OR PROVINCE NO.NATIONAL BOARD NO.Westinghouse Joseph Oat and Sons Joseph Oat and Sons Greer Hydraulics Greer Hydraulics Greer Hydraulics Joseph Oat and Sons 1817-IE 1817-IF U11046 U11424 344 345 GNI-1848 GNI-1846 GNI-1847 1787-1C Ul1425 376 I Page 3 of 10 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS' AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. OWNER -DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

2. PLANT -KEWAUNEE POWER STATION, N490 HWY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16, 1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCE Regenerative Heat Exchanger ARG Letdown Heat Exchanger AHLD Seal Water Heat Exchanger AHSW Seal Water Injection Filter AFSI- 1A Seal Water Injection Filter AFSI-1B Reactor Coolant Filter AFRC Seal Water Filter AFSW Class 2 Piping Charging Pump APCH-1A MANUFACTURER OR INSTALLER Joseph Oat and Sons MANUFACTURER OR INSTALLER SERIAL NO.1831-13 STATE OR NATIONAL PROVINCE NO. BOARD NO.U11409 413 U11410 414 U11411 415 Atlas 1206 U11405 U11404 Atlas Commercial Filters Commercial Filters AMF Cuno AMF Cuno Texas Pipe Bending Ajax Iron Works 734 1031 596 1172 1173 101072 101073 121 123 2616 2618/6578 Page 4 of 10 'FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. OWNER -DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

2. PLANT -KEWAUNEE POWER STATION, N490 HWY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16, 1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCE Charging Pump APCH-1B Charging Pump APCH-1C Charging Pump APCH-1A Suction Stabilizer Charging Pump APCH-1B Suction Stablizer Charging Pump APCH-IC Suction Stablizer MANUFACTURER OR INSTALLER Ajax Iron Works Ajax Iron Works Greer Hydraulics Greer Hydraulics Greer Hydraulics MANUFACTURER OR INSTALLER SERIAL NO.STATE OR PROVINCE NO.NATIONAL BOARD NO.6576 6577 GHI-10234 GH1 123 GHI-10235 568 569 570 Residual Heat Removal Pump APRH1-IA Residual Heat Removal Pump APRH2-1B Byron Jackson Byron Jackson 681N0277 681N0276 Page 5 of 10 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. OWNER -DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

2. PLANT -KEWAUNEE POWER STATION, N490 HWY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16, 1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCE Diesel Generator AHDG-1A Cooling Water Exchangers (2)Diesel Generator AHDG-1B Cooling Water Exchangers (2)Auxiliary' Feedwater Pump APFM-1A Motor Driven Auxiliary Feedwater Pump APFM-1B Motor Driven Auxiliary Feedwater Pump APFT Turbine Driven Reactor Coolant Pump RCPC-1A Lube Oil Cooler Reactor Coolant Pump RCPC-1B Lube Oil Cooler MANUFACTURER OR INSTALLER MANUFACTURER OR INSTALLER SERIAL NO.STATE OR PROVINCE NO.NATIONAL BOARD NO.ITT Standard Corp.ITT Standard Corp.Pacific Pump Pacific Pump Pacific Pump Perfex Corporation Senior Engineering Company 750797-01-2

&750797-01-3 750797-01-1

&750797-01-4 46573 46574 46575 723701-1 4014 1357901 Page 6 of 10 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. OWNER -DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

2. PLANT -KEWAUNEE POWER STATION, N490 HWY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16, 1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCEI Class 3 Piping Containment Fan Cooler AHCF-1A MANUFACTURER.OR INSTALLER MANUFACTURER OR INSTALLER SERIAL NO.STATE OR PROVINCE NO.NATIONAL BOARD NO.Texas Pipe Bending Containment Fan Cooler AHCF-1B Joy Manufacturing and American Air Filter Joy Manufacturing and American Air Filter Joy Manufacturing and American Air Filter Joy Manufacturing and American Air Filter GF14402 GF14399 Containment Fan Cooler AHCF-1C GF14401 Containment Fan Cooler AHCF-1D GF14400 Safety Injection Pump Lube Oil Cooler AHSC-1A Flow Serve 21414 Page 7 of 10 FORM NIS-l OWNER'S REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE-RULES

1. OWNER -DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511
2. PLANT -KEWAUNEE POWER STATION, N490 HWY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16, 1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCE MANUFACTURER ORINSTALLER MANUFACTURER OR INSTALLER SERIAL NO.STATE OR PROVINCE NO.NATIONAL BOARD NO.Safety Injection Pump Lube Oil Cooler AHSC-1B Safety Injection Pump Heat Exchangers (2)AHSC-1A Safety Injection Pump Heat Exchangers (2)AHSC-1B Residual Heat Removal Pump AHRHRP-1A Shaft Seal Heat Exchanger Residual Heat Removal Pump AHRHRP-1B Shaft Seal Heat Exchanger Containment Spray Pump APCS-1A Gland Seal Cooler Borg Warner S-96635 Borg Warner Borg Warner 854030:854030 854030:854030 Flowserve Flowserve Helliflow 03LEX607100/04 03LEX607100/01 49486938 Page 8 of 10 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. OWNER -DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

2. PLANT -KEWAUNEE POWER STATION, N490 HWY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16,1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCE Containment Spray Pump APCS-1B Gland Seal Cooler Component Cooling Pump APCC-1A Component Cooling Pump APCC-1B Service Water Pump APSW-1A1 Service Water Pump APSW-1A2 Service Water Pump APSW-1B1 Service Water Pump APSW-1B2 Spent Fuel Pool Heat Exchanger AHSF MANUFACTURER

'OR INSTALLER MANUFACTURER OR INSTALLER SERIAL NO.STATE OR PROVINCE NO.NATIONAL BOARD NO.Helliflow 6080694 Ingersoll Dresser Pump Flow Serv.Ingersoll Dresser Pump Flow Serv.Worthington Pump Worthington Pump Flowserve Flowserve Struther Wells 0600009 0600010 VTP27737 75 TU-1719-1 09 08-001 0908-002 1-68-06-1519 U11445 Page 9 of 10 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. OWNER -DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

2. PLANT -KEWAUNEE POWER STATION, N490 HWY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16, 1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCE Service Water Pump Strainer ASSW-1A1 Service Water Pump Strainer ASSW-1A2 Service Water Pump Strainer ASSW-1B1 Service Water Pump Strainer ASSW-1B2 Component Cooling Heat Exchanger AHCC1-IA Component Cooling Heat Exchanger AHCC2-1B Component Cooling Surge Tank ATCS Control Room Air Conditioning Unit 1A Coil MANUFACTURER OR INSTALLER S.P. Kinney Engineers S.P. Kinney Engineers S.P. Kinney Engineers S.P. Kinney Engineers Engineers and Fabricators Co.Engineers and Fabricators Sharpsville Steel Trane Company MANUFACTURER OR INSTALLER SERIAL NO.STATE OR PROVINCE NO.NATIONAL BOARD NO.2278 2279 2280 2281 S-26125 S-26126 714 U39499 U39500 U11421 3269 3270 714 KlH202002 Page 10 of 10 FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. OWNER -DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

2. PLANT -KEWAUNEE POWER STATION, N490 HWY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16, 1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCE Control Room Air Conditioning UnitilB Coil Control Room Air Conditioning Expansion Tank 1A Control Room Air Conditioning Expansion TanklB MANUFACTURER OR INSTALLER Trane Company MANUFACTURER OR INSTALLER SERIAL NO.STATE OR PROVINCE NO.NATIONAL BOARD NO.K1H202003 ITT Bell and Gossett ITT Bell and Gossett 116013 FORM NIS-1 (Back)8. Examination Dates: September 23, 2008 to October 22, 2009 9. Inspection Period Identification:

10. Inspection Interval Identification:
11. Applicable Edition of Section XI: 12. Date/Revision of Inspection Plan: 2nd/ 4th 1998 Addenda: 2000 February 6, 2009 Revision 3 13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan. Reference Tab C 14. Abstract of Results of Examinations and Tests.Reference Tab B and Tab F 15. Abstract of Corrective Measures.

Reference Tab B and Tab F Utilization of ASME Boiler and Pressure Vessel Code Section XI Code Case: N-460, N-532-4 and N-566-2.We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.Certificate of Authorization No. (If applicable):

Not Applicable Expiration Date: Not Applicable Date: 200Q Signed: Dominion-Kewaunee By: /Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of

  • and employed by 076401 -,n el1 c. 7" of C 01VAJ e77 caT have inspected the components described in this Owner's Report during the period-5"07"C* 8&2-- 0 to 2Z eZ'- cMe ?_ 0 ? , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection.

Plan and as required by the ASME Code,Section XI.By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions A'" //6Z Xad., -,-/ 1,9,91y Inspector's Signature National Board, State, Province, and Endorsements Date: c 1,j,',&- 20 20 e) 5 Serial No.09-723, ATTACHMENT 4 2009 INSERVICE INSPECTION

SUMMARY

REPORT"FORM NIS-1, OWNER'S REPORT FOR INSERVICE INSPECTIONS" CLASS MC COMPONENTS SECOND TEN-YEAR INTERVAL KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. OWNER -DOMINION ENERGY KEWAUNEE, INC.N490 HIGHWAY 42 KEWAUNEE, WISCONSIN 54216-9511

2. PLANT -KEWAUNEE POWER STATION, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511
3. PLANT UNIT -NO. 1 4. OWNER CERTIFICATE OF AUTHORIZATION

-N/A 5. COMMERCIAL SERVICE DATE -JUNE 16, 1974 6. NATIONAL BOARD NUMBER FOR UNIT -N/A 7. COMPONENTS INSPECTED

-COMPONENT OR APPURTENANCE Reactor Building Containment Vessel Personnel Airlock MANUFACTURER OR INSTALLER Chicago Bridge and Iron Company Chicago Bridge and Iron Company MANUFACTURER OR INSTALLER SERIAL NO.C4454 C4454 STATE OR NATIONAL PROVINCE NO. BOARD NO.U11423 U11423 FORM NIS-1 (Back)8. Examination Dates: September 26, 2009 to October 22, 2009 9. Inspection Period Identification:

10. Inspection Interval Identification:
11. Applicable Edition of Section XI: 12. Date/Revision of Inspection Plan: Ist 2nd 2001 Addenda: 2003 March 9, 2009 Revision:

3 13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concernifig status of work required for the Inspection Plan. Reference.Tab C 14. Abstract of Results of Examinations and Tests. Reference Tab B and Tab F 15. Abstract of Corrective Measures.

Reference Tab B and Tab F We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.Certificate of Authorization No. (If applicable):

Not Applicable Expiration Date: Not Applicable Date: Ocdw-,3 2009 Signed: minion-Kewaunee By: e. 1 k Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of W1.,, -Ao$1A and employed by 014.=o -rita o. of have inspected the components described in this Owner's Report during the period Z 6 r m v to , , and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.By signing this certificate, neither the Inspector nor his employer makes any Warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with th' tion./~-3/4t~ r-t Commissions A16 //6?Z A,3/,/AN W,//0013// Inspector's Signature-)

National Board, State, Province, and Endorsements Date: 23 oc3-? 20 200o2 Serial No.09-723 ATTACHMENT 5 2009 INSERVICE INSPECTION

SUMMARY

REPORT"FORM NIS-2, OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITIES"*(33 TOTAL)KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc.N490 Highway 42, Kewaunee, Wisconsin 54216-9511

2. Plant Kewaunee Power Station N490 Highway 42, Kewaunee.

Wisconsin 54216-9511

3. Work Performed By Dominion Enerqy-Kewaune N490 Highway 42, Kewaunee, Wisconsin 54216-9511
4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Date 06/24/2008 Sheet 1 of 2 Unit No. 1 Work Order KW04-006910 Type Code Sym. Stamp NA Authorization No. Not Applicable Expiration Date Not Applicable

'5. (a) Applicable Construction Code NA (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed Stamped*APCH-1B-SC2 AJAX IRON WORKS 6576 NA 00076 1967 INSTALLED N 7. Description of Work INSTALL CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM CHARGING PUIMP 1B MOTOR AND BASE SUPPORT PLATES.8. Tests conducted Hydrostatic D Pneumatic LI Other L Pressure p Nominal Operating Pressure D deg. F Exempt 1-7 si Test Temp.9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS'-2 (Back)Sheet 2 of 2 Date: 06/24/2008 Name of Component:

APCH-11B-SC2

'Work Order Number: KW04-006910 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization' No. Not Applicable

.Expiration Date Not Applicable Signed M2 Add" )&Id~A4~4LA1UWn Date P120 0 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period ___'_O_ to Z2oci'0, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property dam'age or a loss of any kind arising from or connected with this inspection.

npeto'Commissions -NB_11622, 1. N, B, A WIS 100131 InspectorsSgntr, National Board, State, Province, and Endorsements Date 20 AVe'6.k&,20 _.& ' -__ _

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section Xl 1. Owner Dominion Energy Kewaunee, Inc. Date 03/02/2009 N490 Hiqhway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1. of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW04-006939

3. Work Performed By Dominion Energy-Kewaune'<

Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable

4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Expiration Date Not Applicable
5. (a) Applicable Construction Code NA (c) Applicable Section Xl Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of,4 Name of Component Manufacturer APCH-1C-SC3 AJAX IRON WORKS Manufacturer Serial No.6577 National Board No.NA Other ID 00077 Year Built 1967 Corrected, Removed, or Installed INSTALLED ASME Code Stamped N 7. Description of Work INSTALL CLASS 2 CHEMICAL'AND VOLUME CONTROL SYSTEM CHARGING PUMP 1C MOTOR AND BASE SUPPORTS..8. Tests conducted Hydrostatic D Other D Pneumatic E Pressure Nominal Operating Pressure psi Test Temp.Exempt A 1 deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 03/02/2009 Name of Component:

APCH-1C-SC3 Work Order Number: KW04-006939 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed I JAfM " & &)J/Wt. Date NVn4 20 9 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6MVOS, to 2 Z0O470, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

$iIIC¢at&Commissions NB 11622, 1, N, B, A WIS 100131 nspector's Signature National Board, State, Province, and Endorsements Date _ _____ __ ,20 ___

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 11/04/2008 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100278054

3. Work Performed By Dominion Enerqy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Expiration Date Not Applicable
5. (a) Applicable Construction Code SEC. VIII DIV.I-1975 (c) Applicable Section Xi Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed Stamped APD-1B GREER HYDRAULICS GHI-1846 NA 07001 1975 INSTALLED Y 7. Description of Work INSTALL REPLACMENT DAMPENER SPRING ON CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM CHARGING PUMP 1B PULSATION DAMPENER.8. Tests conducted Hydrostatic Pneumatic Nominal Operating Pressure v Exempt D Other Pressure 2237 psi Test Temp. 112 deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 11/04/2008 Name of Component:

APD-11B Work Order Number: KW100278054 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed 4&UWV'LA)

Date kdaWA ,20 09 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6,1lt' to ZZe-T'h9, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

a -- Commissions NB 11622', 1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date ? ,-aVeM66*k 20 49_

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner DominionIEnergy Kewaunee, Inc. Date 11/02/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100278450

3. Work Performed By. Dominion Enerqy-Kewaune Type Code Sym. Stamp N__A N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 36 Class 1 REACTOR COOLANT Expiration Date Not Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable Section Xl Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed, Stamped PR-F2 TEXAS PIPE BENDING 383969 NA NA 1969 INSTALLED N 7. Description of Work INSTALL REPLACEMENT 12 STUDS AND 24 NUTS ON CLASS 1 REACTOR COOLANT SYSTEM 6" INLET FLANGE PR-F2 TO'6" VALVE PR-3B.8. Tests conducted Hydrostatic Pneumatic Nominal Operating Pressure Exe'mpt -I Other ] Pressure 2240 psi Test Temp. 546 deg.F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 11/02/2009 Name of Component:

PR-F2 Work Order Number: KW100278450 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Aoplicable Signed f.46 eJr. -J-A"V39V An T h Date NW/ &ML 9. 20 Owner or Owner's Designee, Title V CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period (Ii'"e6 to ZZc7"'d, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

/Commissions NB 11622, 1, N, B, A WIS 100131 Inspector's Signature Date 3 ,, A , &-ft National Board, State, Province, and Endorsements

,20 _

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Enermqy Kewaunee, Inc. ,Date 10/30/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100280694

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Expiration Date Not Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable Section XI Code Case N.A (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code, Component Manufacturer Serial No. Board No. ID Built Installed Stamped LD-5 CROSBY ASHTON GAGE NF NA CS109-001 1970 CORRECTED N CO.7. Description of Work REMOVE FOR SET POINT TESTING AND REPAIR CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM 2" VALVE LD-5.8. Tests conducted Hydrostatic Pneumatic D Nominal Operating Pressure 1 Exempt D Other El Pressure 167 psi Test Temp. 105 deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/30/2009 Name of Component:

LD-5 Work Order Number: KW100280694 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this CORRECTED conforms to the requirements of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed tnAf/ .1m6 O&V Date 4L 9 20 (a__Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period ,thwM4O8 to ZZ047'9, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

__Commissions N3 11622,1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, arid Endorsements Date 9 FJO$(8^6.

Z ,20 09 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 10/30/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 Unit No! 1 2. Plant Kewaunee Power Station N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100315676

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp N__A N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 36 Class 1 REACTOR COOLANT Expiration Date Not Applicable
5. (a) Applicable Construction Code B16.5-1967 (c) Applicable Section Xl Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6: Identification of Components Name of Component PR-2A Name of Manufacturer MASONEILAN INTERNATIONAL Manufacturer Serial No.H-20693-5-2 National Board No.NA Other Year ID Built RC012-002 1969 Corrected, Removed, or Installed CORRECTED ASME Code Stamped N 7. Description of Work CORRECT SEAT LEAKAGE ON CLASS 1 REACTOR COOLANT SYSTEM 3" VALVE PR-2A.8. Tests conducted Hydrostatic

[]Other D]Pneumatic Nominal Operating Pressure Li Pressure 2240 psi Test Temp. 547 deg. F Exempt 11 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/30/2009 Name of Component:

PR-2A Work Order Number: KW100315676 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this CORRECTED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed f2g2 4'&,$ .A tA Ui'/. Date NL 0 ,20 0o Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company ofCT have inspected the. components described in this Owner's Report during the period 6fA.r4, to 22OTO', and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

a~ Commissions NB 11622, 1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date T NV 6A6 &Z -- 20 09_

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner, Dominion Energy Kewaunee, Inc. Date 10/13/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100362587

3. Work Performed By Dominion Energy-Kewaune Type Code Sym.,Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 33 Class 1 SAFETY INJECTION Expiration Date Not'Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Component RSI-H63 Name of Manufacturer Il-T GRINNELL VALVE COMPANY Manufacturer Serial No.National Board No.Other ID Year Built Corrected, Removed, or Installed ASME Code Stamped NA NA NA 1967 INSTALLED N 7. Description of Work INSTALL REPLACEMENT CLASS 1 SAFETY INJECTION 6" PIPE HYDRAULIC SNUBBER RSI-H63.8. Tests conducted Hydrostatic " El Other D Pneumatic Dl Pressure Nominal Operating Pressure psi Test Temp.LII Exempt El deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/13/2009 Name of Component:

RSI-H63 Work Order Number: KW100362587 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Typý Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed /C" A '- e f Date. 20 0 -Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period ' to ____ ___, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.__. ____,________-__-___

Commissions NB 11622, 1, N, B, A WIS 100131 .Inspector's Signature National Board, State, Province, and Endorsements Date 9 A f 7* ,20 d9 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 10/13/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100362588

3. Work Performed By Dominion Enerqy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 33 Class 2 SAFETY INJECTION Expiration Date Not Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable Section Xl Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed Stamped RSI-H61 ITT GRINNELL VALVE NA NA NA 1967 INSTALLED N COMPANY 7. Description of Work INSTALL REPLACEMENT CLASS 1 SAFETY INJECTION 6" PIPE HYDRAULIC SNUBBER RSI-H61.8. Tests conducted Hydrostatic Pneumatic Nominal Operating Pressure Exempt Other [] Pressure psi Test Temp. deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/13/2009 Name of Component:

RSI-H61 Work Order Number: KW100362588 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed && e 20 A b& D20 j Owner or Owners Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period to Z and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

a444W/?'C44ma_

Commissions NB 11622, 1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date 9 ,20 6?

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 10/06/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100362674

3. Work Performed By .Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 23 Class 2 CONTAINMENT SPRAY Expiration Date Not Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of .Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed Stamped ICS-H7 ITT GRINNELL VALVE NA NA NA 1967 INSTALLED N COMPANY 7. Description of Work INSTALL REPLACEMENT CLASS 2 CONTAINMENT SPRAY 6" PIPE HYDRAULIC SNUBBER ICS-H-17.8. Tests conducted Hydrostatic D Other LI Pneumatic Pressure Nominal Operating Pressure psi Test Temp.Exempt Lfi deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/06/2009

'Name of Component:

ICS-H7 Work Order Number: KW100362674 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed 7U42, A. A%4 lAfwuO trJA4 Date N&" 200 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6M^+tB to 2ZC4-7, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Inspec6tors Commissions NB 11622,a1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date -?,.0V6M64 , 20. 69 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section Xl 1. Owner Dominion Energy Kewaunee, Inc. Date 10/30/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100375362

3. Work Performed By Dominion Enerqy-Kewaune Type Code Sym. Stamp NA N490 Hi-ghway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Expiration Date Not Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable Section Xl Code Case. NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Component LD-4B Name of Manufacturer MASONEILAN INTERNATIONAL, INC.Manufacturer Serial No.H20691-1 National Board No.NA Other Year ID Built CS111-004 1970 Corrected, Removed, or Installed CORRECTED ASME Code Stamped N 7. Description of Work CORRECT SEAT LEAKAGE ON CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM 2" VALVE LD-4B 8. Tests conducted Hydrostatic F]Other D Pneumatic Nominal Operating Pressure Pressure 2236 psi Test Temp. 110 deg. F Exempt 1I 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/30/2009 Name of Component:

LD-4B Work Order Number: KW100375362

/CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this CORRECTED conforms to the requirements of the ASME Code, Section X1.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed 6. PAd' Date Oft 9 20 0 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE'INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period (OP"A" to 2Z0Cr"0Y, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

44~In Ctr Commissions NB 11622,o1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date 9 Vo "20 09 FORM NIS-2 OWNER'S REPORT FOR REPAIR / REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner: Dominion Energy-Kewaunee Name N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address Date October 30, 2009 Sheet: 1 of 2 2. Plant : Kewaunee Power Station Name Unit : No. 1 Work Order Number: N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address KW100385376

3. Work performed by : Dominion Energy-Kewaunee Name Type Code Symbol Stamp Authorization No.Expiration Date Not Applicable Not Applicable Not Applicable N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address 4. Identification of System 36 Class 1 Reactor Coolant System 5. (a) Applicable Construction Code : 1967 ASME B31.1 (b) Applicable Edition of Section XI used for Repair/Replacement Activity : 1998 Edition 2000 Addenda (c) Applicable Section XI Code Case: 6. Identification of Components NA ASME Corrected, Code Name of Name of Manufacturer National Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)1" Flange Dominion NA NA NA 2009 Installed No Upstream of Energy LD-300 7. Description of Work Install replacement 4 Studs and 8 Nuts on Class 1 Reactor Coolant System 1" Flange upstream of 1" Valve LD-300.8. Tests Conducted:

Hydrostatic E1 Pneumatic L-- Nominal Operating Pressure Exempt [I Other EI Pressure 2240 psi Test Temp 546 OF 9. Remarks: Not Applicable Applicable Manufacturer's Data Reports to be attached FORM NIS-2 (Back)Sheet 2 of 2 Date : October 30, 2009 Name of Component:

Work Order Number : 1" Flange Upstream of 1" Valve LD-300 KW100385376 CERTIFICATE OF COMPLIANCE I certify that the statements made in this report are correct and that this conforms to the requirements of the ASME Code,Section XI Type Code Symbol Stamp Not Applicable Certificate of Authorization No.Not Applicable Expiration Date Not Applicable Signed i 6'. Ak lv DateýJvqn* 1. ad 0 1 Owner or Owner's Designee, Title I CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of'Boiler and Pressure Vessel Inspectors and the State or Province of w/,,o.5ces.

and employed by 60&e*- e ,T-of /,Y49?Tite COMA'rAoTMCO have inspected the components described in this Owner's Report during the period 6 M-al o 006 to ?2062aT9r Z4009 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection-IZI 4~d'(npeto' nCommissions A1,9 116ar 1 8T PiJ, an1 End/or (Inspector's Sgn4re) National Board, 'State, Province, and Endorsements Date ,4J 'ev4vark 2L,0O9 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section Xl 1. Owner Dominion Energy Kewaunee, Inc. Date 06/24/2008 N490 Higihway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100390285

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Expiration Date Not Applicable
5. (a) Applicable Construction Code NA (c) Applicable Section Xl Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Name of Component Manufacturer APCH-1B-SC2 AJAX IRON WORKS Manufacturer Serial No.6576 National Board No.NA Other ID 00076 Year Built 1967 Corrected, Removed, or Installed CORRECTED ASME Code Stamped N 7. Description of Work CORRECT BY MODIFYING CLASS 2 CHEMICAL AND VOILUME CONTROL SYSTEM CHARGING PUMP 1B BASE SUPPORTS.8. Tests conducted Hydrostatic Other 1 F Pneumatic Pressure Nominal Operating Pressure psi Test Temp.L-deg. F Exempt 1-7 9. Remarks NOT APPLICAVLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 06/24/2008 Name of Component:

APCH-1B-SC2 Work Order Number: KW100390285 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this CORRECTED conforms to the requirements of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed ,V QWW12 Date 604&t, 20 0 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6m#l"', , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

ct__. _. Commissions NB 11622,1, N, B, A WIS 100131 Inspector's Signature-National Board, State, Province, and Endorsements Date 9 0 V 420 _____9 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 06/24/2008 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100390344

3. Work Performed By Dominion Enerqy-Kewaune Type Code Sym. Stamp N__A N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Expiration Date Not Applicable
5. (a) Applicable Construction Code NA 1(c) Applicable Section Xl Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed Stamped APCH-1B-SC2 AJAX IRON WORKS 6576 NA 00076 1967 CORRECTED N 7. Description of Work PERFORM METAL REMOVAL ON CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM CHARGING PUMP 1B MOTOR AND BASE SUPPORT PADS.8. Tests conducted Hydrostatic Other D ED Pneumatic Pressure Nominal Operating Pressure psi Test Temp.L Exempt L-J deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 06/24/2008 Name of Component:

APCH-1B-SC2 Work Order Number: KW100390344 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this CORRECTED conforms to the requirements of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed -t. 6V. Date NO ,20 j Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 60r'1015 to zz.o.'17 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the .Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

4,n~vCommissions NB 11622, 1, N, B, A WIS 100131 Inspector's Signature-National Board, State, Province, and Endorsements Date 9 20 09 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Enerqy Kewaunee, Inc. Date 06/24/2008 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100393957

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Expiration Date Not Applicable
5. (a) Applicable Construction Code NA (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed Stamped APCH-1B-SC2 AJAX IRON WORKS 6576 NA 00076 1967 CORRECTED N 7. Description of Work CORRECT CRACKED I BEAM SUPPORT ON CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM CHARGING PUMP 1B BAS ESUPPORT.8. Tests conducted Hydrostatic

'- Pneumatic Nominal Operating Pressure Exempt Other E] Pressure psi Test Temp. deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached I NIS-2 (Back)Sheet 2of2 Date: 06/24/2008 Name of Component:

APCH-1B-SC2 Work Order Number: KW100393957 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this CORRECTED conforms to the requirements of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed /'A/L.Le /W L Apwo,' " L)owr Date t 6 9 200 0 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period __________

to Z.Jc'o, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.-Commissions NB 11622,1, N, B, A WIS 100131 Irnrec.towr's Sirnaure National Board, State, Province, and Endorsements Date 9 /UO v6w$4=0A ,20 _ 9 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 10/19/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100395492

3. Work Performed By Dominion Ener-gy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 34 Class 1 RESIDUAL HEAT REMOVAL Expiration Date Not Applicable
5. (a) Applicable Construction Code ASME SECTION VIII (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Component RHR-30B-3 Name of Manufacturer Manufacturer Serial No.BS&B SAFETY SYSTEMS NA National Board No.NA Other Year ID Built AC125-016 2009 Corrected, Removed, or Installed ASME Code Stamped INSTALLED N 7. Description of Work INSTALL REPLACEMENT CLASS 1 RESIDUAL HEAT REMOVAL SYSTEM 1/2" RUPTURE DISC RHR-30B-3.
8. Tests conducted Hydrostatic

--Other D Pneumatic Pressure-1 Nominal Operating Pressure 358 psi Test Temp. 100 deg. F Exempt n-i 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/19/2009 Name of Component:

RHR-30B-3 Work Order Number: KW100395492 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed r- f ., -._ Date NOey 20 __Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6 /I" Y-'V to ZZO'ro 1, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.CL... Commissions NB11622,1,N,B,A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date 9 /V0 L)"w 20 ____20 0 FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 09/24/2008 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100420045

3. Work Performed By Dominion Enerqy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Expiration Date Not Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Component CVC-4A Name of Manufacturer GRINNELL FIRE PROTECTION SYSTEMS Manufacturer Serial No.NF National Board No.NA Other Year ID Built CS033-007 1973 Corrected, Removed, or Installed INSTALLED ASME Code Stamped N 7. Description of Work REPLACED VALVE BONNET ASSEMBLY AND DIAPHRAGM ON CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM 3" VALVE CVC-4A.8. Tests conducted Hydrostatic Other R Pneumatic Pressure D Nominal Operating Pressure ' -E 25 psi Test Temp. 90 deg. F Exempt 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 09/24/2008 Name of Component:

CVC-4A Work Order Number: KW100420045 CERTIFICATE OF COMPLIANCE I certify that the statements made-in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed , X v eu L9UVeV Date M 6*W/, 20 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 41"*Y7 to, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NB 11622,1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date -vV, .. ,20 09 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc.N490 Highway 42, Kewaunee, Wisconsin 54216-9511

2. Plant Kewaunee Power Station N490 Highway 42, Kewaunee, Wisconsin 54216-9511
3. Work Performed By Dominion Enerqy-Kewaune N490 Highway 42, Kewaunee, Wisconsin 54216-9511
4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Date 10/08/2008 Sheet 1 of 2 Unit No. 1 Work Order KW100421013 Type Code Sym. Stamp -N.A Authorization No. Not Applicable Expiration Date Not Applicable
5. (a) Applicable Construction Code NA (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Name of Component Manufacturer APCH-1A-SCI AJAX IRON WORKS Manufacturer Serial No.6578 National Board No.NA Other ID 00075 Year Built 1967 Corrected, Removed, or Installed INSTALLED ASME Code Stamped N 7. Description of Work INSTALL CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM CHARGING PUMP 1A MOTOR AND BASE SUPPORTS.8. Tests conducted Hydrostatic r-1 Pneumatic EL Other ] Pressure Nominal Operating Pressure Exempt =U deg. F psi Test Temp.9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/08/2008 Name of Component:

APCH-1A-SC1 Work Order Number: KW100421013 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed 13A..A&)Lw 6 WW' Date PJ* q '20 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6^040e__ to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor I his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection..Commissions NB 11622,1, N, B, A WIS 100131 Inspector's Signature National Board, State, Provinrce, and Endorsements Date-? /JO0V' ,a--_ 20 09 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 10/30/2009 N490 Hi-ghway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42. Kewaunee, Wisconsin 54216-9511 Work Order KW100427863

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL Expiration Date Not Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable Section Xl Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed Stamped LD-60 VELAN VALVE NF NA CS117-001 1971 CORRECTED N CORPORATION
7. Description of Work CORRECT VALVE PACKING LEAKAGE ON CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM 2" VALVE LD-60.8. Tests conducted Hydrostatic Pneumatic Nominal Operating Pressure El Exempt i]Other E Pressure 164 psi Test Temp. 104 deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: -10/30/2009 Name of Component:

LD-60 Work Order Number: KW100427863 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this CORRECTED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed or Owners 1 Date Designee T 20 VOwner or Owner's Designee, Titler CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6M-t'.'O8 to 2 ~ocT'I, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

c -ZII) C .x4 NB 11622,1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date 9 ,o V'E-3Lj &X ,20 _ _9 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc.N490 Highway 42, Kewaunee, Wisconsin 54216-9511

2. Plant Kewaunee Power Station N490 Highway 42, Kewaunee.

Wisconsin 54216-9511

3. Work Performed By Dominion Enerqy-Kewaune N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Date 08/17/2009 Sheet 1 of 2 Unit No. 1 Work Order KW100453017 Type Code Sym. Stamp NA Authorization No. Not Applicable J 4. Identification of System 23 Class 2 CONTAINMENT SPRAY Expiration Date Not Apl 5. (a) Applicable Construction Code ASME SECT. 11-1986 (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda plicable 6. Identification of Components Name of Component ICS-60A Name of Manufacturer FLOWSERVE Manufacturer Serial No.02BPE National Board No.NA Other ID NA Year Built 2009 Corrected, Removed, or Installed INSTALLED ASME Code Stamped N 7. Description of Work INSTALL CLASS 2 INTERNAL CONTAINMENT SPRAY SYSTEM 2" AND 3/4" PIPING AND 3/4" VALVE ICS-60A.8. Tests conducted Hydrostatic Other E Pneumatic Pressure 285 psi Nominal Operating Pressure L-J Exempt Test Temp. 73 deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 08/17/2009 Name of Component:

ICS-60A Work Order Number: KW100453017 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed &%,VN M-, I A A 6tA Date .4J 20 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period __r___O_ , to 220't1 O?, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Rep5ort. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damageor a loss of any kind arising from or connected with this inspection.

~--- 6i c e4ý7,.( Commissions NB 11622,1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date /'L-UAi, FR. 20 09 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 09/11/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100453019

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 34 Class 2 RESIDUAL HEAT REMOVAL Expiration Date Not Applicable
5. (a) Applicable Construction Code B16.34 (c) Applicable Section Xl Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of , Component RHR-220 Name of Manufacturer FLOWSERVE Manufacturer Serial No.08BPE National Board No.NA Other ID NA Year Built 2009 Corrected, Removed, or Installed INSTALLED ASME Code Stamped N 7. Description of Work IKICIrTAII r 4i ACC I IAI UCAT D)CIIfrW1A O'.C'TCRA Ak1 f 1-tA MIMflIkf A MinOA ' , LD IVI 4 /'%I'iL/ JIt VI ý114LJ J/-+ VPLVF- F-IF-N-44U.
8. Tests conducted Hydrostatic L]Other I-Pneumatic Nominal Operating Pressure Pressure , 175 psi Test Temp. 85 deg. F Exempt n 9. Remarks, NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached I

  • NIS-2 (Back)Sheet 2 of 2 Date: 09/11/2009 Name of Component:

RHR-220 Work Order Number: KW100453019 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code, Section Xl.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed .l" /. X A4 '

Date 20 0 C1 v q Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 61"Y8o to Z2'"'c-?, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

C&-'-4 U- Commissions NB 11622,1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date 9 06:1. 20 01 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 10/20/2009 N490 Hiqhway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee.

Wisconsin 54216-9511 Work Order KW100453022

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 34 Class 2 RESIDUAL HEAT REMOVAL Expiration Date Not Applicable
5. (a) Applicable Construction Code ASME SEC.111-1 986 (c). Applicable Section XI Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Component RHR-40 Name of Manufacturer FLOWSERVE Manufacturer Serial No.95 BPD National Board No.NA Other Year ID Built AC008-013 2009 Corrected, Removed, or Installed INSTALLED ASME Code Stamped N 7. Description of Work INSTALL CLASS2 RESIDUAL HEAT REMOVAL SYSTEM 2" AND 3/4" PIPING AND 3/4" VALVE RHR-40.8. Tests conducted Hydrostatic Other
  • l Pneumatic Pressure 160 psi Nominal Operating Pressure El Test Temp. 70 deg. F Exempt 1 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/20/2009 Name of Component:

RHR-40 Work Order Number: KW100453022 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed Date MJL 200__Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have'inspected the components described in this Owner's Report during the period 6$1-W'c' to ZZ&7T&, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any-warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NB11622,1,N,B,A WIS100131--'Inspector's Signature J r National Board, State, Province, and Endorsements Date_ _ /VV____ ___ ,20 _ _

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section Xl 1. Owner Dominion Energy Kewaunee, Inc. Date 10/29/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit. No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100453023

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No; Not Applicable
4. Identification of System 34 Class 2 RESIDUAL HEAT REMOVAL Expiration Date Not Applicable
5. (a) Applicable Construction Code ASME SECT. 111-1986 (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components I Corrected, ASME Name of Name of 'Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed Stamped RHR-501A FLOWSERVE 03 BPE NA NA 2009 INSTALLED N 7. Description of Work INSTALL 2" AND 3/4" PIPING AND 3/4" VALVE RHR-501A ON CLASS 2 RESIDUAL HEAT REMOVAL SYSTEM.8. Tests conducted Hydrostatic Other F-Pneumatic E I Pressure 135 psi Nominal Operating Pressure M Exempt LI Test Temp. 75 deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back).Sheet 2 of 2 Date: 10/29/2009 Name of Component:

RHR-501A Work Order Number: KW100453023 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed ,0V#9,71t.f(&/Date ak-, 20 09 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period __"______

to 2Z 0'0-7, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection."ii(Inspector's Commissions NB 11622,B1, N, B,tA WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements fI Date ( 9 JO V',, ,20 _9 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section Xl 1. Owner Dominion Energy Kewaunee, Inc. Date 10/19/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100453024

3. Work Performed By Dominion Enerqy-Kewaune ,Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 34 Class 2 RESIDUAL HEAT REMOVAL Expiration Date Not Applicable
5. (a) Applicable Construction Code ASME SECT. 111-1986 (c) Applicable Section XI Code Case NA (b) Applicable Edition of'Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code Compoinent Manufacturer Serial No. Board No. ID Built Installed Stamped RHR-31A-1 FLOWSERVE 07 BPE NA NA 2009 INSTALLED N 7. Description of Work INSTALL 2" AND 3/4" PIPING AND 3/4" VALVE RHR-31A-1 ON CLASS 1 RESIDUAL HEAT REMOVAL SYSTEM.8. Tests conducted Hydrostatic F1 Other D Pneumatic Pressure -L Nominal Operating Pressure 353 psi Test Temp. 99 deg. F Exempt I-9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/19/2009 Name of Component:

RHR-31A-1 Work Order Number: KW100453024 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed AQ4L, 2 /ak WJ4gt.T24tA 9 CU*W, Date No~&-,9 20o Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6 to 2?- and state that to the best of my knowle/dge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

2 WCommissions NB11622,1,N,BA WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date 9 ya';=- 20 _ 9 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 09/23/2009 N490 Higqhway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100453025

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 33 Class 2 SAFETY INJECTION Expiration Date Not Applicable
5. (a) Applicable Construction Code B16.5-1967 (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed Stamped SI-301A ALOYCO INCORPORATED 70A 6354 NA S1017-001 1972 INSTALLED N 7. Description of Work INSTALL REPLACEMENT VALVE BONNET ON CLASS 2 SAFETY INJECTION SYSTEM 10" VALVE SI-301A AND INSTALL NEW 1/2" VENT VALVE SI-301A-1.
8. Tests conducted Hydrostatic

[- Pneumatic 1 Nominal Operating Pressure El Exempt D1 Other Pressure 35 psi Test Temp. 9_3 deg.,F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 09/23/2009 Name of Component:

SI-301A Work Order Number: KW100453025 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Sge e. O *A & 0 Date 20 02 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period to 2ZOC-r'01, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

(1IIII~ w U ?lmtf Commissions NB 11622,1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date q 9' 9' k,6, ,20 0?__

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code'Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 10/30/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Higqhway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100453026

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 33 Class 2 SAFETY INJECTION Expiration Date Not Applicable
5. (a) Applicable Construction Code B16.5-1967 (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Component SI-301B Name of Manufacturer Manufacturer Serial No.ALOYCO INCORPORATED NF National Board No.NA Other Year ID Built S1017-002 1972 Corrected, Removed, or Installed INSTALLED ASME Code Stamped N 7. Description of Work INSTALL REPLACEMENT BONNET ON CLASS 2 SAFETY INJECTION SYSTEM 10" VALVE SI-301B AND INSTALL NEW 3/4" VENT VALVE SI-301B.8. Tests conducted Hydrostatic

[]Other D Pneumatic Nominal Operating Pressure 17 Pressure 10 psi Test Temp. 87 deg. F Exempt nI 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/30/2009 Name of Component:

SI-301B Work Order Number: KW100453026 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable 014A,1~- 20 Signed Zn:ý D (/' ate W0VR& ,20 Owner or Owner's Designee, Tite CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6A,*Y-o to ZZ.cr07, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

InspeYctrs SignatureNatonaCommissions NBo11622,1, N,SB,A WIS 100131 Insectr' SinatreNational Board, State, Province, and Endorseme nts Date 9 'V6" /k_. ,20 O__

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section X1 1. Owner Dominion Energy Kewaunee.

Inc.N490 Highway 42, Kewaunee, Wisconsin 54216-9511

2. Plant Kewaunee Power Station N490 Highway 42. Kewaunee, Wisconsin 54216-9511
3. Work Performed By Dominion Energy-Kewaune N490 Highway 42, Kewaunee, Wisconsin 54216-9511
4. Identification of System 33 Class 2 SAFETY INJECTION Date 11/02/2009 Sheet 1 of 2 Unit No. 1 Work Order KW100453027 Type Code Sym. Stamp NA Authorization No. Not Applicable Expiration Date Not Applicable
5. (a) Applicable Construction Code ASME SECT.ll-1986 (c) Applicable Section Xl Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Component Name of Manufacturer Manufacturer Serial No.National Board No.Other ID Year Built Corrected, Removed, or Installed ASME Code Stamped SI-31-1 FLOWSERVE 99 BPD NA NA 2009 INSTALLED N 7. Description of Work INSTALL 2" AND 3/4" PIPING AND 3/4" VALVE SI-31-1 ON CLASS 2 SAFETY INJECTION SYSTEM.8. Tests conducted Hydrostatic*

] Pneumatic D Other [] Pressure 28 psi Nominal O0 perating Pressure Test Temp. 54 deg. F Exempt --9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 11/02/2009 Name of Component:

SI-31-1 Work Order Number: KW100453027 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed Cv Date k]o ,20 0.Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and PreSsure Vesiel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period ______Y__

to 201C/'7"09, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising.from or connected with this inspection.

iC ne., Commissions NB 11622,1, N, B, A WIS 100131 Inspector's Signature National Board, State:, Province, and Endorsements Date -9 V" 61W r6 e/t 20 0_

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI p, 1. Owner Dominion Enerqy Kewaunee, Inc. Date 10/19/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2/2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100453032

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification ofSystem 33 Class 2 SAFETY INJECTION Expiration Date Not Applicable
5. (a) Applicable Construction Code ASME SECT.IIl-1986 (c) Applicable Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Component Name of Manufacturer Manufacturer Serial No.National Board No.Other ID Year Built Corrected, Removed, or Installed ASME Code Stamped SI-309 FLOWSERVE 96 BPD NA NA 2009 INSTALLED N 7. Description of Work INSTALL 2" AND 3/4" PIPING AND 3/4" VALVE St-309 ON CLASS 2 SAFETY INJECTION SYSTEM.8. Tests conducted Hydrostatic Other D Pneumatic 11 Pressure 353 psi Nominal Operating Pressure E' Exempt D-Test Temp. 105 deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/19/2009 Name of Component:

SI-309 Work Order Number: KW100453032 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed 70J d2,_. Date & ,20 01_Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 61"0ý to 2_OCet, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NB 11622,1, N, B, A WIS 100131 n r SNational Board, State, Province, and Endorsements Inspector's Signature Date- 9 /Jo Ve-0Si " '20 o?__

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 10/30/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100494435

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp N A N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 33 Class 2 SAFETY INJECTION Expiration Date Not Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable-Section XI Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Corrected, ASME Name of Name of Manufacturer National Other Year Removed, or Code Component Manufacturer Serial No. Board No. ID Built Installed Stamped GCC 'DOMINION ENERGY NA -NA NA 2009 INSTALLED N 7. Description of Work INSTALL CLASS 2 SAFETY INJECTION SYSTEM 6" DIAMETER GAS COLLECTION CHAMBER AND 3/4" AND 1/2" PIPING, SUPPORTS AND VALVES SI-39A-1, SI-39A-2 AND SI-39A-3..
8. Tests conducted Hydrostatic r- Pneumatic n Nominal Operating Pressure 1 Exempt -Other El Pressure 2200 psi Test Temp. 56 deg. F 9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/30/2009 Name of Component:

GCC Work Order Number: KW100494435 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed 2-3/4d, 1 DateN&Ww, L ,200 q Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period _______ to Z20cTO?, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NB 11622, 1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date 9

-,20 _ _

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI I 1. Owner Dominion Energy Kewaunee, Inc. Date 10/14/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant, Kewaunee Power Station Unit No. 1 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100494435

3. Work Performed By Dominion Energy-Kewaune Type Code Sym. Stamp NA N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 33 Class 2 SAFETY INJECTION Expiration Date Not Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable Section X1 Code Case NA (b) Applicable Edition of Section XI Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Component SI-H 109 Name of Manufacturer DOMINION ENERGY Manufacturer Serial No.NA National Board No.NA Other ID NA Year Built 2009 Corrected, Removed, or Installed INSTALLED ASME Code Stamped N 7. Description of Work INSTALL CLASS 2 SAFETY INJECTION SYSTEM RIGID SUPPORT SI-H109 FOR 6" DIAMETER GAS COLLECTION CHAMBER.8. Tests conducted Hydrostatic Pneumatic D Other R PressureI Nominal Operating Pressure Exempt El deg. F psi Test Temp.9. Remarks NOT APPLICABLE Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 10/14/2009 Name of Component:

SI-H1i09 Work Order Number: KW100494435 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this INSTALLED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed .Date k L 20.Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6 AW4V'06 to ZZOCO*, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

61117 6dý7L-Ct-d" Commissions NB 11622, 1, N, B, A WIS 100131 Inspector's Signature National Board, State, Province, and Endorsements Date 4 A,#OVa'*f*6r 20 _9 FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner Dominion Energy Kewaunee, Inc. Date 11/02/2009 N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Sheet 1 of 2 2. Plant Kewaunee Power Station Unit No. I N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Work Order KW100528252

3. Work Performed By Dominion Enerqy-Kewaune Type Code Sym. Stamp NA I N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Authorization No. Not Applicable
4. Identification of System 33 Class 2 SAFETY INJECTION Expiration Date Not Applicable
5. (a) Applicable Construction Code B31.1-1967 (c) Applicable Section Xl Code Case NA (b) Applicable Edition of Section Xl Used for Repair/Replacement Activity 1998 Edition 2000 Addenda 6. Identification of Components Name of Component SI-W603 Name of Manufacturer DOMINION ENERGY Manufacturer Serial No.NA National Board No.NA Other ID NA Year Built 2009 Corrected, Removed, or Installed REPAIRED ASME Code Stamped N 7. Description of Work CORRECT BY REMOVING 2.5" LINEAR INDICATION ON 6" CIRCUMFERENTIAL WELD SI-W603.8. Tests conducted Hydrostatic

-' Pneumatic D Other Pressure Nominal Operating Pressure--11 Exempt Es deg. F psi Test Temp.9. Remarks NOT APPLICABLE.

Applicable Manufacturer's Data Reports to be Attached NIS-2 (Back)Sheet 2 of 2 Date: 11/02/2009 Name of Component:

SI-W603 Work Order Number: KW100528252 CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this REPAIRED conforms to the requirements of the ASME Code,Section XI.Type Code Symbol Stamp* NA Certificate of Authorization No. Not Applicable Expiration Date Not Applicable Signed 6.A 2 7 O Date Ni1 20 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of CT have inspected the components described in this Owner's Report during the period 6P)1YOe to dCVCiO'i, and state that I to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section X.'By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

c-1---1 ) c tl., -'?' Commissions NB 11622, 1, N, B, A WIS 100131 Z Inspector's Signature National Board, State, Province, and Endorsements Date 9 1OV',41'6' 20 0_ __

FORM NIS-2 OWNER'S REPORT FOR REPAIR / REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner : Dominion Energy-Kewaunee Name N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address 2. Plant: Kewaunee Power Station Name N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address Date : November 2, 2009 Sheet: 1 of 2 Unit : No.. 1 Work Order Number: KW100550233

3. Work performed by : Dominion Energy-Kewaunee Name I N490 Highway 42, Kewaunee Wisconsin 54216-9511 Type Code Symbol Stamp Authorization No.Expiration Date Not Applicable Not Applicable Not Applicable Address 4. Identification of System : 33 Class 2 Safety Injection System, 5. (a) Applicable Construction Code : 1967 ASME 831.1 (b) Applicable Edition of Section XI used for Repair/Replacement Activity : 1998 Edition 2000 Addenda (c) Applicable Section XI Code Case: 6. Identification of Components NA ASME Corrected, Code Name of Name of Manufacturer National Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)SI Train A Dominion NA NA NA 2009 Installed No Vent System Energy 7. Description of Work Install Class 2 Safety Injection System 2" and 1" Vent System Piping, Flanges and Fittings from connection to 12" Piping downstream of 12" Valve SI-351A to 1" Flanqe.8. Tests Conducted:

Hydrostatic D Pneumatic

-Nominal Operating Pressure Exempt []Other [-I Pressure 32 psi Test Temp 86 OF 9. Remarks: Not Applicable Applicable Manufacturer's Data Reports to be attached FORM NIS-2 (Back)Sheet 2 of 2 Date: November 2, 2009 Name of'Component Work Order Number SI Train A Vent System KW100550233 CERTIFICATE OF COMPLIANCE I certify that the statements made in this report are correct and that this conforms to the requirements of the ASME Code,Section XI Type Code Symbol Stamp Not Applicable Certificate of Authorization No.Not Applicable Expiration Date Not Applicable Signed 1ý _Lu&wtýAýw cvmwI.4 Date_N Wtkfl,*, q~ d 0 09 I Owner or Owner's Designee, Titl&V4 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of w,.scov/ and employed by HAMKTV* 5&tM4 '%oLS_ ¢ cT of I-M/lrre co&6eicv 7- have inspected the components described in this\Owner's Report during the period 6 $1 A4-, 8 to zz ,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or*implied, concerning the examinations, tests, and corrective measures described in-this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection c1 LCommissions W.6 J03 " 1-/ /")0/ 3 (Inspectorrs Signa~fre)

National Board, State, Province, and Endorsements Date 9 M0 69 FORM NIS-2 OWNER'S REPORT FOR REPAIR / REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner: Dominion Energy-Kewaunee Name N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address 2. Plant: Kewaunee Power Station Name N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address 3. Work performed by: Dominion Energy-Kewaunee Name N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address 4. Identification of System : 33 Class 2 Safety Injection System 5. (a) Applicable Construction Code: 1967 ASME B31.1 (b) Applicable Edition of Section XI used for Repair/Replacement Activity: (c) Applicable Section XI Code Case: NA Date: November 2, 2009 Sheet: 1 of 2 Unit: No. 1 Work Order Number: KW100550234 Type Code Symbol Stamp Authorization No.Expiration Date Not Applicable Not Applicable Not Applicable 1998 Edition 2000 Addenda 6. Identification of Components Name of Component SI Train B Vent System Name of Manufacturer Dominion Energy Manufacturer National Board Serial No. No.NA NA-Other Identification NA Year Built 2009 Corrected, Removed, or Installed Installed ASME Code Stamped (Yes or No)No 7. Description of Work Install Class 2 Safety Injection System 2" and 1" Vent System Piping, Flange and Fittings from connection to 12" Piping downstream of 12" Valve SI-351B to 1" Flange.8. Tests Conducted:

Hydrostatic

-Pneumatic LI Nominal Operating Pressure Exempt L1 Other I Pressure 30 psi Test Temp 89 OF 9. Remarks: Not Applicable Applicable Manufacturer's Data Reports to be attached FORM NIS-2 (Back)Sheet 2 of 2 Date : November 2, 2009 Name of Component:

Work Order Number SI Train B Vent System KW100550234 CERTIFICATE OF COMPLIANCE I certify that the statements made in this report are correct and that this conforms to the requirements of.the ASME Code,Section XI Type Code Symbol Stamp Not Applicable Certificate of Authorization No.Not Applicable Expiration Date Not Applicable Signed j't A Date I\J*~eAjq)Jwo qi Owner or Owner's Designee, "hltl CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of tWScoM51/

and employed.

by Y4e& 7rC0/_. Cir of f-/Mtr Fe(?Z' have inspected the components described in this Owner's Report during the period 6nAm A-1o0 to cc7"o? , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection KIIIn:a 6&4 -7LA' ~ Cmisin ý"5 1-,~O~Commissions 1-1 (Inspector's Signature)

National Board, State, Province, and Endorsements Date 9 .

FORM NIS-2 OWNER'S REPORT FOR REPAIR / REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code Section XI 1. Owner: Dominion Energy-Kewaunee Name N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address 2. Plant: Kewaunee Power Station Name N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address Date : October 30, 2009 Sheet: 1 of 2 Unit ; No. 1 Work Order Number : KW100589894

3. Work performed by : Dominion Energy-Kewaunee Name N490 Highway 42, Kewaunee Wisconsin 54216-9511 Address 4; Identification of System: 36 Class 1 Reactor Coolant System Type Code Symbol Stamp Authorization No.Expiration Date Not Applicable Not Applicable Not Applicable
5. (a) Applicable Construction Code : ASME Section III Class A.(b) Applicable Edition of Section XI used for Repair/Replacement Activity : 1998 Edition 2000 Addenda (c) Applicable Section XI Code Case: 6. Identification of Components NA ASME Corrected, Code Name of Name of Manufacturer National Board Other Year Removed, or Stamped Component Manufacturer Serial No. No. Identification Built Installed (Yes or No)Pressurizer

.Westinghouse 1151 68-23 PS&E 0041 1968 Installed Yes 7. Description of Work Installed Replacement Gasket and 5 Replacement Bolts on Class 1 Reactor Coolant System Pressurizer.

Manway. Additional Manway Repair/Replacements:

1997: Installed 1 Helicoil, 16 Replacement Manway Bolts and Removed Base Metal for Helicoil Insertion:

2001- Installed 2 Helicoils,Removed Base Metal for Helicoil Insertion and Replaced 5 Mafiway Bolts.8. Tests Conducted:

Hydrostatic LI Pneumatic LI Nominal Operating Pressure Exempt []Other El Pressure 2240 psi Test Temp 546.5 OF 9. Remarks: Reference Westinghouse Letter Report LTR-SGDA-09-176 Revision 0 " Kewaunee Power Station-Applicable Manufacturer's Data Reports to be attached Evaluation for Continued Use of Prior Installed Helical-Coils on the Pressurizer Manway Bolt Holes" FORM NIS-2 (Back)Sheet, 2 of 2 Date : October 30, 2009 Name of Component:

Work Order Number: Pressurizer Manway KW100589894 CERTIFICATE OF COMPLIANCE I certify that the statements made in this report are correct and that this conforms to the requirements of the ASME Code,Section XI /Type Code Symbol Stamp Not Applicable Certificate of Authorization No.Not Applicable Expiration Date Not Applicable Signed Date NmgnrriijeA9, ZOO cj' Owner or Owner's Designee, Title v q CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of W15coV11.#J and employed by 1-tlz-6 o ,.cT of c & C/U 'e,7 have inspected the components described in this Owner's Report during the period 6 o' to Za 0cr 0? , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report.Furthermnore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection

_____-___________Commissions

/Va /M 2 Z/40 W O/- (* (Inspector's Signature)

National Board, State, Province, and Endorsements Date 9 "'1 v,-ms o:

Serial No.09-723 ATTACHMENT 6 2009 INSERVICE INSPECTION

SUMMARY

REPORT EXAMINATION

SUMMARY

CLASS 1, CLASS 2, AND CLASS 3 INSERVICE INSPECTION PROGRAM FOURTH TEN-YEAR INTERVAL KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

KEWAUNEE POWER STATION 4TH INTERVAL:

2ND PERIOD: 2ND OUTAGE 2009 EXAMINATION

SUMMARY

INTRODUCTION An Inservice Inspection (ISI) Program (Scheduled and Augmented) was performed at the Kewaunee Power Station from September 25, 2008 through September 22, 2009 (Non Refueling Outage) and September 26, 2009 through October 22, 2009 (Closing of G1 following Refueling Outage) by Kewaunee Power Station, Lambert, MacGill, and Thomas, Inc.(LMT Inc.) and ITLS examination personnel.

Examinations were performed to satisfy the requirements of: " ASME Boiler and Pressure Vessel Code Section XI 1998 Edition 2000 Addenda" Westinghouse NASL-06-8:

Pressurizer Heater Sleeve Cracking The Inservice Inspection Program Plan and Augmented Inspection Program Plan located under Tab C was prepared by Kewaunee Power Station for the 4th Interval:

2nd Period: 2nd Outage as identified in the Kewaunee Power Station Fourth 10-Year Inservice Inspection (ISI) Program 2004 -2014. Examinations during this Refueling Outage were performed to complete 4th Interval; 2nd Period Examination Requirements of ASME Boiler and Pressure Vessel Code Section XI 1998 Edition 2000 Addenda and Kewaunee Power Station Fourth 10-Year Inservice Inspection (ISI) Program 2004-2014.

The following items were examined: " Reactor Vessel Upper and Lower Internals" Pressurizer Circumferential and Longitudinal Welds" Pressurizer Surge Nozzle to Safe End Weld" Pressurizer Integrally Welded Attachment" Steam Generator Primary Nozzle to Safe End Welds" Class 1, Class 2 and Class 3 Piping and Component Supports and Hangers" Class I and Class 2 Steam Generator Primary Manway Bolting, Pressurizer Manway Bolting, Flange Bolting and Valve Bonnet Bolting" Class I and Class 2 Preservice of Safety Injection and Residual Heat Removal Piping, Supports and Gas Collection Chamber Page 1 of 4

  • Letdown Heat Exchanger Circumferential Weld and Integrally Welded Attachments" Residual Heat Exchanger Circumferential Weld" Seal Water Injection Filter Circumferential Weld" Class 1 System Leakage Test* Class 2 and Class 3 System Leakage Tests EXAMINATIONS The examinations performed were in accordance with an approved Inservice Inspection Program Plan located under Tab C of the final report. Examination Procedures were approved prior to the start of examinations and certification documents relative to personnel, equipment and materials were reviewed and determined to be satisfactory.

Some of the arrangements and details of the Kewaunee Power Station Components and Piping Systems were designed and fabricated before ASME Boiler and Pressure Vessel Code Section XI Code requirements were established.

Examinations performed were intended to examine 100% of the required surface or volume. In some cases, examinations were limited by geometric, metallurgical or design/access restrictions.

In each case, the occurrence and cause of the limitation was documented.

In all cases the maximum amount achievable was examined.Witnessing and surveillance of the examinations were conducted by personnel from: Nuclear Regulatory Commission and Hartford Steam Boiler Inspection and Insurance Company of CT.RESULTS Examinations resulted with the following Recordable Indications being noted on the basis of procedure recording criteria, which are generally more restrictive than specified ASME Boiler and Pressure Vessel Code Section XI Acceptance Standards.

Recordable Indications detected during the 2009 Refueling Outage are listed in Table 1 with a brief summary following.

Specific data relative to all Recordable Indications and their dispositions by either corrective measures, acceptance by ASME Boiler and Pressure Vessel Code Section XI 1998 Edition 2000 .Addenda Acceptance Criteria, Repair or Replacement or Evaluation are located in Tab F of the Final Report Page 2 of 4 TABLE 1 TYPE OR LOCATION OF RECORDABLE INDICATION (RI) METHOD NO. OF RI'S" Reactor Vessel Upper Internals Visual (VT-3) 1 Conduit" Seal Water Injection Filter Volumetric (UT) 1 Weld* Gas Collection Chamber Surface (PT) 1 Weld* Piping Supports and Hangers Visual (VT-3) 1 Support* Valve Bonnet Bolting, Reactor Coolant Visual (VT-3) 10 Items Pump Bolting, Flange Bolting and Pressurizer Manway Bolting* System Leakage Pressure Tests Visual (VT-2) 41 Items 1. Recordable Indication was recorded on the Reactor Vessel Upper Internals Upper Support Plate Thermocouple Conduit at Location C-3. The separated conduit cable was previously recorded in 1995, 2004 and 2006. The separated conduit at location C-3 showed no noticeable change in separation and was previously acceptable under the Kewaunee Power Station Corrective Action Program.2. Ultrasonic 0' and 600 Indications were recorded on the Seal Water Injection Filter 1A Head Circumferential Weld AFSI-W2. These indications were Acceptable per ASME Boiler and Pressure Vessel Code Section XI 1998 Edition 2000 Addenda Table IWB-3514-2 and IWC-3510-2.

The 0' Indications were typical of the flaws recorded on Seal Water Injection Filters lA and lB during Refueling Outages 1982, 1986, 1988, 1992, 1998 and 2001.3. 1 Linear Indication (2.5" in length) was recorded on the Gas Collection Chamber 6" Circumferential Weld SI-W603. The Linear Indication was Unacceptable per ASME Boiler and Pressure Vessel Code Section XI 1998 Edition 2000 Addenda Table IWB-3514-2.

The Linear Indication was removed by buffing, reexamined and acceptable to ASME Boiler and Pressure Vessel Code Section XI 1998 Edition 2000 Addenda Standards.

4. Visual (VT,3) Indication recorded on 16" Feedwater Piping Support FDW-HI 16 was Evaluated and Accepted by: Kewaunee Power Station Engineering and Inservice Inspection Personnel and reviewed by the Authorized Nuclear Inservice Inspector.

Page 3 of 4

5. Visual (VT-3) Indications recorded on Valve Bonnet Bolting (5 Valves), Reactor Coolant Pump Bolting (Main Flange and No. 1 Seal Housing Bolting), Flange Bolting (2 Flanges)and Pressurizer Manway Bolting (IManway) were- (1) Evaluated and Accepted or (2)Repaired, Reexamined and Accepted by: Kewaunee Power Station Engineering or Inservice Inspection Personnel and reviewed by the Authorized Nuclear Inservice Inspector.
6. Visual (VT-2) Indications recorded during System Leakage Pressure Tests (41 Items) were: (1) Evaluated and Accepted or (2) Repaired, Reexamined and Accepted by: Kewaunee Power Station Engineering or Inservice Inspection Personnel.

and reviewed by the Authorized Nuclear Inservice Inspector.

SUMMARY

An Inservice Inspecti'on Program was performed at the Kewaunee Power Station from September 25, 2008 through September 22, 2009 (Non Refueling Outage) and September 26, 2009 through October 22, 2009 (Closing of GI following Refueling Outage). Examinations were performed as scheduled in the Kewaunee Power Station Fourth 10-Year Inservice Inspection (ISI) Program 2004 -2014 to complete examinations for the 4th Interval; 2nd Period. A total of 55 Recordable Indications were detected.

AJl Recordable Indicatiors were corrected or accppted by ASME Boiler and Pressure Vessel Code Section XI 1998 Edition 2000 Addenda Acceptance Criteria, Repair/Replacement or Evaluation requirements Phillip Bukes Date Engineering Programs Inservice Inspection Program Owner Page 4 of 4 Serial No.09-723 ATTACHMENT 7 2009 INSERVICE INSPECTION

SUMMARY

REPORT EXAMINATION

SUMMARY

CLASS MC INSERVICE INSPECTION PROGRAM SECOND TEN-YEAR INTERVAL KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

KEWAUNEE POWER STATION 2ND INTERVAL:

1ST PERIOD: 2ND OUTAGE 2009 EXAMINATION

SUMMARY

INTRODUCTION An Inservice Inspection (ISI) Program for the Class MC Reactor Building Containment Vessel was performed at the Kewaunee Power Station from September 26, 2009 through October 22, 2009 (Closing of G1 following Refueling Outage) by Kewaunee Power Station and Lambert, MacGill and Thomas Inc. examination personnel.

Examinations were performed to satisfy the requirements of: ASME Boiler and Pressure Vessel Code Section XI 2001 Edition 2003 Addenda The Inservice Inspection Program Plan located under Tab C was prepared by Kewaunee Power Station for the 2nd Interval; 1 st Period; 2nd Outage as identified in the Kewaunee Power Station Second 10-Year Inservice Inspection (ISI) Program 2006-2016.

Examinations during this Refueling Outage were performed to complete the 2nd Interval, 1 st Period examination requirements of ASME Boiler and Pressure Vessel Code Section XI 2001 Edition 2003 Addenda and Kewaunee Power Station Second 10-Year Inservice Inspection (ISI) Program 2006-2016.

The following items were examined for the Class MC Reactor Building Containment Vessel: " Accessible Surface Areas* Moisture Barriers* Bolted Connections EXAMINATIONS The examinations performed were in accordance with an approved Inservice Inspection Program Plan located under Tab C of the final report. Examination Procedures were approved prior to the start of examinations and certification documents relative to personnel, equipment and materials were reviewed and determined to be satisfactory.

Page 1 of 3 Some of the arrangements and details of the Kewaunee Power Station Components and Piping Systems were designed and fabricated before ASME Boiler and Pressure Vessel Code Section XI Code requirements were established.

Examinations performed were intended to examine 100% of the required surface or volume. In some cases, examinations were limited by geometric, metallurgical or design/access restrictions.

In all cases the maximum amount achievable was examined.Witnessing and surveillance of the examinations were conducted by: Hartford Steam Boiler Inspection and Insurance Company of CT.RESULTS Examinations resulted with the following Recordable Indications being noted on the basis of procedure recording criteria, which are generally more restrictive than specified ASME Boiler and Pressure Vessel Code Section XI Acceptance Standards.

The Recordable Indications detected during the 2009 Refueling Outage are listed in Table 1 with a brief summary following.

Specific data relative to the Recordable Indications disposition by acceptance per ASME Boiler and Pressure Vessel Code Section XI 2001 Edition 2003 Addenda Acceptance Criteria, Repair/Replacement or Evaluation is located in Tab F of the Final Report.TABLE 1 TYPE OR LOCATION OF RECORDABLE INDICATION (RI) METHOD NO. OF RI'S Reactor Building Containment Vessel General Visual 1 Plate Moisture Barrier 1. General Visual Indications consisting of 2 separations in the moisture barrier of Plate 67.The moisture barrier was repaired under Work Order KW100588970, reexamined and accepted.

The following is provided as required by 10CFR50.55a(b)(2)(ix)(A) for the moisture barrier indications:

((A) Description of the type and estimated extent of degradation, and the conditions that led to the degradation:

2 Separations in the moisture barrier caulking one 2" in length and one 3" in length. Potential causes include age related distressand improper application of the moisture barrier sealant-.Page 2 of 3 (B) An evaluation of each area, and the result of the evaluation:

Evaluation of the metal containment plate indicated no carbon steel plate degradation and no wetness in the area of moisture barrier separation.(C) A description of the necessary corrective action: Work Order was generated to repair the separations in the moisture barrier. Repairs were performed and reexamined with acceptable results.

SUMMARY

An Inservice Inspection Program for the Class MC Reactor Building Containment Vessel was performed at the Kewaunee Power Station from September 26, 2009 through October 22, 2009 (Closing of G1 following Refueling Outage). Examinations were performed as scheduled in the Kewaunee Power Station Second 10-Year Inservice Inspection (ISI) Program 2006-2016.

One Recordable Indication (2 separations in Plate 67 moisture barrier) area was detected.

The Recordable Indication was repaired, reexamined and accepted by Kewaunee Power Station Engineering Personnel.

Phillip .Bukes Engineering Programs Inservice Inspection Program Owner 3,Doot9 Date Page 3 of 3 Serial No.09-723 ATTACHMENT 8, 2009 INSERVICE INSPECTION

SUMMARY

REPORT

SUMMARY

OF EXAMINATIONS THAT WERE LIMITED BY GEOMETRIC, METALLURGICAL, OR DESIGN/ACCESS RESTRICTIONS AND ASSOCIATED DATA SHEETS (10 TOTAL)KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

Serial No.09-723 Docket No. 50-305 Attachment 8 Page 1 of 1

SUMMARY

OF EXAMINATIONS THAT WERE LIMITED BY GEOMETRIC, METALLURGICAL, OR DESIGN/ACCESS RESTRICTIONS Year Component Identification Method of % Recorded as Not Examination Examined and Limitation Pressurizer Circumferential Shell To 2.6%2009 Head Weld P-W3 UT 2 -2.5" x 2.5" Integrally Welded Pads Pressurizer Circumferential Shell To 2.6%2009 Head Weld P-W5 UT 2 -2.5" x 2.5" Integrally Welded Pads 75.0%2009 Residual Heat Exchanger 1A Head Ueldn Circumferential Weld AHRS1-W2 UT Integrally Welded Attachments 8" Inlet and Outlet Nozzles 2009 Regenerative Heat Exchanger Head UT 0.4%Circumferential Weld ARG-W9 2 -2" Nozzles 2009 Letdown Heat Exchanger Shell UT 77.5%Circumferential Weld AHNR-W1 Shell to Flange Configuration 43%2009 Seal Water Injection Filter 1A Head UT 2" Inlet Nozzle 209Circumferential weld AFSI-W2 U "IltNzl 3 Integrally Welded Attachments Nozzle To Safe End Weld RC- 74%2009 W67DM on 14" Pressurizer Surge UT Nozzle To Safe'End Weld Configuration 2009 Circumferential Pipe Weld SI-W74 on 50%12" Safety Injection Valve To Pipe Weld Configuration Nozzle To Safe End Weld RC- 4.5%2009 W76DM on Steam Generator 1A UT 4- 3.5" x4.5" Hotleg Integrally Welded Attachments Nozzle To Safe End Weld RC- 4.2%2009 W77DM on Steam Generator 1A UT 4- 3.5" x4.5" Crossover Leg Integrally Welded Attachments Serial No.09-723 ATTACHMENT 9 2009 INSERVICE INSPECTION

SUMMARY

REPORT"OAR OWNER'S ACTIVITY REPORT" TABLE 1 AND"FORM NIS-2A REPAIR/REPLACEMENT CERTIFICATION RECORD" TABLE 2 KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

Form OAR-I Owner's, Activity Report IAttcm n 1, E-AA II-0 Page 10f Report Number: 2009 Refueling Outage Plant Kewaunee Power Station, N490 Highway 42, Kewaunee, Wisconsin 54216-9511 Unit No. No.1 Commercial service date June 16, 1974 Refueling outage no. K1R30 (if applicable)

Current inspection interval 4th (1st, 2 nd, 3 r, 4 th, other)Current inspection period 2nd (1st, 2nd , 3rd)Edition and Addenda of Section Xl applicable to the inspection plans 1998 Edition 2000 Addenda Date and revision of inspection plans February 6, 2009 Revision 3 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans Not Applicable Code Cases used: N-460, N-532-4 and N-566-2 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI-; and (c) the repair/replacement activities and evaluations supporting the completion of KI. R 3Q conform to the requirements of Section X1.(refueling outage number)Signed P W4 I- .5UOS /&O .f. 1*& .,..W , Date N&1.044, 1,4oO, Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of and employed by -',5Y c7" of eouCicT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or cted with this inspection.

Commissions Ne. , WI /.O/In trs Signature National Board, State, Province and Endorsements Date ,o9 ^0le 67Z o?

Kewaunee Power Station.Table 1 Items.with Flaws or Relevant Conditions that Required Evaluation for Continued Service Flaw or Relevant Condition Examination Found During Scheduled Category Item Number Item Description Evaluation Description Section XI Examination or Test (Yes or No)B-G-2 B-N-1 B-P B-P B-P B-P B-P B-P B-P B-P B-P B-P B-P B-P C-A C-F-1 C-H C-H C-H C-H C-H C-H C-H C-H C-H C-H C-H D-B D-B D-B D-B B7.20 B13.10 B15.10 B15.40 B15.60 B15.70 B15.70 B15.70 B15.70 B15.70 B15.70 B15.70 B15.70 B15.70 C1.20 C5.21 C7.10 C7.10 C7.10 C7.10 C7.10 C7.10 C7.10 C7.10 C7.10 C7.10 C7.10 D2. 10 D2. 10 D2. 10 D2.10 K1..B7.20.001

-PRESSURIZER MANWAY BOLTING K1.B13.10.001

-REACTOR VESSEL INTERNALS K1.B15.10.001 -ASME CODE CLASS 1 K1.B15.40.001 -ASME CODE CLASS 1 K1.B15.60.001 -ASME CODE CLASS 1 K1.B15.70.001 -ASME CODE CLASS 1 K1.B15.70.001 -ASME CODE CLASS 1 K1.B15.70.001 -ASME CODE CLASS 1 K1.B15.70.001 -ASME CODE CLASS 1 K1.B15.70.001 -ASME CODE CLASS 1 K1.B15.70.001 -ASME CODE CLASS 1 K1.B15.70.001 -ASME CODE CLASS 1 K1.B15.70.001 -ASME CODE CLASS 1 K1.B15.70.001 -ASME CODE CLASS 1 SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST SYSTEM PRESSURE TEST K1 .C1.20.017

-SEAL WATER INJECTION FILTER 1A HEAD CIRCUMFERENTIAL WELD K1 .C5.21.118

-6" CIRCUMFERENTIAL WELD KI.C7.10.006

-CHEMICAL AND VOLUME CONTROL Ki.C7.10.006

-CHEMICAL AND VOLUME CONTROL Ki .C7.10.006

-CHEMICAL AND VOLUME CONTROL Ki .C7.10.006

-CHEMICAL AND VOLUME CONTROL K1.C7.10.005

-SI INSIDE CONTAINMENT SYSTEM PRESSURE K1 .C7.10.006

-CHEMICAL AND VOLUME CONTROL K1.C7.10.005"-

SI INSIDE CONTAINMENT SYSTEM PRESSURE K1.C7.10.005

-SI INSIDE CONTAINMENT SYSTEM PRESSURE K1.C7.10.005

-SI INSIDE CONTAINMENT SYSTEM PRESSURE K1 .C7.10.005

-SI INSIDE CONTAINMENT SYSTEM PRESSURE K1 .C7.10.006

-CHEMICAL AND VOLUME CONTROL K1.D2.10.004

-COMPONENT COOLING WATER SYSTEM PRESSURE TEST K1.D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST K1.D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST K1.D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST THREAD DAMAGE MANWAY BOLTS: F106 SEPARATED CONDUIT AT LOCATION C-3: F105 EVIDENCE OF LEAKAGE ON SEAL TABLE: CR353880 EVIDENCE OF LEAKAGE ON EX. LET. HX.: KW100385374 EVIDENCE OF LEAKAGE ON R.C. PUMP 1A SEAL CR353866 EVIDENCE OF LEAKAGE ON RC-300A: CR353829 EVIDENCE OF LEAKAGE ON RC-100A: CR353832 EVIDENCE OF LEAKAGE ON RC-100B: CR353877 EVIDENCE OF LEAKAGE ON RC-301A: CR353864 EVIDENCE OF LEAKAGE ON RC-23028:

CR353868 EVIDENCE OF LEAKAGE ON RHR-1A: CR353850 EVIDENCE OF LEAKAGE ON SI-44A: CR353849 EVIDENCE OF LEAKAGE ON LD-332: CR353840 EVIDENCE OF LEAKAGE ON RC-403: CR353863 ULTRASONIC INDICATIONS WELD AFSI-W2: F100 LINEAR INDICATION WELD SI-W603: F104 EVIDENCE OF LEAKAGE ON LET.HX. STUD: CR116439 EVIDENCE OF LEAKAGE ON CVC-23111-1:

CR116354 EVIDENCE OF LEAKAGE ON CVC-101C:

CR090284 EVIDENCE OF LEAKAGE ON SW INJ. FILTER 1A: CR331022 EVIDENCE OF LEAKAGE ON SI-303B: CR353804 EVIDENCE OF LEAKAGE ON PIA-183A ROOT VALVE: CR116406 EVIDENCE OF LEAKAGE ON SI-46: CR353786 EVIDENCE OF LEAKAGE ON SI-210B; CR 353818 EVIDENCE OF LEAKAGE ON SI-121: CR353784 EVIDENCE OF LEAKAGE ON SI-11 B: CR353785 EVIDENCE OF LEAKAGE ON LET HX FLANGE: CR116438 EVIDENCE OF LEAKAGE ON CC-609A: CR349958 EVIDENCE OF LEAKAGE ON SW-43B2 UNION FITTING: CR334793 EVIDENCE OF LEAKAGE ON SW-50OB: CR334785 EVIDENCE OF LEAKAGE ON SW(R16)-3:

CR334780 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes__________

L _________

+/- _____________________________________________________

a ____________________________________________________

a ScheduleWorks V. 8.1 Page 1 -2 Kewauee Pwer tation Table I Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service Flaw or Relevant Condition Examination Found During Scheduled Category Item Numbe Item Description Evaluation Description Section XI Examination or Test (Yes or No)D-B D2.10 K1.D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST EVIDENCE OF LEAKAGE ON SW-1299B:

CR334778 Yes D-B D2.10 K1 .D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST EVIDENCE OF LEAKAGE ON CONT. FAN COIL 1D: CR349565 Yes D-B D2.10 K1.D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST EVIDENCE OF LEAKAGE ON FS-16809 FITTING: CR28221 Yes D-B D2.10 K1 .D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST EVIDENCE OF LEAKAGE ON HS-2203A:

CR333879 Yes D-B D2.10 Kl.D2.10.004

-COMPONENT COOLING WATER SYSTEM EVIDENCE OF LEAKAGE ON CC-18228-2:

CR349965 Yes PRESSURE TEST D-B D2.10 K1.D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST EVIDENCE OF LEAKAGE ON FS-16810 FITTING: CR28221 Yes D-B D2.10 K1.D2.10.004

-COMPONENT COOLING WATER SYSTEM EVIDENCE OF LEAKAGE ON CCW PUMP 1 B: CR350129 Yes PRESSURE TEST D-B D2.10 K1.D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST EVIDENCE OF LEAKAGE ON SW-901B-1:

CR340570 Yes D-B D2.10 K1 .D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST EVIDENCE OF LEAKAGE ON SW-914C: CR349618 Yes D-B D2.10 K1 .D2.10.002

-SERVICE WATER SYSTEM PRESSURE TEST EVIDENCE OF LEAKAGE ON SW-910C: CR349617 Yes D-B D2.10 K1.D2.10.004

-COMPONENT COOLING WATER SYSTEM EVIDENCE OF LEAKAGE ON FLANGE BY CC-605A: CR349973 Yes PRESSURE TEST NA NA K1 .NA.909 -BORIC ACID INJECTION AND RECIRULATION EVIDENCE OF LEAKAGE ON BA TRANS. PUMP 11B: CR111149 No NA NA KI .NA.909 -BORIC ACID INJECTION AND RECIRULATION EVIDENCE OF LEAKAGE ON BA TRANS. PUMP 1A: CR100394 No 7' A NA K1.NA.783

-ELELMENT-RC LOOP B RTD LOOP FLANGE ORIFICE EVIDENCE OF LEAKAGE ON FLANGE FE-459: F108 No NA NA K1.NA.905

-REACTOR COOLANT PUMP 1A EVIDENCE OF LEAKAGE ON MAIN FLANGE BOLTING: F110 No NA NA K1.NA.813

-REACTOR COOLANT PUMP 1A NO.1 SEAL HOUSING EVIDENCE OF LEAKAGE ON NO. 1 SEAL BOLTS: F109 No BOLTS NA NA K1-.NA.106

-VALVE-CONTROL-COLDLEG LOOP B TO EVIDENCE OF LEAKAGE ON VALVE PS-1B BOLTING: F1 12 No NA NA KI .NA.090 -VALVE-CHECK-LOOP B HOT LEG INJECTION LINE EVIDENCE OF LEAKAGE ON VALVE SI-303B: F1 11 No NA NA K1 .NA.088 -VALVE-MOTOR-RCS LOOP A SUPPLY TO RHR PUMPS EVIDENCE OF LEAKAGE ON VALVE RHR-1A: F101 No NA NA K1.NA.088

-VALVE-MOTOR-RCS LOOP A SUPPLY TO RHR PUMPS THREAD DAMAGE ON VALVE RHR-1A: F103 No NA NA Ki.NA.651

-VALVE-MOTOR-RCP LOOP B SUPPLY TO RHR PUMPS EVIDENCE OF LEAKAGE ON VALVE RHR-1B: F102 No NA NA K1.NA.784

-ELEMENT-RC LOOP A RTD LOOP FLOW ORIFICE EVIDENCE OF LEAKAGE ON FLANGE FE-458: F107 No.NA NA NA -EVIDENCE OF LEAKAGE ON LT-24013:

CR353825 No NA NA K1 .NA.239 -HANGER-SPRING OUT OF TOLERANCE SETTING ON FDW-H1 16: F1 13 No ScheduleWorks V. 8.1 Page 2 -2 FORM NIS-2A REPAIR/REPLACEMENT CERTIFICATION RECORD OWNER'S CERTIFICATE OF COMPLIANCE I certify that the Repair/Replacement conform to the requirements of Section XI activities represented by Repair/Replacement Plan number KIR30 Edition and Addenda of Section XI used: 1998 Edition 2000 Addenda Code Cases used: N-532-4 (if applicable)

Signed 911.\0 P.&LVI-A '-PjU&"e.1&AW Date-a 0 0 Owner or Owner's Deslgnee CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of [i.-1iCOJ6'#9J and employed by 1~, i-e'/'-- .57P7k, ,3J01"e. c7" ofc "r have inspected the components described in Repair/Replacement Plan number k I /?,30 ,and state that to the best of my knowledge and belief, the Owner has performed all the activities described in the Repair/Replacement Plan in accordance with the requirements of Section XL.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the activities described in the Repair/Replacement Plan. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any per-sonal mu or property damage or a loss of any kind arising from or connected with this inspection

____________________

Commissions A-16 M" ZZ 9,3/A/ IWI' /I'6/3/Inspector's Signat~r,--J National Board, State, Province, and Endorsements Date / A, A'O V&-Wl, -R 0, Kiewaiun ree P oe rS~~ R3 ObleRe pal.frIRe p lac 7' 1t la A,2 ..,, Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service Flaw or Relevant Code Corrected, Condition Found During Repair / Replacement Plan Number Class Removed or Item Description Description of Work Scheduled Section Xl Date Complete K1 R30 Installed Examination or Test (Yes_or No)Installed Corrected Installed Installed Installed Installed Installed Installed Corrected Corrected Corrected Installed Installed Installed 1" Flange Upstream of LD-300 PR-2A Pressurizer Manway PR-F2 RHR-30B-3 RSI-H63 APCH-1A-SC1 APCH-1B-SC2 APCH-1 B-SC2 APCH-1 B-SC2 APCH-1 B-SC2 APCH-1C-SC3 APD-1B CVC-4A Install Replacement 4 Studs and 8 Nuts Correct by Repairing Seat Leakage on 3" Valve PR-2A Install Replacement Gasket and 5 Replacement Manway Bolts Install 12 Studs and 24 Nuts on 6" Inlet Flange PR-F2 to PR-3B Install. Replacement 1/2" Rupture Disc RHR-30B-3 Install Replacement Hydraulic Snubber RSI-H63 Install Class 2 Chemical and Volume Control System Charging Pump 1A Motor and Base Support Plates.Install Class 2 Chemical and Volume Control System Charging Pump 1 B Motor and Base Support Plates.Correct by Modifying Class 2 Chemical and Volume Control System Charging Pump 1B Base Supports.Perform Metal Removal on Class 2 Chemical and Volume Control System Charging Pump 1 B Motor and Base Spport Pads.Correct Cracked I Beam Support on Class 2 Chemical and Volume Control System Charging Pump 1 B Base Support.Install Class 2 Chemical and Volume Control System Charging Pump 1C Motor and Base Support Plates Install Replacement Dampener Spring on Chagring Pump 1B Install Replacement Valve Bonnet and Diaphragm No No No No No No No No No No-No No No No 10/21/2009 10/22/2009 10/30/2009 10/22/2009

<' 10/18/2009 10/13/2009 12/08/2008 06/24/2008 06/24/2008 06/24/2008 06/24/2008 02/26/2009 11/04/2008 09/24/2008 Work Order KW1 00385376 WorkOrder KW100315676 Work Order KW1 00589894 Work Order kW1 00278450 Work Order KW1 00395492 Work Order KW1 00362587 Work Order KW100421013 Work Order KW04-006910 Work Order KW100390285 Work Order KW100390344 Work Order KW1 00393957 Work Order KW04-006939 Work Order KW100278054 Work Order KW1 00420045+/- ..- I. .L _______________________

11/10/2009 ScheduleWorks V. 8.1 Page 1 -3

_p .1;'4e r Ue-tow4,: Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service Flaw or Relevant Code Corrected, Condition Found During Repair/ Replacement Plan Numbe Clas .Removed or Item Description Description of Work Scheduled Section Xl Date Complete Re mnb Installed Examination or Test (Ye.R or No)Installed Installed Installed Corrected Corrected C6rected Installed Installed Installed Installed Installed Installed Installed Installed Gas Collection Chamber ICS-60A ICS-H7 LD-4B LD-5 LD-60 RHR-220 RHR-31A-1 RHR-40 RHR-501A RSI-H61 SI Train A Vent System SI Train B Vent Sytsem SI-301A Install 6" Gas Collection Chamber and 3/4" Piping, Supports and Valves SI-39A-1, SI-39A-2 and SI-39-A3 Install 2" and 3/4" Piping and 3/4" Valve ICS-60A Install Replacement Hydraulic Snubber ICS-H7 Correct by Repairing Seat Leakage on 2" Valve LD-4B Correct by Repairing 2" Valve LD-5 Correct Valve Packing Leakage on 2" Valve LD-60 Install 2" and 3/4" Piping and 3/4" Valve RHR-220 Install 2" and 3/4" Piping and 3/4" Valve RHR-31A-1 Install 2" and 3/4" Piping and 3/4" Valve RHR-40 Install 2" and 3/4" Piping and 3/4" Valve RHR-501A Install Replacement Hydraulic Snubber RSI-H61-Install 2" and 1" Vent System Piping, Flange and Fittings from 12" Piping to 1" Flange Downstream of 12" Valve SI-351A Install 2" and 1" Vent System Piping, Flange and Fittings from 12" Piping to 1" Flange Downstream of 12" Valve SI-351 B Install Replacement Valve Bonnet on 10" Valve SI-301A and Install 1/2" Vent Valve SI-301A-1 No No No No No No No No No No No No No No 10/20/2009 08/17/2009 10/06/2009 10/21/2009 10/22/2009 10/20/2009 09/10/2009 10/21/2009 10/10/2009 10/10/2009 10/13/2009 09/23/2009 09/17/2009 09/23/2009 Work Order KW1 00494435 Work Order KW1 00453017 Work Order KW1 00362674 Work Order KW1 00375362 Work Order KW1 00280694 Work Order KW1 00427863 Work Order KW100453019 Work Order KW100453024 Work Order KW1 00453022 Work Order KW1 00453023 Wok Order KW1 00362588 Work Order KW1 00550233 Work Order KW100550234 Work Order KW1 00453025 11/10/2009 ScheduleWorks V. 8.1 Page 2 -3 Abstract of Repairs, Replacements or Corrective Measures_____ ___________

Required for Continued Service Flaw or Relevant Coe Corrected, Condition Found DuringRearIepcmntPnNub Cas Removed or Item Description Description of Work Scheduled Section Xl Date Complete Reai/RpacRetla3ub Installed Examination or Test (Ye or No)Installed rI-301B Install Replacement Bonnet on 10" Valve SI-301B and No 101912009 Work Order KW1 00453026 Install 3/4" Vent Valve I-301 B-I 2 Installed SI-309 Install 2" and 3/4" Piping and 3/4" Vent Valve SI-309 No 10/19/2009 Work Order KW100453032 2 Installed r I m Install 2" and 3/4" Piping and 3/4" Valve SI-31-e No 10/19/2009 Work Order KWI00453027 2 Installed SI-H109 Install Gas Collection Chamber Welded Attachment No 10/12/2009 Work Order KW100494435 Support SI-H109 2 Corrected SI-W603 Correct by Removing 2.5" Linear Indication Yes 10/04/2009 Work Order KW100528252 11/10/2009 ScheduleWorks V. 8.1 Page 3 -3