ML20151U941

From kanterella
Revision as of 04:54, 11 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-77-073,on 770505,laborers Strike Occurred.Cause of Strike Unknown.No Press Release Has Been Made by NRC of Comm Ed Co.Region III Received Notification of Occurrence by Telcon
ML20151U941
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/05/1977
From: Dreher F, Roy G, Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-77-073, PNO-77-73, NUDOCS 9809110244
Download: ML20151U941 (1)


Text

-.

ppg ed JN G C,4, [i, IlN-s t

PRELIMINARY NOTIFICATION May 5, 1977 PRELIMINARY NOTIFICATION OF FVENT OR UNUSUAL OCCURRENCE--PNO-77-73 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.

Facility:

Comonwealth Edison Company, La Salle Units 1 & 2 (DNs50-373&50-374) Seneca, Illinois

Subject:

LABORERS' STRIKE Laborers' union, local 393 went on strike this morning, May 5,1977 and po'sted pickets at two entrances to the La Salle construction site. No craft personnel were crossing the picket line. Non-union personnel were allowed to cross the picket line.

The cause of the strike is unknown, however, the Laborers' had agreed to a one week extension of their contract which expired April 30, 1977.

Licensee representatives stated that posting of pickets at two entrances

'is illegal. The licensee is taking legal action to restrict picketing to one gate.

No violence has been reported.

The duration of the strike is unknown.

'N La Salle Unit 1 construction is about 50% complete and Unit 2 about 40%

complete.

t No press release has been made by NRC or Comonwealth Edison Company.

Region III received notification of this occurrence by telephone from the Licensee Vice President at 9:00 a.m. on May 5, 1977.

Contact:

FADreher, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 Distribution: TransmittedHStl',00

, Chairman Rowden C. C. Kamerer, CA G. F. Murphy, deAE Comissioner Kennedy S. J. Chilk, SECY H. H. Whiteside, SCNR Comissioner Gilinsky H. R. Kyers. HCEE Transmitted:

MNBB?) ^.0 P Bldg 1.* $2-SS Bldg 3. o d L. V. Gossick, ED0

.E. G. Case, NRR C. V. Smith, NMSS S. H. Hanauer, EDO J. A. Harris, PA W. G. Mcdonald, MIPC Luge (MAIL)

E. Volgy au, IE,

/

d R. G. Ryan, OSP T. J. McTiernan, 0IA Region j 2.;03 H. K. Shapar, ELD PRELIMINARY NOTIFICATION

,D N v 98 91 44 770505 PNO-77-073 PDR

-.