MONTHYEARML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20205T6491988-11-0707 November 1988 Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20205R6731988-11-0404 November 1988 Forwards NRC Testimony of Jj Swift Addressing ASLB Inquiries of 881018 & Two Attachments.Related Correspondence ML20205N3691988-10-28028 October 1988 Advises That ASLB Tentatively Calling for Telcon on 881109 W/Parties & State of Tn to Discuss Need for Further Prehearing Conference & Other Scheduling Matters,Per 881026 Request.Served on 881031 ML20206B2481988-10-27027 October 1988 Notice of Significant Licensee Meeting 88-174 on 881118 in King of Prussia,Pa to Discuss Configuration Mgt ML20195B6131988-10-26026 October 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20205K3321988-10-26026 October 1988 Forwards SER Re Const Mod & Licensing of & Application for CP for Facilities.Nrc Review of Safeguards/Security Plans for Two Proposed Facilities Sent to Board & Applicant.Telcon to Discuss Scheduling Matters Requested.W/O Encls ML20155H3621988-10-18018 October 1988 Requests Addl Info Re NRC Environ Assessments Submitted on 880914 for Uncontested Proceedings,To Complete Review of Adequacy of NEPA Assessments.Served on 881018 ML20204G0741988-10-17017 October 1988 Forwards Mh Mobley from State of Tn to NRC Not Received Until 881014.NRC Will Address Matters in Ltr in SER ML20204J5841988-10-12012 October 1988 Forwards AEOD/E807, Pump Damage Due to Low Flow Cavitation, in Response to Item 5 of Actions Directed by EDO to Respond to Diagnostic Evaluation Team Rept.Nrr Issued Bulletin 88-004 Addressing Low Flow Problem ML20205L2281988-10-12012 October 1988 Forwards AEOD/e807, Pump Damage Due to Low Flow Cavitation, in Response to Action Item 5 Assigned by EDO in 880406 Memo Re Diagnostic Evaluation Team Rept for Plant. NRR Issued Bulletin 88-004 Addressing Recirculation Problem ML20155C6941988-10-0505 October 1988 Advises That Review Briefing for Listed Plants Scheduled for 881013.Viewgraphs Encl ML20205Q4941988-10-0303 October 1988 Discusses Concerns Raised by State of Tn Re Abundance of Naturally Occurring Radioactivity in Alchemie Processing. Enrichment of Naturally Occurring Radioisotopes Will Not Pose Significant Health Hazard ML20206E0861988-09-28028 September 1988 Requests Verbal Concurrence W/Publishing Notice of Receipt of Petition for Rulemaking PRM-50-50,per 880926 Telcon W/ C Young.Related Info Encl 1990-02-26
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20205T6491988-11-0707 November 1988 Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn ML20205R6731988-11-0404 November 1988 Forwards NRC Testimony of Jj Swift Addressing ASLB Inquiries of 881018 & Two Attachments.Related Correspondence ML20205N3691988-10-28028 October 1988 Advises That ASLB Tentatively Calling for Telcon on 881109 W/Parties & State of Tn to Discuss Need for Further Prehearing Conference & Other Scheduling Matters,Per 881026 Request.Served on 881031 ML20206B2481988-10-27027 October 1988 Notice of Significant Licensee Meeting 88-174 on 881118 in King of Prussia,Pa to Discuss Configuration Mgt ML20195B6131988-10-26026 October 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20205K3321988-10-26026 October 1988 Forwards SER Re Const Mod & Licensing of & Application for CP for Facilities.Nrc Review of Safeguards/Security Plans for Two Proposed Facilities Sent to Board & Applicant.Telcon to Discuss Scheduling Matters Requested.W/O Encls ML20155H3621988-10-18018 October 1988 Requests Addl Info Re NRC Environ Assessments Submitted on 880914 for Uncontested Proceedings,To Complete Review of Adequacy of NEPA Assessments.Served on 881018 ML20204G0741988-10-17017 October 1988 Forwards Mh Mobley from State of Tn to NRC Not Received Until 881014.NRC Will Address Matters in Ltr in SER ML20204J5841988-10-12012 October 1988 Forwards AEOD/E807, Pump Damage Due to Low Flow Cavitation, in Response to Item 5 of Actions Directed by EDO to Respond to Diagnostic Evaluation Team Rept.Nrr Issued Bulletin 88-004 Addressing Low Flow Problem ML20205L2281988-10-12012 October 1988 Forwards AEOD/e807, Pump Damage Due to Low Flow Cavitation, in Response to Action Item 5 Assigned by EDO in 880406 Memo Re Diagnostic Evaluation Team Rept for Plant. NRR Issued Bulletin 88-004 Addressing Recirculation Problem 1990-02-26
[Table view] |
Text
~
. ( M L s3 3-
~
May 12,1982 ftEMORANDUM FOR D. Okrent, Chairman ACRS Subcommittee on !!idland Plant Units 1 & 2 FROM: D. C. Fischer, Reactor Engineer
SUBJECT:
TENTATIVE SCHEDULE FOR THE ACRS SUBCO*t4ITTEE MEETIllG O!!' MIDLAND PLANT UNITS 1 & 2 $1AY 20-21,1982 WASHINGTON, D.C.
Attached is a tentative schedule for the subject meeting. The purpose of the neeting is to review the application of Consumers Power Company for a license to operate Midland Plant Units 1 & 2.
~
'% The meeting will beain at 8:30 a.m. on Thursday, May 20th. The meeting will be held at the tiidland Holiday Inn,1500 Wackerly Rd., Midland, MI.
Attendance by the followinn ACRS members and consultants is anticipated and hotel reservations have been made at the Midland Holiday Inn for the nights indicated below. If you are unable to nake the meetino, please call us or the hotel and cancel your reservations so that we are not billed.
Hiqhts of D. Okrent 19th & 20th W. htathis D. Moeller "
C. Siess "
P. Davis "
E. Epler W. Lipinski -
F. Parker 20th P. Pomeroy (partial) 20th R. Scavuzzo 19th A 20th M. Trifunac (partial) 20th Z. Zudans 19th 4 20th 8510080403 850930 PDR FOIA 1 DRUNNER85-602 PDR Qg ,gp
' "' c ' > . . . . . . A C,R S , ,,DE1,s c he,rLb,g ,,,,, ,,,,, ,,, ,
,,5 -12 ,8,2,, , ,,,,,,,,,,, ,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,;
co x .) ...... . .... ... .. ... ............ . ......... . . .. ........ ....... . ............... .. .. ................. .................. . ,
C '.TE k ... .. ... .. . .. ......... ......... ................. .. ..... .............. ..................... . . . . . . . . . . . . . . . . . . . . ..................1 n c roru aie no omeu ouc OFFICIAL RECORD COPY . um m-m m '
. ( (
D. Okrent, Ch' airman ,
By copy of this memo, members of the NRC Staff and other participants who will be making presentations to the Subcommittee are reminded of the Subcommittee's need for twenty hard copies of all slides, training aids, and papers presented to the Subcommittee
Attachment:
Tentative Schedule cc: ACRS Members E. Goodwin, NRR R. Fraley, ACRS R. DeYoung, IE M. Gaske, ACRS R. Minogue, RES M. Libarkin, ACRS D. Eisenhut, NRR T. McCreless, ACRS R. Vollmer, NRR J. McKinley, ACRS J. Keppler, NRR G. Quittschreiber, ACRS R. Tedesco, NRR B. White, ACRS E. Adensam, NRR M. Vanderholt, ACRS D. Hood, NRR H. Denton, NRR R. Hernan, NRR E. Case, NRR J. Knight, NRR M. Sinclair I
l 1
j
(
~
. (
TENTATIVE SCHEDULE FOR THE MAY 20 & 21, 1982 ACRS SUBCOMMITTEE MEETING ON MIDLAND UNITS 1 & 2 HOLIDAY INN, 1500 WACKERLY RD., MIDLAND, MI THURSDAY, MAY 20, 1982 APPROXIMATE TIME TOPIC SPEAKER 8:30 A.M. I. CHAIRMAN'S OPENING STATEMENT D. Okrent 8:45 A.M. II. INTRODUCTION BY NRC STAFF NRC Staff A. Overview of OL Review
- 1. Status of review (including open items & licensing conditions)
- 2. Comparison of Midland with other similar PWRs reviewed by the NRC Staff :
- 3. Summary of principal review issues &
status of comments on the TMI Action Plan (including a summary of the safety issues in this review which the NRC Staff believes were the most difficult to resolve)
B. Discussion C. Comments by Applicant 9:30 A.M. III. QUALITY OF DESIGN AND CONTRUCTION A. IAE Report on Significant Plant Experiences (including a discussion on Construction QA/QC and an IAE Assessment of Construction Management)
B. Discussion 10:30 A.M. BREAK i
-,--w-- -- --.--w.- _ ---.% -..-_e - --- - - - -wr - e-- w - , . , - - - - - - - ~ + ,
J . ( l
. TENTATIVE SCHEDULE MIDLAND MAY 20 & 21; 1982 THURSDAY, MAY 20, 1982 (CONTINUED)
APPROXIMATE TIME TOPIC SPEAKER 10:40 A.M. IV. INTRODUCTION BY THE APPLICANT A. General B. Plant and Site Description C. Construction Schedule, Projected Schedule to Commercial Operations V. GENERAL TOPICS FOR DISCUSSION 11:00 A.M. A. Human Factors Review of the Control Room 11:10 A.M. B. Alternate Shutdown Panel 11:20 A.M. C. Instrumentation
- 1. To detect inadequate core cooling
- 2. Reactor vessel level indication 11:30 A.M. D. AC/DC Systems Reliability
- 1. Offsite power
- 2. Emergency diesel power distribution scheme
- 3. Station blackout
- 4. DC system reliability 12:00 E. Process Steam
- 1. System description
- 2. System operation
- 3. Radioactivity monitoring 12:15 P.M. RECESS / LUNCH 1:15 P.M. - 5:00 P.M. SITE VISIT i
i
- . (L (
e TENTATIVE SCHEDULE MIDLAND MAY 20 & 21, 1982 THURSDAY, M;Y 20, 1982 (CONTINUED)
APPROXIMATE TIME TOPIC SPEAKER 6:00 P.M. F. Seismic
- 1. Criteria to which plant and equipment were built (Seismic Input Criteria)
- 2. Site-specific spectra 4
- 3. Probabilistic estimates of increasingly severe earthquakes 1
- 4. Reevaluation of plant components and structures necessary for safe shutdown and decay heat removal (including margins available)
- 5. Need for dewatering to reduce the probability for liquifaction due to an earthquake (including margins available)
- 6. Other factors relevant to issue 8:00 P.M. G. Probabilistic Risk Assessment
- 1. Preliminary findings to date 8:15 P.M. H. Aux 111atry Feedwater System Reliability 9:00 P.M. I. Methods to Reduce Common Cause Failure i
- 1. Systems interaction studies
- 2. Separation of control and protection instrumentation
- 3. Changes in design resulting from previous experience 1
9:30 P.M. J. Other 10:00 P.M. RECESS
, , . _ , _ , ., , - ,____ _ _. .,,,-,.__. . - _.r
l c . ( l I
- 1 TENTATIVE SCHEDULE l MIDLAND , MAY 20 8 21, 1982 FRIDAY, MAY 21, 1982 APPROXIMATE TIME TOPIC SPEAKER V. GENERAL TOPICS FOR DISCUSSION (CONT'D) 8:30 A.M. K. Organization and Management
- 1. Corporate & operational management
- a. Experience levels
- b. Staff buildup - (percentage of engineering and management buildup)
- c. Utility offsite and onsite technical capability organization (Compliance with NUREG-0731, " Management Structure and Technical Resources")
- 2. Operations organization
- a. Plant and industry operating experience
- b. Uses of contractor personnel
- c. Criterion used to determine the oper-ating organizations' ability to assume control of plant from startup groups and contractors
- 3. Nuclear plant engineering organization
- 4. Nuclear services organization
- 5. Nuclear safety reyfew groups
- 6. Quality assurance organization 9:15 A.M. L. Operations Staffing and Training
- 1. Plant management chain of command
- 2. Current status of operations staffing (percentage complete and experience level)
- 3. Selection of for operators and main-tenance personnel
- 4. Plant communications (nomal operations, maintenance, refueling, outages, and emergencies (How are routine and emer-gency instructions handled between unit operators and auxiliary unit operators?)]
/
. ( (
TENTATIVE SCHEDULE MIDLAND MAY 20 8 21, 1982 FRIDAY, MAY 21, 1982 (CONTINUED)
APPROXIMATE TIME TOPIC SPEAKER
- 5. Plant safety review committee
- 6. Uses of contractor personnel
- 7. Uses of STA from utility perspective
- 8. Feedback to operators, STAS, and others of plant and industry ex-perience
- 9. Training for operators and maintenance personnel
- 10. Uses of simulators in training program 11 . Training for serious accidents, DBA and beyond DBA 10:00 A.M. M. Emergency Operating Procedures
- 1. ATOG
- 2. Reliability of instrumentation during abnormal plant conditions
- 3. E0P for case of severe earthquake 10:30 A.M.' BREAK 10:40 A.M.- N. DHR System Operations 10:50 A.M. O. System Highpoint Vents 11:00 A.M. ' - P. Bolting and Other High Strength Material
- 1. RPV bolts 11:10 A.M. Q. Fire Protection
- 1. Potential problems from spurious actuations, flooding or wetting, damper actuations
. ( (
4 TENTATIVE SCHEDULE MIDLAND - MAY 20 & 21, 1982 FRIDAY, MAY 21, 1982 (CONTINUED)
TOPIC SPEAKER APPROXIMATE TIME 11:20 A.M. R. Integrated Control System
. 1. What has been done to upgrade the ICS since TMI changes brought About by B&W vs. CPC
- 2. Failure modes & effect analysis 11:40 A.M. S. Seismic and Environmental Qualification of Equipment Important to Plant Safety 12:00 noon LUNCH 1:00 P.M. T. Items from previous ACRS letters NRC Staff 1:20 P.M. U. Habitability
- 1. Control room
- 2. Emergency response facilities 1:40 P.M. V. Emergency Planning
- 1. Meteorological monitoring program
- 2. Evacuation plan (including impact on DOW Chemical Plant) 1:50 P.M. W. Radiation Protesction Program
- 1. ALARA
- 2. Dose assessment procedures 2:00 P.M. X. Other 2:30 P.M. Y. Status of ACRS review D. Okrent 3:00 P.M. BREAK (CHANGE OF CHAIRMAN) 3:10 P.M. 2. Environmental Mor.:toring (Including Cooling pond, Tittabawasse River and Indigeneous Wildlife) 3:20 P.M. AA. Potential for Ground Water Contamination at the Midland Site 3:30 P.M. BB. Other 4:00 P.M. ADJOURNMENT L