Category:INSPECTION REPORT
MONTHYEARIR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000269/19930061993-03-22022 March 1993 Partially Withheld Insp Repts 50-269/93-06,50-270/93-06 & 50-287/93-06 on 930222-25 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000269/19930011993-02-0101 February 1993 Safeguards Insp Repts 50-269/93-01,50-270/93-01 & 50-287/93-01 on 930104-07.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000269/19920251992-12-0303 December 1992 Insp Repts 50-269/92-25,50-270/92-25 & 50-287/92-25 on 921102-06.No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors, Audits,Protected & Vital Area Barriers.Details Withheld IR 05000269/19910081991-04-10010 April 1991 Insp Repts 50-269/91-08,50-270/91-08 & 50-287/91-08 on 910312-15.violations Noted.Major Areas Inspected:Maint, Control Room Operation,Planning & Scheduling Activities, Training & Procedures,Plant Physical Condition & Mgmt IR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit IR 05000269/19890101989-05-19019 May 1989 Partially Withheld Insp Repts 50-269/89-10,50-270/89-10 & 50-287/89-10 on 890410-14 (Ref 10CFR2.790 & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Barriers IR 05000269/19890091989-04-10010 April 1989 Insp Repts 50-269/89-09,50-270/89-09 & 50-287/89-09 on 890306-10.No Violations Noted.Weaknesses Noted Re Data Base Used to Prepare computer-generated Work Requests.Major Areas Inspected:Design Control,Mods & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19880051988-03-21021 March 1988 Insp Repts 50-269/88-05,50-270/88-05 & 50-287/88-05 on 880217-0316.No Violations Noted.Major Areas Inspected:Maint, Operations,Surveillance,Physical Security & Design Changes IR 05000269/19870101987-03-17017 March 1987 Insp Repts 50-269/87-10,50-270/87-10 & 50-287/87-10 on 870210-0309.No Violations or Deviations Noted.Major Areas Inspected:Areas of Operations,Surveillance,Maint,Followup of Events & Verification of ESF Lineups IR 05000269/19870091987-03-17017 March 1987 Insp Repts 50-269/87-09,50-270/87-09 & 50-287/87-09 on 870209-13.No Violations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Radwaste Programs & Review of TMI Action Items II.B.3 & II.F.1.2 IR 05000269/19870061987-03-0909 March 1987 Insp Repts 50-269/87-06,50-270/87-06 & 50-287/87-06 on 870126-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Ongoing Repairs in Reactor Coolant Pumps & Maint & Welding Activities IR 05000269/19870041987-02-17017 February 1987 Insp Repts 50-269/87-04,50-270/87-04 & 50-287/87-04 on 870113-0209.No Violation or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Linups,Followup of Events & Shutdown Work in Progress IR 05000269/19870021987-02-11011 February 1987 Partially Withheld Insp Repts 50-269/87-02,50-270/87-02 & 50-287/87-02 on 870126-30 (Ref 10CFR2.790).Violation Noted Re Inadequate App R Circuit Analysis IR 05000269/19870031987-02-10010 February 1987 Insp Repts 50-269/87-03,50-270/87-03 & 50-287/87-03 on 870112-16.Violation Noted:Failure to Adequately Evaluate Radiological Hazards IR 05000269/19870081987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-08,50-270/87-08 & 50-287/87-08 on 861222.Major Areas Discussed:Safety Sys Functional Insp & Associated Safety Implications IR 05000269/19870071987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-07,50-270/87-07 & 50-287/87-07 on 861222.Major Areas Discussed:Sequence of Events & Corrective Actions Re Emergency Condenser Circulating Water Sys Degradation IR 05000269/19860341987-02-0505 February 1987 Corrected Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.Insp Erroneously Reported as Having Been Conducted on 861111-0112 IR 05000269/19870011987-01-30030 January 1987 Insp Repts 50-269/87-01,50-270/87-01 & 50-287/87-01 on 870105-08.Violation Noted:Failure to Provide Procedures W/Appropriate Qualitative or Quantitative Acceptance Criteria for Activities Important to Safety ML20211A0061987-01-23023 January 1987 Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Emergency Drills IR 05000269/19860351987-01-0707 January 1987 Insp Repts 50-269/86-35,50-270/86-35 & 50-287/86-35 on 861208-12.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Organization & Mgt of Health Physics Staff ML20212F5511986-12-24024 December 1986 Notice of Violation from Insp on 861103-12 IR 05000269/19860321986-12-10010 December 1986 Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys IR 05000269/19860281986-11-0303 November 1986 Partially Withheld Physical Security Insp Repts 50-269/86-28,50-270/86-28 & 50-287/86-28 on 861014-17 (Ref 10CFR2.790 & 73.21).Violation Noted:Inadequate Protected Area Barrier IR 05000269/19860301986-10-23023 October 1986 Partially Withheld Physical Security Insp Rept 50-269/86-30 on 861007-09 (Ref 10CFR2.790 & 73.21).No Violation Noted. Major Areas Inspected:Physical Protection of Irradiated Reactor Fuel During Transportation Between Sites IR 05000269/19860231986-09-23023 September 1986 Insp Repts 50-269/86-23,50-270/86-23 & 50-287/86-23 on 860826-29.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Review of Procedure & Investigation of Techniques Developed for Ultrasonic Exam of Flange IR 05000269/19860241986-09-19019 September 1986 Insp Repts 50-269/86-24,50-270/86-24 & 50-287/86-24 on 860908.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup Items IR 05000269/19860211986-08-15015 August 1986 Insp Repts 50-269/86-21,50-270/86-21 & 50-287/86-21 on 860708-0811.No Noncompliance or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup of Events IR 05000269/19860221986-08-0101 August 1986 Partially Withheld Insp Repts 50-269/86-22,50-270/86-22 & 50-287/86-22 on 860711 (Ref 10CFR2.790 & 73.21).Violation Noted:Individual Inside Vital Area Wore Invalid Picture Badge IR 05000269/19860151986-05-28028 May 1986 Insp Rept 50-269/86-15 on 860423-25.No Violations or Deviations Noted.Major Areas Inspected:Ultrasonic Exam of Mockup Reactor vessel-to-flange Weld for Correlation of Reflectors Between Vessel & Mockup IR 05000269/19860071986-05-15015 May 1986 Insp Repts 50-269/86-07,50-270/86-07 & 50-287/86-07 on 860317-0512.No Violations or Deviations Noted.Major Areas Inspected:Low Level Radwaste Burial Site & Startup Review of Low Level Radwaste Incinerator IR 05000269/19860121986-04-25025 April 1986 Insp Repts 50-269/86-12,50-270/86-12 & 50-287/86-12 on 860331-0404.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19860041986-04-0404 April 1986 Insp Repts 50-269/86-04,50-270/86-04 & 50-287/86-04 on 860211-0310.No Violation Noted.Major Areas Inspected: Operations,Surveillance,Maint,Verification of ESF Lineups & Refueling Activities IR 05000269/19860081986-04-0202 April 1986 Insp Repts 50-269/86-08,50-270/86-08 & 50-287/86-08 on 860303-07.No Violation or Deviation Noted.Major Areas Inspected:Unit 1 Sludge Cleaning of once-through Steam Generator by Water Slap Method & IE Bulletin 82-02 ML20199G4451986-03-25025 March 1986 Insp Repts 50-269/86-05,50-270/86-05 & 50-287/86-05 on 860224-28.Violation Noted:Failure to Provide Adequate Respiratory Protective Equipment to Maintain Intakes of Radioactive Matl ALARA IR 05000269/19860091986-03-20020 March 1986 Insp Repts 50-269/86-09,50-270/86-09 & 50-287/86-09 on 860306.No Violation or Deviation Noted.Major Areas Inspected:Steam Generator Cleaning & Maint Re Secondary Water Cycle ML20210H4081986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power IR 05000269/19860061986-03-14014 March 1986 Insp Repts 50-269/86-06,50-270/86-06 & 50-287/86-06 on 860224-27.No Violations or Deviations Noted.Major Areas Inspected:Switchyard Surveillance Testing,Containment Isolation Valve Test Witnessing & Procedure Review IR 05000269/19860031986-03-12012 March 1986 Insp Repts 50-269/86-03,50-270/86-03 & 50-287/86-03 on 860218-21.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Work Observation Data Review & Evaluation & Main Feedwater flow-nozzle Mod IR 05000269/19850421986-02-11011 February 1986 Insp Repts 50-269/85-42,50-270/85-42 & 50-287/85-42 on 851216-20.Violation Noted:Failure to Provide Positive Access Control for Two High Radiation Areas ML20137U5451986-02-11011 February 1986 Insp Repts 50-269/85-41,50-270/85-41 & 50-287/85-41 on 851210-860113.Noncompliance Noted:Failure to Follow Exempt Change Procedure & Failure to Shut Down Reactor within 24 H of Discovery of Excessive Leakage ML20154K8981986-02-0707 February 1986 Insp Repts 50-269/85-39,50-270/85-39 & 50-287/85-39 on 851209-13 & 860114.Violation Identified in Area of Physical Barrier - Protected Area.Rept Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000269/19850401986-01-13013 January 1986 Insp Repts 50-269/85-40,50-270/85-40 & 50-287/85-40 on 851209-13.No Violation or Deviation Identified.Major Areas Inspected:Maint & Surveillance Testing of Main Steam Safety Relief & Pressurizer Code Safety Relief Valves IR 05000269/19850381985-12-13013 December 1985 Insp Repts 50-269/85-38,50-270/85-38 & 50-287/85-38 on 851112-1209.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Startup Testing of Safe Shutdown Facility & LER Review ML20137E4031985-11-21021 November 1985 Insp Repts 50-269/85-37,50-270/85-37 & 50-287/85-37 on 851008-1111.Noncompliance Noted:Failure to Document Malfunctioning Valve 3LP-2 in Reactor Operator & Senior Reactor Operator Log IR 05000269/19850351985-10-28028 October 1985 Insp Repts 50-269/85-35,50-270/85-35 & 50-287/85-35 on 851007-11.No Violation or Deviation Noted.Major Areas Inspected:Review & Witnessing of Pre & post-criticality Tests Following Refueling Outage & Info Notice Followup 1994-01-06
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000269/19930061993-03-22022 March 1993 Partially Withheld Insp Repts 50-269/93-06,50-270/93-06 & 50-287/93-06 on 930222-25 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000269/19930011993-02-0101 February 1993 Safeguards Insp Repts 50-269/93-01,50-270/93-01 & 50-287/93-01 on 930104-07.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000269/19920251992-12-0303 December 1992 Insp Repts 50-269/92-25,50-270/92-25 & 50-287/92-25 on 921102-06.No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors, Audits,Protected & Vital Area Barriers.Details Withheld IR 05000269/19910081991-04-10010 April 1991 Insp Repts 50-269/91-08,50-270/91-08 & 50-287/91-08 on 910312-15.violations Noted.Major Areas Inspected:Maint, Control Room Operation,Planning & Scheduling Activities, Training & Procedures,Plant Physical Condition & Mgmt IR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit IR 05000269/19890101989-05-19019 May 1989 Partially Withheld Insp Repts 50-269/89-10,50-270/89-10 & 50-287/89-10 on 890410-14 (Ref 10CFR2.790 & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Barriers IR 05000269/19890091989-04-10010 April 1989 Insp Repts 50-269/89-09,50-270/89-09 & 50-287/89-09 on 890306-10.No Violations Noted.Weaknesses Noted Re Data Base Used to Prepare computer-generated Work Requests.Major Areas Inspected:Design Control,Mods & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19880051988-03-21021 March 1988 Insp Repts 50-269/88-05,50-270/88-05 & 50-287/88-05 on 880217-0316.No Violations Noted.Major Areas Inspected:Maint, Operations,Surveillance,Physical Security & Design Changes IR 05000269/19870101987-03-17017 March 1987 Insp Repts 50-269/87-10,50-270/87-10 & 50-287/87-10 on 870210-0309.No Violations or Deviations Noted.Major Areas Inspected:Areas of Operations,Surveillance,Maint,Followup of Events & Verification of ESF Lineups IR 05000269/19870091987-03-17017 March 1987 Insp Repts 50-269/87-09,50-270/87-09 & 50-287/87-09 on 870209-13.No Violations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Radwaste Programs & Review of TMI Action Items II.B.3 & II.F.1.2 IR 05000269/19870061987-03-0909 March 1987 Insp Repts 50-269/87-06,50-270/87-06 & 50-287/87-06 on 870126-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Ongoing Repairs in Reactor Coolant Pumps & Maint & Welding Activities IR 05000269/19870041987-02-17017 February 1987 Insp Repts 50-269/87-04,50-270/87-04 & 50-287/87-04 on 870113-0209.No Violation or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Linups,Followup of Events & Shutdown Work in Progress IR 05000269/19870021987-02-11011 February 1987 Partially Withheld Insp Repts 50-269/87-02,50-270/87-02 & 50-287/87-02 on 870126-30 (Ref 10CFR2.790).Violation Noted Re Inadequate App R Circuit Analysis IR 05000269/19870031987-02-10010 February 1987 Insp Repts 50-269/87-03,50-270/87-03 & 50-287/87-03 on 870112-16.Violation Noted:Failure to Adequately Evaluate Radiological Hazards IR 05000269/19870081987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-08,50-270/87-08 & 50-287/87-08 on 861222.Major Areas Discussed:Safety Sys Functional Insp & Associated Safety Implications IR 05000269/19870071987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-07,50-270/87-07 & 50-287/87-07 on 861222.Major Areas Discussed:Sequence of Events & Corrective Actions Re Emergency Condenser Circulating Water Sys Degradation IR 05000269/19860341987-02-0505 February 1987 Corrected Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.Insp Erroneously Reported as Having Been Conducted on 861111-0112 IR 05000269/19870011987-01-30030 January 1987 Insp Repts 50-269/87-01,50-270/87-01 & 50-287/87-01 on 870105-08.Violation Noted:Failure to Provide Procedures W/Appropriate Qualitative or Quantitative Acceptance Criteria for Activities Important to Safety ML20211A0061987-01-23023 January 1987 Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Emergency Drills IR 05000269/19860351987-01-0707 January 1987 Insp Repts 50-269/86-35,50-270/86-35 & 50-287/86-35 on 861208-12.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Organization & Mgt of Health Physics Staff ML20212F5511986-12-24024 December 1986 Notice of Violation from Insp on 861103-12 IR 05000269/19860321986-12-10010 December 1986 Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys IR 05000269/19860281986-11-0303 November 1986 Partially Withheld Physical Security Insp Repts 50-269/86-28,50-270/86-28 & 50-287/86-28 on 861014-17 (Ref 10CFR2.790 & 73.21).Violation Noted:Inadequate Protected Area Barrier IR 05000269/19860301986-10-23023 October 1986 Partially Withheld Physical Security Insp Rept 50-269/86-30 on 861007-09 (Ref 10CFR2.790 & 73.21).No Violation Noted. Major Areas Inspected:Physical Protection of Irradiated Reactor Fuel During Transportation Between Sites IR 05000269/19860231986-09-23023 September 1986 Insp Repts 50-269/86-23,50-270/86-23 & 50-287/86-23 on 860826-29.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Review of Procedure & Investigation of Techniques Developed for Ultrasonic Exam of Flange IR 05000269/19860241986-09-19019 September 1986 Insp Repts 50-269/86-24,50-270/86-24 & 50-287/86-24 on 860908.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup Items IR 05000269/19860211986-08-15015 August 1986 Insp Repts 50-269/86-21,50-270/86-21 & 50-287/86-21 on 860708-0811.No Noncompliance or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup of Events IR 05000269/19860221986-08-0101 August 1986 Partially Withheld Insp Repts 50-269/86-22,50-270/86-22 & 50-287/86-22 on 860711 (Ref 10CFR2.790 & 73.21).Violation Noted:Individual Inside Vital Area Wore Invalid Picture Badge IR 05000269/19860151986-05-28028 May 1986 Insp Rept 50-269/86-15 on 860423-25.No Violations or Deviations Noted.Major Areas Inspected:Ultrasonic Exam of Mockup Reactor vessel-to-flange Weld for Correlation of Reflectors Between Vessel & Mockup IR 05000269/19860071986-05-15015 May 1986 Insp Repts 50-269/86-07,50-270/86-07 & 50-287/86-07 on 860317-0512.No Violations or Deviations Noted.Major Areas Inspected:Low Level Radwaste Burial Site & Startup Review of Low Level Radwaste Incinerator IR 05000269/19860121986-04-25025 April 1986 Insp Repts 50-269/86-12,50-270/86-12 & 50-287/86-12 on 860331-0404.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19860041986-04-0404 April 1986 Insp Repts 50-269/86-04,50-270/86-04 & 50-287/86-04 on 860211-0310.No Violation Noted.Major Areas Inspected: Operations,Surveillance,Maint,Verification of ESF Lineups & Refueling Activities IR 05000269/19860081986-04-0202 April 1986 Insp Repts 50-269/86-08,50-270/86-08 & 50-287/86-08 on 860303-07.No Violation or Deviation Noted.Major Areas Inspected:Unit 1 Sludge Cleaning of once-through Steam Generator by Water Slap Method & IE Bulletin 82-02 ML20199G4451986-03-25025 March 1986 Insp Repts 50-269/86-05,50-270/86-05 & 50-287/86-05 on 860224-28.Violation Noted:Failure to Provide Adequate Respiratory Protective Equipment to Maintain Intakes of Radioactive Matl ALARA IR 05000269/19860091986-03-20020 March 1986 Insp Repts 50-269/86-09,50-270/86-09 & 50-287/86-09 on 860306.No Violation or Deviation Noted.Major Areas Inspected:Steam Generator Cleaning & Maint Re Secondary Water Cycle ML20210H4081986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power IR 05000269/19860061986-03-14014 March 1986 Insp Repts 50-269/86-06,50-270/86-06 & 50-287/86-06 on 860224-27.No Violations or Deviations Noted.Major Areas Inspected:Switchyard Surveillance Testing,Containment Isolation Valve Test Witnessing & Procedure Review IR 05000269/19860031986-03-12012 March 1986 Insp Repts 50-269/86-03,50-270/86-03 & 50-287/86-03 on 860218-21.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Work Observation Data Review & Evaluation & Main Feedwater flow-nozzle Mod IR 05000269/19850421986-02-11011 February 1986 Insp Repts 50-269/85-42,50-270/85-42 & 50-287/85-42 on 851216-20.Violation Noted:Failure to Provide Positive Access Control for Two High Radiation Areas ML20137U5451986-02-11011 February 1986 Insp Repts 50-269/85-41,50-270/85-41 & 50-287/85-41 on 851210-860113.Noncompliance Noted:Failure to Follow Exempt Change Procedure & Failure to Shut Down Reactor within 24 H of Discovery of Excessive Leakage ML20154K8981986-02-0707 February 1986 Insp Repts 50-269/85-39,50-270/85-39 & 50-287/85-39 on 851209-13 & 860114.Violation Identified in Area of Physical Barrier - Protected Area.Rept Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000269/19850401986-01-13013 January 1986 Insp Repts 50-269/85-40,50-270/85-40 & 50-287/85-40 on 851209-13.No Violation or Deviation Identified.Major Areas Inspected:Maint & Surveillance Testing of Main Steam Safety Relief & Pressurizer Code Safety Relief Valves IR 05000269/19850381985-12-13013 December 1985 Insp Repts 50-269/85-38,50-270/85-38 & 50-287/85-38 on 851112-1209.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Startup Testing of Safe Shutdown Facility & LER Review ML20137E4031985-11-21021 November 1985 Insp Repts 50-269/85-37,50-270/85-37 & 50-287/85-37 on 851008-1111.Noncompliance Noted:Failure to Document Malfunctioning Valve 3LP-2 in Reactor Operator & Senior Reactor Operator Log IR 05000269/19850351985-10-28028 October 1985 Insp Repts 50-269/85-35,50-270/85-35 & 50-287/85-35 on 851007-11.No Violation or Deviation Noted.Major Areas Inspected:Review & Witnessing of Pre & post-criticality Tests Following Refueling Outage & Info Notice Followup 1994-01-06
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000269/19930061993-03-22022 March 1993 Partially Withheld Insp Repts 50-269/93-06,50-270/93-06 & 50-287/93-06 on 930222-25 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000269/19930011993-02-0101 February 1993 Safeguards Insp Repts 50-269/93-01,50-270/93-01 & 50-287/93-01 on 930104-07.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000269/19920251992-12-0303 December 1992 Insp Repts 50-269/92-25,50-270/92-25 & 50-287/92-25 on 921102-06.No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors, Audits,Protected & Vital Area Barriers.Details Withheld IR 05000269/19910081991-04-10010 April 1991 Insp Repts 50-269/91-08,50-270/91-08 & 50-287/91-08 on 910312-15.violations Noted.Major Areas Inspected:Maint, Control Room Operation,Planning & Scheduling Activities, Training & Procedures,Plant Physical Condition & Mgmt IR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit IR 05000269/19890101989-05-19019 May 1989 Partially Withheld Insp Repts 50-269/89-10,50-270/89-10 & 50-287/89-10 on 890410-14 (Ref 10CFR2.790 & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Barriers IR 05000269/19890091989-04-10010 April 1989 Insp Repts 50-269/89-09,50-270/89-09 & 50-287/89-09 on 890306-10.No Violations Noted.Weaknesses Noted Re Data Base Used to Prepare computer-generated Work Requests.Major Areas Inspected:Design Control,Mods & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19880051988-03-21021 March 1988 Insp Repts 50-269/88-05,50-270/88-05 & 50-287/88-05 on 880217-0316.No Violations Noted.Major Areas Inspected:Maint, Operations,Surveillance,Physical Security & Design Changes IR 05000269/19870101987-03-17017 March 1987 Insp Repts 50-269/87-10,50-270/87-10 & 50-287/87-10 on 870210-0309.No Violations or Deviations Noted.Major Areas Inspected:Areas of Operations,Surveillance,Maint,Followup of Events & Verification of ESF Lineups IR 05000269/19870091987-03-17017 March 1987 Insp Repts 50-269/87-09,50-270/87-09 & 50-287/87-09 on 870209-13.No Violations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Radwaste Programs & Review of TMI Action Items II.B.3 & II.F.1.2 IR 05000269/19870061987-03-0909 March 1987 Insp Repts 50-269/87-06,50-270/87-06 & 50-287/87-06 on 870126-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Ongoing Repairs in Reactor Coolant Pumps & Maint & Welding Activities IR 05000269/19870041987-02-17017 February 1987 Insp Repts 50-269/87-04,50-270/87-04 & 50-287/87-04 on 870113-0209.No Violation or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Linups,Followup of Events & Shutdown Work in Progress IR 05000269/19870021987-02-11011 February 1987 Partially Withheld Insp Repts 50-269/87-02,50-270/87-02 & 50-287/87-02 on 870126-30 (Ref 10CFR2.790).Violation Noted Re Inadequate App R Circuit Analysis IR 05000269/19870031987-02-10010 February 1987 Insp Repts 50-269/87-03,50-270/87-03 & 50-287/87-03 on 870112-16.Violation Noted:Failure to Adequately Evaluate Radiological Hazards IR 05000269/19870081987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-08,50-270/87-08 & 50-287/87-08 on 861222.Major Areas Discussed:Safety Sys Functional Insp & Associated Safety Implications IR 05000269/19870071987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-07,50-270/87-07 & 50-287/87-07 on 861222.Major Areas Discussed:Sequence of Events & Corrective Actions Re Emergency Condenser Circulating Water Sys Degradation IR 05000269/19860341987-02-0505 February 1987 Corrected Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.Insp Erroneously Reported as Having Been Conducted on 861111-0112 IR 05000269/19870011987-01-30030 January 1987 Insp Repts 50-269/87-01,50-270/87-01 & 50-287/87-01 on 870105-08.Violation Noted:Failure to Provide Procedures W/Appropriate Qualitative or Quantitative Acceptance Criteria for Activities Important to Safety ML20211A0061987-01-23023 January 1987 Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Emergency Drills IR 05000269/19860351987-01-0707 January 1987 Insp Repts 50-269/86-35,50-270/86-35 & 50-287/86-35 on 861208-12.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Organization & Mgt of Health Physics Staff ML20212F5511986-12-24024 December 1986 Notice of Violation from Insp on 861103-12 IR 05000269/19860321986-12-10010 December 1986 Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys IR 05000269/19860281986-11-0303 November 1986 Partially Withheld Physical Security Insp Repts 50-269/86-28,50-270/86-28 & 50-287/86-28 on 861014-17 (Ref 10CFR2.790 & 73.21).Violation Noted:Inadequate Protected Area Barrier IR 05000269/19860301986-10-23023 October 1986 Partially Withheld Physical Security Insp Rept 50-269/86-30 on 861007-09 (Ref 10CFR2.790 & 73.21).No Violation Noted. Major Areas Inspected:Physical Protection of Irradiated Reactor Fuel During Transportation Between Sites IR 05000269/19860231986-09-23023 September 1986 Insp Repts 50-269/86-23,50-270/86-23 & 50-287/86-23 on 860826-29.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Review of Procedure & Investigation of Techniques Developed for Ultrasonic Exam of Flange IR 05000269/19860241986-09-19019 September 1986 Insp Repts 50-269/86-24,50-270/86-24 & 50-287/86-24 on 860908.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup Items IR 05000269/19860211986-08-15015 August 1986 Insp Repts 50-269/86-21,50-270/86-21 & 50-287/86-21 on 860708-0811.No Noncompliance or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup of Events IR 05000269/19860221986-08-0101 August 1986 Partially Withheld Insp Repts 50-269/86-22,50-270/86-22 & 50-287/86-22 on 860711 (Ref 10CFR2.790 & 73.21).Violation Noted:Individual Inside Vital Area Wore Invalid Picture Badge IR 05000269/19860151986-05-28028 May 1986 Insp Rept 50-269/86-15 on 860423-25.No Violations or Deviations Noted.Major Areas Inspected:Ultrasonic Exam of Mockup Reactor vessel-to-flange Weld for Correlation of Reflectors Between Vessel & Mockup IR 05000269/19860071986-05-15015 May 1986 Insp Repts 50-269/86-07,50-270/86-07 & 50-287/86-07 on 860317-0512.No Violations or Deviations Noted.Major Areas Inspected:Low Level Radwaste Burial Site & Startup Review of Low Level Radwaste Incinerator IR 05000269/19860121986-04-25025 April 1986 Insp Repts 50-269/86-12,50-270/86-12 & 50-287/86-12 on 860331-0404.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19860041986-04-0404 April 1986 Insp Repts 50-269/86-04,50-270/86-04 & 50-287/86-04 on 860211-0310.No Violation Noted.Major Areas Inspected: Operations,Surveillance,Maint,Verification of ESF Lineups & Refueling Activities IR 05000269/19860081986-04-0202 April 1986 Insp Repts 50-269/86-08,50-270/86-08 & 50-287/86-08 on 860303-07.No Violation or Deviation Noted.Major Areas Inspected:Unit 1 Sludge Cleaning of once-through Steam Generator by Water Slap Method & IE Bulletin 82-02 ML20199G4451986-03-25025 March 1986 Insp Repts 50-269/86-05,50-270/86-05 & 50-287/86-05 on 860224-28.Violation Noted:Failure to Provide Adequate Respiratory Protective Equipment to Maintain Intakes of Radioactive Matl ALARA IR 05000269/19860091986-03-20020 March 1986 Insp Repts 50-269/86-09,50-270/86-09 & 50-287/86-09 on 860306.No Violation or Deviation Noted.Major Areas Inspected:Steam Generator Cleaning & Maint Re Secondary Water Cycle ML20210H4081986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power IR 05000269/19860061986-03-14014 March 1986 Insp Repts 50-269/86-06,50-270/86-06 & 50-287/86-06 on 860224-27.No Violations or Deviations Noted.Major Areas Inspected:Switchyard Surveillance Testing,Containment Isolation Valve Test Witnessing & Procedure Review IR 05000269/19860031986-03-12012 March 1986 Insp Repts 50-269/86-03,50-270/86-03 & 50-287/86-03 on 860218-21.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Work Observation Data Review & Evaluation & Main Feedwater flow-nozzle Mod IR 05000269/19850421986-02-11011 February 1986 Insp Repts 50-269/85-42,50-270/85-42 & 50-287/85-42 on 851216-20.Violation Noted:Failure to Provide Positive Access Control for Two High Radiation Areas ML20137U5451986-02-11011 February 1986 Insp Repts 50-269/85-41,50-270/85-41 & 50-287/85-41 on 851210-860113.Noncompliance Noted:Failure to Follow Exempt Change Procedure & Failure to Shut Down Reactor within 24 H of Discovery of Excessive Leakage ML20154K8981986-02-0707 February 1986 Insp Repts 50-269/85-39,50-270/85-39 & 50-287/85-39 on 851209-13 & 860114.Violation Identified in Area of Physical Barrier - Protected Area.Rept Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000269/19850401986-01-13013 January 1986 Insp Repts 50-269/85-40,50-270/85-40 & 50-287/85-40 on 851209-13.No Violation or Deviation Identified.Major Areas Inspected:Maint & Surveillance Testing of Main Steam Safety Relief & Pressurizer Code Safety Relief Valves IR 05000269/19850381985-12-13013 December 1985 Insp Repts 50-269/85-38,50-270/85-38 & 50-287/85-38 on 851112-1209.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Startup Testing of Safe Shutdown Facility & LER Review ML20137E4031985-11-21021 November 1985 Insp Repts 50-269/85-37,50-270/85-37 & 50-287/85-37 on 851008-1111.Noncompliance Noted:Failure to Document Malfunctioning Valve 3LP-2 in Reactor Operator & Senior Reactor Operator Log IR 05000269/19850351985-10-28028 October 1985 Insp Repts 50-269/85-35,50-270/85-35 & 50-287/85-35 on 851007-11.No Violation or Deviation Noted.Major Areas Inspected:Review & Witnessing of Pre & post-criticality Tests Following Refueling Outage & Info Notice Followup 1994-01-06
[Table view] Category:UTILITY
MONTHYEARIR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit IR 05000269/19890091989-04-10010 April 1989 Insp Repts 50-269/89-09,50-270/89-09 & 50-287/89-09 on 890306-10.No Violations Noted.Weaknesses Noted Re Data Base Used to Prepare computer-generated Work Requests.Major Areas Inspected:Design Control,Mods & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19880051988-03-21021 March 1988 Insp Repts 50-269/88-05,50-270/88-05 & 50-287/88-05 on 880217-0316.No Violations Noted.Major Areas Inspected:Maint, Operations,Surveillance,Physical Security & Design Changes IR 05000269/19870101987-03-17017 March 1987 Insp Repts 50-269/87-10,50-270/87-10 & 50-287/87-10 on 870210-0309.No Violations or Deviations Noted.Major Areas Inspected:Areas of Operations,Surveillance,Maint,Followup of Events & Verification of ESF Lineups IR 05000269/19870091987-03-17017 March 1987 Insp Repts 50-269/87-09,50-270/87-09 & 50-287/87-09 on 870209-13.No Violations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Radwaste Programs & Review of TMI Action Items II.B.3 & II.F.1.2 IR 05000269/19870061987-03-0909 March 1987 Insp Repts 50-269/87-06,50-270/87-06 & 50-287/87-06 on 870126-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Ongoing Repairs in Reactor Coolant Pumps & Maint & Welding Activities IR 05000269/19870041987-02-17017 February 1987 Insp Repts 50-269/87-04,50-270/87-04 & 50-287/87-04 on 870113-0209.No Violation or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Linups,Followup of Events & Shutdown Work in Progress IR 05000269/19870021987-02-11011 February 1987 Partially Withheld Insp Repts 50-269/87-02,50-270/87-02 & 50-287/87-02 on 870126-30 (Ref 10CFR2.790).Violation Noted Re Inadequate App R Circuit Analysis IR 05000269/19870031987-02-10010 February 1987 Insp Repts 50-269/87-03,50-270/87-03 & 50-287/87-03 on 870112-16.Violation Noted:Failure to Adequately Evaluate Radiological Hazards IR 05000269/19860341987-02-0505 February 1987 Corrected Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.Insp Erroneously Reported as Having Been Conducted on 861111-0112 IR 05000269/19870071987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-07,50-270/87-07 & 50-287/87-07 on 861222.Major Areas Discussed:Sequence of Events & Corrective Actions Re Emergency Condenser Circulating Water Sys Degradation IR 05000269/19870081987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-08,50-270/87-08 & 50-287/87-08 on 861222.Major Areas Discussed:Safety Sys Functional Insp & Associated Safety Implications IR 05000269/19870011987-01-30030 January 1987 Insp Repts 50-269/87-01,50-270/87-01 & 50-287/87-01 on 870105-08.Violation Noted:Failure to Provide Procedures W/Appropriate Qualitative or Quantitative Acceptance Criteria for Activities Important to Safety ML20211A0061987-01-23023 January 1987 Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Emergency Drills IR 05000269/19860351987-01-0707 January 1987 Insp Repts 50-269/86-35,50-270/86-35 & 50-287/86-35 on 861208-12.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Organization & Mgt of Health Physics Staff IR 05000269/19860321986-12-10010 December 1986 Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys IR 05000269/19860281986-11-0303 November 1986 Partially Withheld Physical Security Insp Repts 50-269/86-28,50-270/86-28 & 50-287/86-28 on 861014-17 (Ref 10CFR2.790 & 73.21).Violation Noted:Inadequate Protected Area Barrier IR 05000269/19860301986-10-23023 October 1986 Partially Withheld Physical Security Insp Rept 50-269/86-30 on 861007-09 (Ref 10CFR2.790 & 73.21).No Violation Noted. Major Areas Inspected:Physical Protection of Irradiated Reactor Fuel During Transportation Between Sites IR 05000269/19860231986-09-23023 September 1986 Insp Repts 50-269/86-23,50-270/86-23 & 50-287/86-23 on 860826-29.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Review of Procedure & Investigation of Techniques Developed for Ultrasonic Exam of Flange IR 05000269/19860241986-09-19019 September 1986 Insp Repts 50-269/86-24,50-270/86-24 & 50-287/86-24 on 860908.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup Items IR 05000269/19860211986-08-15015 August 1986 Insp Repts 50-269/86-21,50-270/86-21 & 50-287/86-21 on 860708-0811.No Noncompliance or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup of Events IR 05000269/19860221986-08-0101 August 1986 Partially Withheld Insp Repts 50-269/86-22,50-270/86-22 & 50-287/86-22 on 860711 (Ref 10CFR2.790 & 73.21).Violation Noted:Individual Inside Vital Area Wore Invalid Picture Badge IR 05000269/19860151986-05-28028 May 1986 Insp Rept 50-269/86-15 on 860423-25.No Violations or Deviations Noted.Major Areas Inspected:Ultrasonic Exam of Mockup Reactor vessel-to-flange Weld for Correlation of Reflectors Between Vessel & Mockup IR 05000269/19860121986-04-25025 April 1986 Insp Repts 50-269/86-12,50-270/86-12 & 50-287/86-12 on 860331-0404.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19860041986-04-0404 April 1986 Insp Repts 50-269/86-04,50-270/86-04 & 50-287/86-04 on 860211-0310.No Violation Noted.Major Areas Inspected: Operations,Surveillance,Maint,Verification of ESF Lineups & Refueling Activities IR 05000269/19860081986-04-0202 April 1986 Insp Repts 50-269/86-08,50-270/86-08 & 50-287/86-08 on 860303-07.No Violation or Deviation Noted.Major Areas Inspected:Unit 1 Sludge Cleaning of once-through Steam Generator by Water Slap Method & IE Bulletin 82-02 ML20199G4451986-03-25025 March 1986 Insp Repts 50-269/86-05,50-270/86-05 & 50-287/86-05 on 860224-28.Violation Noted:Failure to Provide Adequate Respiratory Protective Equipment to Maintain Intakes of Radioactive Matl ALARA IR 05000269/19860091986-03-20020 March 1986 Insp Repts 50-269/86-09,50-270/86-09 & 50-287/86-09 on 860306.No Violation or Deviation Noted.Major Areas Inspected:Steam Generator Cleaning & Maint Re Secondary Water Cycle ML20210H4081986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power IR 05000269/19860061986-03-14014 March 1986 Insp Repts 50-269/86-06,50-270/86-06 & 50-287/86-06 on 860224-27.No Violations or Deviations Noted.Major Areas Inspected:Switchyard Surveillance Testing,Containment Isolation Valve Test Witnessing & Procedure Review IR 05000269/19860031986-03-12012 March 1986 Insp Repts 50-269/86-03,50-270/86-03 & 50-287/86-03 on 860218-21.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Work Observation Data Review & Evaluation & Main Feedwater flow-nozzle Mod IR 05000269/19850421986-02-11011 February 1986 Insp Repts 50-269/85-42,50-270/85-42 & 50-287/85-42 on 851216-20.Violation Noted:Failure to Provide Positive Access Control for Two High Radiation Areas ML20137U5451986-02-11011 February 1986 Insp Repts 50-269/85-41,50-270/85-41 & 50-287/85-41 on 851210-860113.Noncompliance Noted:Failure to Follow Exempt Change Procedure & Failure to Shut Down Reactor within 24 H of Discovery of Excessive Leakage ML20154K8981986-02-0707 February 1986 Insp Repts 50-269/85-39,50-270/85-39 & 50-287/85-39 on 851209-13 & 860114.Violation Identified in Area of Physical Barrier - Protected Area.Rept Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000269/19850401986-01-13013 January 1986 Insp Repts 50-269/85-40,50-270/85-40 & 50-287/85-40 on 851209-13.No Violation or Deviation Identified.Major Areas Inspected:Maint & Surveillance Testing of Main Steam Safety Relief & Pressurizer Code Safety Relief Valves IR 05000269/19850381985-12-13013 December 1985 Insp Repts 50-269/85-38,50-270/85-38 & 50-287/85-38 on 851112-1209.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Startup Testing of Safe Shutdown Facility & LER Review ML20137E4031985-11-21021 November 1985 Insp Repts 50-269/85-37,50-270/85-37 & 50-287/85-37 on 851008-1111.Noncompliance Noted:Failure to Document Malfunctioning Valve 3LP-2 in Reactor Operator & Senior Reactor Operator Log IR 05000269/19850351985-10-28028 October 1985 Insp Repts 50-269/85-35,50-270/85-35 & 50-287/85-35 on 851007-11.No Violation or Deviation Noted.Major Areas Inspected:Review & Witnessing of Pre & post-criticality Tests Following Refueling Outage & Info Notice Followup IR 05000269/19850341985-10-24024 October 1985 Insp Repts 50-269/85-34,50-270/85-34 & 50-287/85-34 on 850930-1004.No Violation or Deviation Noted.Major Areas Inspected:Fire Protection/Prevention & Followup on Previously Identified Items IR 05000269/19850321985-10-23023 October 1985 Insp Repts 50-269/85-32,50-270/85-32 & 50-287/85-32 on 850910-1007.No Noncompliance or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Offsite Review Committee & Startup from Refueling IR 05000269/19850331985-10-17017 October 1985 Insp Repts 50-269/85-33,50-270/85-33 & 50-287/85-33 on 850923-26.No Violation or Deviation Noted.Major Areas Inspected:Unit 3 Inservice Insp,Review & Record Evaluation & Main Feedwater Flow Nozzle post-weld Heat Treatment IR 05000269/19850311985-10-11011 October 1985 Insp Repts 50-269/85-31,50-270/85-31 & 50-287/85-31 on 850923-27.No Violation or Deviation Noted.Major Areas Inspected:Reactor Bldg Tendon Surveillance Program & Surveillance of Pipe Support & Restraints ML20138M5601985-10-0808 October 1985 Insp Repts 50-269/85-30,50-270/85-30 & 50-287/85-30 on 850916-20.Violation Noted:Failure to Label Containers of Radioactive Matl ML20141A0191985-10-0202 October 1985 Insp Repts 50-269/85-28,50-270/85-28 & 50-287/85-28 on 850903-06.Violation Noted:Inadequate Procedure for Documentation of Vital Area Barrier Insp.Details Withheld (Ref 10CFR2.790(d) & 73.21) ML20133C7481985-09-24024 September 1985 Insp Repts 50-269/85-27,50-270/85-27 & 50-287/85-27 on 850903-06.Violations Noted:Failure to Use Qualified Weld Procedures & to Obtain Final QA Approval on Reactor Coolant Pump Replacement Bolts Prior to Startup ML20132C2821985-09-13013 September 1985 Insp Repts 50-269/85-26,50-270/85-26 & 50-287/85-26 on 850813-0909.Violation Noted:Failure to Follow Procedures for E-bar Determination 1990-07-24
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-97-065, on 971228,initiated Controlled Shutdown of Unit Due to Exceeding TS Leakage Limit of 150 Gpd.Licensee Continuing W/Plant Depressurization & Cooldown & Outage Planned of Several Days to Investigate & Repair SG1997-12-29029 December 1997 PNO-II-97-065:on 971228,initiated Controlled Shutdown of Unit Due to Exceeding TS Leakage Limit of 150 Gpd.Licensee Continuing W/Plant Depressurization & Cooldown & Outage Planned of Several Days to Investigate & Repair SG ML20211K9431997-09-26026 September 1997 Notice of Violation from Insp on 970721-26.Violation Noted: Licensee Failed to Follow Procedures for Security Badges & Access Control of Facility ML20210S0391997-08-27027 August 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $330,000.Violation Noted:Between 970501-02,w/ Fuel in Oconee Unit 3 Core & RCS Temp Greater than 350 F, Licensee Failed to Maintain HPI Sys Operable as Required PNO-II-97-034, on 970613,extended Shutdown to Meet CAL 2-97-03 Commitments to Shutdown Unit 1 No Later than 970614 & to Implement Actions Re HPI Sys.Nrc Resident Inspector Will Followup on Unit 1 Shutdown & Recovery Activities1997-06-13013 June 1997 PNO-II-97-034:on 970613,extended Shutdown to Meet CAL 2-97-03 Commitments to Shutdown Unit 1 No Later than 970614 & to Implement Actions Re HPI Sys.Nrc Resident Inspector Will Followup on Unit 1 Shutdown & Recovery Activities IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts PNO-II-93-039, on 930823,reactor Trip Occurred Due to Loss of Power to Vital Panelboard.Investigation Team Dispatched to Site to Review Root Cause & Plant Response.State & Local Authorities Notified1993-08-24024 August 1993 PNO-II-93-039:on 930823,reactor Trip Occurred Due to Loss of Power to Vital Panelboard.Investigation Team Dispatched to Site to Review Root Cause & Plant Response.State & Local Authorities Notified IR 05000269/19930061993-03-22022 March 1993 Partially Withheld Insp Repts 50-269/93-06,50-270/93-06 & 50-287/93-06 on 930222-25 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000269/19930011993-02-0101 February 1993 Safeguards Insp Repts 50-269/93-01,50-270/93-01 & 50-287/93-01 on 930104-07.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000269/19920251992-12-0303 December 1992 Insp Repts 50-269/92-25,50-270/92-25 & 50-287/92-25 on 921102-06.No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors, Audits,Protected & Vital Area Barriers.Details Withheld PNO-II-92-070, on 921019,several Circuit Breakers Failed in 230KV Switchyard to Open Position for Unknown Reasons. Licensee Has Inititated Investigation to Review Event to Determine Cause & Determine Why Certain Equipment Failed1992-10-20020 October 1992 PNO-II-92-070:on 921019,several Circuit Breakers Failed in 230KV Switchyard to Open Position for Unknown Reasons. Licensee Has Inititated Investigation to Review Event to Determine Cause & Determine Why Certain Equipment Failed PNO-II-91-074B, on 911123,unit Remained in Cold Shutdown,Per Declaration of Alert at 0214 Due to Leak in Rcs.As of 911126,total of 7,800 Gallons of Treated Water Released from Plant to Lake Hartwell1991-11-26026 November 1991 PNO-II-91-074B:on 911123,unit Remained in Cold Shutdown,Per Declaration of Alert at 0214 Due to Leak in Rcs.As of 911126,total of 7,800 Gallons of Treated Water Released from Plant to Lake Hartwell ML20134D2581991-06-0404 June 1991 Notice of Violation from Insp on 910312-15.Violations Noted:Station Was Not Maintained According to Main Procedure MP/0/A/1800/105,Section 6.5,which Clearly Identified That Flange Was to Be Installed on Valve 3LP19 IR 05000269/19910081991-04-10010 April 1991 Insp Repts 50-269/91-08,50-270/91-08 & 50-287/91-08 on 910312-15.violations Noted.Major Areas Inspected:Maint, Control Room Operation,Planning & Scheduling Activities, Training & Procedures,Plant Physical Condition & Mgmt PNO-II-90-070, on 901108,unit Commenced Controlled Shutdown from 60% Power Due to Tube Leak in Steam Generator a1990-11-0808 November 1990 PNO-II-90-070:on 901108,unit Commenced Controlled Shutdown from 60% Power Due to Tube Leak in Steam Generator a IR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900241990-10-0202 October 1990 SALP Repts 50-269/90-24,50-270/90-24,50-287/90-24 & 72-0004/90-24 for Feb 1989 - Jul 1990 IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit IR 05000269/19890101989-05-19019 May 1989 Partially Withheld Insp Repts 50-269/89-10,50-270/89-10 & 50-287/89-10 on 890410-14 (Ref 10CFR2.790 & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Barriers IR 05000269/19890091989-04-10010 April 1989 Insp Repts 50-269/89-09,50-270/89-09 & 50-287/89-09 on 890306-10.No Violations Noted.Weaknesses Noted Re Data Base Used to Prepare computer-generated Work Requests.Major Areas Inspected:Design Control,Mods & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19880051988-03-21021 March 1988 Insp Repts 50-269/88-05,50-270/88-05 & 50-287/88-05 on 880217-0316.No Violations Noted.Major Areas Inspected:Maint, Operations,Surveillance,Physical Security & Design Changes PNO-II-88-013, on 880211,two Workers Slightly Contaminated W/ Radioactive Water.Caused by Approx 1,000 Gallon Leak of Radioactive Water Occurring During Maint on Valve.Workers Showered to Remove Contamination1988-02-12012 February 1988 PNO-II-88-013:on 880211,two Workers Slightly Contaminated W/ Radioactive Water.Caused by Approx 1,000 Gallon Leak of Radioactive Water Occurring During Maint on Valve.Workers Showered to Remove Contamination ML20237B2261987-12-15015 December 1987 EN-87-017A:informs That 870309 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Withdrawn Due to Determination That Violation Did Not Occur. Violation Based on Failure of Emergency Feedwater Pumps ML20235T5821987-09-18018 September 1987 Exam Rept 50-269/OL-87-02 on 870713-23.Exam Results:Seven of Ten Reactor Operator (RO) & Eight of Nine Senior Reactor Operator (SRO) Candidates Passed Written Exam.All RO & SRO Candidates Passed Operating Exam ML20238F7081987-09-0909 September 1987 Exam Rept 50-269/OL-87-01 for Units 1,2 & 3 on 870713-17. Exam results:7 of 10 Reactor Operators & 3 of 6 Senior Reactor Operators Passed ML20236E5111987-07-14014 July 1987 EN-86-056:on 870717,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Will Be Issued to Licensee.Action Based on Failure to Properly Implement Startup Procedure Causing Trains to Fail IR 05000269/19870091987-03-17017 March 1987 Insp Repts 50-269/87-09,50-270/87-09 & 50-287/87-09 on 870209-13.No Violations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Radwaste Programs & Review of TMI Action Items II.B.3 & II.F.1.2 IR 05000269/19870101987-03-17017 March 1987 Insp Repts 50-269/87-10,50-270/87-10 & 50-287/87-10 on 870210-0309.No Violations or Deviations Noted.Major Areas Inspected:Areas of Operations,Surveillance,Maint,Followup of Events & Verification of ESF Lineups ML20207T5431987-03-12012 March 1987 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Noncompliance Noted:Measures Not Established to Assure That Regulatory Requirements & Design Bases Correctly Translated Into Specs,Drawings & Procedures IR 05000269/19870061987-03-0909 March 1987 Insp Repts 50-269/87-06,50-270/87-06 & 50-287/87-06 on 870126-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Ongoing Repairs in Reactor Coolant Pumps & Maint & Welding Activities ML20207R4851987-03-0909 March 1987 EN-87-017:on 870312,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Will Be Issued to Util Based on Failure to Provide Adequate Design Control to Ensure Emergency Feedwater Pump Operability IR 05000269/19870041987-02-17017 February 1987 Insp Repts 50-269/87-04,50-270/87-04 & 50-287/87-04 on 870113-0209.No Violation or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Linups,Followup of Events & Shutdown Work in Progress IR 05000269/19870021987-02-11011 February 1987 Partially Withheld Insp Repts 50-269/87-02,50-270/87-02 & 50-287/87-02 on 870126-30 (Ref 10CFR2.790).Violation Noted Re Inadequate App R Circuit Analysis ML20211A4991987-02-11011 February 1987 Notice of Violation from Insps on 870112-16 IR 05000269/19870031987-02-10010 February 1987 Insp Repts 50-269/87-03,50-270/87-03 & 50-287/87-03 on 870112-16.Violation Noted:Failure to Adequately Evaluate Radiological Hazards ML20210U3211987-02-0505 February 1987 Notice of Violation from Insp on 861015-1110.Violation Noted:For Periods in 1978,1981 & 1986 When Lake Keowee Elevation Less than 792 Ft,Emergency Condenser Cooling Water Sys Inoperable & Unable to Provide Sustained Siphon Flow IR 05000269/19870071987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-07,50-270/87-07 & 50-287/87-07 on 861222.Major Areas Discussed:Sequence of Events & Corrective Actions Re Emergency Condenser Circulating Water Sys Degradation IR 05000269/19870081987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-08,50-270/87-08 & 50-287/87-08 on 861222.Major Areas Discussed:Safety Sys Functional Insp & Associated Safety Implications IR 05000269/19860341987-02-0505 February 1987 Corrected Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.Insp Erroneously Reported as Having Been Conducted on 861111-0112 ML20211A0871987-02-0303 February 1987 Notice of Violation from Insp on 870105-08 IR 05000269/19870011987-01-30030 January 1987 Insp Repts 50-269/87-01,50-270/87-01 & 50-287/87-01 on 870105-08.Violation Noted:Failure to Provide Procedures W/Appropriate Qualitative or Quantitative Acceptance Criteria for Activities Important to Safety ML20211A0061987-01-23023 January 1987 Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Emergency Drills ML20210U9961987-01-22022 January 1987 Exam Rept 50-269/OL-86-03 on 861215.Exam Results:Two Reactor Operator Candidates Passed Written Reexam.Written Exam Questions & Answer Key Encl IR 05000269/19860351987-01-0707 January 1987 Insp Repts 50-269/86-35,50-270/86-35 & 50-287/86-35 on 861208-12.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Organization & Mgt of Health Physics Staff ML20212F5511986-12-24024 December 1986 Notice of Violation from Insp on 861103-12 PNO-II-86-092, on 861218,licensee Shut Down Unit to Begin Scheduled Refueling Outage 6 Wks Early.Caused by Excessive Vibrations in Reactor Coolant Pump 3B2.During Outage,Reactor Coolant Pumps 3B1,3B2 & 3A1 Will Be Modified1986-12-18018 December 1986 PNO-II-86-092:on 861218,licensee Shut Down Unit to Begin Scheduled Refueling Outage 6 Wks Early.Caused by Excessive Vibrations in Reactor Coolant Pump 3B2.During Outage,Reactor Coolant Pumps 3B1,3B2 & 3A1 Will Be Modified IR 05000269/19860321986-12-10010 December 1986 Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys IR 05000269/19860281986-11-0303 November 1986 Partially Withheld Physical Security Insp Repts 50-269/86-28,50-270/86-28 & 50-287/86-28 on 861014-17 (Ref 10CFR2.790 & 73.21).Violation Noted:Inadequate Protected Area Barrier 1997-09-26
[Table view] |
See also: IR 05000269/1985041
Text
-
2
4
- pmREOu ,
UNITED STATES
j 'o
^
NUCLEAR REGULATORY COMMISSION
REGION ll
[ o
101 MARIETTA STREET.N.W.
g j
- 2 ATLANTA, GEORGI A 30323
\.....,/
t,
Report Nos: -50-269/85-41, 50-270/85-41, and 50-287/85-41
Licensee: Duke Power Company
422 South Church Street
Charlotte, N.C. 28242
Facility Name: Oconee Nuclear Station
Docket Nos.: 50-269, 50-270, and 50-287 License Nos.: DPR-38, DPR-47,
and DPR-55
Inspection Conducted: D ember 10.-19851- January 13, 1986
Inspectors: f, - LM1/J by d )1l
)Mte 41gned
,J. C. Bryant //
& .
M. K. ia s s'e r
duw Lff shdu
D6t'e gi"gned
Approved by: /M 3 iT/ThV 08 ktI lh
V. L. Brjwn' lee, Section Chief, ( Acting) Ddte S'igned
Division of Reactor Projects
SUMMARY
Scope: This _ routine, announced inspection entailed 224 inspector-hours on site
~
- in the areas.of operations, surveillance, maintenance, facility modifications,
LER review, and response to the Rancho Seco event.
Results: Of the six areas inspected, no items of noncompliance or deviations
were ider.ti fied in four areas; Two items of noncompliance were found in two
areas; Failure to follow exempt change procedure and failure to shut down reactor
- within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of discovery of excess leakage.
,
Q Q
i
.
.
REPORT DETAILS
1. Licensee Employees Contacted
- M.S. Tuckman, Station Manager
- J.N.. Pope, Superintendent of Operations
- T.B. Owen, Superintendent of Maintenance
- R.T. Bond, Compliance Engineer
- T.C.'Matthews, Technical Specialist
- R.A.-Knoerr, Project Services Engineer
- R.J. Brackett, Senior Quality Assurance Engineer
Other licensee ~ employees contacted included technicians, operators,
mechanics, security force members, and staff engineers.
Resident Inspectors
2. Exit Interview
The inspection scope and findings were summarized on January 13, 1986, with
those persons indicated-in paragraph I above. The licensee did not identify
~
as propri. eta ry any of the materials provided to or reviewed by the
inspectors during this inspection.
3. Licensee Action' on Previous Enforcement Matters
(Closed) Violation 269, 270, 287/85-20-02 Failure to Report FSAR Revisions
as Required. -Adequate corrective action has been taken.
4. Unresolved Items
Unresolved items were not identified on this inspection.
-
5. Plant Operations
The inspectors reviewed plant operations throughout the reporting period to
verify conformance with regulatory requirements, Technical Specifications
-(TS), and administrative controls. Control room logs, shift turnover
records and equipment removal and restoration records were reviewed
routinely. Interviews were conducted with plant operations, maintenance,
chemistry, health physics and performance personnel.
- . - - . . . . . - . . - . . - . - - - , _ . . _
.
.
2
.
Activities within the control rooms were monitored on an almost daily ~ basis.
Inspections were conducted on day and on night shifts, during week days and
on weekends. ' Some inspections were made during shift change in order to
' evaluate shift turnover performance.
_
Actions observed were conducted as
required by Operations Management Procedure 2-1. The complement of licensed
personnel on each shift inspected met or exceeded the requirements of TS.
Operators were responsive to plant annunciator alarms and were cognizant of
plant conditions.
+
Plant' tours were taken throughout the reporting period on a routine basis.
The areas toured included the following:
Turbine Building
Auxiliary Building
Units 1, 2, and 3 Penetration Rooms
Units 1,2, and'3 Electrical Equipment Rooms
Units 1,2, and 3 Cable Spreading Rooms
Station Yard Zone within the Protected, Area
Standby Shutdown Facility
During the plant tours, ongoing activities, housekeeping, security,
equipment status, and radiation control practices were observed.
Unit 1 operated at essentially full power throughout the reporting period,
December 10, 1985 to January 13, 1986.
"
Unit 2 operated at . full power until December.14 when it was shut down to
4 repair a reactor coolant leak at an instrument root valve. The reactor was
returned to power on December 15 and operated at essentially full power
through the remainder of the report period. The shutdown is discussed in
greater detail in paragraph 8 of this report.
Unit 3 began the report period shut down to replace a main turbine bearing.
~
The unit was returned to power on December 16 and operated at essentially
full power the remainder of the report period. The unit startup is
discussed in paragraph 11 of this report.
6. Surveillance Testing
The surveillance tests listed below were reviewed and/or witnessed by the
inspectors to verify procedural and performance adequacy.
The completed tests reviewed were examined for necessary test prerequisites,
instructions, acceptance criteria, technical content, authorization to begin
work, data collection, independent verification where required, handling of
deficiencies noted, and review of completed work.
The tests witnessed, in whole or in part, were inspected to determine that
'
approved procedures were available, test equipment was calibrated,
prerequisites were met, tests were conducted according to procedure, test
results were acceptable and systems restoration was completed.
, _ . , . _ _ _ . . - _ . - _ _ . . _ . _ . - . . . . , .- _ __ - ~ . _ . - , . -__ _
-
.
.
.
3
Surveillances witnessed in whole or in part are as follows:
IP/1/A/305/3C RPS Channel C On-Line Test
PT/2/A/600/18 Unit 2 Motor Driven Emergency Feedwater Pump Test
IP/1/A/301/3S Startup & Intermediate Range Channel Test
PT/1/A/0150/22A Operations Valve Functional Test, Valves BS-1 and
BS-2
PT/1/A/251/01 Low Pressure Service Water Pump Test
Surveillance tests reviewed are as follows:
PT/3/A/0150/22A Operational Valve Functional Test, Unit 3.
No violations or deviations were identified.
7. Maintenance Activities
Maintenance activities were observed and/or reviewed during the reporting
period to verify that ' work was performed by qualified personnel and that
approved procedures in use adequately described work that was not within the
skill of the trade. Activities, procedures and work requests were examined
to veri fy proper authorization to begin work, provisions .for fire,
cleanliness, and exposure control, proper return of equipment to service,
and that limiting conditions for operation were met.
During an inspection of the licensee's program on Motor Operated Valve (MOV)
switch setpoints, the inspectors reviewed numerous work requests for
Maintenance I&E to troubleshoot and repair MOVs which would not operate from
their control roc 1 handswitch. In many cases, either Operations or I&E
opened the valve .om the breaker by depressing the contactor in the breaker
compartment, thus bypassing the switches and motor overloads, allowing
sufficient torque to be developed for opening the valve.
In a number of the maint'enance jobs, the inspectors found that I&E did not
use the applicable procedure, did not find the root cause, and did not take
adequate corrective action to prevent recurrence. Bypassing motor overloads
and switches at the breaker without troubleshooting the problem first was
found to be contradictory to the applicable troubleshooting procedure. In
all cases reviewed, the maintenance jobs were dated prior to a violation
written on the same subject in Report No. 50-287/85-37. That violation
concerned inoperability of Valve 3LP2.
The licensee has taken corrective action to upgrade MOV operability as a
result of his own studies as well as due to the violation; because of this
and the concurrent violation on the same subject, an additional violation
will not be cited. The licensee has stated that the appropriate trouble-
shooting procedure will be used when performing maintenance on MOV's.
~
Bypassing of torque switches and other controls will not be performed prior
to examination to determine root cause, except 'in cases of operational
emergency.
. ._ . . . _ . . __ _ . __ . _ _ _
4
k
.
l 4
8. Unit 2 Reactor Coolant Leakage
On Friday, December 13, at approximately 1:00 am, the unit 2 reactor coolant
system (RCS) leak rate was determined to be 1.32. gallons per minute (gpm).
This determination was the result of the daily surveillance of RCS leakage,
performed during the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period from 12 midnight to 1:00 a.m. For. a
period of approximately 2 weeks the leak rate had been higher than normal,
with occasional results above 1 gpm. Subsequent confirmatory results had
always proven to be less than 1 gpm. Attempts by the Operations staff to
identify and isolate any leakage had been unsuccessful.
However, upon detection of excess leakage on December 13, the subsequent
confirmatory results did not prove to be less than 1 gpm. The leak rate
calculations were begun on an hourly basis at 1:00 a.m. on Friday, December
13, and new- efforts to identify the leak were initiated. Several entries
into the reactor building to inspect accessable areas proved unsuccessful.
- - Ten of the eighteen RCS leak rates calculated on Friday indicated
unidentified leakage that ranged from 1.02 to 1.65 gpm.
The hourly leak rate calculations were continued on Saturday, December 14.
These results also provided evidence of greater than 1 gpm leakage, with ten
of eleven surveillances ranging from 1.07 to 1.52 gpm. At approximately '12
noon on Saturday, plant management decided to begin shutdown of unit 2,'and
at 5:30 p.m., the unit was taken subcritical . While at hot shutdown, a
thorough . inspection revealed a leaking flow transmitter root valve on the
RCS A loop. The leak was repaired and the unit was taken critical on
Sunday, December 15 at 2:03 p.m. and power was escalated to 100%.
Technical Specification 3.1.6.2 states that, if unidentified reactor coolant
- leakage (excluding normal evaporative losses) exceeds I gpm ... the reactor
shall be shut down within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of detection. This 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period
provides a reasonable period of time to; (1) identify the leak and evaluate
its safety significance for continued operation, (2) provide additional
sample results to conclusively prove unidentified leakage less than 1.gpm,
or (3) shutdown the reactor in an orderly fashion if the first two options
,
are not sucessful.
Contrary to the above, on Friday, December 13, upon detection of RCS leakage
in excess of 1 gpm, the leakage was not identified nor proven to be less
than 1 gpm. From the time of detection until the reactor was shutdown a
period of over 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> elapsed. This item is identified as a violation of
Technical Specification 3.1.6.2,. -Violation - Failure to Shutdown Reactor
'
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of Detection of Excess Leakage, (270/85-41-01).
9. Motor Operated Valve (MOV) Switch Setpoints
]
! The inspectors continued an inspection to determine whether the licensee has
an effective program to ensure that valve operator switch settings are
,
selected, set, and maintained properly (see report 85-38). The inspectors
had become aware of numerous industry problems where improperly adjusted
- torque, torque bypass, or limit switches had resulted in valves failing to
,
- . _ - - _
i
.
.
5
operate when required either in operational events or during testing.
Additionally, the recently issued IE Bulletin 85-03, addresses new
requirements in certain safety related systems. The inspectors conducted
.'
this inspection to determine the extent, if any, of valve switch problems in
safety related systems at Oconee.
The responsible I&E engineers contacted indicated that no formal program
exists at the Oconee nuclear station for determining setpoints. Torque
4
switch setpoints may be derived by any one of the following methods:
(1) from the NSM package if specified, (2) from the electrical (OEE)
<
drawing, if specified, or (3) field determined, i.e., setting the switch to
whatever it takes to operate the valve. Thus the setpoints may not be based
on engineering analysis of system pressures, valve operator size, and other
factors. It was noted that switches being adjusted in the field did not
,
appear to consider the design or operating pressures.
~ Based on a review of the station Inservice Inspection Program and~
discussions with staff test personnel, the inspectors determined that the
program does not verify the adequacy of switch setpoints through testing of
valves under the appropriate operating or accident pressure conditions. In .
many cases, safety related valves are stroke tested under conditions of no
differential pressure, which may be entirely different from the conditions
for which the ' valve (s) may be called upon to operate.
2
The work history of approximately 25 safety related MOVs was reviewed to
determine the number of events where the MOV failed to operate properly,
whether switch setpoints were a significant contributing factor, and whether
,
adequate corrective action was taken. A large number of events were
'
identified by the computer listing for these MOVs, however, only a se'ected
, number were evaluated by the inspector.
Review of the work histories identified many cases where torque switch
setpoints were adjusted by I&E technicians in the field, using adequately
'
' detailed and documented procedures. These completed procedures then became
'
the reference for future use by plant personnel for documentation of the
setpoints. However, it is again noted .that the adjustments and subsequent
'
stroking for operability testi.ng was completed with little or no pressure on i
the valve (s), a condition entirely different than may exist later.
Based on the above inspecton activities the inspectors have concluded that
the licensee does not presently have an adequate program to determine the
, correct setpoints for switches on safety related motor operators, to
document and control these setpoints, and to verify their adequacy through a
'
4 test program based on testing, where possible, under actual system
differential pressure conditions.
The above findings were discussed with the licensee along with a discussion
of IE Bulletin 85-03, Motor Operated Valve Common Mode Failures During Plant
Transients Due to Improper Switch Setpoints were discussed. That bulletin
requires licensees to develop and i mpl eme.,t a program for selecting,
- . - .- -.- - - .-.-_.-.-. .--.-- -. .-.
__ . _
.. . - _ _ _ _- _ _ . ..
,
.
.
6
setting, and maintaining switch setpoints for MOVs on certain safety related
systems.
The licensee is developing a valve improvement program, partly in response
!' to the IE Bulletin, but also in part due to histories of valve maintenance
problems.' The station has recently requested _ Design Engineering to develop
i a document listing the maximum and minimum torque settings for MOVs at the
- Oconee Station. Additionally,.the test staff and maintenance engineers are
- looking at methods to test valve operators under the actual system operating
conditions or under similar conditions on a test stand.
While the IE Bulletin only requires development of the program for the High
Pressure Injection and Emergency Feedwater systems at Oconee, the station is
considering implementation of the program for other. safety related systems.
The inspectors will follow the development and implementation of this
program.
i 10. Licensee Event Reports
The inspectors reviewed nonroutine event reports to verify that report
details met license requirements, identified the cause of the event,
described corrective actions appropriate for the idenfified cause, and
adequately addressed the event and any generic implications. In addition,
as appropriate, the inspectors examined operating and maintenance logs, and
i records and internal investigation reports.
Personnel were interviewed to verify that the report accurately reflected
the circumstances of the event, that the corrective action had been taken or
i responsioility assigned to assure completion, and that the event was
4
reviewed by the licensee, as stipulated in the Technical Specifications. The
following event reports-were reviewed: ;
(Closed) LER270/85-06 Reactor Trip on High RCS Pressure Following Closure
of Turbine Intercept and Bypass Valves. Event was caused by a spurious
signal generated while trouble shooting.
(Closed) LER287/85-01 Reactor T. rip Due to High RCS Pressure. Problem was
j caused by a failed integrated control system module.
(Closed) LER287/85.-02 Lockout of Startup Transformer. The lockot.t was
caused by an actual fault pressure condition; however, the root cause of the
pressure could not be determined.
,
11. Review of Unit 3 Startup
On December 16, Unit 3 was taken critical and returned to power operations
following a 21 day outage to replace a bearing on the high pressure turbine. !
The inspectors witnessed portions of the startup to verify proper
performance of plant staff, adherence to procedures, and control room
coordination. Following the plant startup, the inspectors conducted a
detailed review of the completed controlling procedure for unit startup,
i
j
-_____-__ _ _ _ _ _ _ _ - _ - - _ _ _ _ _ _ _ - _ _ _ _ _ . _ - - - _ _ _ __
1
.
.
.
7
OP/3/A/1102/01, and associated procedures required to be performed in
conjunction with the controlling procedure.
The - procedures were reviewed in order to determine correct procedural
adherence, whether required sequences of activities were followed, whether
adequate system lineups were performed or verified, and whether systems and
components were verified operable as required.
No violations or deviations were identified.
12. Review of Non-Conforming Item Reports (71707)
The inspectors reviewed Non-Conforming Item Reports (NCIR) to verify that
identified deficiencies are tracked via the licensee's problem identifica-
tion system and that prompt corrective action is taken. A question as to
the timeliness of operability reviews was raised based on inspector review
of NCIR No. 0-1608, as well as to the nature of the NCIR.
This NCIR dealt with an exempt change which added nipples to two thermowells
on a 3/8 inch line at the pressurizer sample cooler near the primary sample
hood. The addition was necessary to facilitate sampling of the reactor
coolant system (RCS). The 3/8 inch line is isolated from the RCS by two
remotely operated valves, one inside and one outside containment, which are
normally closed except when a sample is taken.
In this Class E system, schedule 40 one inch nipples and 3000 pound one inch
couplings were used to effect the exempt change. Flow diagram 0FD-110A-3.1
specifies that schedule 160 piping and 5000 pound fittings be used. The
inspectors discussed the matter with Duke Power Company Design personnel who
stated that wall thickness, at the thread, of the nipples used was
calculated to be 0.063 inches, while the code requirement for the
application is 0.141 inches.
The inspectors noted that, though an operability review was required, thirty
days were allowed for th'e review. Since the NCI dealt with what amounted to
substandard material in a sample system connected to the RCS, the inspectors
did not agree with the thirty day review. The licensee then isolated the
affected system and reworked the modification with materials of the correct
strength.
In determining the cause of the non-conforming item, the inspectors reviewed
the Oconee Project Services procedure for exempt changes. In substance, the
procedure requires that the site accountable engineer (A/E) contact Design
Engineering for verbal approval of an exempt change (EC) concept; on
approval of the EC the A/E sends detailed drawings of the change in a
variation notice (VN) to Design Engineering for review; on approval by
Design Engineering of final drawings and specifications the work may
proceed. However, the work may proceed prior to Design Engineering
approval, but the system may not be returned to service until the approval
is received.
.
.
8
In the case -of EC OE-0426, verbal approval was received for the change on
October 5,1985, and the work was performed on October 6 and the system
returned to service. The site engineer who prepared the job apparently
neglected to consider loss of strength due to the 316S-Schedule 40 one inch
nipple and coupling being threaded connections.
A variation notice (VN) detailing the modification was sent to Design
Engineering on October 7 and on December 12, the VN was rejected by Design
Engineering. An NCIR was not issued until January 3, 1986. On January 3 it
was sent by QA to the compliance section for Operability Review. The NRC
inspectors saw the NCI on January 9 and the licensee took immediate
corrective action.
Technical. Specification 6.4.1 ' states that the station will be oper_ated and
maintained ' according to approved procedures. Paragraph 6.4. lc. of this
specification includes actions taken to correct specific and foreseen
malfunctions of systems or components involving nuclear safety and radiation
levels. Failure to follow the exempt change procedure is an apparent
violation of Technical Specification (Violation- Failure to Follow Procedure
on Exempt Change, 85-41-02).
The inspectors pointed out that any conditions which possibly compromised
the integrity of the RCS should have immediate review. The licensee agreed
that the delay was not acceptable and that the system would have to be
revised to prevent recurrence. The licensee pointed out that, due to
earlier identified weaknesses in the program for problem evaluation,
documentation and corrective action, the Problem Investigation Report (PIR)
System had been developed and is scheduled to be implemented by June 1,
1986. The PIR will facilitate the mechanism for any employee to identify a
non-conformance and initiate corrective action. The system will be
coordinated by the Compliance Section. Specific time frames will be
assigned to the di f ferent program elements, including the operability
review, when required.
Implementation of the PIR system should resolve inspector concerns on the
timeliness of performing operability reviews. The residents will follow
implementation of this system, and it is listed as inspector followup item;
IFI 287/85-41-03; Timeliness of Operability Reviews.
13. Inspector Followup Items
(Closed) IFI 270/81-32-03 PORV Block Valve Failures. Corrective action was
taken at the time of the event to prevent recurrence. Corrective actions to
assure proper maintenance on motor operated valves, as a result of plant
problems and in response to Bulletin 85-03, Motor Operated Valve Common Mode
Failures During Plant Transients Due to Improper Switch Settings is
discussed in paragraph 9 of this report.
-
i
.
-9
1
14. Facility Modifications (37701)
The inspectors completed their review of selected test procedures performed
during checkout of the Standby Shutdown Facility (SSF). The previous
report, No. 50-269,270,287/85-38, paragraph 12, discussed the SSF diesel
. generator in reference to IE Bulletin 79-23 which pointed out a potential
generator failure due to the flow of circulating currents.
The referenced report stated that, at the factory, connections (shown as
corrections in the referenced report) had not been made between low KVA
rated transformers and high KVA diesel generators without adequate
limitations on the flow of circulating currents. ~ The inspector requested
the licensee to verify that site installation had not compromised these
limitations. The licensee inspected the generator, relative to Bulletin
79-23, and stated that it was determined to be a wye-wye ungrounded
connection, which eliminated the possibility of-high circulating current.
Bulletin 79-23 was closed in 1979 since Oconee, at that time, had no diesel
generators. The licensee has determined that the SSF diesel generator,
subsequently instal. led, meets the requirements of Bulleting 79-23. This
item is closed.
15. TMI Action Items (NUREG-0737)
2.K.9 (Closed) Failure Modes and ' Effects Analysis on ICS. As a result of
the correspondence from the NRC to Duke, Wagner to Parker, dated 02/03/82,
this. item should have been cle' sed. This item is now considered closed.
16. Noble Gas Activity Monitor Out of Service (Unit 2)
Radiation Instrument Alarm (RIA) 45 is one of six monitors in the Unit Vent
Monitoring System and monitors noble gas release. At 4:25 p.m. on
December 18, 1985, 2RIA-45 was declared out of service and turnover given to
repair. Repair would normally be made on the following day shift.
Technical Specifications Table 3.5.5-2.2a shows that if RIA-40 is out of
service, a . grab sample must be analyzed every eight hours.
.
Operations
personnel did not detect this requirement.
At 8:00 a.m. on December-19, it_was determined that the stack should have
been sampled every eight hours. A sample was taken at 8:30 a.m. on
December 19, 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> after the monitor was declared operable. 2RIA-40 was
returned to service at 10:30 a.m. on December 19.
The licensee immediately took corrective action, reported the event to NRC,
and also took corrective action to cause shift personnel to review technical
specifications when an instrument is taken out of service. Failure to
sample the stack within eight hours of RIA-40 being declared out of service
is a violation. of Technical Specification 3.5.5.2. However, the violation
will not be cited since it meets the requirements of 10 CFR Part 2,
Appendix C, Paragraph A.
.
.
i
'
,
10
17. Rancho Seco Overcooling Event
Upon hearing of the loss of integrated control system (ICS) power at Rancho
Seco, which resulted in an overcooling event, the inspectors began a
determination of the Oconee staffs reaction to the event. The staff had
already begun an investigation of 'the Oconee plant response and the
differences between Oconee and Rancho Seco, and had initiated an operator
training program. On January 9, the inspectors attended an operator
training class on the simulator _ in which operators were subjected to the '
loss of ICS power, loss of ICS automatic control, and loss of ICS hand
control. All three result in different plant responses.
Based on the inspector's understanding of the Rancho Seco system, apparent
. differences in automatic response to loss of ICS power is as follows:
At Rancho Seco, main fe. ! water valves close to 50%, feedwater pumps run back
.to minimum speed, turbine bypass and atmospheric dump valves open to 50%.
The reactor trip ~ ped on high pressure due to initial underfeed of the steam
generators with 'the overcooling transient following due to steam generator
overfeed and steam flow through the open bypass and dump valves. Operator
response was complicated due to emergency feedwater pumps'and valves having
controls from the ICS, which had lost power.
At Oconee the main feedwater pumps trip on loss of ICS power, thus tripping
the reactor and turbine on an ' anticipatory trip. The turbine bypass valves
fail closed and the atmospheric dump valves have no automatic controls
(chainwheel only). The Oconee engineered safety features and emergency
feedwater pumps and valves are independent of the ICS. l
!