(BVPS-1 and 2) - Issuance of Amendment 8-Percent Extended Power Uprate (TAC Nos. MC4645 and MC4646)
ML061720248
Person / Time
Site: Beaver Valley
Issue date: 07/19/2006
From: Colburn T
NRC/NRR/ADRO/DORL/LPLI-1
To: Lash J
FirstEnergy Nuclear Operating Co
Colburn T, NRR/DORL/LPLI-1, 415-1402
Shared Package
ML061720274 List:
References
TAC MC4645, TAC MC4646
Download: ML061720248 (12)


Text

July 19, 2006 Mr. James H. Lash Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -

ISSUANCE OF AMENDMENT REGARDING THE 8-PERCENT EXTENDED POWER UPRATE (TAC NOS. MC4645 AND MC4646)

Dear Mr. Lash:

The Commission has issued the enclosed Amendment No. 275 to Facility Operating License No. DPR-66 and Amendment No. 156 to Facility Operating License No. NPF-73 for the BVPS-1 and 2. These amendments consist of changes to the Facility Operating Licenses and the Technical Specifications (TSs) in response to your application dated October 4, 2004, as supplemented by letters dated February 23, May 26, June 14, July 8 and 28, August 26, September 6, October 7, 28, and 31, November 8, 18, and 21, and December 2, 6, 9, 16, and 30, 2005, and January 25, February 14 and 22, March 10 and 29, May 12, and July 6, 2006.

These amendments revise the Facility Operating Licenses and TSs to authorize an approximately 8-percent increase in the licensed rated thermal power from 2,689 megawatts thermal (MWt) to 2,900 MWt. This increase is considered an extended power uprate (EPU).

Additionally, these amendments approve full implementation of an alternative source term in accordance with Title 10 of the Code of Federal Regulations, Section 50.67, and using Regulatory Guide 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors. The NRC also approved other TS changes which you requested, which are not directly related to the EPU, including deletion of the power range neutron-flux high-negative rate trip, removal of the boron injection tank boron concentration for BVPS-1, renaming the boron injection flow path for BVPS-1, addition of a footnote to Table 3.3-3 for BVPS-1, and correction of an inconsistency regarding a referenced permissive for BVPS-1.

In your letter dated February 22, 2006, you requested to withdraw certain changes to your application for BVPS-1, which had previously been approved in Amendment No. 273 dated February 9, 2006, as these changes were no longer necessary. Additionally, your requested change to delete the amendment number from paragraph 2.C(2) of each Facility Operating License so that number would be left blank for these and all future Amendments will not be evaluated as part of these amendments and will be the subject of a future licensing action.

J. Lash A copy of our safety evaluation is also enclosed. The Notice of Issuance is enclosed and is being forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Timothy G. Colburn, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosures:

1. Amendment No. 275 to DPR-66
2. Amendment No. 156 to NPF-73
3. Safety Evaluation
4. Notice of Issuance cc w/encls: See next page

J. Lash A copy of our safety evaluation is also enclosed. The Notice of Issuance is enclosed and is being forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Timothy G. Colburn, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosures:

1. Amendment No. 275 to DPR-66
2. Amendment No 156 to NPF-73
3. Safety Evaluation
4. Notice of Issuance cc w/encls: See next page Package No. ML061720274 Safety Evaluation No. ML061720376 ACCESSION NO. ML061720248 *Input received. No substantive changes made.

OFFICE LPLI-1/PM LPLI-1/LA AFPB/BC CSGB/BC CPNB/BC EQVA/BC CVIB/BC NAME TColburn SLittle SWeerakody* LLund* TChan* DThatcher* MMitchell*

DATE 7/13/06 7/13/06 06/09/05 09/08/05 08/03/05 11/15/05 12/28/05 OFFICE EEEB/BC AADB/BC IHPB/BC(A) ACVB/BC APLA/BC ACVB/BC SBPB/BC NAME RJenkins* MKotzalas* SKlementowicz* RDennig* MRubin* RDennig* DSolorio*

DATE 01/05/06 01/13/06 01/18/06 02/01/06 02/28/06 03/01/06 03/09/06 OFFICE EEMB/BC EICB/BC REBB/BC IOLB/BC SPWB/BC SPWB/BC TechEd NAME KManoly* AHowe* RFranovich* NOKeefe* JNakoski* JNakoski* HChang DATE 03/10/06 03/15/06 03/15/06 03/22/06 04/04/06 04/13/06 06/26/06 OFFICE OGC LPLI-1/BC DORL/D NRR/D NAME JMoore RLaufer CHaney JDyer DATE 07/12/06 07/17/06 07/18/06 7/19/06 OFFICIAL RECORD COPY

DISTRIBUTION:

PUBLIC LPLI-1 R/F J. Dyer RidsNrrWpcMail M. Webber RidsNrrOd S. Collins, RI RidsRgn1MailCenter B. Boger RidsNrrAdro C. Haney RidsNrrDorl C. Holden RidsNrrDorl R. Laufer RidsNrrDorlLpla T. Colburn RidsNrrPMTColburn S. Little RidsNrrLASLittle J. Nakoski RidsNrrDssSpwb D. Solorio RidsNrrDssSbpb T. Bloomer RidsNrrDciCsgb T. Chan RidsNrrDciCpnb M. Mitchell RidsNrrDciCvib K. Gruss RidsNrrDciCfeb K. Manoly RidsNrrDeEemb A. Howe RidsNrrDeEicb E. Brown RidsNrrDeEeeb D. Thatcher RidsNrrDeEqva N. OKeefe RidsNrrDirsIolb T. Boyce RidsNrrDirsItsb T. Frye RidsNrrDirsIhpb M. Kotzalas RidsNrrDraAadb M. Rubin RidsNrrDraApla S. Weerakody RidsNrrDraAfpb R. Dennig RidsNrrDraAcvb OGC RidsOgcRp ACRS RidsAcrsAcnwMailCenter G. Hill (4)

R. Bellamy, RI RidsRgn1MailCenter B. Singal DORL DPR

FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION CORP.

DOCKET NO. 50-334 BEAVER VALLEY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 275 License No. DPR-66

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by FirstEnergy Nuclear Operating Company, et al. (the licensee), dated October 4, 2004, as supplemented by letters dated February 23, May 26, June 14, July 8 and 28, August 26, September 6, October 7, 28, and 31, November 8, 18, and 21, and December 2, 6, 9, 16, and 30, 2005, and January 25, February 14 and 22, March 10 and 29, May 12, and July 6, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications and license as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-66 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 275, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance. A phased approach to power uprate may be taken. Full implementation will be completed prior to startup from the fall 2007 refueling outage. Items (a) and (c) below shall be completed prior to increasing power above 2689 MWt. Completion of item (b) shall follow the schedule in 10 CFR 50.71(e). Appropriate plant modifications as described in the licensee's application and the NRC staff's safety evaluation dated July 19, 2006, shall be made prior to exceeding 2689 MWt. Implementation shall include: (a) applicable revisions to plant operating procedures and the completion of operator training for the phases of the proposed power uprate being implemented, (b) incorporation of licensing basis changes into the next revision of the Updated Final Safety Analysis Report required by 10 CFR 50.71(c), and (c) inclusion of the commitments, as described in the licensees application, as supplemented, and the staffs safety evaluation dated July 19, 2006, in the licensees commitment tracking program.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License and Technical Specifications Date of Issuance: July 19, 2006

ATTACHMENT TO LICENSE AMENDMENT NO. 275 FACILITY OPERATING LICENSE NO. DPR-66 DOCKET NO. 50-334 Replace the following page of the Facility Operating License with the attached revised page.

The revised page is identified by amendment number and contains marginal lines indicating the areas of change.

Remove Insert 3 3 Replace the following pages of Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert VI VI 1-1 1-1 3/4 1-16 3/4 1-16 3/4 3-2 3/4 3-2 3/4 3-7 3/4 3-7 3/4 3-11 3/4 3-11 3/4 3-15 3/4 3-15 3/4 3-18 3/4 3-18 3/4 4-6 3/4 4-6 3/4 4-18 3/4 4-18 3/4 4-20 3/4 4-20 3/4 4-21 3/4 4-21 3/4 5-3 3/4 5-3 3/4 5-6 3/4 5-6 3/4 5-7 3/4 5-7 3/4 5-7a -----

3/4 7-1 3/4 7-1 3/4 7-2 3/4 7-2 3/4 7-4 3/4 7-4 3/4 7-7 3/4 7-7 3/4 7-8 3/4 7-8

FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION CORP.

OHIO EDISON COMPANY THE TOLEDO EDISON COMPANY DOCKET NO. 50-412 BEAVER VALLEY POWER STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 156 License No. NPF-73

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by FirstEnergy Nuclear Operating Company, et al. (the licensee), dated October 4, 2004, as supplemented by letters dated February 23, May 26, June 14, July 8 and 28, August 26, September 6, October 7, 28, and 31, November 8, 18, and 21, and December 2, 6, 9, 16, and 30, 2005, and January 25, February 14 and 22, March 10 and 29, May 12, and July 6, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications and license as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-73 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 156, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of the date of its issuance. A phased approach to power uprate may be taken except that BVPS-2 shall not increase power levels beyond its previously licensed power level of 2689 megawatts thermal until startup from the fall 2006 refueling outage. Full implementation will be completed prior to startup from the spring 2008 refueling outage. Items (a) and (c) below shall be completed prior to increasing power above 2689 MWt. Completion of item (b) shall follow the schedule in 10 CFR 50.71(e). Appropriate plant modifications as described in the licensee's application and the NRC staff's safety evaluation dated July 19, 2006, shall be made prior to exceeding 2689 MWt. Implementation shall include: (a) applicable revisions to plant operating procedures and the completion of operator training for the phases of the proposed power uprate being implemented, (b) incorporation of licensing basis changes into the next revision of the Updated Final Safety Analysis Report required by 10 CFR 50.71(c), and (c) inclusion of the commitments, as described in the licensees application, as supplemented, and the staffs safety evaluation dated July 19, 2006, in the licensees commitment tracking program.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation

Attachment:

Changes to the Facility Operating License and Technical Specifications Date of Issuance: July 19, 2006

ATTACHMENT TO LICENSE AMENDMENT NO.175 FACILITY OPERATING LICENSE NO. NPF-73 DOCKET NO. 50-412 Replace the following page of the Facility Operating License with the attached revised page.

The revised page is identified by amendment number and contains marginal lines indicating the areas of change.

Remove Insert 3a 3a Replace the following pages of Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert 1-1 1-1 2-1 2-1 3/4 1-15 3/4 1-15 3/4 3-2 3/4 3-2 3/4 3-10 3/4 3-10 3/4 4-9 3/4 4-9 3/4 4-14a 3/4 4-14a 3/4 4-14b 3/4 4-14b 3/4 5-1 3/4 5-1 3/4 5-7 3/4 5-7 3/4 7-1 3/4 7-1 3/4 7-2 3/4 7-2 3/4 7-3 3/4 7-3 3/4 7-6 3/4 7-6 6-20 6-20

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Gary R. Leidich James H. Lash President and Chief Nuclear Officer Vice President FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-SEB1 Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 Joseph J. Hagan Senior Vice President of Operations Lew W. Myers and Chief Operating Officer Executive Vice President, Special Projects FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-SGRP Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 Danny L. Pace Senior Vice President, Fleet Engineering Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Beaver Valley Power Station 76 South Main Street Mail Stop A-BV-A Akron, OH 44308 P.O. Box 4, Route 168 Shippingport, PA 15077 Jeannie M. Rinckel Vice President, Fleet Oversight Commissioner James R. Lewis FirstEnergy Nuclear Operating Company West Virginia Division of Labor Mail Stop A-GO-14 749-B, Building No. 6 76 South Main Street Capitol Complex Akron, OH 44308 Charleston, WV 25305 David W. Jenkins, Attorney Director, Utilities Department FirstEnergy Corporation Public Utilities Commission Mail Stop A-GO-18 180 East Broad Street 76 South Main Street Columbus, OH 43266-0573 Akron, OH 44308 Director, Pennsylvania Emergency Manager, Fleet Licensing Management Agency FirstEnergy Nuclear Operating Company 2605 Interstate Dr.

Mail Stop A-GHE-107 Harrisburg, PA 17110-9364 395 Ghent Road Akron, OH 44333 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149

Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:

Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077