(BVPS-1 and 2) - Extended Power Uprate (EPU) Acceptance Review (TAC Nos. MC4645 and MC4646)
ML051300147
Person / Time
Site: Beaver Valley
Issue date: 05/18/2005
From: Holden C
NRC/NRR/DLPM
To: Pearce L
FirstEnergy Nuclear Operating Co
Holden C
References
TAC MC4645, TAC MC4646
Download: ML051300147 (6)


Text

May 18, 2005 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -

EXTENDED POWER UPRATE (EPU) ACCEPTANCE REVIEW (TAC NOS.

MC4645 AND MC4646)

Dear Mr. Pearce:

By letter to the Nuclear Regulatory Commission (NRC) dated October 4, 2004, FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted a license amendment request for BVPS-1 and 2. The proposed amendment would change the BVPS-1 and 2, operating licenses to increase the maximum authorized power level from 2689 megawatts thermal (MWt) to 2900 MWt. This proposed change represents an increase of approximately 8 percent above the current maximum authorized power level. The NRC staff performed an acceptance review of the application to determine whether or not there was sufficient detail to allow the NRC staff to proceed with its detailed technical review and to ensure that the application adequately characterized the regulatory requirements and licensing basis of the plant. The NRC provided the results of its acceptance review by letter dated January 6, 2005, and indicated that the application did not have sufficient information for the NRC staff to begin its review in 6 areas.

The NRC staff stated that the licensee should respond and provide the missing information within 60 days and that if it could not provide the information it should notify the staff in writing so that a new submittal date could be agreed upon. The NRC staff stated that it would consider the licensees application complete such that a review schedule could be established and the review begun upon receipt of the missing information. The licensee supplemented its application by letter dated February 23, 2005, providing additional information in 5 of the 6 areas. The licensee stated that the information in the remaining area of probabilistic safety would not be able to be provided until June 30, 2005.

The purpose of this letter is to provide the results of the NRC staff's acceptance review of the EPU additional information for BVPS-1 and 2, contained in the February 23, 2005, supplement.

The NRC staff has reviewed your February 23, 2005, supplement and concluded that it provides technical information in sufficient detail to enable the NRC staff to begin its review in the 5 areas addressed by the enclosure to the NRC staffs January 6, 2005, letter.

Upon receipt of information that adequately addresses the remaining deficiencies, the NRC staff will consider your application complete, such that the detailed technical review can be initiated and a schedule for completing our review can be established. If the response cannot be provided by the previously specified date of June 30, 2005, FENOC should notify the NRC staff in writing and provide justification for the delay and why the licensees application should

L. Pearce not be denied consistent with Title 10 of the Code of Federal Regulations, Section 2.108, Denial of application, for failure to supply information.

If you have any questions, please contact the BVPS-1 and 2, Project Manager, Mr. Timothy G.

Colburn, at (301) 415-1402.

Sincerely,

/RA/

Cornelius F. Holden, Director Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page

ML051300147 NRR-106 OFFICE PDI-1/PM PDI-2/LA SPLB/BC EEIB/BC RLEP/D NAME TColburn MOBrien SLittle for JHannon JCalvo PTKuo DATE 5/11/05 05/11/05 5/11/05 5/12/05 5/12/05 OFFICE PDIII-1/LPM IPSB/BC SPSB/BC PDI-1/SC PD-I/D NAME JStang TQuay MTschiltz RLaufer CHolden DATE 5/11/05 5/12/05 5/12/05 5/16/05 5/17/05

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -

EXTENDED POWER UPRATE (EPU) ACCEPTANCE REVIEW (TAC NOS.

MC4645 AND MC4646)

Dated: May 18, 2005 Distribution PUBLIC PDI-1 R/F OGC ACRS TColburn JStang MOBrien (hard copy)

RLaufer CHolden WRuland JLyons LMarsh BSheron WBorchardt JDyer ADrozd SJones MRubin LRaghavan EMarinos DThatcher SWeerakkody RJenkins DTrimble AKugler JTatum GGalletti JBongarra NPatel SLaur LFields HWalker MTschiltz JCalvo JHannon TQuay PTKuo ABurritt, RI SLee, EDO RI

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Mary OReilly, Attorney Rich Janati, Chief FirstEnergy Nuclear Operating Company Division of Nuclear Safety FirstEnergy Corporation Bureau of Radiation Protection 76 South Main Street Department of Environmental Protection Akron, OH 44308 Rachel Carson State Office Building P.O. Box 8469 FirstEnergy Nuclear Operating Company Harrisburg, PA 17105-8469 Regulatory Affairs/Performance Improvement Mayor of the Borough of Shippingport Larry R. Freeland, Manager P O Box 3 Beaver Valley Power Station Shippingport, PA 15077 Post Office Box 4, BV-A Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Commissioner James R. Lewis 475 Allendale Road West Virginia Division of Labor King of Prussia, PA 19406 749-B, Building No. 6 Capitol Complex Resident Inspector Charleston, WV 25305 U.S. Nuclear Regulatory Commission Post Office Box 298 Director, Utilities Department Shippingport, PA 15077 Public Utilities Commission 180 East Broad Street FirstEnergy Nuclear Operating Company Columbus, OH 43266-0573 Beaver Valley Power Station ATTN: R. G. Mende, Director Director, Pennsylvania Emergency Work Management (BV-IPAB)

Management Agency Post Office Box 4 2605 Interstate Dr. Shippingport, PA 15077 Harrisburg, PA 17110-9364 FirstEnergy Nuclear Operating Company Ohio EPA-DERR Beaver Valley Power Station ATTN: Zack A. Clayton Mr. B. F. Sepelak Post Office Box 1049 Post Office Box 4, BV-A Columbus, OH 43266-0149 Shippingport, PA 15077 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077