MONTHYEARML0930200562009-11-12012 November 2009 10/28/2009 Summary of Meeting with NEI to Discuss Generic License Renewal Topics and Activities ML0905400922009-03-0303 March 2009 Summary of the License Renewal Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute ML0805206192008-03-0505 March 2008 Proposed License Renewal Interim Staff Guidance LR-ISG-2008-01: Staff Guidance Regarding the Station Blackout Rule (10 CFR 50.63) Associated with License Renewal Applications ML0729504952007-11-0808 November 2007 09/25/2007 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0717703762007-08-29029 August 2007 Proposed License Renewal Interim Staff Guidance LR-ISG-2007-02: Changes to Generic Aging Lesson Learned Report Aging Management Program XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements ML0722706072007-08-28028 August 2007 Summary of the License Renewal Telephone Conference Call and Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0717200422007-08-0909 August 2007 Draft of Revised Inspection Procedure IP-71003, Post-Approval Site Inspection for License Renewal ML0716401332007-08-0202 August 2007 Letter to James Riley, NEI, Regarding Final License Renewal Interim Staff Guidance LR-ISG-2006-03: Staff Guidance for Preparing Severe Accident Mitigation Alternatives Analyses ML0716902162007-07-0909 July 2007 03/21/2007, Summary of Meeting with Nuclear Energy Institute and Industry Representatives Regarding Environmental Report Content to Support License Renewal Application Reviews ML0631904402007-02-0808 February 2007 Ltr. to A. Marion and D. Lochbaum Proposed License Renewal Interim Staff Guidance LR-ISQ-2006-02 ML0627002362006-10-11011 October 2006 Y020060051 - Applicability of the Backfitting Rule to the Obligations of NRC Renewal Licensees Under 10 CFR 54.37(b) ML0620502192006-07-27027 July 2006 Change of U.S. (NRC) Branch Chief an Office of (NRR) Points of Contact for Nuclear Energy Institute (NEI) and Topic of Interest ML0611200022006-05-0303 May 2006 Proposed License Renewal Interim Staff Guidance LR-ISG-2006-01: Plant-Specific Aging Management Program for Inaccessible Areas of Boiling Water Reactor Mark I Steel Containment Drywell Shell ML0519400572005-07-12012 July 2005 U.S. Nuclear Regulatory Commission Comments on Nuclear Energy Institute (NEI) 05-01, Severe Accident Mitigation Alternative (SAMA) Analysis Guidance Document (Revision a) ML0512502452005-05-0505 May 2005 Staff Response to Industry Position Paper on the Interim Staff Guidance Process - Response to Letter Dated February 18, 2005 ML0502103032005-01-19019 January 2005 Negative Impact Caused by 90-day Public Comment Period and Delay in Release of NEI 95-10 ML0424407762004-08-31031 August 2004 INDUSTRY-PROPOSED Material, Environment, Aging Effects, and Program Combinations for the GALL Report Update ML0420402542004-07-21021 July 2004 Staff Response to Industry Questions on the NRC ISG Process Document Dated December 12, 2003 - Response to Your Letter Dated February 13, 2004 ML0416000872004-05-28028 May 2004 Proposed Method of the Nuclear Energy Institute to Update the GALL Report ML0402201242004-01-21021 January 2004 Evaluation of Proposed Interim Staff Guidance (ISG)-11: Recommendations for Fatigue Environmental Effects in a License Renewal Application ML0235206202003-12-12012 December 2003 the Interim Staff Guidance Process ML0331100602003-11-0303 November 2003 Addition of Aging Management Program (AMP) for Fuse Holders ML0331005162003-11-0303 November 2003 Proposed Interim Staff Guidance (ISG)-12: Addition of Generic Aging Lessons Learned (GALL) Aging Management Program (AMP) XI.M35, ONE-TIME Inspection of SMALL-BORE Piping, for License Renewal ML0322505792003-08-12012 August 2003 Proposed Interim Staff Guidance (ISG)-15: Revision of Generic Aging Lessons Learned (GALL) Aging Management Program (AMP) XI.E2, Electrical Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Instrumentation Circuits ML0318106302003-06-30030 June 2003 Request for Additional Information for Proposed Interim Staff Guidance (ISG)-11: Recommendations for Fatigue Environmental Effects in a License Renewal Application ML0318101422003-06-27027 June 2003 Resource Needs for License Renewal Application Reviews ML0313207982003-05-12012 May 2003 Proposed Interim Staff Guidance (ISG)-16: Time-Limited Aging Analyses (Tlaas) Supporting Information for License Renewal Applications ML0310805272003-04-18018 April 2003 Resource Needs for License Renewal Application Reviews ML0310104232003-04-0808 April 2003 Proposed Interim Staff Guidance (ISG) on Identification and Treatment of Housing for Active Components for License Renewal ML0309900522003-04-0707 April 2003 Standardized Format for License Renewal Applications (MB7344) ML0308300952003-03-21021 March 2003 Staff Comments to Industry Guidance on Revised 54.4 (a)(2) Scoping Criterion (Non-Safety Affecting Safety) for License Renewal ML0306905122003-03-10010 March 2003 Interim Staff Guidance (ISG) - 5 on the Identification and Treatment of Electrical Fuse Holders for License Renewal ML0235005162002-12-16016 December 2002 Consolidated List of Commitments for License Renewal ML0234401702002-12-0303 December 2002 Enclosures 2 and 3 - Interim Staff Guidance (ISG)-04: Aging Management of Fire Protection Systems for License Renewal ML0234401372002-12-0303 December 2002 Interim Staff Guidance (ISG)-04: Aging Management of Fire Protection Systems for License Renewal L-84-001, Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter)2002-11-13013 November 2002 Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter) ML0231904792002-11-13013 November 2002 Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter) ML0228004112002-09-25025 September 2002 Response to Letter License Renewal Appeals Process & Rules of Engagement ML0221203832002-07-30030 July 2002 Staff Guidance for Updating the Improved License Renewal Guidance Documents ML0220600482002-07-24024 July 2002 Nuclear Regulatory Commission'S Review Schedule of EPRI Technical Report, Guidelines for Addressing Fatigue Environmental Effects in License Renewal Application, (MRP-47), Draft Revision G ML0220602902002-07-24024 July 2002 Observations from Nuclear Energy Institute (NEI) License Renewal Demonstration Project & Comments from Advisory Committee on Reactor Safety Safeguards (ACRS) Letter Which May Result in Changes to NEI 95-10, Revision 3 ML0219205182002-07-11011 July 2002 Staff Comments to Industry Response on Proposed Staff Guidance on Aging Management of Fire Protection Systems for License Renewal ML0219107222002-07-10010 July 2002 07/10/2002 Letter Re Reactor License Renewal Brochure, NUREG/BR-0291 ML0213703202002-05-16016 May 2002 Proposed Staff Guidance on the Identification and Treatment of Electrical Fuse Holders for License Renewal ML0209801942002-04-0505 April 2002 Staff Response to Industry'S Proposed Revisions of Chapters II and III Generic Aging Lessons Learned (GALL) Report on Aging Management of Concrete Elements ML0209204642002-04-0101 April 2002 Nuclear Energy Inst. & Union of Concerned Scientists - Staff Guidance on Scoping of Equipment Relied on to Meet Requirements of Standard Blackout (SBO) for License Renewal ML0206001002002-03-0101 March 2002 Proposed Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout (SBO) Rule (10 CFR 50.63) for License Renewal (10 CFR 54.4(a)(3)) ML0203204912002-01-28028 January 2002 Enclosure to Proposed Staff Guidance on Aging Management of Fire Protection Systems for License Renewal ML0203204532002-01-28028 January 2002 Proposed Staff Guidance on Aging Management of Fire Protection Systems for License Renewal ML0203002942002-01-28028 January 2002 Proposed Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout Rule (10 CFR 50.63) for License Renewal That Was Issued for Comments on November 14, 2001 2009-03-03
[Table view] Category:Meeting Agenda
MONTHYEARML0905400922009-03-0303 March 2009 Summary of the License Renewal Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute ML0722706072007-08-28028 August 2007 Summary of the License Renewal Telephone Conference Call and Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0716902162007-07-0909 July 2007 03/21/2007, Summary of Meeting with Nuclear Energy Institute and Industry Representatives Regarding Environmental Report Content to Support License Renewal Application Reviews ML0636000042007-01-26026 January 2007 11/30/2006 Summary of the License Renewal Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute Regarding Generic Aging Lessons Learned Aging Management Program XI.E6 ML0623401602006-08-21021 August 2006 Summary of License Renewal Telephone Conference Call and Meeting Held Between the Us NRC and NEI ML0529205872005-10-18018 October 2005 10/18/05 - Summary of Telephone Conference Call Held on September 29, 2005, Between the U.S. Nuclear Regulatory Commission (NRC) Staff and the Nuclear Energy Institute (NEI) License Renewal Task Force 2009-03-03
[Table view] Category:Meeting Summary
MONTHYEARML0905400922009-03-0303 March 2009 Summary of the License Renewal Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute ML0824805472008-10-0303 October 2008 07/18/2008-Summary of License Renewal Meeting Held Between Us Nuclear Regulatory Commission Staff and Nuclear Energy Institute to Discuss Industry Comments on Draft License Renewal Interim Staff Guidance 2008-01 ML0810704692008-04-28028 April 2008 03/18/2008-Summary of Meeting Regulatory Information Conference Session Titled, Post-Approval Site Inspection for License Renewal. ML0733203712008-01-11011 January 2008 Summary of the License Renewal Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute ML0729504952007-11-0808 November 2007 09/25/2007 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0722706072007-08-28028 August 2007 Summary of the License Renewal Telephone Conference Call and Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0721102732007-08-20020 August 2007 Summary of the License Renewal Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute ML0716902162007-07-0909 July 2007 03/21/2007, Summary of Meeting with Nuclear Energy Institute and Industry Representatives Regarding Environmental Report Content to Support License Renewal Application Reviews ML0716302412007-06-22022 June 2007 Summary of the License Renewal Telephone Conference Call and Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0710601022007-04-30030 April 2007 03/21/2007 Summary of the License Renewal Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute to Discuss Generic License Renewal Topics, Lessons Learned from the Audit Process, and License Rene ML0636000042007-01-26026 January 2007 11/30/2006 Summary of the License Renewal Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute Regarding Generic Aging Lessons Learned Aging Management Program XI.E6 ML0634801362006-12-27027 December 2006 Summary of the License Renewal Telephone Conference Call and Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0610302822006-05-30030 May 2006 01/31/2006 Summary of Telephone Conference Call Between U.S. Nuclear Regulatory Commission Staff & Nuclear Energy Institute Re Proposed Interim Staff Guidance for License Renewal (LR-ISG) Associated with Corrosion Mark I Steel Containment D ML0602005072006-01-20020 January 2006 12/20/05 - Summary of License Renewal Telephone Conference Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0535400292005-12-19019 December 2005 12/19/2005 - Summary of License Renewal Meeting Between the U.S. Nuclear Regulatory Commission (NRC) Staff and the Nuclear Energy Institute (NEI) License Renewal Working Group ML0428105092004-10-0707 October 2004 Summary Meeting Between the U.S. Nuclear Regulatory Commission and the Nuclear Energy Institute on August 19, 2004 to Discuss Severe Accident Mitigation Alternatives Analyses ML0221802202002-08-0505 August 2002 07/23/2002, Summary of License Renewal Meeting Between NRC Staff, Nuclear Energy Inst. (NEI) & Utilities to Discuss Status of License Renewal Activities ML0211301302002-04-22022 April 2002 Meeting Summary with Nuclear Energy Institute (Nei), Florida Power & Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), Exelon Generation Company (Exelon), and Omaha Public Power District (OPPD ML0210705242002-04-0808 April 2002 Attachments 2, 3, 4, 5, & 6 for April 8, 2002 Meeting with NEI, Florida Power and Light Company (Fpl), Virginia Electric and Power Company (Vepco), Duke Energy Corporation (Duke), Exelon Generation Company (Exelon), & Omaha Public Power Dis ML0124900172001-09-0505 September 2001 Summary of 07/25/2001 Meeting with the Nuclear Energy Institute (NEI) License Renewal Task Force on Demonstration Project Using Improved Renewal Guidance Documents ML0037406782000-08-11011 August 2000 Summary of Meeting with the Nuclear Energy Institute on Industry'S Comments on Chapter 2, Structures and Components Subject to Aging Management Review of the Draft Standard Review Plan for the Review of License Renewal Applications for Nucl ML0037294532000-07-0303 July 2000 Summary of Meeting with the Nuclear Energy Institute (NEI) to Discuss Industry Comments on the Draft Generic Aging Lessons Learned (GALL) Report - Mechanical Systems Chapter IV, Sections A1, B1, and C1 ML0037182252000-05-25025 May 2000 Summary of May 10, 2000, Phone Call Between the U.S. NRC Staff, Contractor and NEI Representatives to Discuss Industry Comments Submitted by NEI on April 24, 2000, on the Draft Generic Aging Lessond Learned (GALL) Report - Electrical Equipm ML0037186432000-05-24024 May 2000 Summary of Meeting with the Nuclear Energy Instiute (NEI) to Discuss the Relationship Between the Generic Aging Lessons Learned (GALL) Report and the Standard Review Plan for License Renewal (SRP-LR) 2009-03-03
[Table view] |
Text
March 3, 2009 ORGANIZATION: Nuclear Energy Institute
SUBJECT:
SUMMARY
OF THE LICENSE RENEWAL MEETING BETWEEN THE U.S.
NUCLEAR REGULATORY COMMISSION STAFF AND THE NUCLEAR ENERGY INSTITUTE The U.S. Nuclear Regulatory Commission staff (NRC or the staff) and representatives of the Nuclear Energy Institute (NEI) met on January 28, 2009, to discuss generic license renewal topics and license renewal process improvements. Enclosure 1 lists the meeting participants and Enclosure 2 provides the meeting agenda. A summary of the discussion follows.
- 1. Status of License Renewal Interim Staff Guidance (LR-ISG)
- a. Staff Guidance Regarding the Station Blackout Rule (10 CFR 50.63) Associated with License Renewal Applications (LR-ISG-2008-01)
The staff indicated that it is still holding discussions internally on this LR-ISG and acknowledged that NEI had provided useful comments on the draft. The staff stated that the schedule for resolving this issues generically has not been established and, as such, it is expected to continue to appear during plant-specific license renewal application reviews. NEI commented that the staff should clarify the technical basis for establishing the scoping boundary and to define the transmission system voltage. NEI expressed concern that the staff has not resolved the issue. NEI commented that backfitting regulations should apply if the scoping boundary is outside the plants current licensing basis.
- b. Changes to NUREG-1801, Revision 1, Generic Aging Lessons Learned (GALL)
Report Aging Management Program XI.E6, "Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (LR-ISG-2007-02)
The staff indicated that this LR-ISG is in the final approval stage and final guidance may be issued as early as February 2009. The staff mentioned that it recently delayed approval so that it could add a backfitting discussion to the LR-ISG, which is in response to a recommendation from NRC Office of the Inspector General (OIG) audit on the effectiveness of the license renewal program (OIG-07-A-15).
- c. Updates to the License Renewal Interim Staff Guidance Process (LR-ISG-2007-01)
The staff stated that it is currently finalizing a proposed LR-ISG process revision and plans to request in the Federal Register public comments on the proposal.
The proposed revision will include administrative updates and extend the process for revising certain guidance documents associated with the staffs environmental review of license renewal applications. The staff is also augmenting the process in response to a recommendation from the NRCs OIG audit. The staff will
propose to include in each LR-ISG a new backfitting discussion section to document the staffs determinations as to whether an LR-ISG involves newly identified SSCs, and if it does not, then whether the LR-ISG constitutes backfitting. The staff will also propose to eliminate the clarification and compliance LR-ISG designations, and instead rely on the new backfitting discussion for specifying licensee implementation of LR-ISGs.
- 2. Status of the GALL Report Update The staff stated that it is finalizing the schedule to complete the update and has procured contract support. NEI indicated that it is finalizing comments for the staffs consideration and plans to submit them in several packages as follows: aging management program comments within the next few weeks, followed by electrical and structural comments by the end of February 2009, and all comments by the end of April 2009. NEI asked whether the NRC is considering placing the GALL Report on the NRCs public Web site to make updating it easier.
- 3. Status of the Generic Environmental Impact Statement (GEIS) Rulemaking The staff indicated that it plans to issue the draft GEIS in summer 2009 and the final GEIS in the middle of 2011. The staff suggested that it will use a standard 75-day period for submitting public comments on the draft GEIS. Also, the revised GEIS will be more user-friendly with a resource-based approach, rather than the current systems approach.
NEI requested the staff to specify an implementation date for the revised GEIS so that applicants can have advance notice to better prepare their license renewal applications.
The staff indicated that the content requirements would not change radically and implementation of the revised GEIS could be handled similarly to the implementation of GALL Report, Revision 1.
- 4. Streamlining the License Renewal Process for Life Beyond 60 Years NEI indicated interest in future discussions for streamlining the license renewal process and determining the staffs review focus on these applications. NEI stated that, after the first license renewal, subsequent renewals will be less complex because the aging management programs will already be in-place. Also, as with the first decision to apply for license renewal, licensees will likely make early decisions to apply for subsequent license renewals so as to better plan for their plants futures. NEI reminded the staff that some licensees are eligible to re-apply for license renewal as early as 2009, but most-likely the NRC could expect to see these types of renewal applications as early as 2013.
The staff indicated that it is interested to obtain more operating experience to better ascertain the effectiveness of license renewal aging management programs. The staff commented that subsequent license renewals will most likely be focused technically, rather than on procedure. To facilitate its planning and budgeting, the staff stated that it soon plans to issue another regulatory issue summary to request written notification of when licensees intend to submit license renewal applications. The staff requested that any licensee planning to submit a license renewal application for life beyond 60 years also provide such notification to the NRC.
In addition, a representative from the NRCs Office of Nuclear Regulatory Research stated that there are currently five technical focus areas being considered for plant operation beyond 60 years: (1) electrical cables, (2) concrete materials, especially in high-temperature and high-radiation environments, (3) reactor vessel and internals components, (4) buried and submerged structures, and (5) coatings. The staff stated that it is working to identify any new technical issues as soon as possible while working with the industrys technical organization, the Electric Power Research Institute.
Regarding coatings, NEI commented that inspection programs are usually taken credit for preventing aging, not the coatings themselves. NEI also stated that aging concrete could potentially be a significant limiter on plant life because replacing concrete is difficult.
- 5. New Topics
- a. Acceptance Reviews The NRC stated that licensees need to submit complete license renewal applications. Providing the required information later is not acceptable and does not constitute a complete application acceptable for docketing.
- b. Application Review Schedules The NEI commented that sometimes license renewal review milestones posted on the NRCs public Web site are not accurate and complete. NEI stated that the cut-off date for submitting responses to requests for additional information (RAIs) is an important milestone for applicant planning. Also, NEI stated that sometimes there is confusion as to this final cut-off date. The staff responded that it attempts to present the Advisory Committee on Reactor Safeguards with a safety evaluation report with no open items. To achieve this goal some leeway in determining the final RAI cut-off date is preferable. NEI agreed with the staff that sometimes it is beneficial to not set a hard date.
The staff stated that some review schedules have been delayed for various reasons, but the NRC is aware that lengthening the review process can cost applicants more money (e.g., to maintain contractor support). The staff stated that it is working to finalize review schedules around 24 months for the latest five license renewal applications.
- c. Audit Process The NEI commented that changes to the license renewal audits have resulted in more RAIs. NEI suggested that a future workshop could be helpful to gauge the effectiveness and efficiency of these changes. The staff stated that it does not want to lose the efficiencies of the audit process and it is tracking the number of RAIs issued for each license renewal review. NEI commented that applicants want to know how to plan for these audits, and also whether applications should be changed to reduce RAIs. NEI agreed with the staff that the audit process is
helpful for eliminating unnecessary RAIs, and the staff stated that it is open to any suggestions to improve the audits.
- d. Inspections Under NRC Inspection Procedure 71003 The NEI commented that, after completion of the first post-renewal inspections under NRC Inspection Procedure 71003, it may be beneficial to look at the process to determine whether any lessons can be learned. The staff said that it will consider this recommendation for the future.
- e. Use of NRC Regulatory Guide 1.207 for License Renewal The NEI raised a question as to whether NRC Regulatory Guide 1.207 for evaluating fatigue analyses for new reactors also is acceptable for license renewal of existing operating plants.
- f. Web Compatible CDs The NEI provided comments on improving instructions for submitting electronic copies of license renewal applications for posting to the NRCs public Web site.
- 6. Public Participation No member of the public chose to provide comments or ask questions at the meeting.
\RA\
Matthew Homiack, General Engineer Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/encls: See next page
ML090540092 OFFICE PM:RPOB:DLR LA:DLR BC:RERB:DLR BC:RPOB:DLR NAME MHomiack SFigueroa BPham TTate DATE 03/3/09 03/3/09 02/26/09 03/3/09
Participant List License Renewal Meeting between the U.S. Nuclear Regulatory Commission (NRC) Staff and the Nuclear Energy Institute January 28, 2009 PARTICIPANT AFFILIATION Brian Holian NRC Bo Pham NRC Travis Tate NRC C. E. Carpenter NRC Matthew Homiack NRC Al Fulvio Exelon Mike Heath Progress Energy Dave Flyte PPL Susquehanna Ken Putnam FPL - Duane Arnold Ray Kuyler Morgan Lewis Arden Aldridge South Texas / STARS Anthony F. Ploplis Progress Energy Cliff Custer FENOC Massoud Tafazzoli Areva Abbas Mostala Energy Northwest Columbia Generating Station Christopher Mallner Progress Energy Bill Victor NPPD David Bremer NPPD Michael Semmler Westinghouse Reza Ahrabli Entergy Rick Buckley Entergy Alan Cox Entergy Eric Blochor STARS - Worley Parsons Loyd Wright SCE - STARS Gary M. Adkins TVA Michael R. Fallin Constellation Julie Keys Nuclear Energy Institute Deann Raleigh* SCIENTECH
- Participated by teleconference ENCLOSURE 1
Agenda License Renewal Meeting between the U.S. Nuclear Regulatory Commission (NRC) Staff and the Nuclear Energy Institute (NEI)
January 28, 2009 Generic License Renewal - Topics Lead
- 1. Status of License Renewal Interim Staff Guidance (LR-ISG) NRC
- a. Staff Guidance Regarding the Station Blackout Rule (10 CFR 50.63) Associated with License Renewal Applications (LR-ISG-2008-01)
- b. Changes to NUREG-1801, Revision 1, Generic Aging Lessons Learned (GALL) Report Aging Management Program XI.E6, "Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (LR-ISG-2007-02)
- c. Updates to the License Renewal Interim Staff Guidance Process (LR-ISG-2007-01)
- 2. Status of the GALL Report Update NRC
- 3. Status of the Generic Environmental Impact Statement (GEIS) NRC Rulemaking
- 4. Streamlining the License Renewal Process for Life Beyond 60 Years NEI
- 5. New Topics NRC/NEI
- 6. Public Participation All ENCLOSURE 2
Letter to the Nuclear Energy Institute, from M. Homiack, dated March 3, 2009
SUBJECT:
SUMMARY
OF THE LICENSE RENEWAL MEETING BETWEEN THE U.S.
NUCLEAR REGULATORY COMMISSION STAFF AND THE NUCLEAR ENERGY INSTITUTE DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr RidsNrrDlrRpb1 Resouce RidsNrrDlrRpb2 Resouce RidsNrrDlrRer1 Resouce RidsNrrDlrRer2 Resouce RidsNrrDlrRerb Resouce RidsNrrDlrRpob Resouce RidsNrrDci Resouce RidsNrrDra Resouce RidsNrrDe Resouce RidsNrrDeEemb Resouce RidsNrrDeEeeb Resouce RidsNrrDss Resouce RidsOgcMailCenter Resouce RidsNrrAdes Resouce
RConte, RI GHopper, RII AStone, RIII NOKeefe, RIV
Nuclear Energy Institute Project No. 690 cc:
Ms. Christine S. Salembier, Commissioner Mr. Garry G. Young State Liaison Officer Manager, License Renewal Services Department of Public Service 1448 SR 333, N-GSB-45 112 State Street, Drawer 20 Russellville, AR 72802 Montipelier, VT 05620-2601 Ms. Lorrie Bell, Project Manager Mr. Frederick W. Polaski Wolf Creek Nuclear Operating Corporation Manager License Renewal P.O. Box 411 Exelon Corporation Burlington, KS 66839 200 Exelon Way Kennett Square, PA 19348 Mr. Roger Stewart Progress Energy Carolinas, Inc.
Mr. Clifford I. Custer 3581 West Entrance Road Project Manager, License Renewal RNP A9 FirstEnergy Nuclear Operating Company Hartsville, SC 29550 P.O. Box 4 Route 168 (Mail Stop SIM-2) Mr. Michael H. Crowthers, Supervisor Shippingport, PA 15077 Nuclear Regulatory Affairs PPL Susquehanna, LLC Mr. Paul Gunter, Director Two North Ninth Street (GENPL4)
Reactor Watchdog Project Allentown, PA 18101-1179 Nuclear Information & Resource Service 6930 Carroll Avenue, Suite 340 Mr. Michael A. Balduzzi Takoma Park, MD 20912 Sr. Vice President & COO Regional Operations, NE Mr. Hugh Jackson Entergy Nuclear Operations Public Citizen's Critical Mass Energy & 440 Hamilton Avenue Environment Program White Plains, NY 10601 215 Pennsylvania Avenue, SE Washington, DC 20003 Mr. Chalmer Myer 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35201 Ms. Mary Olson Nuclear Information & Resource Service Southeast Office P.O. Box 7586 Asheville, NC 28802