Proposed License Renewal Interim Staff Guidance LR-ISG-2008-01: Staff Guidance Regarding the Station Blackout Rule (10 CFR 50.63) Associated with License Renewal Applications
ML080520619
Person / Time
Site: PROJ0690
Issue date: 03/05/2008
From: Kuo P
NRC/NRR/ADRO/DLR
To: Lochbaum D, Jeffrey Riley
Nuclear Energy Institute, Union of Concerned Scientists
Sakai, S, DLR/NRR, 415-1884
References
LR-ISG-2008-01
Download: ML080520619 (11)


Text

March 5, 2008 Mr. James H. Riley Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

PROPOSED LICENSE RENEWAL INTERIM STAFF GUIDANCE LR-ISG-2008-01: STAFF GUIDANCE REGARDING THE STATION BLACKOUT RULE (10 CFR 50.63) ASSOCIATED WITH LICENSE RENEWAL APPLICATIONS

Dear Mr. Riley:

The purpose of this letter is to provide you with the opportunity to comment on the proposed License Renewal Interim Staff Guidance (LR-ISG) LR-ISG-2008-01, which clarifies the previously issued LR-ISG-02, Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout (SBO) Rule (10 CFR 50.63) for License Renewal, dated April 1, 2002, which has been incorporated into Section 2.5.2.1.1 of NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, Revision 1.

The NRC staff met with NEI representatives during public meetings on July 25, 2007, September 25, 2007, December 12, 2007, and January 30, 2008, to discuss issues associated with the staff position on the license renewal scoping requirements regarding the offsite power system for SBO recovery.

The staff has enclosed Figure Nos. 1, 2, 3, and 4, Figures for LR-ISG-2008-01: SBO Scoping Boundary. You may also access these figures from the NRC Agencywide Documents Access and Management System under Accession No. ML080520620. The figures consists of the different configurations of the SBO offsite power recovery path that are acceptable to the staff and meet the license renewal scoping requirements in accordance with 10 CFR 54.4(a)(3).

This LR-ISG provides clarification of existing guidance with no additional requirements.

A notice relating to this proposed LR-ISG is being sent to the Office of the Federal Register for publication. The staff is requesting your comments on the proposed LR-ISG as indicated in the Federal Register Notice. If you have any questions regarding this matter, please contact Ms. Stacie Sakai, by telephone at 301-415-1884 or via e-mail at sxs11@nrc.gov.

An identical letter was sent to Mr. David Lochbaum at the Union of Concerned Scientists.

Sincerely,

/RA/

Pao-Tsin Kuo, Director Division of License Renewal Office of Nuclear Reactor Regulation Project No. 690

Enclosure:

Proposed LR-ISG-2008-01 cc w/encl: See next page

March 5, 2008 Mr. David Lochbaum Union of Concerned Scientists 1707 H Street, NW, Suite 600 Washington, DC 20006-3919

SUBJECT:

PROPOSED LICENSE RENEWAL INTERIM STAFF GUIDANCE LR-ISG-2008-01: STAFF GUIDANCE REGARDING THE STATION BLACKOUT RULE (10 CFR 50.63) ASSOCIATED WITH LICENSE RENEWAL APPLICATIONS

Dear Mr. Lochbaum:

The purpose of this letter is to provide you with the opportunity to comment on the proposed License Renewal Interim Staff Guidance (LR-ISG) LR-ISG-2008-01, which clarifies the previously issued LR-ISG-02, Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout (SBO) Rule (10 CFR 50.63) for License Renewal, dated April 1, 2002, which has been incorporated into Section 2.5.2.1.1 of NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, Revision 1.

The NRC staff met with NEI representatives during public meetings on July 25, 2007, September 25, 2007, December 12, 2007, and January 30, 2008, to discuss issues associated with the staff position on the license renewal scoping requirements regarding the offsite power system for SBO recovery.

The staff has enclosed Figure Nos. 1, 2, 3, and 4, Figures for LR-ISG-2008-01: SBO Scoping Boundary. You may also access these figures from the NRC Agencywide Documents Access and Management System under Accession No. ML080520620. The figures consists of the different configurations of the SBO offsite power recovery path that are acceptable to the staff and meet the license renewal scoping requirements in accordance with 10 CFR 54.4(a)(3).

This LR-ISG provides clarification of existing guidance with no additional requirements.

A notice relating to this proposed LR-ISG is being sent to the Office of the Federal Register for publication. The staff is requesting your comments on the proposed LR-ISG as indicated in the Federal Register Notice. If you have any questions regarding this matter, please contact Ms. Stacie Sakai, by telephone at 301-415-1884 or via e-mail at sxs11@nrc.gov.

An identical letter was sent to Mr. James H. Riley at the Nuclear Energy Institute for industry comment.

Sincerely,

/RA/

Pao-Tsin Kuo, Director Division of License Renewal Office of Nuclear Reactor Regulation Project No. 690

Enclosure:

Proposed LR-ISG-2008-01 cc w/encl: See next page

ML080520624 (Package); ML080520619 (Letter); ML080520620 (Figures); ML080520632 (FRN)

OFFICE RER2:DLR LA: DLR RER2:DLR BC:DE:EEIB NAME SSakai YEdmonds RMathew GWilson DATE 02/21/08 02/29/08 02/21/08 02/27/08 OFFICE OGC (NLO)

BC:DLR:RER2 D:DLR NAME MBaty RAuluck PTKuo DATE 02/26/08 02/29/08 03/05/08 Letter to: James Riley, David Lochbaum, from: Pao-Tsin Kuo, Dated March 5, 2008

SUBJECT:

PROPOSED LICENSE RENEWAL INTERIM STAFF GUIDANCE LR-ISG-2008-01: STAFF GUIDANCE REGARDING THE STATION BLACKOUT RULE (10 CFR 50.63) ASSOCIATED WITH LICENSE RENEWAL APPLICATIONS DISTRIBUTION:

HARD COPY:

DLR RF SSakai E-MAIL:

PUBLIC GWilson SRay RidsNrrOd RidsNrrAdro RidsNrrAdes RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDra RidsNrrDe SSakai BRogers RLi DNguyen RMathew

Nuclear Energy Institute Project No. 690 cc:

Ms. Christine S. Salembier, Commissioner State Liaison Officer Department of Public Service 112 State Street, Drawer 20 Montipelier, VT 05620-2601 Ms. Julie Keys Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 Mr. Frederick W. Polaski Manager License Renewal Exelon Corporation 200 Exelon Way Kennett Square, PA 19348 Mr. Clifford I. Custer Project Manager, License Renewal FirstEnergy Nuclear Operating Company P.O. Box 4 Route 168 (Mail Stop SIM-2)

Shippingport, PA 15077 Mr. Paul Gunter, Director Reactor Watchdog Project Nuclear Information & Resource Service 6930 Carroll Avenue, Suite 340 Takoma Park, MD 20912 Mr. Hugh Jackson Public Citizen's Critical Mass Energy &

Environment Program 215 Pennsylvania Avenue, SE Washington, DC 20003 Mr. Chalmer Myer 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35201 Ms. Mary Olson Nuclear Information & Resource Service Southeast Office P.O. Box 7586 Asheville, NC 28802 Mr. Garry G. Young Manager, License Renewal Services 1448 SR 333, N-GSB-45 Russellville, AR 72802 Ms. Lorrie Bell, Project Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Mr. Roger Stewart Progress Energy Carolinas, Inc.

3581 West Entrance Road RNP A9 Hartsville, SC 29550 Mr. Michael H. Crowthers, Supervisor Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street (GENPL4)

Allentown, PA 18101-1179 Mr. Michael A. Balduzzi Sr. Vice President & COO Regional Operations, NE Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601

PROPOSED LICENSE RENEWAL INTERIM STAFF GUIDANCE LR-ISG-2008-01:

STAFF GUIDANCE REGARDING THE STATION BLACKOUT RULE (10 CFR 50.63)

ASSOCIATED WITH LICENSE RENEWAL APPLICATIONS Staff Position Consistent with the requirements specified in Title 10, Section 54.4(a)(3), of the Code of Federal Regulations (10 CFR 54.4(a)(3)) and 10 CFR 50.63(a)(1), the scope of license renewal should include the offsite recovery path from the transmission system to the Class 1E distribution system. The offsite and onsite power circuits must permit functioning of structures, systems, and components necessary to respond to the event. The rationale for this position follows.

Rationale In The license renewal rule, 10 CFR 54.4(a)(3) requires that the scope of license renewal include All systems, structures, and components relied on in safety analyses or plant evaluations to perform a function that demonstrates compliance with the Commissions regulations forstation blackout (10 CFR 50.63). In The station blackout (SBO) rule, 10 CFR 50.63(a)(1), states that each light-water-cooled nuclear power plant licensed to operate must be able to withstand and recover from an SBO of a specified duration that is based on factors that include (iii) The expected frequency of loss of offsite power; and (iv) The probable time needed to restore offsite power. In this regard, the SBO rule is consistent with the staff findings identified in the statement of considerations and NUREG-1032, Evaluation of Station Blackout Accidents at Nuclear Power Plants, issued June 1988. In particular, with regard to factor (iv), the staff found that restoration of offsite power (0.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> median time to restore) is more likely to terminate an SBO event than restoration of the emergency diesel generators (8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> median time to repair).

In Appendix A, General Design Criteria for Nuclear Power Plants, to 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, General Design Criterion (GDC) 17, Electric Power Systems, requires that two physically independent circuits shall supply electric power from the transmission network to the onsite electric distribution system.

These circuits must be designed and located so as to minimize to the extent practical the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. A switchyard common to both circuits is acceptable. Each of these circuits shall be designed to be available soon enough after a loss of all onsite alternating current (ac) power supplies and the loss of the other offsite electric power circuit to ensure that specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded. One of these circuits (the immediate access circuit) shall be designed to be available within a few seconds following a loss-of-coolant accident to ensure the maintenance of core cooling, containment integrity, and other vital safety functions.

Plants not licensed in accordance with GDC 17 were licensed to satisfy plant-specific principal design criteria presented in the plant updated final safety analysis report (FSAR). These criteria are similar to GDC 17. The electric grid is the source of power to the offsite power system.

Therefore, all operating plants have offsite power requirements similar to GDC 17. The plant technical specifications embody the operational restrictions for the design requirements for the loss of offsite power sources.

ENCLOSURE

SBO is the loss of offsite and onsite ac electric power to the essential and nonessential switchgear buses in a nuclear power plant. It does not include the loss of ac power fed from inverters powered by station batteries or loss of ac power from an alternate ac power source.

The U.S. Nuclear Regulatory Commission added the SBO rule to the regulations in 10 CFR Part 50 because, as operating experience accumulated, concern arose that the reliability of both the offsite and onsite ac power systems might be less than originally anticipated, even for designs that met the requirements of GDC 17 and GDC 18, Inspection and Testing of Electric Power Systems. The results of risk studies indicate that estimated core melt frequencies from SBOs vary considerably between plants and could be a significant risk contributor for some plants.

As a result, the SBO rule required that nuclear power plants have the capability to withstand and recover from the loss of offsite and onsite ac power of a specified duration (the coping duration).

In their plant evaluations, licensees followed the guidance specified in Regulatory Guide (RG) 1.155, Station Blackout, issued August 1988, and NUMARC 87-00, Guidelines and Technical Bases for NUMARC Initiatives Addressing Station Blackout at Light Water Reactors, to determine their required plant-specific coping duration. The agency based the criteria specified in RG 1.155 to calculate a plant-specific coping duration on the expected frequency of loss of offsite power and the probable time needed to restore offsite power, as well as the other two factors (onsite emergency ac power source redundancy and reliability) specified in 10 CFR 50.63(a)(1). In requiring that a plants coping duration be based in part on the probable time needed to restore offsite power, 10 CFR 50.63(a)(1) specifies that the offsite power system be an assumed method of recovering from an SBO. Disregarding the offsite power system as a means of recovering from an SBO would not meet the requirements of the 10 CFR 50.63 rule and would result in a longer required coping duration.

The use of the offsite power system within 10 CFR 50.63(a)(1) as a means of recovering from an SBO should not be construed to be the only acceptable means of recovering from an SBO.

A licensee could, for example, recover offsite power or emergency (onsite) power. It is not possible to determine before an actual SBO event which source of power can be returned first.

As a result, 10 CFR 50.63(c)(1)(ii) and its associated guidance in RG 1.155, Sections 1.3 and 2, require procedures to recover from an SBO that include restoration of offsite and onsite power.

Based on the above, licensees rely on both the offsite and onsite power systems to meet the requirements of the SBO rule. Elements of both offsite and onsite power are necessary to determine the required coping duration under 10 CFR 50.63(a)(1), and the procedures required by 10 CFR 50.63(c)(1)(ii) must address both offsite power and onsite power restoration. It follows, therefore, that both systems are used to demonstrate compliance with the SBO rule and must be included within the scope of license renewal consistent with the requirements of 10 CFR 54.4(a)(3). The onsite power system is included within the scope of license renewal on the basis of the requirements under 10 CFR 54.4(a)(1) (safety-related systems). The equipment that is relied upon to cope with an SBO (e.g., alternate ac power sources) is included within the scope of license renewal on the basis of the requirements under 10 CFR 54.4(a)(3).

The offsite power system is therefore necessary to complete the required scope of the electrical power systems under license renewal.

The staff has recently noted during the review of license renewal applications that some applicants have not included all of the components and structures within the scope of license renewal needed for recovering the offsite source from an SBO event as required by 10 CFR 54.4(a)(3). Failure to include all of the structures and components within the scope of

license renewal will result in those structures and components not being subject to aging management review, and the effects of aging will not be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis for the period of extended operation in accordance with 10 CFR 54.21(a)(1) and (a)(3).

During its evaluation of licensee compliance with the requirements in 10 CFR 50.63, Loss of All Alternating Current Power, the staff has assessed the offsite power recovery paths that are credited in the licensee evaluation of SBO coping duration. The SBO coping duration evaluation is based on the criteria specified in 10 CFR 50.63(a)(1). The staffs regulatory assessment and acceptance of licensees compliance with the SBO rule for offsite power is based on the site-related characteristics and power design characteristics as defined in RG 1.155, and also the availability and reliability of the offsite power including the protective coordination of switchyard breakers.

The offsite power systems of U.S. Nuclear Power Plants consist of a transmission system component and a switchyard that provides a source of power and a plant system component that connects that power source to a plants onsite electrical distribution system which powers safety equipment. The staff considers each plant design individually, reviewing the plants FSAR and associated electrical drawings. The key to performing the scoping for the SBO recovery path is defining the boundary of the offsite power source at the switchyard. A switchyard can have multiple offsite lines supplying the switchyard buses. Although switchyard designs vary, most plants have either a ring bus or breaker-and-a-half scheme.

The scoping boundary, as outlined in the Standard Review Plan-License Renewal (SRP-LR),

Section 2.5.2.1.1, should be from the breaker or breakers from the switchyard (connections to the line side). If there is a circuit breaker between the power transformer (startup, reserve, auxiliary, or main transformer) and the switchyard bus, and the circuit breaker is directly bolted to the switchyard bus, then that circuit breaker is acceptable as the scoping boundary. If there is a disconnect switch, but no circuit breaker exists between the transformer and the switchyard bus, then the circuit breaker(s) connected to the switchyard bus that feeds the power transformer (startup, reserve, auxiliary, or main transformer) should be acceptable as the scoping boundary.

The circuit breaker, as the scoping boundary, provides connection to offsite power via the switchyard bus, which can be powered by any of the incoming transmission lines. This breaker should be at the transmission system voltage to ensure adequate protection of safety bus and the recovery of offsite power. The staff believes that the circuit breaker needs to be within the scope of license renewal because of its ability to provide plant power, protect downstream circuits and provide plant operator-controlled isolation and energization ability. In addition, a circuit breaker coordinates with other protective devices to minimize the probability of loss of offsite power and prevent transients from affecting the onsite distribution system as offsite power is being restored. For these reasons, a circuit breaker remains as the scoping boundary.

Using a disconnect switch or other component downstream of the breaker is not consistent with the staff position of compliance with the SBO rule and is not acceptable for meeting the SBO scoping requirements for license renewal.

As discussed above, for purposes of the license renewal, the staff has determined that the offsite recovery paths that must be included within the scope of license renewal, in accordance with 10 CFR 54.4(a)(3), consist of circuits from two independent sources. Both paths start from

the switchyard breaker to the plant Class 1E safety buses. This path includes (1) switchyard circuit breakers that connect to the offsite power system (i.e., grid), (2) power transformers, (3) intervening overhead or underground circuits (i.e., cables, buses and connections, transmission conductors and connections, insulators, disconnect switches, and associated components), (4) circuits between the circuit breakers and power transformers, (5) circuits between the power transformers and onsite electrical distribution system, and (6) control circuit cables and connections and structures associated with components in the recovery path. The SBO recovery path scoping boundary ends at the line side of the switchyard breaker(s) at transmission system voltage. For the switchyard breakers, bolted connections to the switchyard bus and structural components supporting the breakers are within the scope of license renewal.

The control circuit cables and its connections for the switchyard breakers are not within the scope of license renewal. Figures of different configurations of the SBO offsite power recovery path that are acceptable to the staff and meet the license renewal scoping requirements in accordance with 10 CFR 54.4(a)(3) are available via ADAMS at Accession No. ML080520620.

The ownership of switchyard components is not a factor in ensuring that the effects of aging will be adequately managed for components and structures needed for recovering the offsite circuits from an SBO event consistent with the requirements in 10 CFR 54.4, Scope, and 10 CFR 54.21, Contents of ApplicationTechnical Information. The staff recognizes that there are interface and control agreements between the licensee and transmission system operator. These agreements do not preclude the applicant from complying with requirements specified in 10 CFR 54.4 and 10 CFR 54.21.

Designating the appropriate offsite power system long-lived passive structures and components that are part of this circuit path as subject to an aging management review will ensure the maintenance of the bases underlying the SBO requirements over the period of the extended license. This is consistent with the Commissions expectations in including the SBO event under 10 CFR 54.4(a)(3) of the license renewal rule.