December 3, 2002Mr. Alan NelsonNuclear Energy Institute 1776 I Street, NW., Suite 400 Washington, DC 20006-3708Mr. David LochbaumUnion of Concerned Scientists 1707 H Street, NW., Suite 600 Washington, DC 20006-3919
SUBJECT:
INTERIM STAFF GUIDANCE (ISG)-04: AGING MANAGEMENT OF FIREPROTECTION SYSTEMS FOR LICENSE RENEWAL
Dear Messrs. Nelson and Lochbaum:
By letter dated January 22, 2002, the Nuclear Regulatory Commission (NRC) staff provided theNuclear Energy Institute (NEI) and the Union of Concerned Scientists the opportunity to comment on proposed guidance to clarify the fire protection systems program described in NUREG-1801, "Generic Aging Lessons Learned (GALL) Report," dated July 2001. The staff received NEI's written comments on June 17, 2002. The staff discussed these comments with NEI during a public meeting on July 25, 2002. The staff finalized the Interim Staff Guidance (ISG) to address these comments. The enclosed ISG consists of: (1) staff position (Enclosure 1); (2) aging management programs (Enclosure 2) for Chapter XI.M26, "Fire Protection" and Chapter XI.M27, "Fire Water Systems" of NUREG-1801, GALL Report; and (3) FSAR Supplement Table 3.3-2 (Enclosure 3) of NUREG-1800, "Standard Review Plan for Review of License Renewal." The staff plans to incorporate these comments into the improved license renewal guidance documents in a future update. The staff considers this ISG as clarifications with no additional requirements and, therefore, did not perform a backfit evaluation.As requested by NEI, the staff has assigned the following ISG designations for previouslyapproved ISGs, to date, in order to assist the applicants with their license renewal applications before a future update. The corresponding ADAMS accession numbers are shown in the parentheses:ISG-01Staff Guidance on the Position of the GALL Report Presenting OneAcceptable Way to Manage Aging Effects for License Renewal (ML013300531)ISG-02 Staff Guidance on Scoping of Equipment Relied on to Meet theRequirements of the Station Blackout Rule for License Renewal (ML020920464)ISG-03 Revision of Chapters II and III of GALL Report on Aging Management ofConcrete Elements (ML013300426)
A. Nelson and D. Lochbaum- 2 -For the above approved ISGs, the staff requests that the NEI consider corresponding changesin NEI 95-10, Revision 3, "Industry Guidance for Implementing the Requirements of 10 CFRPart 54 - The License Renewal Rule," if any. Should you have any questions regarding thismatter, please contact Peter Kang at 301-415-2779.Sincerely,
/RA/David B. Matthews, DirectorDivision of Regulatory Improvement Programs Office of Nuclear Reactor RegulationProject No. 690
Enclosures:
As stated cc w/encls: See next page A. Nelson and D. Lochbaum- 2 -For the above approved ISGs, the staff requests that the NEI consider corresponding changesin NEI 95-10, Revision 3, "Industry Guidance for Implementing the Requirements of 10 CFRPart 54 - The License Renewal Rule," if any. Should you have any questions regarding thismatter, please contact Peter Kang at 301-415-2779.Sincerely, /RA/David B. Matthews, DirectorDivision of Regulatory Improvement Programs Office of Nuclear Reactor RegulationProject No. 690
Enclosures:
As stated cc w/encls: See next pageDISTRIBUTION
- See next pageAccession No.: Package: ML022260137*See previous concurrence C:\ORPCheckout\FileNET\ML023440137.wpd OFFICE LARLEP:DRIPSC:RLEP:DRIPBC:EMEB:DENAMEHBerillaPKangSLeeEImbro DATE8/15/02*8/15/02*8/16/02*8/16/02*
OFFICESPLB:DSSAOGCPD:RLEP:DRIPD:DRIP NAMEJHannonJMoorePTKuoDMatthews DATE8/20/02*10/15/02* 12/2/02 12/3/02OFFICIAL RECORD COPY DISTRIBUTION: Letter to A. Nelson & D. Lochbaum, Dated: December 3, 2002 Package: ML023440085 HARD COPY RLEP RFE-MAIL:PUBLICJ. Johnson W. Borchardt D. Matthews F. Gillespie RidsNrrDe R. Barrett E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo C. Holden P. Shemanski H. Nieh G. Holahan H. Walker S. Black B. Boger D. Thatcher G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy W. McDowell S. Smith (srs3)
T. Kobetz R. Assa C. Munson RLEP Staff
A. ThadaniC. Julian R. Gardner M. Farber M. Modes J. Vora NRC Staff Position on Aging Management of Fire Protection SystemsIntroductionThe staff plans to revise the Fire Protection (FP) system aging management program inNUREG-1801.1. Staff Position for Wall Thinning of FP Piping Due to Internal CorrosionFire Protection (FP) piping is typically designed for a 50-year life in industrial applications. Thelimiting aging mechanism is general corrosion. Because the general corrosion of FP piping is typically very uniform, loss of intended function as a result of catastrophic failure caused by wall thinning throughout the system is possible and needs to be managed. However, internal inspections performed during each refueling cycle by disassembling portions of the FP piping, as stated in NUREG-1801, Chapter XI.M27, "Fire Water Systems," may not be most effectivemeans to detect this aging effect. Each time the system is opened, oxygen is introduced into the system and this accelerates the potential for general corrosion. Therefore, the staff recommends that the applicant perform a baseline pipe wall thickness evaluation of the fire protection piping using a non-intrusive means of evaluating wall thickness, such as volumetric inspection, to detect this aging effect before the current license term expires. The staff also recommends that the applicant perform pipe wall thickness evaluations at plant-specific intervals during the period of extended operation. The plant-specific inspection intervals are determined by engineering evaluation performed after each inspection of the fire protection piping to detect degradation prior to the loss of intended function. As an alternative to pipe wall thickness evaluations, an applicant may use the existing Chapter XI.M27.As part of the review of this issue and the above stated approach, a concern was raised as tothe inspection specifications of the internal surface of below grade FP piping. The staff acknowledges that some applicants may be able to demonstrate that the environmental and material conditions that exist on the interior surface of below grade FP piping are similar to the conditions that exist within the interior surface of the above grade FP piping. If an applicant makes such a demonstration, the staff agrees that the results of the interior inspections of the above grade FP piping can be extrapolated to evaluate the interior condition of the below grade FP piping. If not, additional inspection activities are needed to provide the reasonable assurance that the intended function of below grade FP piping will be maintained consistent with an applicant
's current licensing basis for the period of extended operation.2. Staff Position for Testing of Sprinkler HeadsNFPA 25, 1999 Edition, Section 2.3.3.1, "Sprinklers," states, "where sprinklers have been inplace for 50 years, they shall be replaced or representative samples from one or more sample areas shall be submitted to a recognized testing laboratory for field service testing.
" NFPA 25also contains guidance to perform this sampling every 10 years after the initial field service testing. Enclosure 1 The 50-year service life of sprinkler heads does not necessarily occur at the 50th year ofoperation in terms of licensing. The service life is defined from the time the sprinkler system is installed and functional. In most cases, sprinkler systems are in place several years before the operating license is issued. However, sprinkler systems in some plants may have been installed after the plant was placed in operation. The staff recommends, in accordance with NFPA 25, that sprinkler head testing should be performed at year 50 of sprinkler system service life, not at year 50 of plant operation, with subsequent sprinkler head testing every 10 years thereafter.3.Staff Position for Valve Line-up Inspections of Halon/Carbon Dioxide Fire SuppressionSystemsNUREG-1801, Chapter XI.M26, "Fire Protection," currently identifies the need to perform afunctional test of the halon/carbon dioxide fire suppression systems to determine the suppression agent charge pressure and verify that the extinguishing agent supply valves are open and the system is in automatic mode. Section 54.21 of Title 10 of the Code of FederalRegulations (CFR) specifies that an aging management review is to be performed for thosestructures and components that perform an intended function without moving parts, or without a change in configuration or properties, and that are not subject to replacement based on a qualified life or specified time period. The staff reviewed these items and determined that a valve lineup inspection, charging pressure inspection, and an automatic mode of operation verification are operational activities pertaining to system or component configurations or properties that may change, and are not related to aging management. Therefore, the staff position is to revise NUREG-1801 to eliminate the halon/carbon dioxide system inspections for charging pressure, valve lineups, and automatic mode of operation.Backfit considerationThe staff has determined that this ISG clarifies the staff position on aging management of FPsystems and does not affect adequate protection or compliance with 10 CFR Part 54, the License Renewal Rule. Therefore, the staff did not evaluate this ISG for backfit.
NUCLEAR ENERGY INSTITUTE Project No. 690
cc:Mr. Joe BartellU.S. Department of Energy NE-42 Washington, DC 20585Ms. Christine S. SalembierCommissioner State Liaison Officer Department of Public Service 112 State St., Drawer 20 Montipelier, VT 05620-2601Mr. Stephen T. HaleFlorida Power & Light Company 9760 S.W. 344 St.
Florida City, FL 33035Mr. William CorbinVirginia Electric & Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, VA 23060Mr. Frederick W. PolaskiManager License Renewal Exelon Corporation 200 Exelon Way Kennett Square, PA 19348George WrobelManager, License Renewal R.E. Ginna Nuclear Power Plant 1503 Lake Rd.
Ontario, NY 14519Ronald B. ClaryManager, Plant Life Extension V.C. Summer Nuclear Station Bradham Blvd.
P.O. Box 88 Jenkinsville, SC 29065Mr. Robert GillDuke Energy Corporation Mail Stop EC-12R P.O. Box 1006 Charlotte, NC 28201-1006Mr. John B. HermanManager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550Mr. Paul GunterDirector of the Reactor Watchdog Project Nuclear Information & Resource Service
1424 16 th St., NW, Suite 404Washington, DC 20036Mr. Hugh JacksonPublic Citizen
's Critical Mass Energy & Environment Program 215 Pennsylvania Ave., SE Washington, DC 20003Mary OlsonNuclear Information & Resource Service Southeast Office P.O. Box 7586 Asheville, NC 28802 Talmage B. ClementsManger - License Renewal Nuclear Engineering Services
CP&L 410 South Wilmington St.
Raleigh, NC 27602