Proposed Interim Staff Guidance (ISG)-12: Addition of Generic Aging Lessons Learned (GALL) Aging Management Program (AMP) XI.M35, ONE-TIME Inspection of SMALL-BORE Piping, for License Renewal
ML033100516
Person / Time
Site: PROJ0690
Issue date: 11/03/2003
From: Kuo P
NRC/NRR/DRIP/RLEP
To: Lochbaum D, Marion A
Nuclear Energy Institute, Union of Concerned Scientists
Kuo PT, NRR/DRIP/RLEP, 415-1183
References
+KBR1SISP20050608, ISG-12
Download: ML033100516 (9)


Text

November 3, 2003Mr. Alex MarionMr. David LochbaumNuclear Energy InstituteUnion of Concerned Scientists 1776 I Street, NW., Suite 4001707 H Street, NW., Suite 600 Washington, DC 20006-3708Washington, DC 20006-3919

SUBJECT:

PROPOSED INTERIM STAFF GUIDANCE (ISG)-12: ADDITION OF GENERICAGING LESSONS LEARNED (GALL) AGING MANAGEMENT PROGRAM (AMP) XI.M35, "ONE-TIME INSPECTION OF SMALL-BORE PIPING," FOR LICENSE RENEWAL

Dear Messrs. Marion and Lochbaum:

The purpose of this letter is to provide you with an opportunity to comment on proposed interimstaff guidance (ISG) that adds GALL AMP XI.M35, "One-Time Inspection of Small-Bore Piping,"

for license renewal. Operating experience has shown that cracking of small-bore Class 1 piping as a result of stress corrosion or thermal fatigue has not been prevalent during service. Thus, for plants that have not experienced cracking of small-bore Class 1 piping resulting from stress corrosion or thermal fatigue, a one-time inspection is an acceptable method for confirming that these aging effects are not occurring. However, if a plant has experienced cracking in small-bore Class 1 piping as a result of stress corrosion or thermal fatigue, periodic inspection may be necessary as a plant-specific AMP. The U.S. Nuclear Regulatory Commission (NRC) staff has developed the proposed ISG to clarify under what circumstances a one-time inspection is needed for small-bore Class 1 piping to provide additional assurance that the small-bore piping is not aging or that the effects of aging are insignificant.In the April 18, 2001, License Renewal Steering Committee meeting, the Nuclear EnergyInstitute (NEI) identified small-bore Class 1 piping as one of five topics in the GALL report needing continued dialog with the staff (see ADAMS Accession No. ML011410321). On May 29, 2002, the staff met with NEI and other industry representatives to discuss the status of industry activities on those five topics. At this meeting, NEI indicated that the GALL report should be revised to reflect the staff's acceptance of one-time inspection of small-bore Class 1 piping in license renewal applications. Also, during the meeting, it was agreed that an ISG should be issued to clarify under what circumstances a one-time inspection is needed for small-bore Class 1 piping (see ADAMS Accession No. ML021630359). The staff is enclosing its rationale for a new ISG-12 (Enclosure 1), and proposed GALL AMPXI.35, "One-Time Inspection of Small-Bore Piping" (Enclosure 2). The NRC is requesting your comments on the proposed ISG within 30 days following the date of this letter to facilitate a timely resolution of this issue.

November 3, 2003A. Marion and D. Lochbaum For resolved ISGs, it is also possible that comparable changes might be needed for futurerevisions to NEI 95-10, "Industry Guidance for Implementing the Requirements of10 CFR Part 54 - The License Renewal Rule.

" If you have any questions regarding this matter,please contact Mr. Peter Kang of my staff at 301-415-2779.Sincerely,/RA/Pao-Tsin Kuo, Program DirectorLicense Renewal and Environmental Impacts Division of Regulatory Improvement Programs Office of Nuclear Reactor RegulationProject 690

Enclosures:

As stated cc w/encls: See next page November 3, 2003A. Marion and D. Lochbaum For resolved ISGs, it is also possible that comparable changes might be needed for futurerevisions to NEI 95-10, "Industry Guidance for Implementing the Requirements of10 CFR Part 54 - The License Renewal Rule.

" If you have any questions regarding this matter,please contact Mr. Peter Kang of my staff at 301-415-2779.Sincerely,/RA/Pao-Tsin Kuo, Program DirectorLicense Renewal and Environmental Impacts Division of Regulatory Improvement Programs Office of Nuclear Reactor RegulationProject 690

Enclosures:

As stated cc w/encls: See next pageC:\ORPCheckout\FileNET\ML033100516.wpd* See Previous ConcurrenceOFFICELA: RLEP:DRIPPM:RLEP:DRIPSC:RLEP:DRIPNAMEMJenkins*PKang*SWest*

DATE8/14/038/14/038/20/03 OFFICEC:EMCB:DEOGCPD:RLEP:DRIP NAMEWBateman*JMoore*RWeisman for PTKuoDATE8/22/0310/7/0311/3/03OFFICIAL RECORD COPY DISTRIBUTION: Letter to Messrs. Marion and Lochbaum, Dated: November 3, 2003 Accession No. ML033100516HARD COPY RLEP RFP. KangE-MAIL:PUBLICJ. Craig D. Matthews F. Gillespie C. Grimes RidsNrrDe E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski H. Nieh J. Fair S. Black B. Boger D. Thatcher R. Pettis G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy W. McDowell S. Smith (srs3)

S. Duraiswamy C. Munson RLEP Staff


A. Thadani C. Julian R. Gardner M. Farber M. Modes J. Vora L. Kozak B. Elliot PROPOSED INTERIM STAFF GUIDANCE (ISG)-12: ADDITION OF GENERIC AGING LESSONS LEARNED (GALL) AGING MANAGEMENT PROGRAM (AMP) XI.M35, "ONE-TIME INSPECTION OF SMALL-BORE PIPING," FOR LICENSE RENEWALStaff PositionSmall-bore piping is ASME Class 1 piping less than 4-inches nominal pipe size (NPS), whichincludes pipes, fittings, and branch connections. This small-bore piping does not receive volumetric examination during service. Operating experience has shown that cracking of small bore piping as a result of stress corrosion or thermal fatigue has not been prevalent during service. Thus, for plants that have not experienced cracking of small-bore Class 1 piping resulting from stress corrosion or thermal fatigue, a one-time inspection is an acceptable method for confirming these aging effects are not occurring. However, if a plant has experienced cracking in small-bore Class 1 piping resulting from stress corrosion or thermal fatigue, periodic inspection may be necessary as a plant-specific AMP. Therefore, applicants for license renewal should evaluate these pipes for susceptibility to cracking from these aging mechanisms and determine whether a one-time volumetric inspection of such pipes is needed or it should propose a plant-specific AMP for them. The staff intends to revise the GALL report to clarify that for plants that have not experienced such cracking, a one-time inspection is needed to provide additional assurance that aging of such piping is not occurring or that the effects of aging are insignificant.RationaleThe current ASME Section XI inspection requirements, according to Table IWB-2500-1,Examination Category B-J, Item No. B9.21, for small-bore piping include a surface examination for piping less than 4-inches NPS and greater than 1-inch NPS. Also, Examination Category B-P requires system leakage and hydrostatic tests for small-bore piping. A volumetric examination is used to detect cracking resulting from high cycle thermal fatigue or stress corrosion. For plants that have not experienced cracking of small-bore Class 1 piping resulting from stress corrosion or thermal fatigue, an AMP would not be warranted at the time an applicant seeks to renew its license. However, a one-time inspection can provide additional assurance that either aging of Class 1 piping is not occurring or the effects of aging areinsignificant.

The method chosen for the one-time inspection of small-bore piping should bevolumetric examination. The program description should include volumetric examination ofinspection locations selected on the basis of detailed evaluations of material susceptibility, operating environment, stress, and risk. A risk-informed method can be used to determine locations susceptible to crack initiation resulting from stress corrosion or thermal cycling due to thermal stratification or turbulent penetration. The sample size should be based on an assessment of materials of fabrication, environment, aging effects, and operating experience.Enclosure 1 XI.M35 One-Time Inspection of Small-Bore PipingProgram DescriptionSmall-bore piping is ASME Class 1 piping less than 4-inches normal pipe sizing, which includespipes, fittings, and branch connections. The current ASME Section XI inspection requirements, according to table IWB-2500-1 Examination Category B-J Item No. B9.21, for small-bore piping include a surface examination for piping less than 4 inches and greater than 1-inch. Also, Examination Category B-P requires to perform system leakage and hydrostatic tests. However, the staff believes that for a one-time inspection detection of cracking resulted from high cycle thermal fatigue or intergranular stress corrosion should be performed using volumetric examination. This is to provide additional assurance that either aging to Class 1 piping is not occurring or the aging is insignificant such that an aging management program (AMP) is notwarranted.

Should evidence of significant aging be revealed by a one-time inspection, periodicinspection may be necessary as a plant-specific AMP. The plant-specific program should alsodescribe volumetric examination of inspection locations selected on the basis of detailed evaluations of material susceptibility, operating environment, stress, and risk.Evaluation and Technical Basis 1.Scope of Program: The small bore piping inspection is a one-time inspection of asample of ASME Class 1 piping less than 4-inches in diameter. The program includes measures to verify that degradation is not occurring, thereby confirming that there is no need to manage aging-related degradation or validating the effectiveness of any existing AMP for the period of extended operation. The sample size should be based on an assessment of materials of fabrication, environment, aging effects, and operating experience.2.Preventive Actions: One time inspection is an inspection activity independent ofmethods to mitigate or prevent degradation.3.Parameters Monitored/Inspected: Inspection is performed in accordance with therequirements of the American Society of Mechanical Engineers (ASME) Code and 10 CFR Part 50, Appendix B, by using one or more of a variety of nondestructive examination (NDE) methods, including visual, volumetric, and surface techniques. A risk-informed analysis can be used to determine locations susceptible to crack initiation resulting from stress corrosion or thermal cycling due to thermal stratification or turbulent penetration. Enclosure 2 4.Detection of Aging Effects: For small-bore piping, actual inspection locations arebased on physical accessibility, exposure level, NDE techniques, and locations identified in U.S. Nuclear Regulatory Commission (NRC) Information Notice (IN) 97-46. The one-time inspection program for small-bore piping includes locations that are susceptible to crack initiation resulting from stress corrosion or thermal cycling due to thermal stratification or turbulent penetration. Guidelines for identifying piping susceptible to potential effects of thermal stratification or turbulent penetration are provided in EPRI report 1000701, "Interim Thermal Fatigue Management Guideline (MRP-24)," January 2001. For small-bore piping, one-time inspections using volumetric examination are performed on selected weld locations to detect cracking before the end of the current operating license.5.Monitoring and Trending: This is a one-time inspection and, as such, no monitoring ortrending is anticipated. This is considered appropriate because cracking of small-bore piping has not been prevalent in the industry and a one-time inspection program is adequate. However, the evaluation of the inspection results may indicate the need for additional examinations (i.e., a plant-specific AMP) consistent with ASME Section XI, Subsection IWB. 6.Acceptance Criteria: If flaws or indications exceed the acceptance standards of ASMEParagraph IWB-3400, they are evaluated in accordance with IWB-3131, and additional examinations are performed in accordance with IWB-2430.7.Corrective Actions: The site corrective action program, quality assurance (QA)procedures, site review and approval process, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable in addressing the corrective actions, confirmation process, and administrative controls.8.Confirmation Process: See Item 7, above.9.Administrative Controls: See Item 7 above.

10.Operating Experience: This one-time inspection is a new activity, which will usevolumetric techniques with demonstrated capability and a proven industry record todetect piping weld and base material flaws. However, the specific application of the technique on small-bore piping needs to be qualified before the examination.

References10 CFR 50.55a, Codes and Standards, Office of the Federal Register, National Archives andRecords Administration, 2000ASME Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, ASMEBoiler and Pressure Vessel Code, 1995 edition through the 1996 addenda, American Society of Mechanical Engineers, New York, NY.NRC Information Notice 97-46, Unisolable Crack in High-Pressure Injection Piping, U.S.Nuclear Regulatory Commission, July 9, 1997.EPRI report 1000701, Interim Thermal Fatigue Management Guideline (MRP-24), January 2001(ADAMS Accession No. ML010810162).

NUCLEAR ENERGY INSTITUTE Project No. 690 cc:Mr. Joe Bartell U.S. Department of Energy NE-42 Washington, DC 20585Ms. Christine S. SalembierCommissioner State Liaison Officer Department of Public Service 112 State St., Drawer 20 Montipelier, VT 05620-2601Mr. Stephen T. HaleFlorida Power & Light Company 9760 S.W. 344 St.

Florida City, FL 33035Mr. William CorbinVirginia Electric & Power Company Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, VA 23060Mr. Frederick W. PolaskiManager License Renewal Exelon Corporation 200 Exelon Way Kennett Square, PA 19348George WrobelManager, License Renewal R.E. Ginna Nuclear Power Plant 1503 Lake Rd.

Ontario, NY 14519Ronald B. ClaryManager, Plant Life Extension V.C. Summer Nuclear Station Bradham Blvd.

P.O. Box 88 Jenkinsville, SC 29065Mr. Garry G. YoungManager, License Renewal Services 1448 SR 333, N-GSB-45 Russellville, AR 72802Mr. John B. HermanManager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, NE 68023-0550Mr. Paul GunterDirector of the Reactor Watchdog Project Nuclear Information & Resource Service

1424 16 th St., NW, Suite 404Washington, DC 20036Mr. Hugh JacksonPublic Citizen

's Critical Mass Energy & Environment Program 215 Pennsylvania Ave., SE Washington, DC 20003Mary OlsonNuclear Information & Resource Service Southeast Office P.O. Box 7586 Asheville, NC 28802 Talmage B. ClementsManager - License Renewal Nuclear Engineering Services

CP&L 410 South Wilmington St.

Raleigh, NC 27602Mr. Fred Emerson Nuclear Energy Institute 1776 I St., N.W., Suite 400 Washington, DC 20006-3708Mr. Charles R. PierceManager - License Renewal Southern Nuclear Operating Company P. O. Box 1295 Birmingham, AL 35201