"Draft Meeting" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.

Summary of License Renewal Meeting Held Between Us Nuclear Regulatory Commission Staff and Nuclear Energy Institute to Discuss Industry Comments on Draft License Renewal Interim Staff Guidance 2008-01
ML082480547
Person / Time
Site: PROJ0690
Issue date: 10/03/2008
From: David Wrona
NRC/NRR/DLR/RPOB
To:
Nuclear Energy Institute
Wrona D J, NRR, 415-2292
References
LR-ISG-2008-01
Download: ML082480547 (8)


Text

October 3, 2008 ORGANIZATION: Nuclear Energy Institute

SUBJECT:

SUMMARY

OF THE LICENSE RENEWAL MEETING HELD BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND THE NUCLEAR ENERGY INSTITUTE On July 18, 2008, the U.S. Nuclear Regulatory Commission (NRC or the staff) and the Nuclear Energy Institute (NEI) met to discuss industry comments on draft License Renewal Interim Staff Guidance (LR-ISG)-2008-01, Staff Guidance Regarding the Station Blackout Rule Title 10 of the Code of Federal Regulations Section 50.63 (10 CFR 50.63) Associated with License Renewal Applications. Enclosure 1 provides a listing of the meeting participants and Enclosure 2 contains the meeting agenda. A summary of the discussion follows.

In a letter to NEI, dated March 5, 2008, Agencywide Documents Access and Management System (ADAMS) accession number ML080520619, the staff provided industry the opportunity to comment on the draft ISG. The staff also published a Federal Register Notice (73 FRN 13258), dated March 12, 2008, which provided the same comment opportunity to the public.

The draft ISG clarifies the existing guidance provided in the Standard Review Plan for license renewal regarding the scoping of structures and components for the off-site power source recovery path that meets the requirements of the station blackout rule. On May 12, 2008, NEI provided comments on the draft ISG on behalf of the nuclear energy industry (ADAMS accession number ML081350619). Both the March 5, 2008, letter from the NRC and the May 12, 2008, letter from NEI were made available during the meeting.

During the meeting, NEI representatives provided a handout (ADAMS accession number ML082400193) and discussed their comments on the draft ISG. The staff answered questions and clarified its position that the license renewal scoping boundary of the off-site source to the plant is the first breaker at the transmission system voltage, unless compliance with the provisions of General Design Criterion 17 or equivalent plant-specific principal design criteria and 10 CFR 50.63 off-site power recovery paths are specifically excluded from the plant's current licensing basis as they relate to the capability to achieve and maintain safe shutdown (non-design-basis accident) in the event of a station blackout. The NEI representatives expressed disagreement with the staff's position. The staff stated that the NEI comments would be evaluated and considered as they finalized the draft ISG.

No members of the public participated in this meeting.

\\RA\\

David J. Wrona, Sr. Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Project No. 690

Enclosures:

As stated cc w/encls: See next page

ML082480547 OFFICE PM:RPOB:DLR LA:DLR BC:EEEB:DE BC:RPOB:DLR NAME DWrona IKing GWilson (Roy Mathew for)

TTate DATE 09/08/08 09/30/08 09/15/08 10/03/08

List of Participants License Renewal Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute July 18, 2008 PARTICIPANTS AFFILIATIONS Bruce Boger U.S. Nuclear Regulatory Commission (NRC)

Jack Grobe NRC Brian Holian NRC Raj Auluck NRC George Wilson NRC Roy Mathew NRC Dave Wrona NRC G. Singh Matharu NRC Duc Nguyen NRC M. K. Bagchi NRC Rui Li NRC Stacey Sakai NRC Alex Marion Nuclear Energy Institute (NEI)

Tony Pietrangelo NEI John Butler NEI Julie Keys NEI Michael Fallin Constellation Energy Mike Stroud Entergy Roger B. Rucker Entergy Rick Cliche FPL David Flyte PPL Susquehanna Paul Crawley STARS/APS

Agenda U.S. NRC Staff and the Nuclear Energy Institute Meeting July 18, 2008 Topic Lead

1. Introductions NRC
2. Discussion of Comments of Station Blackout Scoping Draft Interim Staff Guidance NEI/NRC
3. Public Participation All

Letter to Nuclear Energy Institute, from D. Wrona, dated October 3,2008

SUBJECT:

SUMMARY

OF THE LICENSE RENEWAL MEETING HELD BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND THE NUCLEAR ENERGY INSTITUTE DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDss RidsOgcMailCenter RidsNrrAdes RidsNrrAdro MModes, RI LLake, RII AStone, RIII NOkeefe, RIV GWilson

Nuclear Energy Institute Project No. 690 Ms. Christine S. Salembier, Commissioner State Liaison Officer Department of Public Service 112 State St., Drawer 20 Montipelier, VT 05620-2601 Ms. Julie Keys Nuclear Energy Institute 1776 I St., N.W., Suite 400 Washington, DC 20006-3708 Mr. Frederick W. Polaski Manager License Renewal Exelon Corporation 200 Exelon Way Kennett Square, PA 19348 Mr. Clifford I. Custer Project Manager, License Renewal FirstEnergy Nuclear Operating Company P.O. Box 4 Route 168 (Mail Stop SIM-2)

Shippingport, PA 15077 Mr. Paul Gunter, Director Reactor Watchdog Project Nuclear Information & Resource Service 6930 Carroll Avenue, Suite 340 Takoma Park, MD 20912 Mr. Hugh Jackson Public Citizen's Critical Mass Energy &

Environment Program 215 Pennsylvania Ave., SE Washington, DC 20003 Mary Olson Nuclear Information & Resource Service Southeast Office P.O. Box 7586 Asheville, NC 28802 Mr. Garry G. Young Manager, License Renewal Services 1448 SR 333, N-GSB-45 Russellville, AR 72802 Robert A. Vincent Licensing Lead - License Renewal Project Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Lorrie Bell, Project Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Roger Stewart Progress Energy Carolinas, Inc.

3581 West Entrance Road RNP A9 Hartsville, SC 29550 Michael H. Crowthers, Supervisor Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street (GENPL4)

Allentown, PA 18101-1179