ML003740678

From kanterella
Jump to navigation Jump to search

"Draft Meeting" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.

Summary of Meeting with the Nuclear Energy Institute on Industrys Comments on Chapter 2, Structures and Components Subject to Aging Management Review of the Draft Standard Review Plan for the Review of License Renewal Applications for Nucle
ML003740678
Person / Time
Site: PROJ0690
Issue date: 08/11/2000
From: Mitra S
NRC/NRR/DRIP/RLSB
To: Walters D
Nuclear Energy Institute
Mitra, SK, NRR/RLSB, 415-2783
References
Download: ML003740678 (6)


Text

August 11, 2000 ORGANIZATION:

Nuclear Energy Institute

SUBJECT:

SUMMARY

OF MEETING WITH THE NUCLEAR ENERGY INSTITUTE (NEI) ON INDUSTRYS COMMENTS ON CHAPTER 2, STRUCTURES AND COMPONENTS SUBJECT TO AGING MANAGEMENT REVIEW OF THE DRAFT STANDARD REVIEW PLAN FOR THE REVIEW OF LICENSE RENEWAL (SRP-LR) APPLICATIONS FOR NUCLEAR POWER PLANTS On July 18, 2000, representatives from NEI met with the Nuclear Regulatory Commission (NRC) staff in Rockville, Maryland. The purpose of this meeting was to discuss industrys comments on Chapter 2, Structures and Components Subject to Aging Management Review of the April 21, 2000, Draft Standard Review Plan for the Review of License Renewal Applications for Nuclear Power Plants (SRP-LR). NEI provided their comments as a handout at a June 26, 2000, public meeting. A list of meeting attendees is attached.

During the meeting the staff asked the industry to clarify certain of NEIs comments. NRC Staff and NEI representatives discussed comments on each section of Chapter 2. The staff will take following actions as a result of the discussion;



Scoping and Screening Methodology (Section 2.1):

The staff will reconsider industrys comment about reviews of facilitys Probabilistic Risk Analysis (PRA) and results of facilitys Individual Plant Examination of External Events (IPEEE)

The staff will clarify that paragraph 2.1.3.1 on page 2.1.4 does not imply that a compilation, review and submission of documents that may comprise CLB is required.

The staff will reconsider whether the subject Piece Parts in the Table 2.1.3 is necessary based on the experience from the initial application reviews.



Plant Level Scoping Results (Section 2.2), System Scoping and Screening Results:

Mechanical (Section 2.3), Scoping and Screening Results: Structures (Section 2.4),

Scoping and Screening Results: Electrical and Instrumentation and Control Systems (Section 2.5)

NEIs comments generally reflect a need for clarifying the staffs review approach. The staff review approach is to sample the applicants scoping results.

To come to a "reasonable assurance" finding, the staff should find no omission of components and structures identified by the applicant as subject to an aging

management review (AMR). This is consistent with the staff review of the initial license renewal applications.

August 11, 2000 NEI suggested that the staff should use applicants scoping methodology to review scoping and screening results. However, the staff performs an independent review of the applicants scoping and screening results. The purpose of the independent review is to verify the adequacy of the applicants scoping methodology.

The SRP provides guidance to the staff to perform review. NEI comments would delete most of the guidance under staff review procedures. This is not consistent with the purpose of the SRP.

The staff will consider whether to delete the last example in Table 2.5-1 because it does not describe a space approach and is not consistent with the rest of the information in the table.

The Staff stated that it would consider NEIs comments in preparing the draft SRP-LR for issuance for public comment in August.

/RA/

Sikhindra Mitra, Project Manager License Renewal and Standardization Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 690

Attachment:

As stated cc: See next page August 11, 2000 NEI suggested that the staff should use applicants scoping methodology to review scoping and screening results. However, the staff performs an independent review of the applicants scoping and screening results. The purpose of the independent review is to verify the adequacy of the applicants scoping methodology.

The SRP provides guidance to the staff to perform review. NEI comments would delete most of the guidance under staff review procedures. This is not consistent with the purpose of the SRP.

The staff will consider whether to delete the last example in Table 2.5-1 because it does not describe a space approach and is not consistent with the rest of the information in the table.

The Staff stated that it would consider NEIs comments in preparing the draft SRP-LR for issuance for public comment in August.

/RA/

Sikhindra Mitra, Project Manager License Renewal and Standardization Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No. 690

Attachment:

As stated cc: See next page DISTRIBUTION:

See next page DOCUMENT NAME: C:\\July18meeting sum.wpd

  • See previous concurrence OFFICE LA RLSB RLSB:SC RLSB:BC NAME EHylton SKMitra PTKuo CGrimes DATE 08/ 9 /00 08/ 9/00 08/11/00 08/11/00 OFFICIAL RECORD COPY

NUCLEAR ENERGY INSTITUTE Project No. 690 cc:

Mr. Dennis Harrison U.S. Department of Energy NE-42 Washington, D.C. 20585 Mr. Richard P. Sedano, Commissioner State Liaison Officer Department of Public Service 112 State Street Drawer 20 Montipelier, Vermont 05620-2601 Mr. Douglas J. Walters Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 DJW@NEI.ORG National Whistleblower Center 3238 P Street, N.W.

Washington, DC 20007-2756 Mr. Robert Gill Duke Energy Corporation Mail Stop EC-12R P.O. Box 1006 Charlotte, NC 28201-1006 Mr. Charles R. Pierce Southern Nuclear Operating Co.

40 Inverness Center Parkway BIN B064 Birmingham, AL 35242 Mr. David Lochbaum Union of Concerned Scientists 1616 P. St., NW Suite 310 Washington, DC 20036-1495 Mr. Garry Young Entergy Operations, Inc.

Arkansas Nuclear One 1448 SR 333 GSB-2E Russellville, Arkansas 72802

NRC MEETING WITH THE NUCLEAR ENERGY INSTITUTE ON CHAPTER 2 OF THE DRAFT SRP-LR ATTENDANCE LIST JULY 18, 2000 NAME ORGANIZATION DOUG WALTERS NEI JOHN RYCYNA CNS DAVID HOSTETLER VA POWER KEN KARCHER EPRI ROUNETTE NADER DUKE ROGER NEWTON WEPCO PAUL COLAIANNI DUKE JUAN PERALTA NRC/NRR/DIPM/IQMB CHRIS GRATTON NRC/NRR/DSSA/SPLB NOEL DUDLEY ACRS CORNELIUS HOLDEN NRC/NRR/DIPM/IIPB PT KUO NRC/NRR/DRIP/RLSB SAM LEE NRC/NRR/DRIP/RLSB S. K. MITRA NRC/NRR/DRIP/RLSB PAUL SHEMANSKI NRC/NRR/DE/EEIB Enclosure