|
---|
Category:Letter
MONTHYEARML24304A3482024-10-29029 October 2024 10-29-24 NEI Letter to NRC Status and Way Forward on NEI 99-04 Revision 1 ML24274A3112024-09-30030 September 2024 Request for NRC Review and Endorsement of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 ML24255A0702024-09-0909 September 2024 09-09-24_NRC_Industry Timeliness Request Regarding Items Relied Upon for Safety ML24204A2162024-07-22022 July 2024 Withdrawal of Fee Exemption Request for Endorsement of NEI White Paper, Selection of a Seismic Scenario for an EPZ Boundary Determination ML24204A2082024-07-22022 July 2024 07-22-24_NRC_NEI Withdrawal of Fee Exemption Request for Wp Selection of Seismic Scenario for EPZ Determination ML24187A0552024-07-0303 July 2024 Fee Exemption Request for NEI White Paper Selection of Seismic Scenario for EPZ Determination ML24184C1212024-07-0202 July 2024 NEI - Request for NRC Endorsement of NEI 24-05 Revision 0, an Approach for Risk-Informed Performance-Based Emergency Planning ML24173A2712024-06-14014 June 2024 NEI - Proposed Changes to Inspection Procedure (IP) 71130.10, Cybersecurity ML24165A0852024-06-13013 June 2024 NEI White Paper - Impact of Higher Source Term Fractions on EQ Doses ML24165A0862024-06-13013 June 2024 NEI White Paper - Proposed Control Room Dose Acceptance Criteria Supporting RG 1.183 R2 ML24165A0872024-06-12012 June 2024 NEI White Papers Supporting NRC Workshop Discussions Regarding Nuclear Regulatory Commissions (NRC) Potential Changes to Regulatory Guide 1.183 ML24152A3242024-05-31031 May 2024 NEI Concept Paper: Regulation of Rapid High-Volume Deployable Reactors in Remote Locations ML24159A7312024-05-23023 May 2024 05-23-24 Nuclear Energy Institute Letter to the U.S. Nuclear Regulatory Commission Re Industry Comments on Buildings as Items Relied on for Safety ML24135A1982024-04-23023 April 2024 SFAQ No 2022-02, SAE Program Requirements - NEI Withdrawal Letter ML24078A2212024-03-15015 March 2024 3-15-24 NEI Letter Aveil from Juhle on Pur ML24061A0572024-02-29029 February 2024 Endorsement of NEI 08-09, Revision 7, Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML24023A0392024-01-22022 January 2024 NEI Comments on the Information Collection Renewal for Domestic Licensing of Special Nuclear Material, Docket Id NRC-2023-0118 ML23355A1972023-12-14014 December 2023 NEI, Comments on NRC Draft Resolution of SFAQ 2022-02, SAE Program Requirements ML23219A1672023-10-25025 October 2023 Response Letter to Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23270B9002023-09-27027 September 2023 NEI Letter Request for an Extension of Comment Period on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses, Docket Id NRC 2023 0079 ML23268A0102023-09-22022 September 2023 NEI, Fee Exemption Request for Endorsement, Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 23-01, Operator Cold License Training Plan for Advanced Nuclear Reactors ML23241A8612023-08-25025 August 2023 Consolidated Industry Comments to NRC Regulatory Issue Summary 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23236A4992023-08-24024 August 2023 Industry Feedback on Region II Fuel Cycle Facility Construction Oversight Workshop Held August 15, 2023, and Suggested Topics for Additional Public Meetings in Fall 2023 ML23256A1622023-08-0101 August 2023 Incoming NEI Letter Dated August 1, 2023 Regarding Increase in Fees 2023-2025 ML23206A0292023-07-24024 July 2023 Incoming Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23143A1232023-06-22022 June 2023 NRC Fee Waiver Request for Draft NEI 23-01 ML23200A1662023-05-30030 May 2023 NEI Proposed Metrics for a Performance-Based Emergency Preparedness Program ML23116A0732023-05-25025 May 2023 Letter to Hillary Lane in Response to a Request for a Fee Exemption for NEI 23-03 ML23135A7332023-05-0909 May 2023 NEI Comments on NRC Safety Culture Program Effectiveness Review ML23110A6782023-04-18018 April 2023 Request for Review and Endorsement of NEI 23-03, Supplemental Guidance for Application of 10 CFR 50.59 to Digital Modifications at Non-Power Production or Utilization Facilities ML23110A6752023-04-18018 April 2023 04-18-23_NRC_Fee Waiver for NEI 23-03 ML23110A6762023-04-18018 April 2023 04-18-23_NRC_NEI 23-03 Review + Endorse ML24120A2702023-04-0404 April 2023 Melody Rodridguez NEI Comment on Controlled Unclassified Information ML23107A2302023-03-31031 March 2023 NEI Letter, to Andrea Veil, NRC, Regarding Industry Recommendations for a 10 CFR 50.46a/c Combined Rulemaking ML23138A1662023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23083B4622023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23060A2142023-03-0101 March 2023 NEI, Request for NRC Endorsement of NEI White Paper, Enabling a Remote Response by Members of an Emergency Response Organization, Revision 0 ML23060A3272023-03-0101 March 2023 NEI, Wireless Cyber Security Guidance ML23023A2752023-01-23023 January 2023 Request for Extension of Comment Period from the Nuclear Energy Institute on PRM-50-124 - Licensing Safety Analysis for Loss-of-Coolant Accidents ML22348A1122023-01-17017 January 2023 Letter to Richard Mogavero Response to Fee Exemption NEI 08-09 Revision 7 ML22353A6082023-01-11011 January 2023 U.S. Nuclear Regulatory Commission Report of the Regulatory Audit of the NEI-Proposed Aging Management Program Revision to Selective Leaching Program (XI.M33) ML22349A1012022-12-12012 December 2022 LTR-22-0343 Ellen Ginsberg, Sr. Vice President, General Counsel and Secretary, Nuclear Energy Institute, Expresses Concerns Related to Issuance of Regulatory Issue Summary 2022-02; Operational Leakage ML22336A0372022-11-16016 November 2022 Fee Exemption Request for NEI 08-09 Revision 7 - Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML22321A3152022-11-16016 November 2022 NEI Letter with Comments on Significance Determination Process Timeliness Review ML22298A2262022-10-25025 October 2022 Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated October 2022 ML22298A2302022-10-17017 October 2022 Submittal of NEI 22-03, Draft Revision 0, Nuclear Generation Quality Assurance Program Description ML22207B6512022-07-26026 July 2022 NEI, Full Fee Exemption Request for Industry Guidance Proposal - Weather Related Administrative Controls During Transient Outdoor Dry Cask Operations ML22195A1662022-07-14014 July 2022 NEI, Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 ML22195A0672022-07-13013 July 2022 Fee Exemption Request for Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 21-05, Reporting Guidance for Licensees with Risk-Informed Licensing Bases ML22195A0202022-07-13013 July 2022 07-13-22 NRC Fee Exemption Request for NEI 21-05 Review 2024-09-09
[Table view] |
Text
July 27, 2006 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
CHANGE OF U.S. NUCLEAR REGULATORY COMMISSION (NRC) BRANCH CHIEF AND OFFICE OF NUCLEAR REACTOR REGULATION (NRR) POINTS OF CONTACT FOR NUCLEAR ENERGY INSTITUTE (NEI) ACTIVITIES AND TOPICS OF INTEREST
Dear Mr. Riley:
Effective July 10, 2006, Ms. Stacey L. Rosenberg assumed the responsibilities as the Division of Policy and Rulemaking, Special Projects Branch Chief for NEI interactions. Ms. Rosenberg may be reached by telephone at (301) 415-3868 or electronic mail at slr@nrc.gov; Ms. Rosenbergs NRC mail stop is O-7E1A.
To ensure that all documents are properly captured and profiled in the NRCs Agencywide Documents and Access Management System, we request that NEI address all documents submitted to NRC as follows:
Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Please include the Project Number 690 on all documents related to License Renewal and Project Number 689 on all other NRR correspondence. If there are specific NRR staff members, whom you want to ensure receive a copy of NEI submittals, please send them a courtesy copy. Enclosed for your information and use is a current list of NRR points of contact for common NEI activities and topics of interest. If you require assistance for an item that is not included in the enclosed list, please contact Ms. Rosenberg or your Project Manager, Michelle Honcharik at (301) 415-1774 or mch3@nrc.gov.
Sincerely,
/RA/
James W. Clifford, Acting Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689
Enclosure:
As stated cc w/encl: See next page
Nuclear Energy Institute Project No. 689 cc:
Mr. Anthony Pietrangelo, Senior Director Ms. Barbara Lewis Risk Regulation Assistant Editor Nuclear Energy Institute Platts, Principal Editorial Office 1776 I Street, NW, Suite 400 1200 G St., N.W., Suite 1100 Washington, DC 20006-3708 Washington, DC 20005 Mr. H. A. Sepp, Manager Mr. Gary Welsh Regulatory and Licensing Engineering Institute of Westinghouse Electric Company Nuclear Power Operations P. O. Box 355 Suite 100 Pittsburgh, PA 15230-0355 700 Galleria Parkway, SE Atlanta, GA 30339-5957 Mr. Jack Roe Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Mr. Gary L. Vine, Executive Director Federal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 Mr. Pedro Salas Regulatory Assurance Manager - Dresden Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765
Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
CHANGE OF U.S. NUCLEAR REGULATORY COMMISSION (NRC) BRANCH CHIEF AND OFFICE OF NUCLEAR REACTOR REGULATION (NRR) POINTS OF CONTACT FOR NUCLEAR ENERGY INSTITUTE (NEI) ACTIVITIES AND TOPICS OF INTEREST
Dear Mr. Riley:
Effective July 10, 2006, Ms. Stacey L. Rosenberg assumed the responsibilities as the Division of Policy and Rulemaking, Special Projects Branch Chief for NEI interactions. Ms. Rosenberg may be reached by telephone at (301) 415-3868 or electronic mail at slr@nrc.gov; Ms. Rosenbergs NRC mail stop is O-7E1A.
To ensure that all documents are properly captured and profiled in the NRCs Agencywide Documents and Access Management System, we request that NEI address all documents submitted to NRC as follows:
Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Please include the Project Number 690 on all documents related to License Renewal and Project Number 689 on all other NRR correspondence. If there are specific NRR staff members, whom you want to ensure receive a copy of NEI submittals, please send them a courtesy copy. Enclosed for your information and use is a current list of NRR points of contact for common NEI activities and topics of interest. If you require assistance for an item that is not included in the enclosed list, please contact Ms. Rosenberg or your Project Manager, Michelle Honcharik at (301) 415-1774 or mch3@nrc.gov.
Sincerely,
/RA/
James W. Clifford, Acting Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 689
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC PSPB Reading File RidsNrrDpr RidsNrrDprPspb RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsNrrPMMHoncharik TChan RidsOgcMailCenter EImbro TAlexion BMozafari SSchneider TKobetz JNakoski MMurphy FGillespie DMatthews TFrye ADAMS ACCESSION NO.: ML062050219 NRR-106 OFFICE PSPB/PM PSPB/LA PSPB/BC DPR/(A)DD NAME MHoncharik DBaxley SRosenberg JClifford DATE 7/26/06 7/25/06 7/26/06 7/26/06 OFFICIAL RECORD COPY
NRR POINTS OF CONTACT Topic NRR POC Streamlining Process for Adoption of ASME Eugene Imbro, NRR/DE Code Cases mail stop: O-9E3 electronic mail: EXI@nrc.gov Power Uprates Thomas Alexion, NRR/DPR/PGCB mail stop: O-12H2 electronic mail: TWA@nrc.gov Rulemaking Regarding 10 CFR 19.13, Stewart Schneider, NRR/DPR/PRA 20.1003, 20.1904, and 20.2104 mail stop: O-12H3 electronic mail: SXS4@nrc.gov Risk-informed Technical Specification Bob Tjader, NRR/DIRS/SPWB Initiatives mail stop: O-12H2 electronic mail: TRT@nrc.gov Reporting Requirements in 10 CFR 50.46 John Nakoski, NRR/DSS/SPWB Regarding Peak Cladding Temperatures mail stop: O-10B3 electronic mail: JAN1@nrc.gov Licensing Action Task Force Martin Murphy, NRR/DORL mail stop: O-9H6 electronic mail: MCM2@nrc.gov Topical Report Reviews Michelle Honcharik, NRR/DPR/PSPB mail stop: O-7E1A electronic mail: MCH3@nrc.gov License Renewal Frank Gillespie, NRR/DLR mail stop: O-12E5 electronic mail: FPG@nrc.gov New Reactors David Matthews, NRR/DNRL mail stop: O-12E5 electronic mail: DBM@nrc.gov Industry Initiative on Groundwater Protection Timothy Frye, NRR/DIRS/IHPB mail stop: O-6F2 electronic mail: TJF@nrc.gov ENCLOSURE