ML023500516

From kanterella
Jump to navigation Jump to search
Consolidated List of Commitments for License Renewal
ML023500516
Person / Time
Site: PROJ0690
Issue date: 12/16/2002
From: Kuo P
NRC/NRR/DRIP/RLEP
To: Lochbaum D, Alexis Nelson
Nuclear Energy Institute, Union of Concerned Scientists
Kim T J, NRR/DRIP/RLEP, 415-1392
References
Download: ML023500516 (65)


Text

December 16, 2002Mr. Alan NelsonNuclear Energy Institute 1776 I Street, NW., Suite 400 Washington, DC 20006-3708Mr. David LochbaumUnion of Concerned Scientists 1707 H Street, NW., Suite 600 Washington, DC 20006-3919

SUBJECT:

CONSOLIDATED LIST OF COMMITMENTS FOR LICENSE RENEWAL

Dear Messers. Nelson and Lochbaum:

The purpose of this letter is to request, through the Nuclear Energy Institute, that eachapplicant for license renewal provide us with a consolidated list of commitments included in the license renewal application with appropriate cross references (e.g., chapter and page number of the license renewal application, Updated Final Safety Analysis Report Supplement location, response to request for additional information or open item number) and the applicable implementation schedule of each item. We plan to include this information, after the staff's review, in our safety evaluation report (SER). This information will be used in the staff's future confirmatory inspections of the applicant's programs associated with license renewal (as a site-specific attachment to Inspection Procedure 71003, "Post-Approval Site Inspection for License Renewal"). While it is not a regulatory requirement, we believe this consolidated list of commitments will increase effectiveness and efficiency of future inspectors to focus on verifying the applicant's implementation of the commitments, and will, therefore, reduce potentially unnecessary regulatory burden. Such a list, as a ready reference, will also provide other stakeholders (e.g., the public) with added confidence that necessary commitments have been identified to ensure safe operation of the plant during the period of extended operation. We request that a letter forwarding the consolidated list of commitments be provided to the staff in time to be included in the staff's SER. Absent the applicant's submittal of such consolidated list of commitments, the staff will developa list to be included in the staff's SER. In this case, the staff will develop the consolidated list of commitments based on its review of various parts of the application.

By letter dated December 11, 2002, Dominion submitted the license renewal commitment list for North Anna and Surry. Please consider Dominion's format in standardizing the commitment list and provide corresponding guidance in NEI 95-10, "Industry Guidance for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule," as appropriate.

A. Nelson- 2 -If you have any questions regarding this matter, please contact T. J. Kim of my staff at 301-415-1392.Sincerely,/RA/Pao-Tsin Kuo, Program DirectorLicense Renewal and Environmental Impacts Division of Regulatory Improvement Programs Office of Nuclear Reactor RegulationProject No. 690 cc: See next page A. Nelson- 2 -If you have any questions regarding this matter, please contact T. J. Kim of my staff at 301-415-1392.Sincerely,/RA/Pao-Tsin Kuo, Program DirectorLicense Renewal and Environmental Impacts Division of Regulatory Improvement Programs Office of Nuclear Reactor RegulationProject No. 690 cc: See next pageDISTRIBUTION

See next page Accession no.: ML023500516*See previous concurrenceDocument Name:C:\ORPCheckout\FileNET\ML023500516.wpdOFFICERLEP:PMRLEP:LARLEP:SCRLEP:PDNAMETJKim*HBerilla*SLee*PTKuo*

DATE12/13/200212/13/200212/13/200212/16/2002OFFICIAL RECORD COPY DISTRIBUTION: Letter to Mr. Alan Nelson, Dated: December 16, 2002 HARD COPY RLEP RFT.J. KimE-MAIL:PUBLICJ. Johnson W. Borchardt D. Matthews F. Gillespie RidsNrrDe R. Barrett E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo C. Holden P. Shemanski H. Nieh G. Holahan H. Walker S. Black B. Boger D. Thatcher G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy W. McDowell S. Smith (srs3)

T. Kobetz R. Assa C. Munson RLEP Staff


A. Thadani C. Julian R. Gardner M. Farber M. Modes J. Vora NUCLEAR ENERGY INSTITUTE Project No. 690

cc:Mr. Joe BartellU.S. Department of Energy NE-42 Washington, DC 20585Ms. Christine S. SalembierCommissioner State Liaison Officer Department of Public Service 112 State St., Drawer 20 Montipelier, VT 05620-2601Mr. Stephen T. HaleFlorida Power & Light Company 9760 S.W. 344 St.

Florida City, FL 33035Mr. William CorbinVirginia Electric & Power Company Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, VA 23060Mr. Frederick W. PolaskiManager License Renewal Exelon Corporation 200 Exelon Way Kennett Square, PA 19348George WrobelManager, License Renewal R.E. Ginna Nuclear Power Plant 1503 Lake Rd.

Ontario, NY 14519Mr. David LochbaumUnion of Concerned Scientists 1707 H St., NW, Suite 600 Washington, DC 20006-3919Ronald B. ClaryManager, Plant Life Extension V.C. Summer Nuclear Station Bradham Blvd.

P.O. Box 88 Jenkinsville, SC 29065Mr. Robert GillDuke Energy Corporation Mail Stop EC-12R P.O. Box 1006 Charlotte, NC 28201-1006Mr. John B. HermanManager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, NE 68023-0550Mr. Paul GunterDirector of the Reactor Watchdog Project Nuclear Information & Resource Service

1424 16 th St., NW, Suite 404Washington, DC 20036Mr. Hugh JacksonPublic Citizen's Critical Mass Energy &

Environment Program 215 Pennsylvania Ave., SE Washington, DC 20003Mary OlsonNuclear Information & Resource Service Southeast Office P.O. Box 7586 Asheville, NC 28802 Talmage B. ClementsManager - License Renewal Nuclear Engineering Services

CP&L 410 South Wilmington St.

Raleigh, NC 27602