ML051250245

From kanterella
Jump to navigation Jump to search
Staff Response to Industry Position Paper on the Interim Staff Guidance Process - Response to Letter Dated February 18, 2005
ML051250245
Person / Time
Site: PROJ0690
Issue date: 05/05/2005
From: Kuo P
NRC/NRR/DRIP/RLEP
To: Lochbaum D, Marion A
Nuclear Energy Institute, Union of Concerned Scientists
Hoffman, S T, NRR, 415-3245
References
Download: ML051250245 (7)


Text

May 5, 2005 Mr. Alex Marion Mr. David Lochbaum Senior Director, Engineering Union of Concerned Scientists Nuclear Generation Division 1707 H Street, NW, Suite 600 Nuclear Energy Institute Washington, DC 20006-3919 1776 I Street, NW, Suite 400 Washington, DC 20006-3708

SUBJECT:

STAFF RESPONSE TO INDUSTRY POSITION PAPER ON THE INTERIM STAFF GUIDANCE PROCESS - RESPONSE TO YOUR LETTER DATED FEBRUARY 18, 2005

Dear Messrs. Marion and Lochbaum:

By letter dated December 12, 2003, we issued our final guidance document related to the interim staff guidance (ISG) process. By letter dated February 13, 2004, you submitted a series of questions and requested clarifications on the process. NRC staff responses to these inquiries were enclosed by letter on July 21, 2004. By letter dated February 18, 2005, you enclosed an Industry Position Paper discussing the application of 10 CFR 54.37(b).

The NRC staff maintains its position on the effect of § 54.37(b), which requires that updates of the Final Safety Analysis Report (FSAR) pursuant to 10 CFR 50.71(e) include any systems, structures, and components (SSCs) newly identified that would have been subject to an aging management review or evaluation of time-limited aging analyses in accordance with § 54.21.

§ 54.37(b) also requires that [t]his FSAR update must describe how the effects of aging will be managed such that the intended function(s) in § 54.4(b) will be effectively maintained during the period of extended operation. It remains the staffs position, as explained in the Responses to Nuclear Energy Institute Questions on the Process for Interim Staff Guidance Developments and Implementation, dated July 21, 2004, that after a renewed license is issued, § 54.37(b) requires the licensee to assess newly identified SSCs and manage their aging, if necessary, without the staffs performance of a backfit analysis. The requirement stems from application of the rule language itself, and therefore does not constitute a new requirement or a new interpretation that could be considered a backfit.

A. Marion and D. Lochbaum Furthermore, § 54.37(b) does not limit how newly identified SSCs are found; rather, any entity may identify such SSCs. Therefore, should the NRC staff identify (through an interim staff guidance) an SSC as needing an aging management review to comply with § 54.21, all holders of renewed licenses affected by this SSC would then be obligated by the requirements of

§ 54.37(b) to take appropriate action leading to an update of the FSAR with respect to that SSC.

The Statement of Consideration (SOC) for the rule as originally promulgated in 1991 supports this view. It states at 56 Fed. Reg. 64966:

The Commission continues to believe that a special provision in 10 CFR part 54 that would impose backfit-style requirements on the agency is not needed. ... Any additional requirements to address age-related degradation unique to license renewal that are necessary to ensure compliance with the plants current licensing basis may be imposed without regard to cost. This is analogous to the compliance exemption in 10 CFR 50.109(a)(4)(I). The NRC need not prepare a separate document explaining the basis for such a conclusion.

The SOC for the 1995 revision of the rule similarly supports the staffs position. The 1995 SOC states at 60 Fed. Reg. 22483-84:

For newly identified [SSCs] that would have required either an aging management review or a time-limited aging analysis, the final rule requires that the licensee describe in the periodic FSAR update how the effects of aging will be managed to ensure that [SSCs] perform their intended function during the period of extended operation.

Two commenters to the 1995 rule revision suggested that the level of detail required by

§ 54.37(b) was greater than and inconsistent with the level of detail required in the FSAR supplement required by § 54.21(d). However, the Commission emphasized that the level of detail required by § 54.37(b) is appropriate since newly identified SSCs would not have been reviewed as part of the renewal application. 60 Fed. Reg. at 22484. Therefore, detailing the newly identified SSCs in FSAR updates would assure that licensees have considered relevant technical information regarding the aging effects of these SSCs. Including newly identified SSCs in FSAR updates would also establish appropriate administrative and regulatory controls on the programs that manage their aging. Id.

A. Marion and D. Lochbaum In summary, § 54.37(b) requires the holder of a renewed license to include newly identified SSCs in updated FSARs, as well as to describe how the effects of aging will be managed for such SSCs. A reading of the 1991 and 1995 SOCs for the Part 54 rule confirms the staffs position that it may impose the requirements of § 54.37(b) without conducting a backfit analysis.

If you have any questions regarding this matter, please contact Steve Hoffman at 301-415-3245.

Sincerely,

/RA/

Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Project No.: 690 cc w/encls: See next page

ML051250245 Document Name: E:\Filenet\ML051250245.wpd OFFICE PM:RLEP LA:RLEP OGC:NLO SC:RLEP PD:RLEP (w/comments)

NAME SHoffman YEdmonds DReddick KChang PTKuo (S. Hoffman for)

DATE 05/02/05 04/29/05 05/02/05 05/02/05 05/05/05 NUCLEAR ENERGY INSTITUTE Project No. 690 cc:

Mr. Joe Bartell Mr. Paul Gunter U.S. Department of Energy Director of the Reactor Watchdog Project NE-42 Nuclear Information & Resource Service Washington, DC 20585 1424 16th St., NW, Suite 404 Washington, DC 20036 Ms. Christine S. Salembier Commissioner State Liaison Officer Mr. Hugh Jackson Department of Public Service Public Citizen's Critical Mass Energy &

112 State St., Drawer 20 Environment Program Montipelier, VT 05620-2601 215 Pennsylvania Ave., SE Washington, DC 20003 Mr. James Ross Nuclear Energy Institute Mary Olson 1776 I St., N.W., Suite 400 Nuclear Information & Resource Service Washington, DC 20006-3708 Southeast Office P.O. Box 7586 Mr. William Corbin Asheville, NC 28802 Virginia Electric & Power Company Innsbrook Technical Center Talmage B. Clements 5000 Dominion Blvd. Manager - License Renewal Glen Allen, VA 23060 Progress Energy P.O. Box 1551 Mr. Frederick W. Polaski Raleigh, NC 27602 Manager License Renewal Exelon Corporation Mr. Charles R. Pierce 200 Exelon Way Manager - License Renewal Kennett Square, PA 19348 Southern Nuclear Operating Company P. O. Box 1295 Peter A. Mazzaferro Birmingham, AL 35201 Site Project Manager - License Renewal Nine Mile Point Nuclear Station, LLC Mr. Garry G. Young P.O. Box 63 Manager, License Renewal Services Lycoming, NY 13093 1448 SR 333, N-GSB-45 Russellville, AR 72802 Mr. David Lochbaum Union of Concerned Scientists Richard J. Grumbir 1707 H St., NW, Suite 600 Project Manager, License Renewal Washington, DC 20006-3919 Indiana Michigan Power Company Nuclear Generation Group Mark Ackerman 500 Circle Drive Project Manager, License Renewal Buchanan, MI 49107 FirstEnergy Nuclear Operating Company P.O. Box 4 Route 168 (Mail Stop BV-SGRP)

Shippingport, PA 15077

NUCLEAR ENERGY INSTITUTE Project No. 690 cc:

Mr. Timothy E. Abney, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. James E. Knorr 6610 Nuclear Road Two Rivers, WI 54241

DISTRIBUTION: Letter to A. Marion and D. Lochbaum, Re: Staff response to letter dated 2/18/05, Dated: May 5, 2005 ADAMS Accession No.: ML051250245 HARD COPY RLEP RF E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff C. Julian M. Modes J. Vora L. Kozak D. Reddick