August 9, 2007 Mr. Jim Riley Nuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
DRAFT OF REVISED INSPECTION PROCEDURE IP-71003, POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
Dear Mr. Riley:
As discussed in previous telephone conferences and meetings, the U.S. Nuclear Regulatory Commission (NRC or staff) staff was in the process of revising Inspection Procedure (IP)
IP-71003, Post-Approval Site Inspection for License Renewal. The staff has now completed its reviewing of the procedure, and the previously issued IP-71003 has now been revised. This review involved the staff from the Office of Nuclear Reactor Regulation (NRR)/Division of License Renewal, the staff from the NRR/Division of Inspection and Regional Support and experienced renewal inspection personnel from the NRCs four regional offices. Information that was discussed with Nuclear Energy Institute (NEI) and representatives from the industry during past telephone conferences and meetings has also been considered and incorporated in this revision, where appropriate.
The staff is forwarding a copy of the subject draft IP for stake-holders review and comment.
The staff solicits comments on the scope of, and/or, any clarity concerns contained in the draft IP. The final IP will be issued after making any necessary changes received from stake-holders and will be made publicly available. The NRC staff's disposition of your comments on the draft IP will be discussed prior to the staffs issuance of the final IP for implementation.
To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft IP showing proposed changes and provide a summary table of the proposed changes. If you have any questions, please contact Dr. Rajender Auluck, Branch Chief, at 301-415-1025 or via e-mail at rca@nrc.gov.
An identical letter is being sent to Mr. David Lochbaum at the Union of Concerned Scientists for comments.
Sincerely,
/RA/
Pao-Tsin Kuo, Director Division of License Renewal Office of Nuclear Reactor Regulation
Enclosure:
As Stated cc w/encl: See next page
August 9, 2007 Mr. David Lochbaum Union of Concerned Scientists 1707 H Street, NW, Suite 600 Washington, DC 20006-3919
SUBJECT:
DRAFT OF REVISED INSPECTION PROCEDURE IP-71003, POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
Dear Mr. Lochbaum:
As discussed in previous telephone conferences and meetings, the U.S. Nuclear Regulatory Commission (NRC or staff) staff was in the process of revising Inspection Procedure (IP)
IP-71003, Post-Approval Site Inspection for License Renewal. The staff has now completed its reviewing of the procedure, and the previously issued IP-71003 has now been revised. This review involved the staff from the Office of Nuclear Reactor Regulation (NRR)/Division of License Renewal, the staff from the NRR/Division of Inspection and Regional Support and experienced renewal inspection personnel from the NRCs four regional offices. Information that was discussed with NEI and representatives from the industry during past telephone conferences and meetings has also been considered and incorporated in this revision, where appropriate.
The staff is forwarding a copy of the subject draft IP for stake-holders review and comment.
The staff solicits comments on the scope of, and/or, any clarity concerns contained in the draft IP. The final IP will be issued after making any necessary changes received from stake-holders and will be made publicly available. The NRC staff's disposition of your comments on the draft IP will be discussed prior to the staffs issuance of the final IP for implementation.
To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft IP showing proposed changes and provide a summary table of the proposed changes. If you have any questions, please contact Dr. Rajender Auluck, Branch Chief, at 301-415-1025 or via e-mail at rca@nrc.gov.
An identical letter is being sent to Mr. Jim Riley at the NEI for industry comments.
Sincerely,
/RA/
Pao-Tsin Kuo, Director Division of License Renewal Office of Nuclear Reactor Regulation
Enclosure:
As Stated cc w/encl: See next page
Package: ML071720222 Letter: ML071720042 IP71003: ML071720174 OFFICE PM:RLRB:DLR LA:DLR BC:RLRB:DLR BC:IRIB:DIRS DD:DIRS D:DLR NAME NBLe SFigueroa RAuluck TReis ECollins PTKuo DATE 06/27/07 06/27/07 08/08/07 06/26/07 06/27/07 08/09/07
Letter to J. Riley and D. Lochbaum From P.T. Kuo Dated August 9, 2007 DISTRIBUTION
SUBJECT:
DRAFT OF REVISED INSPECTION PROCEDURE IP-71003, POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDci RWeisman RidsNrrDra SSmith (srs3)
RidsNrrDe SDuraiswamy RidsNrrDeEemb RidsNrrDlr RidsNrrDeEeeb RidsNrrDlrRlra RidsNrrDeEqvb RidsNrrDlrRlrb RidsNrrDss RidsNrrDlrRlrc RidsOgcMailCenter RidsNrrDlrReba RidsNrrAdes RidsNrrDlrRebb MModes, RI CJulian, RII
Nuclear Energy Institute Project 690 cc:
Christine S. Salembier, Commissioner State Liaison Officer Department of Public Service 112 State St., Drawer 20 Montipelier, VT 05620-2601 Mr. Frederick W. Polaski Manager License Renewal Exelon Corporation 200 Exelon Way Kennett Square, PA 19348 Mr. Clifford I. Custer Project Manager, License Renewal FirstEnergy Nuclear Operating Company P.O. Box 4 Route 168 (Mail Stop SIM-2)
Shippingport, PA 15077 Mr. Paul Gunter, Director Reactor Watchdog Project Nuclear Information & Resource Service 6930 Carroll Avenue, Suite 340 Takoma Park, MD 20912 Mr. Hugh Jackson Public Citizen's Critical Mass Energy &
Environment Program 215 Pennsylvania Ave., SE Washington, DC 20003 Mary Olson Nuclear Information & Resource Service Southeast Office P.O. Box 7586 Asheville, NC 28802 Mr. Garry G. Young Manager, License Renewal Services 1448 SR 333, N-GSB-45 Russellville, AR 72802 Robert A. Vincent Licensing Lead - License Renewal Project Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Lorrie Bell, Project Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Roger Stewart Progress Energy Carolinas, Inc.
3581 West Entrance Road RNP A9 Hartsville, SC 29550 Michael H. Crowthers, Supervisor Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street (GENPL4)
Allentown, PA 18101-1179