MONTHYEARML0930200562009-11-12012 November 2009 10/28/2009 Summary of Meeting with NEI to Discuss Generic License Renewal Topics and Activities ML0905400922009-03-0303 March 2009 Summary of the License Renewal Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute ML0805206192008-03-0505 March 2008 Proposed License Renewal Interim Staff Guidance LR-ISG-2008-01: Staff Guidance Regarding the Station Blackout Rule (10 CFR 50.63) Associated with License Renewal Applications ML0729504952007-11-0808 November 2007 09/25/2007 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0717703762007-08-29029 August 2007 Proposed License Renewal Interim Staff Guidance LR-ISG-2007-02: Changes to Generic Aging Lesson Learned Report Aging Management Program XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements ML0722706072007-08-28028 August 2007 Summary of the License Renewal Telephone Conference Call and Meeting Held Between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute License Renewal Task Force ML0717200422007-08-0909 August 2007 Draft of Revised Inspection Procedure IP-71003, Post-Approval Site Inspection for License Renewal ML0716401332007-08-0202 August 2007 Letter to James Riley, NEI, Regarding Final License Renewal Interim Staff Guidance LR-ISG-2006-03: Staff Guidance for Preparing Severe Accident Mitigation Alternatives Analyses ML0716902162007-07-0909 July 2007 03/21/2007, Summary of Meeting with Nuclear Energy Institute and Industry Representatives Regarding Environmental Report Content to Support License Renewal Application Reviews ML0631904402007-02-0808 February 2007 Ltr. to A. Marion and D. Lochbaum Proposed License Renewal Interim Staff Guidance LR-ISQ-2006-02 ML0627002362006-10-11011 October 2006 Y020060051 - Applicability of the Backfitting Rule to the Obligations of NRC Renewal Licensees Under 10 CFR 54.37(b) ML0620502192006-07-27027 July 2006 Change of U.S. (NRC) Branch Chief an Office of (NRR) Points of Contact for Nuclear Energy Institute (NEI) and Topic of Interest ML0611200022006-05-0303 May 2006 Proposed License Renewal Interim Staff Guidance LR-ISG-2006-01: Plant-Specific Aging Management Program for Inaccessible Areas of Boiling Water Reactor Mark I Steel Containment Drywell Shell ML0519400572005-07-12012 July 2005 U.S. Nuclear Regulatory Commission Comments on Nuclear Energy Institute (NEI) 05-01, Severe Accident Mitigation Alternative (SAMA) Analysis Guidance Document (Revision a) ML0512502452005-05-0505 May 2005 Staff Response to Industry Position Paper on the Interim Staff Guidance Process - Response to Letter Dated February 18, 2005 ML0502103032005-01-19019 January 2005 Negative Impact Caused by 90-day Public Comment Period and Delay in Release of NEI 95-10 ML0424407762004-08-31031 August 2004 INDUSTRY-PROPOSED Material, Environment, Aging Effects, and Program Combinations for the GALL Report Update ML0420402542004-07-21021 July 2004 Staff Response to Industry Questions on the NRC ISG Process Document Dated December 12, 2003 - Response to Your Letter Dated February 13, 2004 ML0416000872004-05-28028 May 2004 Proposed Method of the Nuclear Energy Institute to Update the GALL Report ML0402201242004-01-21021 January 2004 Evaluation of Proposed Interim Staff Guidance (ISG)-11: Recommendations for Fatigue Environmental Effects in a License Renewal Application ML0235206202003-12-12012 December 2003 the Interim Staff Guidance Process ML0331100602003-11-0303 November 2003 Addition of Aging Management Program (AMP) for Fuse Holders ML0331005162003-11-0303 November 2003 Proposed Interim Staff Guidance (ISG)-12: Addition of Generic Aging Lessons Learned (GALL) Aging Management Program (AMP) XI.M35, ONE-TIME Inspection of SMALL-BORE Piping, for License Renewal ML0322505792003-08-12012 August 2003 Proposed Interim Staff Guidance (ISG)-15: Revision of Generic Aging Lessons Learned (GALL) Aging Management Program (AMP) XI.E2, Electrical Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Instrumentation Circuits ML0318106302003-06-30030 June 2003 Request for Additional Information for Proposed Interim Staff Guidance (ISG)-11: Recommendations for Fatigue Environmental Effects in a License Renewal Application ML0318101422003-06-27027 June 2003 Resource Needs for License Renewal Application Reviews ML0313207982003-05-12012 May 2003 Proposed Interim Staff Guidance (ISG)-16: Time-Limited Aging Analyses (Tlaas) Supporting Information for License Renewal Applications ML0310805272003-04-18018 April 2003 Resource Needs for License Renewal Application Reviews ML0310104232003-04-0808 April 2003 Proposed Interim Staff Guidance (ISG) on Identification and Treatment of Housing for Active Components for License Renewal ML0309900522003-04-0707 April 2003 Standardized Format for License Renewal Applications (MB7344) ML0308300952003-03-21021 March 2003 Staff Comments to Industry Guidance on Revised 54.4 (a)(2) Scoping Criterion (Non-Safety Affecting Safety) for License Renewal ML0306905122003-03-10010 March 2003 Interim Staff Guidance (ISG) - 5 on the Identification and Treatment of Electrical Fuse Holders for License Renewal ML0235005162002-12-16016 December 2002 Consolidated List of Commitments for License Renewal ML0234401702002-12-0303 December 2002 Enclosures 2 and 3 - Interim Staff Guidance (ISG)-04: Aging Management of Fire Protection Systems for License Renewal ML0234401372002-12-0303 December 2002 Interim Staff Guidance (ISG)-04: Aging Management of Fire Protection Systems for License Renewal L-84-001, Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter)2002-11-13013 November 2002 Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter) ML0231904792002-11-13013 November 2002 Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter) ML0228004112002-09-25025 September 2002 Response to Letter License Renewal Appeals Process & Rules of Engagement ML0221203832002-07-30030 July 2002 Staff Guidance for Updating the Improved License Renewal Guidance Documents ML0220600482002-07-24024 July 2002 Nuclear Regulatory Commission'S Review Schedule of EPRI Technical Report, Guidelines for Addressing Fatigue Environmental Effects in License Renewal Application, (MRP-47), Draft Revision G ML0220602902002-07-24024 July 2002 Observations from Nuclear Energy Institute (NEI) License Renewal Demonstration Project & Comments from Advisory Committee on Reactor Safety Safeguards (ACRS) Letter Which May Result in Changes to NEI 95-10, Revision 3 ML0219205182002-07-11011 July 2002 Staff Comments to Industry Response on Proposed Staff Guidance on Aging Management of Fire Protection Systems for License Renewal ML0219107222002-07-10010 July 2002 07/10/2002 Letter Re Reactor License Renewal Brochure, NUREG/BR-0291 ML0213703202002-05-16016 May 2002 Proposed Staff Guidance on the Identification and Treatment of Electrical Fuse Holders for License Renewal ML0209801942002-04-0505 April 2002 Staff Response to Industry'S Proposed Revisions of Chapters II and III Generic Aging Lessons Learned (GALL) Report on Aging Management of Concrete Elements ML0209204642002-04-0101 April 2002 Nuclear Energy Inst. & Union of Concerned Scientists - Staff Guidance on Scoping of Equipment Relied on to Meet Requirements of Standard Blackout (SBO) for License Renewal ML0206001002002-03-0101 March 2002 Proposed Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout (SBO) Rule (10 CFR 50.63) for License Renewal (10 CFR 54.4(a)(3)) ML0203204912002-01-28028 January 2002 Enclosure to Proposed Staff Guidance on Aging Management of Fire Protection Systems for License Renewal ML0203204532002-01-28028 January 2002 Proposed Staff Guidance on Aging Management of Fire Protection Systems for License Renewal ML0203002942002-01-28028 January 2002 Proposed Staff Guidance on Scoping of Equipment Relied on to Meet the Requirements of the Station Blackout Rule (10 CFR 50.63) for License Renewal That Was Issued for Comments on November 14, 2001 2009-03-03
[Table view] |
Text
August 9, 2007Mr. Jim RileyNuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
DRAFT OF REVISED INSPECTION PROCEDURE IP-71003, "POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL"
Dear Mr. Riley:
As discussed in previous telephone conferences and meetings, the U.S. Nuclear RegulatoryCommission (NRC or staff) staff was in the process of revising Inspection Procedure (IP)
IP-71003, "Post-Approval Site Inspection for License Renewal." The staff has now completed its reviewing of the procedure, and the previously issued IP-71003 has now been revised. This review involved the staff from the Office of Nuclear Reactor Regulation (NRR)/Division of License Renewal, the staff from the NRR/Division of Inspection and Regional Support and experienced renewal inspection personnel from the NRC's four regional offices. Information that was discussed with Nuclear Energy Institute (NEI) and representatives from the industry during past telephone conferences and meetings has also been considered and incorporated in this revision, where appropriate.The staff is forwarding a copy of the subject draft IP for stake-holders' review and comment. The staff solicits comments on the scope of, and/or, any clarity concerns contained in the draft IP. The final IP will be issued after making any necessary changes received from stake-holders and will be made publicly available. The NRC staff's disposition of your comments on the draft IP will be discussed prior to the staff's issuance of the final IP for implementation.To facilitate the NRC staff's review of your comments, please provide a marked-up copy of thedraft IP showing proposed changes and provide a summary table of the proposed changes. If you have any questions, please contact Dr. Rajender Auluck, Branch Chief, at 301-415-1025 or via e-mail at rca@nrc.gov
.An identical letter is being sent to Mr. David Lochbaum at the Union of Concerned Scientists for comments. Sincerely,/RA/Pao-Tsin Kuo, Director Division of License Renewal Office of Nuclear Reactor Regulation
Enclosure:
As Statedcc w/encl: See next page August 9, 2007Mr. David LochbaumUnion of Concerned Scientists 1707 H Street, NW, Suite 600 Washington, DC 20006-3919
SUBJECT:
DRAFT OF REVISED INSPECTION PROCEDURE IP-71003, "POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL"
Dear Mr. Lochbaum:
As discussed in previous telephone conferences and meetings, the U.S. Nuclear RegulatoryCommission (NRC or staff) staff was in the process of revising Inspection Procedure (IP)
IP-71003, "Post-Approval Site Inspection for License Renewal." The staff has now completed its reviewing of the procedure, and the previously issued IP-71003 has now been revised. This review involved the staff from the Office of Nuclear Reactor Regulation (NRR)/Division of License Renewal, the staff from the NRR/Division of Inspection and Regional Support and experienced renewal inspection personnel from the NRC's four regional offices. Information that was discussed with NEI and representatives from the industry during past telephone conferences and meetings has also been considered and incorporated in this revision, where appropriate.The staff is forwarding a copy of the subject draft IP for stake-holders' review and comment. The staff solicits comments on the scope of, and/or, any clarity concerns contained in the draft IP. The final IP will be issued after making any necessary changes received from stake-holders and will be made publicly available. The NRC staff's disposition of your comments on the draft IP will be discussed prior to the staff's issuance of the final IP for implementation.To facilitate the NRC staff's review of your comments, please provide a marked-up copy of thedraft IP showing proposed changes and provide a summary table of the proposed changes. If you have any questions, please contact Dr. Rajender Auluck, Branch Chief, at 301-415-1025 or via e-mail at rca@nrc.gov
.An identical letter is being sent to Mr. Jim Riley at the NEI for industry comments. Sincerely,/RA/Pao-Tsin Kuo, Director Division of License Renewal Office of Nuclear Reactor Regulation
Enclosure:
As Statedcc w/encl: See next page
Package: ML071720222 Letter: ML071720042IP71003: ML071720174OFFICEPM:RLRB:DLRLA:DLRBC:RLRB:DLRBC:IRIB:DIRSDD:DIRSD:DLRNAMENBLeSFigueroaRAuluckTReisECollinsPTKuo DATE06/27/0706/27/0708/08/0706/26/0706/27/0708/09/07 Letter to J. Riley and D. Lochbaum From P.T. Kuo Dated August 9, 2007DISTRIBUTION
SUBJECT:
DRAFT OF REVISED INSPECTION PROCEDURE IP-71003, "POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL"HARD COPY: DLR RFE-MAIL:PUBLIC RidsNrrDci RWeisman RidsNrrDra SSmith (srs3)
RidsNrrDe SDuraiswamy RidsNrrDeEemb RidsNrrDlr RidsNrrDeEeeb RidsNrrDlrRlra RidsNrrDeEqvb RidsNrrDlrRlrb
RidsNrrDss RidsNrrDlrRlrc RidsOgcMailCenter RidsNrrDlrReba RidsNrrAdes RidsNrrDlrRebb
MModes, RI CJulian, RII Nuclear Energy InstituteProject 690
cc:Christine S. Salembier, CommissionerState Liaison Officer Department of Public Service 112 State St., Drawer 20 Montipelier, VT 05620-2601Mr. Frederick W. PolaskiManager License Renewal Exelon Corporation 200 Exelon Way Kennett Square, PA 19348Mr. Clifford I. CusterProject Manager, License Renewal FirstEnergy Nuclear Operating Company P.O. Box 4 Route 168 (Mail Stop SIM-2)
Shippingport, PA 15077Mr. Paul Gunter, DirectorReactor Watchdog Project Nuclear Information & Resource Service 6930 Carroll Avenue, Suite 340 Takoma Park, MD 20912Mr. Hugh JacksonPublic Citizen's Critical Mass Energy &
Environment Program 215 Pennsylvania Ave., SE Washington, DC 20003Mary OlsonNuclear Information & Resource Service Southeast Office P.O. Box 7586 Asheville, NC 28802 Mr. Garry G. YoungManager, License Renewal Services 1448 SR 333, N-GSB-45 Russellville, AR 72802Robert A. VincentLicensing Lead - License Renewal Project Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043Lorrie Bell, Project ManagerWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839Roger StewartProgress Energy Carolinas, Inc.
3581 West Entrance Road RNP A9 Hartsville, SC 29550Michael H. Crowthers, Supervisor Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street (GENPL4)
Allentown, PA 18101-1179