IR 05000237-14-403; 05000249-14-403; on 03/10/2014 - 03/14/2014, Dresden Nuclear Power Station, Units 2 and 3; Protection of Safeguards Information (71130.06) (Cover Letter Only)
ML14115A217
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/25/2014
From: Richard Skokowski
Plant Support Branch II
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Joseph Maynen
References
EA-13-253 IR-14-403
Download: ML14115A217 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532-4352 April 25, 2014

EA-13-253 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION UNITS 2 AND 3, NRC SECURITY BASELINE INSPECTION REPORT 05000237/2014403; 05000249/2014403 Dear Mr. Pacilio

On March 14, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Station, Units 2 and 3, and discussed the results of this inspection with Mr. S. Marik and other members of your staf Inspector documented the results of this inspection in the enclosed inspection repor t. The inspection examined activities conducted under your license as they relate to public health and safety, the common defense and security, and to confirm compliance with the Commission's rules and regulations and with the conditions of your licens Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personne The NRC inspector documented one finding of very low security significance (Green) in this repor This finding involved a violation of NRC requirement A cross-cutting aspect was assigned to this finding in the area of Human Performance

- Training [H.9] because the licensee failed to recognize that a newly created document needed to be controlled as Safeguards informatio This deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the sit In addition, the inspector documented a licensee-identified violation which was determined to be Severity Level IV in this repor The NRC is treating these violations as Non-Cited Violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Polic If you contest the violations or significance of these NCVs and/or if you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial and/or disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Dresden Nuclear Power Statio Enclosure contains Sensitive Unclassified Non-Safeguards Informatio When separated from enclosure, this transmittal document is decontrolle M. Pacilio-2- In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1)

and its disclosure to unauthorized individuals could present a security vulnerabilit Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAM If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information

- Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 C FR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your respons Should you have any questions concerning this inspection, we will be pleased to discuss them with yo

Sincerely,

/RA/ Richard A. Skokowski , Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Nonpublic Enclosure:

IR 05000237/2014403; 05000249/2014 403 w/Attachment: Supplemental Information

cc w/encl: