IR 05000237/2022002

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000237/2022002; 05000249/2022002 and 07200037/2022002 and Exercise of Enforcement Discretion
ML22220A283
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/08/2022
From: Robert Ruiz
NRC/RGN-III/DRP/B1
To: Rhoades D
Constellation Energy Generation
References
EA-22-055 IR 2022002
Download: ML22220A283 (23)


Text

August 8, 2022

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - INTEGRATED INSPECTION REPORT 05000237/2022002; 05000249/2022002 AND 07200037/2022001 AND EXERCISE OF ENFORCEMENT DISCRETION

Dear Mr. Rhoades:

On June 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station, Units 2 and 3. On July 26, 2022, the NRC inspectors discussed the results of this inspection with Mr. Pat Boyle, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Robert Ruiz, Chief Branch 1 Division of Reactor Projects

Docket Nos. 05000237, 05000249 and

07200037 License Nos. DPR-19 and DPR-25

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000237 and 05000249

License Numbers:

DPR-19 and DPR-25

Report Numbers:

05000237/2022002; 05000249/2022002 and 07200037/2022001

Enterprise Identifier: I-2022-002-0048

Licensee:

Constellation Energy Generation, LLC

Facility:

Dresden Nuclear Power Station, Units 2 and 3

Location:

Morris, IL

Inspection Dates:

April 01, 2022 to July 23, 2022

Inspectors:

A. Demeter, Resident Inspector

G. Edwards, Health Physicist

R. Edwards, Senior Reactor Inspector

M. Learn, Transportation and Storage Inspector

A. Nguyen, Senior Resident Inspector

M. Porfirio, Illinois Emergency Management Agency

C. St. Peters, Resident Inspector

Approved By:

Robert Ruiz, Chief

Branch 1

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Dresden Nuclear Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status EDG EA-22-055 Tornado Hazards Protection at Independent Spent Fuel Storage Installations 60855 Closed LER 05000249/2021-001-01 LER 2021-001-01 for Dresden Nuclear Power Station, Unit 3, Reactor Scram due to Main Power Transformer Failure 71153 Closed

PLANT STATUS

Unit 2 began the inspection period at rated thermal power. On June 11, 2022, the unit was downpowered to approximately 62 percent for a scheduled control rod pattern adjustment, scram time testing, turbine valve testing, and repairs to the 2B feedwater pump and regulating valve. The unit was returned to rated thermal power on June 12, 2022, and remained at or near rated thermal power for the remainder of the inspection period.

Unit 3 began the inspection period at rated thermal power. On April 9, 2022, the unit was downpowered to approximately 35 percent to investigate elevated drywell leakage values. The unit was shut down on April 10, 2022, for forced outage, D3F55 to repair the cause of the elevated drywell leakage, a packing leak on the 1B main steam isolation valve. Following repairs, the unit was returned to rated thermal power on April 13, 2022. On June 4, 2022, the unit was downpowered to approximately 75 percent for a scheduled control rod pattern adjustment, scram time testing, and turbine bypass valve testing. The unit was returned to rated thermal power on June 5, 2022 and remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme hot weather for the following systems:

Service water, reactor building closed cooling water, turbine building closed cooling water, containment cooling service water, the emergency diesel generators and auxiliaries, and station batteries on May 10-11, 2022.

The inspectors also evaluated the plants offsite AC power systems and onsite alternate AC power systems, including the switchyard and transformers to ensure prior issues had been addressed before the onset of summer weather conditions. The inspectors verified that weather-related equipment deficiencies on susceptible plant systems identified during the previous year had been corrected prior to the onset of summer weather.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

(1) Unit 2 core spray system on May 6-9, 2022
(2) Unit 2 and Unit 3 service water and associated cooling water systems on May 9-10, 2022
(3) Unit 2 and Unit 3 turbine building and reactor building closed cooling water systems on May 10-11, 2022

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2 isolation condenser system on April 25-27, 2022.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Zone 6.1, Unit 3 250V Battery Charger Room, elev. 538' and Fire Zone 7.0.B, Unit 3 Battery Room, elev. 551' on June 1, 2022
(2) Fire Zone 1.1.1.3, Unit 3 General Area, elev. 545' on June 1, 2022
(3) Fire Zone 8.2.5.C, Unit 2/3 EHC Reservoir Area, elev. 517', on June 6, 2022

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Unit 2 and Unit 3 torus basement and ECCS corner rooms

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered between April 4, 2022, and May 16, 2022.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during the Unit 3 emergent shutdown and startup activities for forced outage, D3F55, on April 10-12, 2022

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated the performance of a complex casualty graded scenario by a crew of licensed plant operators in the facility's simulator on May 4, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Closed cooling water systems
(2) AC/DC Distribution System

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 3 emergent shutdown risk for D3F55 concurrent with 'A' CST inoperable to both units for repairs to an ECCS suction valve on April 10-12, 2022
(2) Dry cask storage evolutions during the week of April 25, 2022
(3) Elevated plant risk during scheduled Unit 3 EDG maintenance window on April 25-27, 2022
(4) Elevated plant and fire risk during scheduled 3A core spray maintenance window on May 9-10, 2022
(5) Elevated plant and fire risk on Unit 2 and Unit 3 during work week May 16-20, 2022, for ECCS divisional work windows, common unit SBGT work window, and Dry Fuel Storage elevated risk
(6) Unit 3 emergent work to troubleshoot and repair issues with the plant process computer and rod block monitor, June 4-6, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Historical operability of the isolation condenser batteries (2)2A LPCI Motor Bearing Oil Sample had High Moisture Content
(3) Unit 3 LPCI Relay, 3-1530-127, Contacts had High Resistance
(4) Unit 3 Diesel Generator Resistor, R19, Degradation
(5) Impact on Unit 3 Batteries due to degraded ventilation system and warm weather

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

(1 Partial)

The inspectors evaluated the following temporary or permanent modifications:

(1)

(Partial)

Unit 2 and Unit 3 High Pressure Core Injection Signal Converter Modification

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1) Intermediate range monitor (IRM) functional testing per DOS 0700-02, 0700-04, and 0700-05, after troubleshooting and calibration of Unit 3 IRM 14 on April 11, 2022
(2) DOS 0250-02, full closure timing and exercising of MSIVs and DOS 0250-03, MSIV fail safe closure test, after repairs to packing on the Unit 3 1B MSIV on April 11, 2022
(3) DOS 1400-05, core spray system pump operability and quarterly IST test with torus available, after the 3A core spray maintenance window on May 10, 2022

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated forced outage (D3F55) activities on Unit 3 for increased drywell leakage due to a 1B MSIV packing leak from April 10-13, 2022.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (2 Samples)

(1) Unit 2 diesel generator endurance run and full load reject on April 19 and 20, 2022
(2) Unit 2 and Unit 3 38.5 percent rated core thermal power scram bypass pressure switches calibration and functional checks on date April 19, 2022

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Dresden 2Q2022 focus area drill on June 28,

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Walkdowns and Observations (IP Section 03.01) (8 Samples)

The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:

(1) Area Radiation Monitors used on the refuel floor
(2) Frisker used at the radiologically controlled area exit
(3) Continuous Air Monitor used to monitor the Unit 2 drywell
(4) Small Article Monitor used at the radiologically controlled area exit
(5) Continuous Air Monitor used on the refuel floor
(6) Continuous Air Monitor used to monitor the Unit 3 drywell
(7) Portable Alpha/Beta smear counter used on the refuel floor
(8) Frisker used in the radiological waste building

Calibration and Testing Program (IP Section 03.02) (13 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection instruments:

(1) ThermoFisher Scientific SAM12, SN#12095
(2) ThermoFisher Scientific SAM12, SN#152
(3) ThermoFisher Scientific SAM12, SN#151
(4) ThermoFisher Scientific PM12, SN#011
(5) ThermoFisher Scientific PM12, SN#121
(6) ThermoFisher Scientific PM12, SN#011
(7) Ludlum Model 177, SN#0024972
(8) Ludlum Model 3030P, SN#001631
(9) Ludlum Model 177, SN#0017414
(10) Mirion Argos 5, SN#1503-039
(11) Mirion Argos 5, SN#1012-305
(12) Mirion Argos 5, SN#1206-085
(13) Mirion DMC3000, SN#950999 Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (2 Samples)

The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:

(1) Unit 2/3 Particulate, Iodine, and Noble Gas (SPING-3/4) chimney effluent monitor
(2) Unit 3 Service Water effluent sample radiation monitor

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) Unit 2 (April 1, 2021 through March 31, 2022)
(2) Unit 3 (April 1, 2021 through March 31, 2022)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 2 (April 1, 2021 through March 31, 2022)
(2) Unit 3 (April 1, 2021 through March 31, 2022)

BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)

(1) Unit 2 (April 1, 2021 through March 31, 2022)
(2) Unit 3 (April 1, 2021 through March 31, 2022)

===71152S - Semiannual Trend Problem Identification and Resolution

Semiannual Trend Review (Section 03.02)===

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in equipment reliability that might be indicative of a more significant safety issue.

71153 - Follow Up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)

The inspectors evaluated the following licensee event reports (LERs):

(1) LER2021-001-01, Reactor Scram due to Main Power Transformer Failure (ADAMS Accession No. ML22165A204). The inspectors reviewed the updated LER submittal. The previous LER submittal was reviewed in Inspection Report

===05000237/2021004 and 05000249/2021004.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

60855 - Operation of an ISFSI Operation of an ISFSI===

(1) The inspectors assessed the licensees Independent Spent Fuel Storage Installation (ISFSI) cask loading activities from May 9 through May 26, 2022. Specifically, the inspectors observed the following activities during the loading of multi-purpose canister (MPC) No. 787:
  • heavy lift of the loaded transfer cask (HI-TRAC) from the spent fuel pool to the cask processing area
  • canister processing including blowdown and forced helium dehydration
  • stack-up and download of the MPC from the HI-TRAC into the storage cask (HI-STORM)
  • radiological field surveys

The inspectors performed walkdowns of the ISFSI pad, including walkdowns of the ISFSI haul path.

The inspectors evaluated the following:

  • spent fuel selected for loading into dry cask storage during this loading campaign
  • selected corrective action program documents
  • selected 72.48 screenings and evaluations

INSPECTION RESULTS

Enforcement Discretion Enforcement Action EA-22-055: Tornado Hazards Protection at Independent Spent Fuel Storage Installations 60855

Description:

Upon issuance of U.S. NRC Enforcement Guidance Memorandum (EGM) 22-001 (ML22087A496), dated April 15, 2022, the licensee performed an assessment of all outdoor dry cask storage activities that are not explicitly analyzed for tornado hazards in the cask licensing basis. One configuration was identified by the licensee when a loaded Holtec HI-STORM 100 storage overpack is brought out of the reactor building without a lid installed.

This configuration is not explicitly analyzed in the HI-STORM 100 FSAR. Title 10 of the Code of Federal Regulations (CFR) 72.212 (b)(6), states, in part, that the general licensee must:

review the Safety Analysis Report referenced in the [Certificate of Compliance] CoC or amended CoC and the related NRC Safety Evaluation Report, prior to use of the general license, to determine whether or not the reactor site parameters, including analyses of earthquake intensity and tornado missiles, are enveloped by the cask design bases considered in these reports. The results of this review must be documented in the evaluation made in paragraph (b)(5) of this section. Tornado hazards are evaluated in the Holtec HI-STORM Final Safety Analysis Report (FSAR) section 3.4.8, Tornado Wind and Missile Impact, and section 11.2.6.2, Tornado

Analysis.

These sections of the FSAR do not include an analysis for tornado hazards with the storage overpack lid removed. Similarly, the licensee did not have an evaluation demonstrating the reactor site parameters enveloped the cask design basis for tornado missiles specifically for the configuration where a loaded storage overpack was outdoors with the lid off.

Corrective Actions: The licensee entered the issue into its corrective action program to address the actions specified in EGM 22-001. Specifically, the licensee established additional measures that:

(1) mitigate tornado hazards, through procedures, during periods of ISFSI handling operations which include:
(a) precluding outdoor dry cask storage activities during periods of adverse weather;
(b) establishing meteorological criteria and designating staff to monitor weather during ISFSI handling operations;
(c) describing actions to take in the event of severe weather necessary to place the cask in an analyzed condition; and
(d) minimizing the duration of ISFSI handling operations during which ISFSI important to safety structures, systems, and components are in an unanalyzed condition.
(2) document that required weather checks are complete prior to the start of ISFSI handling operations
(3) document in the CAP a request for the CoC holder to request an amendment within six months of the date of the EGM

Because the licensee implemented compensatory measures and plans to take necessary actions to restore compliance in accordance with the EGM, the NRC is allowing continued ISFSI handling operations.

Corrective Action References: IR 04494731; NRC Issuance of EGM 22-001 for ISFSI Tornado Hazard; 04/21/2022

Enforcement:

Significance/Severity: The inspectors assessed the issue as being more than minor significance but not more than Severity Level IV. Consistent with the guidance in EGM 22-001 discussed below, the NRC is exercising enforcement discretion.

Violation: Title 10 of the Code of Federal Regulations (CFR) 72.122 (b)(6), states, in part, that the general licensee must: review the Safety Analysis Report referenced in the CoC or amended CoC and the related NRC Safety Evaluation Report, prior to use of the general license, to determine whether or not the reactor site parameters, including analyses of earthquake intensity and tornado missiles, are enveloped by the cask design bases considered in these reports. The results of this review must be documented in the evaluation made in paragraph (b)(5) of this section.

Contrary to the above, on April 15, 2022, the licensee did not have a documented evaluation determining whether the reactor site parameters, including analyses of tornado missiles, were enveloped by the cask design bases considered in the Safety Analysis Report. Specifically, the licensee failed to have an analysis for tornado hazards when the loaded storage overpack is outside the reactor building without a lid installed.

Basis for Discretion: Because this violation was identified during the discretion period covered by Enforcement Guidance Memorandum 22-001, Enforcement Discretion for Noncompliance of Tornado Hazard Protection requirements at Independent Spent Fuel Storage Installations, and because the licensee was implementing compensatory measures and has taken or plans to take the necessary actions to restore compliance, the NRC is exercising enforcement discretion by not issuing an enforcement action for the violation and is allowing continued ISFSI handling operations.

Observation: Equipment Reliability Trend and Improvement Actions 71152S The inspectors performed a semiannual review of issues entered into the corrective action program (CAP) and a cognitive review of plant observations over the period of January 1, 2022, to June 30, 2022, to identify any potential trends that might indicate the existence of a more significant safety issue. The inspectors also reviewed the licensee's Equipment Reliability Excellence Plan to evaluate their corrective actions being taken to address gaps in this area.

In 2021, as a result of several impactful equipment deficiencies, the licensee and NRC identified a decline in their equipment reliability program. The licensee created the Excellence Plan to holistically review the equipment reliability program, identify gaps, and create corrective actions to address identified vulnerabilities. This Plan is a broad-scope, on-going effort that the inspectors reviewed to check-in on the licensee's progress in addressing equipment issues. To this point, the licensee has conducted several training and knowledge management activities for the engineering organization, as well as others throughout the site, to ensure all those involved in the process understood their critical roles in ensuring equipment deficiencies are properly identified, evaluated, and resolved to improve reliability. The licensee has also performed several benchmarking activities, within and external to the Constellation fleet, to identify best practices and improve their program for better results. Finally, the licensee has conducted a number of system reviews to identify specific vulnerabilities in the system and create targeted corrective actions to address those vulnerabilities. For example, a review of the Nuclear Instrumentation system created corrective actions to implement new maintenance strategies for replacement of undervessel cables and connectors for the instruments that repeatedly have caused inoperability/unreliability of these components.

The inspectors reviewed these system certifications, actions, and due dates. Currently, the actions appear appropriate; however, the inspectors emphasized that continued focus on executing aggressive schedules were needed to address some of the issues because of the age of the issue and/or the potential risk from allowing the issues to linger for an extended period of time. For example, the inspectors identified a Fire Protection (FP) system pipe that had a leak during a routine plant walkdown. This was one of several leaks on piping in this system that had revealed itself over the past year. The leak identified also impacted (dripped on) a Containment Cooling Service Water (CCSW) pipe and was creating a rust spot on that pipe. Both of these systems, FP and CCSW, have long-range plans to replace known degraded sections of piping due to the age and raw water conditions of the pipes. Based on issues self-revealed over the past year, these long-range plans have been re-scheduled to first available opportunities (either on-line or next refueling outage) to ensure more timely resolution. This is just one of several examples over the past six months, where leaks have occurred on raw water system piping. Also, during this time frame, the licensee had to emergently address a service water piping leak associated with the main turbine lube oil cooler. This issue could have had a significant operational impact on the unit if it hadn't been identified in a timely manner.

In the first half of 2022, the plant had still encountered many equipment deficiencies that have resulted in emergent responses on behalf of the organization to resolve, some of these also included emergent system inoperabilities and unit downpowers. For example, in March during a downpower, Unit 2 conducted emergent repairs to the 2B Feedwater pump breaker. In April, Unit 3 emergently shut down to repair packing leakage from the 1B Main Steam Isolation Valve (MSIV). Both of these issues were similar to or the same as prior equipment deficiencies on those components. The inspectors emphasized that the licensee ensure they are thoroughly evaluating all new events, and their extent-of-conditions, for lessons-learned and any gaps that could be addressed in their Equipment Reliability Excellence Plan.

Overall, for the first half of the year's activities associated with the Equipment Reliability Excellence Plan, the inspectors determined that, generally, the system reviews the licensee conducted were comprehensive and took into account some long-standing equipment degradation issues and deficiencies that need to be addressed in a timely manner. Currently, the corrective actions have due dates that are commensurate with the safety significance/risk impact of the deficiencies. The inspectors did not identify any findings or violations associated with the activities in the Plan up to this point.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 26, 2022, the inspectors presented the integrated inspection results to Mr. P. Boyle, Site Vice President, and other members of the licensee staff.
  • On May 6, 2022, the inspectors presented the radiation protection inspection results to Mr. C. Joseph, Plant Manager, and other members of the licensee staff.
  • On May 26, 2022, the inspectors presented the Operation of an ISFSI inspection results to Mr. C. Joseph, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

60855

ALARA Plans

DR-0-22-00204/5

22 Dry Cask Activities

Corrective Action

Documents

AR 04234314

East ISFSI Walkdown Quarterly Results

03/29/2019

AR 04234323

West ISFSI Walkdown Quarterly Results

03/29/2019

AR 04246946

2019 Dry Cask #2 WIP

05/07/2019

AR 04259220

2019 Dry Cask Post Job Review

06/25/2019

AR 04267696

West ISFSI 3Y Structural Inspection Finding

07/29/2019

AR 04267706

East ISFSI 3Y Structural Inspection Findings

07/29/2019

AR 04284952

West ISFSI Walkdown Quarterly Results

10/04/2019

AR 04303751

West ISFSI Walkdown Quarterly Results

2/13/2019

AR 04305177

West ISFSI Annual Walkdown Results

2/19/2019

AR 04305186

East ISFSI Annual Walkdown Results

2/19/2019

AR 04354188

20 Dresden Dry Cask Storage Campaign Critique & LL

07/01/2020

AR 04358890

Corrosion on Top of Dry Casks

07/24/2020

AR 04360195

West ISFSI Quarterly Walkdown Results Vent Holes and

Dents

07/31/2020

AR 04360197

West ISFSI Quarterly Walkdown Results Surface Rust on

Casks

07/31/2020

AR 04376788

NOS ID: West ISFSI 72.212 has Incorrect 72.48 Revisions

10/15/2020

AR 04489544

22 14M ISFSI Cask Surveillance Inspection Results

04/01/2022

Miscellaneous

DCS Approval PCI Qualification Records

03/30/2022

DCS Approval LTS Qualification Records

03/31/2022

2.212 Evaluation

Report

East ISFSI 72.212 Evaluation Report

2.212 Evaluation

Report

West ISFSI 10 CFR 72.212 Evaluation Report

DRE22-0001

Dresden Unit 3 Fuel Selection Packages and Alternate

Assembly List for 2022 Campaign

2/04/2022

Procedures

DFP 0800-72

HI-STORM Processing

DOA 0800-01

Spent Fuel Cask Abnormal Conditions

GQP 9.2

High Temperature Liquid Penetrant Examination and

Acceptance Standards for Welds, Base Materials, and

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Cladding

GQP 9.6

Visual Examination of Welds

NF-AA-622

Fuel Selection and Documentation for Dry Cask Loading

OU-MW-671-200

FHD for BWRs

PI-CNSTR-OP-

EXE-H-01

Closure Welding of Holtec Multi-Purpose Canisters at Exelon

Facilities

Self-Assessments NOSA-DRE-20-

Independent Spent Fuel Storage Installation Audit Report

10/21/2020

Work Orders

05016349

D2/3 1Y COM Reactor Building Overhead Crane Inspection

2/11/2021

05044995

D2/3 1Y COM ISFSI Test of HI-TRAC Trunnions

05/27/2021

05046564

D2/3 1Y COM ISFSI Test of HI-STORM Lift Bracket

06/01/2021

05049684

D2/3 AN COM ISFSI Test of U2/3 RB 125 Ton Lift Yoke

06/09/2021

05127655

D2/3 1Y COM OSHA INSP Crane - RX BLDG Overhead

04/05/2022

05127675

D2/3 1Y COM OSHA Reactor BLDG Overhead Crane

Inspection

04/07/2022

05137506

D2/3 12M COM ISFSI Test of MPC Lift Cleats

05/28/2021

71111.01

Corrective Action

Documents

4498962

Unit 3 Battery Room Air Conditioning Unit Compressor

Unreliable

05/11/2022

4499142

Trend IR: HVAC Performance at the Onset of Warm

Weather

05/11/2022

4500938

Unexpected Alarm, 902-7, H-3, Turbine Vacuum Lo

05/20/2022

4501989

Contingency TCCP for Loss of All Isophase Bus Duct

Cooling

05/25/2022

4506261

Thermography Anomaly Found in Unit 3 MPT

06/18/2022

4506651

MPT 3 Winding #2 Temperature Setpoint Discrepancy

06/21/2022

AR 04442299

Dresden 2022 Summer Readiness Actions Per WC-AA-107

08/24/2021

Miscellaneous

Site Certification Letter for Summer Readiness

05/06/2022

Procedures

DOP 4450-08

Dresden Cooling Lake Operation

WC-AA-107

Seasonal Readiness

WC-DR-104-1001 Dresden 345kV Switchyard Configuration Risk Assessment

71111.04

Procedures

DOP 1300-M1/E1

Unit 2 Isolation Condenser System Checklist

DOP 1400-E1

Unit 2 Core Spray System Electrical Checklist

DOP 1400-M1

Unit 2 Core Spray System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

DOP 1500-E1

Unit 2 LPCI and CCSW Electrical Checklist

DOP 1500-E1

Unit 3 LPCI and CCSW Electrical Checklist

DOP 1500-M1

Unit 2 LPCI and Containment Cooling Valve Checklist

DOP 1500-M1

Unit 3 LPCI and Containment Cooling Valve Checklist

DOP 3700-M2/E2

Unit 2 RBCCW System Checklist

DOP 3700-M2/E2

Unit 3 RBCCW System Checklist

DOP 3800-M1

Unit 3 Turbine Building Closed Cooling Water System

Checklist

DOP 3800-M1

Unit 2 Turbine Building Closed Cooling Water System

Checklist

DOP 3900-E1

Unit 2(3) Service Water and Screen Wash System Electrical

Checklist

DOP 3900-M1

Unit 2/3 Service Water and Screen Wash Valve Checklist

DOP 6600-M1

Unit 2 Standby Diesel Generator Checklist

DOP 6600-M1

Unit 3 Standby Diesel Generator Checklist

71111.05

Fire Plans

24 U3RB-26

Fire Zone 1.1.1.3, Unit 3 General Area, Elev. 545'

168 U3TB-79

Fire Zone 7.0.B, Unit 3 Battery Room, Elev. 551'

169 U3TB-80

Fire Zone 6.1, Unit 3 250V Battery Charger Room, Elev. 538' 06

175 U2/3TB-92

Fire Zone 8.2.5.C, Unit 2/3 EHC Reservoir Area, Elev. 517'

71111.06

Corrective Action

Documents

4496905

Groundwater In-Leakage into Unit 2 Reactor Building from

HRSS Pipe Tunnel

05/01/2022

4497744

Rainwater into Unit 3 Torus Basement from HRSS Pipe

Tunnel

05/03/2022

Engineering

Evaluations

DR-PSA-012

Internal Flood Evaluation Summary and Notebook

71111.11Q Corrective Action

Documents

4500616

Follow-Up to IR 4496004 (DEP Failure in LORT Requal)

05/18/2022

Procedures

DGP 01-01

Unit Startup

2

DGP 02-01

Unit Shutdown

175

71111.12

Corrective Action

Documents

4498962

Unit 3 Battery Room Air Conditioning Unit Compressor

Unreliable

05/11/2022

AR 04326378

TBCCW Pump - Lessons Learned

03/06/2020

AR 04337578

Request WGE to Evaluate Trend in RBCCW TCV

04/22/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Performance

AR 04460820

D2R27: MOV 2-3703 Overtorque and Trace Anomalies

11/14/2021

AR 04488199

IEMA ID - 3B TBCCW Pump Noise

03/29/2022

AR 04492766

Engineering to Perform a SA for Raw Water Programs

04/13/2022

AR 04493035

Generate WR to Inspect Actuator of MOV 2-3703 in D2R28

04/13/2022

Engineering

Changes

2098

Replace [Unit 3 Battery Room] HVAC Unit

Engineering

Evaluations

PMC-22-135043

Increase Frequency of PMRQ 789-01 to O1/1RFL (D3R27)

06/20/2022

Miscellaneous

Unit 3 AC/DC System Health Report

06/30/2022

Unit 3 Station Battery Maintenance Template

06/30/2022

71111.13

Corrective Action

Documents

4482832

Increasing Floor Drain Leakage in Unit 3 Drywell

03/06/2022

4490878

Increasing Unit 3 Drywell Floor Drain Leakage

04/06/2022

4491049

Unit 3 Drywell Iodine 131 Increasing

04/07/2022

4491759

Unit 3 Drywell Beta Above NSO Appendix A Action Level

04/09/2022

4491906

3B RBCCW TCV Packing Leak

04/10/2022

4500354

Unexpected Main Control Room Alarm Unit 2 West Reactor

Building Floor Drain Sump Level Hi-Hi

05/17/2022

4502749

Unexpected Alarm: Core Thermal Power High

05/30/2022

4503851

Core Thermal Power Plant Process Computer Inputs Froze

06/04/2022

Corrective Action

Documents

Resulting from

Inspection

4495502

NRC ID: Small Oil Leak by Unit 2 EDG Immersion Heater

04/25/2022

Engineering

Evaluations

Safety Function

Determination 22-

05-001

Division 2 Containment Cooling Service Water System

05/17/2022

Miscellaneous

22 Dry Cask Storage (DCS) Flow Chart

Unit 3 Shutdown Safety Plan

Procedures

DAN 923-4, B-2

Unit 2 West Reactor Building Floor Drain Sump Level Hi-Hi

DEOP 0300-01

Secondary Containment Control

DFP 0850-01

Slow or Rapid Water Level Loss in Fuel Pool/Reactor Cavity

DFP 0850-02

New/Irradiated Fuel Damage

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

DFP 0850-03

High Radiation on Refuel Floor

OP-AA-107-F-01

Risk Screening/Mitigation Plan

OP-AA-108-117

Protected Equipment Lists (Various)

various

71111.15

Corrective Action

Documents

4347579

Relay Contacts not Conducting

06/02/2020

4495629

Resistor Degradation

04/25/2022

4498962

Unit 3 Battery Room Air Conditioning Unit Compressor

Unreliable

05/11/2022

4499062

2A LPCI MUB Lube Oil Sample Returned with High Moisture

05/11/2022

4500689

3-1530-127 Relay Contact 3/4 had High Resistance

05/19/2022

IR 04481354

2/3B Iso Condenser Makeup Pump Failed to Start on First

Try

2/28/2022

IR 04481363

Engineering to Evaluate Iso Condenser Batteries

2/28/2022

Drawings

2E-3437

Schematic Diagram LPCI Containment Cooling System 1

AO

Engineering

Evaluations

350673

Effects of Elevated Temperatures on the Unit 3 Station

Batteries

454497

Unit 3 DG Resistor Degradation

04/27/2022

Procedures

DOS 1300-03

2/3A(B) Isolation Condenser Makeup Pump Quarterly

Operability

71111.18

Calculations

DRE98-0077

Dresden HPCI Room Thermal Response with Reduced

Room Cooler Capability

001

Corrective Action

Documents

AR 04371250

Part 21: Continuously Energized Eaton D26 Relays

09/22/2020

AR 04468573

HPCI Signal Converter Mod Temperature Qual Concerns

2/28/2021

AR 04479219

HPCI Signal Converter - Commercial Grade Dedication

Issue

2/18/2022

Engineering

Changes

EC 395525

Replace U2 HPCI Signal Converter and Flow Indicating

Controller

008

EC 397957

Replace U3 HPCI Signal Converter and Flow Indicating

Controller

007

Procedures

LA-AA-104-1001

50.59 Review Coversheet Replace U2 HPCI Signal

Converter and Flow Indicating Controller

LS-AA-104-1001

50.59 Review Coversheet Replace U3 HPCI Signal

Converter and Flow Indicating Controller

006

LS-AA-104-1003

50.59 Screening Form Replace Unit 2 HPCI Signal

Converter and Flow Indicating Controller

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.19

Corrective Action

Documents

4491953

Unit 3 IRM 14 Issue

04/10/2022

4492293

Unit 3 IRM 14 Drawer Mode Switch Needs

Repair/Replacement

04/11/2022

Procedures

DIS 0700-45

IRM Channel Calibration

DOS 0250-02

Full Closure Timing and Exercising of Main Steam Isolation

Valves

DOS 0250-03

Main Steam Isolation Valve Fail Safe Closure Test

DOS 0700-02

Intermediate Range Monitor (IRM) Downscale Rod Block

Functional Test

DOS 0700-04

IRM Detector Position Rod Block Functional Test

DOS 0700-05

IRM Upscale and Inoperative Functional Testing

Work Orders

1514134

Unit 3 IRM 14 Issue

04/11/2022

1966818

Disassemble and Inspect 3-1402-13A Per DTP 48 and

Perform NDE-UT Unit 3 Division I Core Spray

05/10/2022

29976

3A Core Spray Pump Test with Torus Available

05/10/2022

247737

Unit 3 Drywell Pressure Step Change Up

04/11/2022

71111.20

Corrective Action

Documents

4491749

Unit 3 Drywell Pressure Step Change Up

04/09/2022

4491934

Unit 3 Condenser Normal Makeup LCV Packing Leak

04/10/2022

4491970

Unit 3 Mechanical Vacuum Pump Suction Valve Interlock

Issues

04/10/2022

4492781

3-0203-1A Extent of Condition Torque Check

04/13/2022

4493866

Unit 3 Drywell Iodine Adverse Trend After D3F55

04/18/2022

Corrective Action

Documents

Resulting from

Inspection

4491932

NRC ID: 3B Reactor Feedwater Pump Inboard Seal Heat

Exchanger Leak

04/10/2022

4492231

Unit 3 Drywell Closeout D3F55

04/11/2022

71111.22

Procedures

DIS 0500-07

38.5 Percent Rated Core Thermal Power Scram Bypass

Pressure Switches Calibration and Functional Checks

DOS 6600-12

Diesel Generator Tests Endurance and Margin/Full Load

Rejection/ECCS/Hot Restart

71124.05

Calibration

Records

Work Order

04982780-1

Month Technical Specification Service Water Effluent

Sample Radiation Monitor Calibration

2/07/2022

Work Order 05007751

Unit 2/3 18 Month Technical Specification Chimney SPING-4

Effluent Monitor Calibration

08/12/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

AR 04427294

Upward Trend in Unit 2 Drywell CAM Activity.

06/03/2021

AR 04493146

RP EP Instrumentation going out of Calibration

04/14/2022

AR 04494912

Fastscan and Accuscan II WBC Inoperable

04/22/2022

Procedures

RP-AA-700

Controls for Radiation Protection Instrumentation

RP-AA-700-1235

Operation and Calibration of the PM-12 Gamma Portal

Monitor

RP-AA-700-1240

Operation and Calibration of the Canberra ARGOS-5

Personnel Contamination Monitor

RP-AA-700-1500

Operation and Source Check of the Ludlum 3030P

Alpha/Beta Sample Counter

RP-AA-700-1501

Operation and Calibration of the Model SAM-9/11 Small

Articles Monitor

RP-DR-905

Operation of the MTF, Refuel Floor and 2/3 Off-Gas Filter

Building NMC WIND-2B Continuous Air Monitor

Self-Assessments AR 04469158

22 Radiation Instrumentation Self-Assessment

04/18/2022

71124.07

Miscellaneous

Monthly Report of the Meteorological Monitoring Program at

Dresden Nuclear Generating Station

2/2022

Dresden Nuclear Power Station 2020 Annual Radiological

Environmental Operating Report

05/2020

Procedures

EIML-SPM-1

Sampling Procedures Manual, Environmental Incorporated

Midwest Laboratory

71151

Miscellaneous

Performance Indicator Data: Barrier Integrity - RCS Identified

Leakage

04/01/2021

through

03/31/2022

MSPI Emergency AC Power Systems Prepared Data

Package

04/01/2021

through

03/31/2022

MSPI HPI Prepared Data Package

04/01/2021

through

03/31/2022

Procedures

DR-MSPI-01

Reactor Oversight Program MSPI Basis Document

LS-AA-2100

Monthly Data Elements for NRC Reactor Coolant System

(RCS) Leakage

71152S

Corrective Action

4489659

Rust Found on Core Spray Piping/Nuts under Unit 2 East

04/02/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

LPCI Room Cooler

4489931

Unit 2 Standby Coolant Line Recommendation for Guided

Wave

04/04/2022

4489933

Unit 3 Standby Coolant Line Recommendation for Guided

Wave

04/04/2022

4490647

MPT 3 Cooling Missed Opportunity

04/05/2022

4492766

Engineering to Perform FASA for Raw Water Programs

04/13/2022

4502154

System Certification Actions for RPS/NI

05/10/2022

4503201

System Certification Actions for Reactor Recirculation

05/31/2022

4504158

System Certification Actions for Service Water

06/07/2022

4504396

System Certification Actions for Main Steam

06/07/2022

4508872

ERVR4 Offgas Review - Engineering Follow-Up Action

Needed

07/01/2022