Integrated Inspection Report 05000237/2022001 and 05000249/2022001
ML22110A129
Person / Time
Site: Dresden  
Issue date: 04/20/2022
From: Kenneth Riemer
NRC/RGN-III/DRP/B1
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2022001
Download: ML22110A129 (19)


Text

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - INTEGRATED INSPECTION REPORT 05000237/2022001 AND 05000249/2022001

Dear Mr. Rhoades:

On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station, Units 2 and 3. On April 5, 2022, the NRC inspectors discussed the results of this inspection with Ms. Carolyne Joseph, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding did not involve a violation of NRC requirements.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Dresden Nuclear Power Station, Units 2 and 3.

April 20, 2022 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000237 and 05000249

License Numbers:

DPR-19 and DPR-25

Report Numbers:

05000237/2022001 and 05000249/2022001

Enterprise Identifier:

I-2022-001-0062

Licensee:

Constellation Energy Generation, LLC

Facility:

Dresden Nuclear Power Station, Units 2 and 3

Location:

Morris, IL

Inspection Dates:

January 01, 2022 to March 31, 2022

Inspectors:

A. Nguyen, Senior Resident Inspector

A. Demeter, Reactor Engineer

M. Domke, Reactor Inspector

G. Edwards, Senior Health Physicist

M. Garza, Emergency Preparedness Inspector

M. Porfirio, Illinois Emergency Management Agency

Approved By:

Kenneth R. Riemer, Chief

Branch 1

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Dresden Nuclear Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Document a Condition Adverse to Quality for the Unit 3 Main Power Transformer Control Power Cabinet Fire Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events Green FIN 05000237,05000249/2022001-01 Open/Closed

[H.11] -

Challenge the Unknown 71152A A finding of very low safety significance (Green) was self-revealed for the licensees failure to follow PI-AA-120, Issue Identification and Screening Process, for documenting a condition adverse to quality. Specifically, the licensee failed to document an identified hot spot on a resistor within the Unit 3 main power transformer (MPT) during startup monitoring on November 3, 2021. This was a missed opportunity for the licensee to evaluate and mitigate the potential adverse impacts of the hot spot prior to a fire occurring in the control power cabinet of the MPT on November 18, 2021.

Additional Tracking Items

None.

PLANT STATUS

Unit 2 began the inspection period at rated thermal power. On February 5, 2022, power was reduced to approximately 80 percent to a control rod shaper pull and make emergent repairs to the 2B reactor feed pump. The unit returned to rated thermal power on February 6, 2022. On March 5, 2022, power was reduced to approximately 75 percent to perform a control rod sequence exchange and bypass valve testing. The unit was returned to rated thermal power on March 6, 2022, and remained at or near full rated thermal power for the remainder of the inspection period.

Unit 3 began the inspection period at rated thermal power. On March 12, 2022, power was reduced to approximately 80 percent for a control rod sequence exchange, control rod drive testing, and to repair a main turbine control valve cable. The unit returned to rated thermal power on March 13, 2022, and remained at or near full rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2 station blackout (SBO) diesel during Unit 3 SBO diesel work window on January 15, 2022
(2) Unit 3 high pressure coolant injection (HPCI) alignment following maintenance window on March 2-3, 2022
(3) Unit 2 HPCI alignment following maintenance window on March 8, 2022

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the emergency diesel generator (EDG) systems during the weeks of March 14 and March 28, 2022.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Zone 1.1.2.3 Unit 2 reactor building general area 545' on January 22, 2022
(2) Fire Zone 8.2.6.C Unit 2/3 lube oil reservoir area elevation 534' on January 29, 2022
(3) Fire Zone 1.1.2.3, Unit 2 HPCI pump room, elevation 476' on February 15, 2022
(4) Fire Zone 1.1.2.5A, Unit 2 isolation condenser area, elevation 589' on February 15, 2022
(5) Fire Zone 1.1.2.1, Unit 2 torus basement and torus catwalk, elevation 476' on February 22, 2022
(6) Fire Zone 1.1.1.1, Unit 3 torus basement and torus catwalk, elevation 476' on February 22, 2022

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Containment cooling service water vault door leak rate following failure of as left leak rate test

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during the performance of load drop to 75 percent power to support control rod adjustments and reactor feedwater pump 2B breaker maintenance on February 5, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a crew performance evaluation scenario in the main control room simulator on February 10, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) EDG air start systems maintenance strategy due to moisture intrusion

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

(1) Emergent work to replace 2B RFP breaker due to 2B RFP ON light not illuminated during pump operation as documented in AR 04473265 on February 5, 2022
(2) Elevated risk work to replace 2B RBCCW pump motor per WO 99226609, on February 14-15, 2022
(3) Emergent, elevated risk work to replace the Unit 3 digital electrohydraulic control (DEHC) system pressure controller 'S' VCMI card per WO 5232279 on February 17, 2022
(4) Elevated risk preventive maintenance window for Unit 3 HPCI on March 1 - 2, 2022
(5) Elevated risk for Unit 2 EDG maintenance window and emergent work prior to the window on March 13-18, 2022
(6) Emergent, elevated risk work to address Unit 3 turbine lube oil cooler service water drain line shear and flooding in turbine building on March 22, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (2 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Historic operability of level transmitter (LT) 3-0302-82D when found outside Technical Specification value during surveillance testing
(2) Unit 2 EDG fuel priming pump failure to start during post-maintenance testing

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)

(1) Unit 2 SBO diesel generator breaker functional testing following troubleshooting and repair of high resistance on cables from Bus 23 to Bus 61 on February 11, 2022
(2) Unit 2 functional and operational testing of the 2B reactor feedwater pump following replacement of 4KV breaker per WO 5225086 on January 22, 2022 (3)2B RBCCW pump testing following motor replacement per WO 99226609 on February 17, 2022
(4) DOS 6600-01, 2/3 diesel generator surveillance test, following replacement of the jacket water pressure switch on February 28, 2022
(5) DOS 2300-03, Unit 3 HPCI system operability and quarterly IST verification test on March 3, 2022
(6) DOS 6600-01, Unit 2 diesel generator surveillance test, following preventive maintenance window on March 18, 2022
(7) DOS 6600-01, Unit 2/3 diesel generator surveillance test, following preventative maintenance window on March 30, 2022

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (1 Sample)

(1) DIS 0500-31, Unit 3 scram discharge volume level instrumentation calibration and functional tests, on March 10, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1) DOS 1100-04, standby liquid control system quarterly/comprehensive pump test for the inservice testing (IST) program on March 24, 2022

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the following maintenance and testing of the alert and notification system:

2020 PNS System Maintenance Report

2021 PNS System Maintenance Report

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the emergency preparedness organization

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) Dresden 1Q2022 focused area drill on March 10,

RADIATION SAFETY

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (1 Sample)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1) Unit 2/3 reactor building ventilation system

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee processes, stores, and uses external dosimetry

Internal Dosimetry (IP Section 03.03) (1 Sample)

The inspectors evaluated the following internal dose assessments:

(1) Whole Body Count inVivo analysis performed on January 28, 2022

Special Dosimetric Situations (IP Section 03.04) (1 Sample)

The inspectors evaluated the following special dosimetric situations:

(1) Declared pregnant worker documentation from January 12,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) Unit 2 (January 1, 2021 through December 31, 2021)
(2) Unit 3 (January 1, 2021 through December 31, 2021)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (2 Samples)

(1) Unit 2 (January 1, 2021 through December 31, 2021)
(2) Unit 3 (January 1, 2021 through December 31, 2021)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)

(1) Unit 2 (January 1, 2021 through December 31, 2021)
(2) Unit 3 (January 1, 2021 through December 31, 2021)

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) April 1, 2021 through December 31, 2021 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
(1) April 1, 2021 through December 31, 2021 EP03: Alert and Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) April 1, 2021 through December 31, 2021

71152A - Annual Follow-Up Problem Identification and Resolution Annual Follow-Up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Evaluation of and corrective actions associated with the second Unit 3 main power transformer fire inside the control power cabinet under AR 4461720
(2) Corrective actions associated with design control NCV of LPCI LOOP select differential pressure switches water intrusion under AR

INSPECTION RESULTS

Failure to Document a Condition Adverse to Quality for the Unit 3 Main Power Transformer Control Power Cabinet Fire Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events Green FIN 05000237,05000249/2022001-01 Open/Closed

[H.11] -

Challenge the Unknown 71152A A finding of very low safety significance (Green) was self-revealed for the licensees failure to follow PI-AA-120, Issue Identification and Screening Process, for documenting a condition adverse to quality. Specifically, the licensee failed to document an identified hot spot on a resistor within the Unit 3 main power transformer (MPT) during startup monitoring on November 3, 2021. This was a missed opportunity for the licensee to evaluate and mitigate the potential adverse impacts of the hot spot prior to a fire occurring in the control power cabinet of the MPT on November 18, 2021.

Description:

On November 18, 2021, the Unit 3 main control room received multiple alarms associated with the MPT. Shortly thereafter, a small fire was reported in the control power cabinet of the MPT. The fire was extinguished immediately, and the operators entered the applicable abnormal operating procedures. The unit was emergently down powered to take the turbine offline and affect repairs to the transformer.

Technicians inspected the control power cabinet and found damage to several components within the cabinet. A troubleshooting team was established to further inspect the transformer to identify the cause of the fire. The cause of the fire was determined to be overheating of adjustable resistor CBA2 due to a heating element that was in parallel with the resistor being open circuited, causing all current to flow through CBA2 (overloaded). These components are part of one of the winding hot spot temperature circuits. A temporary modification was installed to remove this part of the circuit from service and adjust settings on the associated winding temperature gauge to compensate for this missing element of the circuit.

The licensee conducted a causal evaluation for the equipment failure under AR 4461720.

During this evaluation, it was revealed that thermography was performed as part of the startup monitoring of the new transformer after installation on November 3, 2021. The thermography documentation recorded a temperature for the failed resistor that was higher than normal. After conversations with the thermographer, it was determined that the individual was unsure of the result obtained, asked the supervisor and peers about the data, and decided that the temperature reading was not abnormal; therefore, the issue was not entered into the CAP. The licensee conducted a Human Performance Review Board for this issue under AR 4470594 and concluded that not appropriately documenting and evaluating this thermography data was a missed opportunity to mitigate the potential adverse impacts of the hot spot and possibly prevent the fire. Specifically, Exelon procedure, PI-AA-120, Issue Identification and Screening Process, section 3.7 delineates the responsibilities of issue originators, which includes ensuring conditions that have or could have an undesirable effect on performance of equipment are properly documented. This procedure also defines a condition adverse to quality as any failures, malfunctions, deficiencies, defective items, and non-conformances.

Corrective Actions: The individual and supervisor were provided coaching on entering items into the corrective action program and the thermography procedure guidance was enhanced for what are acceptable temperature values for different components.

Corrective Action References: AR 4461720, Transformer 3 Trouble, and AR 4470594, Missed Opportunity for Thermography Data Analysis

Performance Assessment:

Performance Deficiency: The failure to document the identified hot spot, a condition adverse to quality, during thermography of the Unit 3 MPT during startup monitoring was contrary to licensee procedure, PI-AA-120, Issue Identification and Screening Process.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Initiating Events cornerstone and adversely affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the licensee failed to document a condition adverse to quality, a hot spot on a resistor identified during thermography, which adversely impacted operation of the Unit 3 MPT, resulting in a fire.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The finding screened as having very low safety significance (Green) based on answering No to the transient initiator question because it did not cause a reactor scram and/or the loss of mitigation equipment.

Cross-Cutting Aspect: H.11 - Challenge the Unknown: Individuals stop when faced with uncertain conditions. Risks are evaluated and managed before proceeding. Specifically, in this finding individuals were aware of an unanticipated or abnormal result (i.e. higher than normal temperature reading for the resistor), but did not effectively evaluate or resolve the issue, resulting in a missed opportunity to potentially mitigate or eliminate the cause of the control power cabinet fire due to overheating of the circuit.

Enforcement:

Inspectors did not identify a violation of regulatory requirements associated with this finding.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 5, 2022, the inspectors presented the integrated inspection results to Ms. C. Joseph, Plant Manager, and other members of the licensee staff.

On February 11, 2022, the inspectors presented the radiation protection inspection results to Mr. P. Boyle, Site Vice President, and other members of the licensee staff.

On March 18, 2022, the inspectors presented the EP program inspection results inspection results to Ms. C. Joseph, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

DOP 2300-M1/E1

Unit 3 HPCI System Checklist

DOP 2300-M1/E1

Unit 2 HPCI System Checklist

DOP 6600-04

Diesel Generator 2/3 Preparation for Standby Operation

DOP 6600-M2

Unit 2/3 Emergency Diesel Generator Mechanical Checklist

DOP 6606-E2

Unit 2/3 Standby Diesel Generator Electrical Checklist

DOP 6620-E1

Unit 2 Station Blackout Electrical Checklist

71111.04

Procedures

DOP 6620-M1

Unit 2 Station Blackout Mechanical Checklist

Corrective Action

Documents

4477688

XL3 34-19, Unit 2 HPCI Room Fire Alarm

2/12/2022

4480022

NRC ID: Evidence of Thru Wall Leak on Fire Protection

Piping for Unit 3

2/22/2022

Corrective Action

Documents

Resulting from

Inspection

4480027

NRC ID: Free Insulation Torus Bay 6 under Unit 2 HPCI

Discharge Line

2/22/2022

101 U2RB-1

Fire Zone 1.1.2.1, Unit 2 Torus Basement and Torus

Catwalk, Elev. 476'

104 U2RB-4

Fire Zone 1.1.2.3, Unit 2 HPCI Pump Room, Elev. 476'

108 U2RB-7

Fire Area/Zone 1.1.2.3 Unit 2 Reactor Building General Area

545'

115 U2RB-12

Fire Zone 1.1.2.5.A, Unit 2 Isolation Condenser Area, Elev.

589'

116 U3RB-19

Fire Zone 1.1.1.1, Unit 3 Torus Basement and Torus

Catwalk, Elev. 476'

Fire Plans

177 U2/3TB-94

Fire Area/Zone 8.2.6.C Unit 2/3 Lube Oil Reservoir Area

Elev. 534'

71111.05

Procedures

OP-AA-201-008

Pre-Fire Plan Manual

Miscellaneous

DR-PSA-012

Internal Flood Evaluation Summary and Notebook

DOA 0040-02

Localized Flooding in Plant

DOS 1500-21

CCSW Pump Vault Watertight Door Leak Test

Procedures

DTP 70

Evaluation of CCSW Pump Vault Flood Protection Leakage

Test Result

71111.06

Work Orders

04761794-01

EWP MM D3 4Y Com Adjust CCSW Vault Door/Repl Seal &

Packing

03/23/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

04761794-02

Op Perform as Left Leak Test Per DOS 1500-21

03/24/2022

OP-AA-101-111

Roles and Responsibilities of On-Shift Personnel

OP-AA-103-102

Watch Standing Practices

OP-AA-104-101

Communications

TQ-AA-150

Operator Training Programs

71111.11Q

Procedures

TQ-AA-155

Conduct of Simulator Training and Evaluation

4454158

U3 EDG Failure to Start

10/20/2021

Corrective Action

Documents

4475764

Fleet EDG Starting Air PCM Template

2/02/2022

Miscellaneous

(A)(1) Maintenance Rule Functional Failure Determination

for U3 EDG

11/24/2021

Procedures

ER-AA-310

Implementation of the Maintenance Rule

71111.12

Work Orders

05198802

EWP MM EOC Replace Air Start Motors for 2/3 EDG

03/28/2022

4389199

2A RFP Indicating Light Out

2/09/2020

4465153

2B RFP ON Light Not Illuminated During Pump Operation

2/01/2022

4473265

2B RFP ON Light Not Illuminated During Pump Operation

01/21/2022

4484453

Unit 2 EDG Circulating Oil and Turbo Pump Breaker Tripped

at MCC 28-3

03/12/2022

4484516

Unit 2 EDG Immersion Heater Breaker Trip

03/13/2022

4485615

Unit 3 EDG Air Receiver Tank A1 Outboard Drain Valve is

Leaking

03/17/2022

4486517

Unit 3 Service Water Leak

03/22/2022

Corrective Action

Documents

4486783

Extent of Condition of 3B Cooler Drain Line

03/23/2022

Corrective Action

Documents

Resulting from

Inspection

4485610

Unit 3 EDG Air Receiver Tank A2 Outboard Drain Valve is

Leaking

03/17/2022

Engineering

Evaluations

634756

Rigging Evaluation for Removal and Replacement of 2B

RBCCW Pump Motor, 2-3701-B

Procedures

OP-AA-108-117

Protected Equipment List

232279

Replace Pressure Control Master Bus Controller VCMI in

903-31 Panel

2/17/2022

71111.13

Work Orders

226609

Replace 2B RBCCW Pump Motor, 2-3701-B

2/15/2022

71111.15

Corrective Action

04483846

LT 3-0302-82B Found OOT

03/10/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

04485609

Trend IR: OOT for DIS 0500-31

03/17/2022

4481363

Engineering to Evaluate Iso Condenser Batteries

2/28/2022

4483846

LT 3-0302-82D found Out of Tolerance during Surveillance

03/10/2022

Documents

4485332

Unit 2 EDG Fuel Priming Pump Will Not Start

03/16/2022

Engineering

Evaluations

360279

Evaluate EDG Startup without Fuel Oil Priming Pump

Operability

Evaluations

OPDC 04483846-

Evaluate LS 3-0302-82D for Historic Operability

03/25/2022

Procedures

DIS 0500-31

Unit 3 Scram Discharge Volume Level Instrumentation

Calibration and Functional Tests

4476857

Bus 23 from SBO Bus 61 Trip Circuit is Not Working

2/08/2022

4481065

2/3 EDG Trip during DOS 6600-01, Entered DOA 6600-01

2/27/2022

4481877

Unit 3 HPCI Tank Oil Heater T3 Phase Grounded

03/01/2022

4485082

Unit 2 EDG Cooling Water Immersion Heater Damaged

Leads

03/15/2022

4485216

Unit 2 EDG Cooling Water Immersion Heater Grounded

03/15/2022

4485836

Unit 2 Diesel Fuel Oil Pump Discharge Pressure Low during

Surveillance

03/18/2022

Corrective Action

Documents

4486463

Unit 2 EDG Crankcase Oil Level Low

03/22/2022

Engineering

Changes

453984

Engineering Evaluation for Repair/Replacing Cable Leads

03/15/2022

DOS 2300-03

Unit 3 High Pressure Coolant Injection System Operability

and Quarterly IST Verification Test

118

Procedures

DOS 6600-01

Diesel Generator Surveillance Tests

146

4897803

Unit 2 EDG Fuel Priming Pump Troubleshooting

03/17/2022

207263

Unit 2 Diesel Generator Fast Start Operability Surveillance

Test

03/18/2022

25086

2B RFP ON Light Not Illuminated During Pump Operation

Contingency Plan

01/22/2022

230117

Bus 23 from SBO Bus 61 Trip Circuit is Not Working

2/11/2022

234795

Troubleshoot and Repair 2/36641-525 for 2/3 EDG Trip

during DOS 6600-01

2/28/2022

71111.19

Work Orders

226609

Replace 2B RBCCW Pump Motor, 2-3701-B

2/17/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4483846

LT 3-0302-82D found Out of Tolerance

03/10/2022

4483851

LT 3-0302-82B found Out of Tolerance

03/10/2022

4484035

LT 3-0302-82H found Out of Tolerance

03/10/2022

4484083

LT 3-0302-82J found Out of Tolerance

03/10/2022

4484086

LT 3-0302-82K found Out of Tolerance

03/10/2022

Corrective Action

Documents

4485609

Trend IR: Out of Tolerances for DIS 0500-31

03/17/2022

DIS 0500-31

Unit 3 Scram Discharge Volume Level Instrumentation

Calibration and Functional Tests

Procedures

DOS 1100-04

Standby Liquid Control System Quarterly/Comprehensive

Pump Test for the Inservice Testing (IST) Program

71111.22

Work Orders

4961801

Unit 3 Scram Discharge Volume High Level Channel

Calibration

03/10/2022

27342

EP Technical Support Center Inventory Issues 1Q2020

03/17/2020

27344

Operations Support Center Inventory 1Q2020 Inventory

Items

03/17/2020

4343994

EP Siren Failure (BD04)

06/19/2020

4345693

EP Siren Failure (BD16)

06/26/2020

4360601

EP Siren Failure D02

09/02/2020

4362267

EP Siren Failure (BD18)

08/10/2020

4363005

Siren AC Power Outages

09/13/2020

4433570

EP Siren Failure (BD18)

07/06/2021

4438721

Grundy County Siren Controller Error

08/03/2021

4438754

Inadvertent Siren Activation for Will County Sirens

08/03/2021

4463617

EP Siren Failure (DR22)

11/29/2021

Corrective Action

Documents

4475265

EP-Multiple Siren Activation During Siren Test

2/01/2022

71114.02

Miscellaneous

PNS System Maintenance Report

20 and

21

71114.03

Miscellaneous

Emergency Response Organization (ERO) Augmentation

Drill Reports

20 - 2021

24146

NOSA-DRE-20-03 Dresden Station Emergency

Preparedness Audit

05/19/2020

25253

Exelon Phone System Not Working Correctly

03/10/2020

71114.05

Corrective Action

Documents

27348

Field Team Inventory 1Q2020 Items

03/17/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4337583

NOS ID: Revise PMRQ 174726-01 Annual Speaker

Surveillance

04/22/2020

4337665

NOS ID: Address the Request of CC FPD

04/22/2020

4337667

NOS ID: Contact Morris Hospital to Ensure Alignment

04/22/2020

4375330

Objective Failure D.1 During Full PI Drill

10/08/2020

4396529

Unit 3 570' Reactor Chemistry Sample Panel Leak

01/18/2021

4437797

Failed DCs and Sat w/Comments for 2021 NRC Graded

Scenario

07/29/2021

4453508

Security - Emergency Response to Site in PA

10/17/2021

4453866

4.0 Critique - TR3 Failure and 63 SCRAM

10/19/2021

4454026

MCR EONS Transmittal Issue

10/19/2021

4454286

EP Critique/ Lessons Learned from Unusual Event

Declaration

10/20/2021

4468795

4Q2021 Dresden CR/SIM/TSC/OSC Equipment Issues

2/29/2021

EP-AA-1004

Radiological Emergency Plan Annex for Dresden Station

EP-AA-1004

Addendum 3

Emergency Action Levels for Dresden Station

Miscellaneous

EP-DR-1000

Dresden Station Radiological Emergency Plan

AR 04412362

RP Training: New SCBA Equipment Implement Beginning

22

03/29/2021

Corrective Action

Documents

AR 04453786

Suspected H2 Leak Causing CO Monitors to Alarm

11/17/2021

RP-AA-444

Controlled Negative Pressure (CNP) Fit Testing

RP-AA-825-101

Monthly Inspection and Maintenance of MSA Firehawk Mask

Mounted Regulator SCBAs

71124.03

Procedures

RP-DR-832

Operation of the Mako Air Compressor and The Mako

Stationary Containment Fill Station (SCFS)

Corrective Action

Documents

AR 04474916

Investigation Whole Body Count Performed

01/28/2022

Corrective Action

Documents

Resulting from

Inspection

AR 04477349

NRC ID: DPW Documentation

2/12/2022

Procedures

RP-AA-270

Prenatal Radiation Exposure

71124.04

Radiation

Whole Body Count InVivo Analysis

01/28/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Surveys

RP-AA-270;

Attachments 3-5

Declaration of Pregnancy Forms

01/21/2021

NRC Performance Indicator Data: Initiating Events -

Unplanned Power Changes per 7000 Critical Hours

01/01/2021 -

2/31/2021

Miscellaneous

NRC Performance Indicator Data: Initiating Events -

Unit/Reactor Shutdown Occurrences

01/01/2021 -

2/31/2021

LS-AA-2010

Monthly Data Elements for NRC/WANO Unit/Reactor

Shutdown Occurrences

71151

Procedures

LS-AA-2030

Monthly Data Elements for NRC Unplanned Power Changes

per 7000 Critical Hours

4461720

Transformer 3 Trouble

11/18/2021

4470594

Missed Opportunity for Thermography Data Analysis

01/07/2022

Corrective Action

Documents

4471962

2B West LPCI Room Cooler Leaking

01/14/2022

Corrective Action

Documents

Resulting from

Inspection

4446558

Receipt of NRC 2Q2021 Inspection Report

11/18/2021

71152A

Procedures

PI-AA-120

Issue Identification and Screening Process

11