SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - SECURITY BASELINE INSPECTION REPORT 05000237/2024401 AND 05000249/2024401
Dear David Rhoades:
On March 7, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station, Units 2 and 3 and discussed the results of this inspection with Hardik Patel, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000237 and 05000249
License Numbers:
Report Numbers:
05000237/2024401 and 05000249/2024401
Enterprise Identifier:
I-2024-401-0075
Licensee:
Constellation Nuclear
Facility:
Dresden Nuclear Power Station, Units 2 and 3
Location:
Morris, IL
Inspection Dates:
March 4, 2024 to March 7, 2024
Inspectors:
S. Cavanaugh, Physical Security Inspector
K. Maloney, Senior Physical Security Inspector
Approved By:
Michael E. Ziolkowski, Chief
Security, Emergency Preparedness, and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Dresden Nuclear Power Station,
Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program.
The following elements were evaluated from this IP:
Equipment Performance, Testing, and Maintenance (1 Sample)
- (1) Tier I: All Tier II: 02.09 a - b; 02.10 a; 02.11 a Tier III: 02.14; 02.15 a
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On March 7, 2024, the inspectors presented the security baseline inspection results to Hardik Patel, Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
27-0014-00-10
FLIR SR Series Thermal Camera Installation and Operation
Manual
210
All Alarms
Between 0956 am
to 1032 am
Alarm History for Security Diesel Generator Run
2/14/2024
G-991-R1
General Installation, Operations, Maintenance and Parts
Manual for Autodor 1295 Slide Gate Operator Model F
SR#:00079640
PD Retire PMID-RQ: 183495-01 D2/3 SA PM Adjustment of
Thermal Cameras Due to Seasonal Changes Justification
09/30/2012
Miscellaneous
Zone Alarm
History Filter by
Zone and or Zone
Group
Tamper alarm history for Zones 4/5
2/4/2023 to
2/20/2023
FIREARMS MAINTENANCE, TESTING AND
ACCOUNTABILITY
Sy-AA-101-122-
104
Performance of Special Purpose Detector, Communications,
Lighting and Biometrics Threshold Tests
SY-DR-101-101-
F-16
PA Patrol Including Tours 10, 11, 12, 13 and 14
SY-DR-101-101-
F-18
OCA Patrol MAF OCA PA/VA Barrier Inspection
Procedures
SY-DR-101-122-
103
Dresden Specific Access Control Device and Portal Tests
01668260
D2/3 2Y PM Security Perimeter Sensor Coil & Power Supply
INS
08/20/2014
05121945
00177566-01, PMNS, D2/3 AN PM INSP/REPAIR/TEST
SECURITY PERIMETER FIBER DETECT 1, W
03/21/2022
243465
D2/3 AN PM INSP/REPAIR SECURITY PERIMETER
SHAKER DETECTION
08/03/2023
245234 01
D2/3 AN SECURITY PFRM WIRE TENSION X-FIELD ZONE
06/15/2023
Work Orders
05321896
D1/2/3 AN COM SECURITY SYS TAMPER TEST WORK
01/23/2024
Designation
Description or Title
Revision or
Date
05396429
01/21/2024
05434331
D2/3 1M COM MAINTENANCE TO NSMART VIDEO
CAPTURE & BIOMETRICS
2/12/2024
05434678
D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 3
2/08/2024
05441108
D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 4
2/13/2024
05449570
D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 1
2/24/2024
05458981
D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 2
2/29/2024
Work Orders
PMID Number
8542-01
Perform Semi-Annual PM to manually operated gates