IR 05000237/2024401

From kanterella
Jump to navigation Jump to search
– Security Baseline Inspection Report 05000237/2024401 and 05000249/2024401
ML24107B027
Person / Time
Site: Dresden  
(DPR-019, DPR-025)
Issue date: 04/18/2024
From: Michael Ziolkowski
NRC/RGN-III/DRSS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2024401
Download: ML24107B027 (1)


Text

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - SECURITY BASELINE INSPECTION REPORT 05000237/2024401 AND 05000249/2024401

Dear David Rhoades:

On March 7, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station, Units 2 and 3 and discussed the results of this inspection with Hardik Patel, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000237 and 05000249

License Numbers:

DPR-19 and DPR-25

Report Numbers:

05000237/2024401 and 05000249/2024401

Enterprise Identifier:

I-2024-401-0075

Licensee:

Constellation Nuclear

Facility:

Dresden Nuclear Power Station, Units 2 and 3

Location:

Morris, IL

Inspection Dates:

March 4, 2024 to March 7, 2024

Inspectors:

S. Cavanaugh, Physical Security Inspector

K. Maloney, Senior Physical Security Inspector

Approved By:

Michael E. Ziolkowski, Chief

Security, Emergency Preparedness, and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Dresden Nuclear Power Station,

Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program.

The following elements were evaluated from this IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: All Tier II: 02.09 a - b; 02.10 a; 02.11 a Tier III: 02.14; 02.15 a

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 7, 2024, the inspectors presented the security baseline inspection results to Hardik Patel, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

27-0014-00-10

FLIR SR Series Thermal Camera Installation and Operation

Manual

210

All Alarms

Between 0956 am

to 1032 am

Alarm History for Security Diesel Generator Run

2/14/2024

G-991-R1

General Installation, Operations, Maintenance and Parts

Manual for Autodor 1295 Slide Gate Operator Model F

SR#:00079640

PD Retire PMID-RQ: 183495-01 D2/3 SA PM Adjustment of

Thermal Cameras Due to Seasonal Changes Justification

09/30/2012

Miscellaneous

Zone Alarm

History Filter by

Zone and or Zone

Group

Tamper alarm history for Zones 4/5

2/4/2023 to

2/20/2023

SA-AA-150-103

FIREARMS MAINTENANCE, TESTING AND

ACCOUNTABILITY

Sy-AA-101-122-

104

Performance of Special Purpose Detector, Communications,

Lighting and Biometrics Threshold Tests

SY-DR-101-101-

F-16

PA Patrol Including Tours 10, 11, 12, 13 and 14

SY-DR-101-101-

F-18

OCA Patrol MAF OCA PA/VA Barrier Inspection

Procedures

SY-DR-101-122-

103

Dresden Specific Access Control Device and Portal Tests

01668260

D2/3 2Y PM Security Perimeter Sensor Coil & Power Supply

INS

08/20/2014

05121945

00177566-01, PMNS, D2/3 AN PM INSP/REPAIR/TEST

SECURITY PERIMETER FIBER DETECT 1, W

03/21/2022

243465

D2/3 AN PM INSP/REPAIR SECURITY PERIMETER

SHAKER DETECTION

08/03/2023

245234 01

D2/3 AN SECURITY PFRM WIRE TENSION X-FIELD ZONE

06/15/2023

71130.04

Work Orders

05321896

D1/2/3 AN COM SECURITY SYS TAMPER TEST WORK

01/23/2024

Designation

Description or Title

Revision or

Date

05396429

D2/3 QTR PM ON SECURITY X-RAY

01/21/2024

05434331

D2/3 1M COM MAINTENANCE TO NSMART VIDEO

CAPTURE & BIOMETRICS

2/12/2024

05434678

D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 3

2/08/2024

05441108

D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 4

2/13/2024

05449570

D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 1

2/24/2024

05458981

D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 2

2/29/2024

71130.04

Work Orders

PMID Number

8542-01

Perform Semi-Annual PM to manually operated gates

0