SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - SECURITY BASELINE INSPECTION REPORT 05000237/2024401 AND 05000249/2024401

Dear David Rhoades:

On March 7, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station, Units 2 and 3 and discussed the results of this inspection with Hardik Patel, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000237 and 05000249

License Numbers: DPR-19 and DPR-25

Report Numbers: 05000237/2024401 and 05000249/2024401

Enterprise Identifier: I-2024-401-0075

Licensee: Constellation Nuclear

Facility: Dresden Nuclear Power Station, Units 2 and 3

Location: Morris, IL

Inspection Dates: March 4, 2024 to March 7, 2024

Inspectors: S. Cavanaugh, Physical Security Inspector K. Maloney, Senior Physical Security Inspector

Approved By: Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Dresden Nuclear Power Station,

Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program.

The following elements were evaluated from this IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: All Tier II: 02.09 a - b; 02.10 a; 02.11 a Tier III: 02.14; 02.15 a

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On March 7, 2024, the inspectors presented the security baseline inspection results to Hardik Patel, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71130.04 Miscellaneous 427-0014-00-10 FLIR SR Series Thermal Camera Installation and Operation 210

Manual

All Alarms Alarm History for Security Diesel Generator Run 02/14/2024

Between 0956 am

to 1032 am

G-991-R1 General Installation, Operations, Maintenance and Parts 0

Manual for Autodor 1295 Slide Gate Operator Model F

SR#:00079640 PD Retire PMID-RQ: 183495-01 D2/3 SA PM Adjustment of 09/30/2012

Thermal Cameras Due to Seasonal Changes Justification

Zone Alarm Tamper alarm history for Zones 4/5 12/4/2023 to

History Filter by 12/20/2023

Zone and or Zone

Group

Procedures SA-AA-150-103 FIREARMS MAINTENANCE, TESTING AND 3

ACCOUNTABILITY

Sy-AA-101-122-Performance of Special Purpose Detector, Communications, 0

104 Lighting and Biometrics Threshold Tests

SY-DR-101-101-PA Patrol Including Tours 10, 11, 12, 13 and 14 11

F-16

SY-DR-101-101-OCA Patrol MAF OCA PA/VA Barrier Inspection 12

F-18

SY-DR-101-122-Dresden Specific Access Control Device and Portal Tests 1

103

Work Orders 01668260 D2/3 2Y PM Security Perimeter Sensor Coil & Power Supply 08/20/2014

INS

05121945 00177566-01, PMNS, D2/3 AN PM INSP/REPAIR/TEST 03/21/2022

SECURITY PERIMETER FIBER DETECT 1, W

243465 D2/3 AN PM INSP/REPAIR SECURITY PERIMETER 08/03/2023

SHAKER DETECTION

245234 01 D2/3 AN SECURITY PFRM WIRE TENSION X-FIELD ZONE 06/15/2023

05321896 D1/2/3 AN COM SECURITY SYS TAMPER TEST WORK 01/23/2024

71130.04 Work Orders Designation Description or Title Revision or

Date

05396429 D2/3 QTR PM ON SECURITY X-RAY 01/21/2024

05434331 D2/3 1M COM MAINTENANCE TO NSMART VIDEO 02/12/2024

CAPTURE & BIOMETRICS

05434678 D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 3 02/08/2024

05441108 D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 4 02/13/2024

05449570 D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 1 02/24/2024

05458981 D2/3 1Month PM MAF EXP DET 9A/B/C/D Maint Cycle 2 02/29/2024

PMID Number Perform Semi-Annual PM to manually operated gates 0

8542-01

5