|
---|
Category:Letter
MONTHYEARRS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000237/20230052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2023005; 05000249/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 IR 05000237/20230112024-08-0707 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 IR 05000237/20200012024-08-0606 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001 ML24184A1712024-08-0202 August 2024 SLRA Schedule Letter RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information2024-07-31031 July 2024 Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information ML24136A1322024-07-30030 July 2024 Transmittal Letter for Renewed License ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24204A1862024-07-24024 July 2024 – Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2; TSTF-591, Revision 0; and 10 CFR 50.69 ML24193A0882024-07-24024 July 2024 Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Unit 1 Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations (Docket 50-10) IR 05000237/20243012024-06-27027 June 2024 NRC Initial License Examination Report 05000237/2024301; 05000249/2024301 ML24138A0572024-06-26026 June 2024 – Issuance of Amendment Nos. 285 and 278 Application to Adopt TSTF-564, Safety Limit MCPR ML24138A1812024-06-18018 June 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-06-14014 June 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 ML24128A2742024-06-14014 June 2024 Notice of Acceptance and Opportunity for Hearing - Letter RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24156A2332024-06-11011 June 2024 Letter Supplemental Information for Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities SVPLTR 24-0020, Registration of Use of Casks to Store Spent Fuel2024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel ML24183A2752024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2024-05-28028 May 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors SVPLTR 24-0019, Registration of Use of Casks to Store Spent Fuel2024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel ML24145A0432024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel 10 CFR 72.212 ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24158A0012024-05-22022 May 2024 License Amendment Request to Adopt TSTF-564 (EPID L-2023-LLA-0120) Illinois State Concurrence ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24135A0722024-05-10010 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report ML24134A1132024-05-0808 May 2024 Retraction: LER 2303-001-00 for Dresden Nuclear Power Station, Unit 2, HPCI Inoperable Due to Air Void Accumulation ML24129A1352024-05-0808 May 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-59 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) IR 05000237/20240012024-05-0101 May 2024 Integrated Inspection Report 05000237/2024001 & 05000249/2024001 ML24092A3412024-05-0101 May 2024 SLRA - Receipt and Availability - Letter ML24127A0982024-04-30030 April 2024 Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 2024-09-06
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000237/20243012024-06-27027 June 2024 NRC Initial License Examination Report 05000237/2024301; 05000249/2024301 IR 05000237/20213012021-06-17017 June 2021 NRC Initial License Examination Report 05000237/2021301; 05000249/2021301 IR 05000237/20203012020-08-27027 August 2020 NRC Initial License Examination Report 05000237/2020301; 05000249/2020301 IR 05000237/20193012019-05-29029 May 2019 NRC Initial License Examination Report 05000237/2019301 and 05000249/2019301 IR 05000237/20173012017-09-29029 September 2017 NRC Initial License Examination Report 05000237/2017301; 05000249/2017301 (Rkw) IR 05000237/20163022017-03-0808 March 2017 NRC Initial License Reexamination Report 05000237/2016302; 05000249/2016302 (Jls) IR 05000237/20163012016-09-22022 September 2016 NRC Initial License Examination Report 05000237/2016301; 05000249/2016301 IR 05000237/20153012015-05-21021 May 2015 Er 05000237/2015301; 05000249/2015301; 4/06/2015 - 04/22/2015; Exelon Nuclear Operations, Inc., Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-05-29029 May 2014 (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20133012013-12-17017 December 2013 Er 05000237/13-301; 05000249/13-301; 9/30/2013 - 11/26/2013; Exelon Nuclear Operations, Inc., Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report ML12286A3162012-10-12012 October 2012 Er 05000237-12-301; 05000249-12-301; 08/06/2012 - 08/27/2012; Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report ML1118810982011-10-0404 October 2011 Issuance of Amendments Regarding Revision to Technical Specification to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode IR 05000237/20103012010-04-16016 April 2010 Er 05000237-10-301(DRS), 05000249-10-301(DRS), on 2/8/2010 - 3/17/2010, Exelon Nuclear Generating Company, LLC, Dresden Station, Initial License Examination Report IR 05000237/20093012009-04-18018 April 2009 Er 05000237/2009301(DRS) & 05000249/2009301(DRS), on 03/09/09 - 03/23/09; Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report IR 05000237/20083012008-04-17017 April 2008 Initial License Examination Report 05000237-08-301, 05000249-08-301 on 03/03/2008 - 03/20/2008 IR 05000237/20073012007-06-27027 June 2007 Er 05000237-07-301(DRS); 05000249-07-301(DRS); 04/23/2007-04/30/2007; Dresden Nuclear Power Station; Initial License Examination Report SVPLTR 06-0035, Revised Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations.2006-06-22022 June 2006 Revised Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations. IR 05000237/20043012004-09-20020 September 2004 Er 05000237-04-301, 05000249-04-301; 08/16/04-08/20/04; Dresden Nuclear Power Station, Units 2 & 3; Initial License Examination Report IR 05000237/20023022003-02-10010 February 2003 Er 05000237-02-302(DRS), 05000249-02-302(DRS); Exelon Generation Company, LLC; on 01/21/03; Dresden Nuclear Power Station. Initial License Examination Report 2024-06-27
[Table view] |
Text
June 17, 2021
SUBJECT:
DRESDEN NUCLEAR POWER STATIONNRC INITIAL LICENSE EXAMINATION REPORT 05000237/2021301; 05000249/2021301
Dear Mr. Rhoades:
On May 14, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed your Dresden Nuclear Power Station. The enclosed report documents the results of those examinations. Preliminary observations noted during the examination process were discussed on April 23, 2021, with Mr. D. Thomas and other members of your staff. An exit meeting was conducted by telephone on May 20, 2021, between Mr. D. Thomas of your staff and Mr. C. Zoia, Senior Operator Licensing Examiner, to review the proposed final grading of the written examination for the license applicants. During the telephone conversation, NRC resolutions of the facilitys post-examination comments, initially received by the NRC on May 14, 2021, were discussed.
The NRC examiners administered an initial license examination operating test during the week of April 19, 2021. The written examination was administered by Dresden Nuclear Power Station training department personnel on April 26, 2021. Four Senior Reactor Operator and three Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on May 20, 2021. Seven applicants passed all sections of their respective examinations. Four were issued senior operator licenses and three were issued operator licenses.
The administered written examination and operating test, as well as documents related to the development and review (outlines, review comments and resolution, etc.) of the examination will be withheld from public disclosure until May 14, 2023. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Patricia Digitally signed by Patricia J. Pelke J. Pelke Date: 2021.06.17 21:33:05 -05'00'
Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25
Enclosures:
1. Examination Report 05000237/2021301; 05000249/2021301 2. Simulator Facility Fidelity Report
REGION III==
Docket No: 50-237; 50-249 License No: DPR-19; DPR-25 Report No: 05000237/2021301; 05000249/2021301 Enterprise Identifier: L-2021-OLL-0022 Licensee: Exelon Generation Company, LLC Facility: Dresden Nuclear Power Station, Units 2 and 3 Location: Morris, IL Dates: April 19, 2021 through May 14, 2021 Examiners: C. Zoia, Senior Operations Engineer, Chief Examiner G. Roach, Senior Operations Engineer, Examiner R. Baker, Senior Operations Engineer, Examiner Examination Authors: J. Robbins, Operations Engineer, Examiner in Training L. Rodriguez, Operations Engineer, Examiner in Training Approved by: P. Pelke, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS
ER 05000237/2021301; 05000249/2021301; 04/19/2021- 05/14/2021; Dresden Nuclear Power
Station, Units 2 and 3; Initial License Examination Report.
The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission (NRC) examiners in accordance with the guidance of NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, Revision 11.
Examination Summary:
Seven of seven applicants passed all sections of their respective examinations. Four applicants were issued senior operator licenses and three applicants were issued operator licenses.
(Section 4OA5.1).
REPORT DETAILS
4OA5 Other
.1 Initial Licensing Examinations
a. Examination Scope
The NRC examiners and members of the facility licensees staff used the guidance prescribed in NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 11, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensees staff developed the written examination and NRC examiners prepared the operating test. The NRC examiners validated the proposed examination during the week of March 15, 2021, with the assistance of members of the facility licensees staff. During the on-site validation week, the examiners audited more than 20 percent of the license applications for accuracy. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of April 19 through April 22, 2021.
The facility licensee administered the written examination on April 26, 2021.
b. Findings
- (1) Written Examination The NRC examiners determined that the written examination, as proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Less than 20 percent of the proposed examination questions were determined to be unsatisfactory, requiring significant modification or replacement.
During validation of the written examination, several questions were modified or replaced. All changes made to the proposed written examination were made in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet. Form ES-401-9, the written examination outlines, and both the proposed and final written examinations, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS) on May 14, 2023 (ADAMS Accession Numbers ML20136A313, ML20136A310, ML20136A312, and ML20136A316, respectively).
On May 14, 2021, the licensee submitted documentation noting that there were no post-examination comments for consideration by the NRC examiners when grading the written examination.
The NRC examiners graded the written examination on May 11, 2021, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
- (2) Operating Test During the validation of the operating test, several Job Performance Measures were modified or replaced, and some modifications were made to the dynamic simulator scenarios. Changes made to the operating test portion of the examination, were documented on Form ES-301-7, Operating Test Comments. Form ES-301-7, the operating test outlines, and both the proposed and final as administered dynamic simulator scenarios and Job Performance Measures, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS on May 14, 2023 (ADAMS Accession Numbers ML20136A313, ML20136A310, ML20136A312, and ML20136A316, respectively).
The NRC examiners completed operating test grading on May 20, 2021.
- (3) Examination Results Three applicants at the Senior Reactor Operator level and three applicants at the Reactor Operator level were administered written examinations and operating tests. In addition, one Senior Reactor Operator applicant was administered only a written exam.
All seven applicants passed all portions of their examinations and were issued their respective operating licenses on May 20, 2021.
.2 Examination Security
a. Scope
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Part 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG 1021, Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
b. Findings
None.
4OA6 Meetings
.1 Debrief
The chief examiner presented the examination team's preliminary observations and findings on April 23, 2021, to Mr. D. Thomas, Senior Manager of Training, and other members of the Dresden Nuclear Power Station Operations and Training Department staff.
.2 Exit Meeting
The chief examiner conducted an exit meeting on May 20, 2021, with Mr. D. Thomas, Senior Manager of Training, by telephone. The NRCs final disposition of the stations grading of the written examination and post-examination comments were disclosed and discussed during the telephone discussion. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- D. Thomas, Senior Manager of Training
- J. Condreay, Operations Training Manager
- H. Patel, Shift Operations Superintendent
- F. Winter, Initial License Training Exam Author
- M. McCormick, Operations Facility Representative
- A. Kuzava, Senior Operations Training Instructor
- M. Shreve, Initial License Training Group Lead Instructor
- J. Van Fleet, Director of Organizational Performance and Regulatory
- D. Walker, Regulatory Affairs Specialist
U.S. Nuclear Regulatory Commission
- C. Zoia, Senior Operations Engineer, Chief Examiner
- R. Baker, Senior Operations Engineer, Examiner
- G. Roach, Senior Operations Engineer, Examiner
- J. Robbins, Operations Engineer, Examiner in Training
- L. Rodriguez, Operations Engineer, Examiner in Training
- A. Nguyen, Dresden Senior Resident Inspector
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF ACRONYMS USED
ADAMS Agency-Wide Document Access and Management System
NRC U.S. Nuclear Regulatory Commission
SIMULATION FACILITY FIDELITY REPORT
Facility Licensee: Dresden Nuclear Power Station, Units 2 and 3
Facility Docket No: 50-237; 50-249
Operating Tests Administered: April 19, 2021 through April 22, 2021
The following documents observations made by the U.S. Nuclear Regulatory Commission
examination team during the initial operator license examination. These observations do
not constitute audit or inspection findings and are not, without further verification and review,
indicative of non-compliance with Title 10 of the Code of Federal Regulations, Part 55.45(b).
These observations do not affect U.S. Nuclear Regulatory Commission certification or approval
of the simulation facility other than to provide information which may be used in future
evaluations. No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were
observed:
ITEM DESCRIPTION
SWR 0136983 Simulator Out of Bounds during a scenario
SWR 0136981 Clean Demineralizer Header Pressure Erratic/Reading Incorrectly
AR 04418521 CAEP Issue - 2 Valves closed automatically during a JPM
2