{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
[[Issue date::August 11, 2011]]
-4352 August 11, 2011 Mr. Anthony Silakoski Nuclear Fleet Security Florida Power & Light 700 Universe Boulevard Juno Beach, FL 33408
 
Mr. Anthony Silakoski Nuclear Fleet Security Florida Power & Light 700 Universe Boulevard Juno Beach, FL 33408


SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2011405(DRS); 5000301/2011405(DRS)
SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2011405(DRS); 5000301/2011405(DRS)


==Dear Mr. Silakoski:==
==Dear Mr. Silakoski:==
On July 15, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 15, 2011, with Mr. T. Conboy and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
On July 15, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 15, 2011, with Mr. T. Conboy and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.


The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
No findings of significance were identified.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
 
However, because of the security
-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA by Donald Funk Acting for/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 Nonpublic  
Sincerely,/RA by Donald Funk Acting for/
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50
-266; 50-301 License Nos. DPR
-24; DPR-27 Nonpublic  


===Enclosure:===
===Enclosure:===
Inspection Report 05000266/2011405(DRS); 05000301/2011405(DRS)  
Inspection Report 05000266/2011405(DRS);
05000301/2011405(DRS)


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Hay, RIV M. Fencl, Security Manager cc w/o encl: Distribution via ListServ
Supplemental Information cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Hay, RIV M. Fencl, Security Manager cc w/o encl:
Distribution via ListServ
}}
}}

Revision as of 10:53, 4 August 2018

IR 05000301-11-405, 05000301-11-405; on 07/15/2011, Point Beach Nuclear Plant, Unit 1 & 2, NRC Security Baseline Inspection Report
ML11223A349
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/11/2011
From: Skokowski R A
Plant Support Branch II
To: Silakoski A
Florida Power & Light Co
References
IR-11-405
Download: ML11223A349 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532

-4352 August 11, 2011 Mr. Anthony Silakoski Nuclear Fleet Security Florida Power & Light 700 Universe Boulevard Juno Beach, FL 33408

SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2011405(DRS); 5000301/2011405(DRS)

Dear Mr. Silakoski:

On July 15, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 15, 2011, with Mr. T. Conboy and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

However, because of the security

-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA by Donald Funk Acting for/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50

-266; 50-301 License Nos. DPR

-24; DPR-27 Nonpublic

Enclosure:

Inspection Report 05000266/2011405(DRS);

05000301/2011405(DRS)

w/Attachment:

Supplemental Information cc w/encl:

S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Hay, RIV M. Fencl, Security Manager cc w/o encl:

Distribution via ListServ