IR 05000397/2015501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 36: Line 36:
Docket No. 50-397 License No. NPF-21 cc: Electronic Distribution  
Docket No. 50-397 License No. NPF-21 cc: Electronic Distribution  


January 6, 2016 Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
ML16007A733 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 Letter to Mark from Mark S. Haire, dated January 6, 2016
Richland, WA 99352-0968
 
SUBJECT: COLUMBIA GENERATING STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000397/2015501
 
==Dear Mr. Reddemann:==
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Columbia Generating Station. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000397/2015501. The inspection results associated with the 2015-501 reports are documented in Integrated Resident Inspection Reports 2015-001, 2015-002, 2015-003, and 2015-004. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
 
Docket No. 50-397 License No. NPF-21 cc: Electronic Distribution
 
Distribution: See next page ADAMS ACCESSION NUMBER: ML16007A733 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 OFFICIAL RECORD COPY Letter to Mark from Mark S. Haire, dated January 6, 2016


SUBJECT: COLUMBIA GENERATING STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000397/2015501 DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov)
SUBJECT: COLUMBIA GENERATING STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000397/2015501 DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov)

Revision as of 19:28, 20 May 2018

Columbia Generating Station - NRC Emergency Preparedness Annual Inspection Report IR 05000397/2015501
ML16007A733
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/06/2016
From: Haire M S
Plant Support Branch-1
To: Reddemann M E
Energy Northwest
References
IR 2015501
Download: ML16007A733 (3)


Text

January 6, 2016

Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968

SUBJECT: COLUMBIA GENERATING STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000397/2015501

Dear Mr. Reddemann:

On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Columbia Generating Station. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000397/2015501. The inspection results associated with the 2015-501 reports are documented in Integrated Resident Inspection Reports 2015-001, 2015-002, 2015-003, and 2015-004.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-397 License No. NPF-21 cc: Electronic Distribution

ML16007A733 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 Letter to Mark from Mark S. Haire, dated January 6, 2016

SUBJECT: COLUMBIA GENERATING STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000397/2015501 DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Gregory.Kolcum@nrc.gov)

Resident Inspector (Dan.Bradley@nrc.gov) Resident Inspector (Steven.Janicki@nrc.gov) Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer (Thomas.Sullivan@nrc.gov)

Project Engineer (Matthew.Kirk@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Balwant.Singal@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)