IR 05000397/2015404

From kanterella
Jump to navigation Jump to search
IR 05000397/2015404, on 04/30/2015, Columbia Generating Station, NRC Security Inspection
ML15162A188
Person / Time
Site: Columbia 
Issue date: 06/11/2015
From: Mark Haire
Plant Support Branch-1
To: Reddemann M
Energy Northwest
References
IR 2015404
Download: ML15162A188 (4)


Text

June 11, 2015

SUBJECT:

COLUMBIA GENERATING STATION, NRC SECURITY INSPECTION REPORT 05000397/2015404

Dear Mr. Reddemann:

On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Columbia Generating Station. The NRC inspector discussed the results of this inspection with Mr. W. Hettel, Vice President of Operations, and other members of your staff.

The inspector documented the results of this inspection in the enclosed inspection report.

No NRC-identified or self-revealing findings were identified during this inspection.

However, the inspector documented a licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspectors at Columbia Generating Station.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 Mark However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-397 License No. NPF-21

Enclosure:

Inspection Report 05000397/2015404 w/Attachment: Supplemental Information

cc: Electronic Distribution Mark However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-397 License No. NPF-21

Enclosure:

Inspection Report 05000397/2015404 w/Attachment: Supplemental Information

cc: Electronic Distribution

Distribution:

See next page

ADAMS Accession Number: ML15162A188 Entire Report ADAMS:

Publicly Available Non-Sensitive Keyword SUNSI Review By: DHolman Yes No Non-Publicly Available Sensitive MD 3.4 Non-Public A.3 Cover Letter Only ADAMS:

Publicly Available Non-Sensitive Keyword SUNSI Review By: DHolman Yes No Non-Publicly Available Sensitive SUNSI Review Complete; NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1

NAME DHolman JBuchanan MHaire WWalker MHaire

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

DATE 6/10/15 6/10/15 6/10/15 6/11/15 6/11/15 Letter to Mark from Mark S. Haire, dated June 11, 2015

SUBJECT:

COLUMBIA GENERATING STATION, NRC SECURITY INSPECTION REPORT 05000397/2015404

Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSIR (Douglas.Garner@nrc.gov)

Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Senior Resident Inspector (Jeremy.Groom@nrc.gov)

Site Administrative Assistant (Douglas.Bodine@nrc.gov)

Distribution by RIV w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeremy.Groom@nrc.gov)

Resident Inspector (Dan.Bradley@nrc.gov)

Site Administrative Assistant (Douglas.Bodine@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Daniel.Bradley@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Team Leader, DRS/TSS (Don.Allen@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)

ROPReports Resource