ML20205C565: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:, _ _ _ - _ _ _ _ _    _
{{#Wiki_filter:, _ _ _ - _ _ _ _ _
E. J. Mroc2                                     85 Form Apprav;d by Station supsrintendent                     Effactive Date STATION PROCEDURE COVER SHEET A. IDENTIFI5ATION Number E0P 35 FR-H.3                                 Rev. 1 Title RESPONSE TO STEAM GENERATOR HIGH LEVEL Prepared By J. D. Catlin B. REVIEW I have reviewed the above procedure and have found it to be satisfactory.
E. J. Mroc2
TITLE                         SIGNATURE           DATE DEPARTMENT HEAD                                   4 H             /2 C. UNREVIEWEDSAFETYQUESTIONEVALUATIONDOCUMENTATIONREQUfRED:
* 85 Form Apprav;d by Station supsrintendent Effactive Date STATION PROCEDURE COVER SHEET A.
(Significant change in procedure method or scope           YES ( )   NO M as described in FSAR)
IDENTIFI5ATION Number E0P 35 FR-H.3 Rev.
1 Title RESPONSE TO STEAM GENERATOR HIGH LEVEL Prepared By J. D. Catlin B.
REVIEW I have reviewed the above procedure and have found it to be satisfactory.
TITLE SIGNATURE DATE DEPARTMENT HEAD 4 H
/2 C.
UNREVIEWEDSAFETYQUESTIONEVALUATIONDOCUMENTATIONREQUfRED:
(Significant change in procedure method or scope YES ( )
NO M as described in FSAR)
(If yes, document in PORC/SORC meeting minutes)
(If yes, document in PORC/SORC meeting minutes)
ENVIRONMENTAL IMPACT (Adverse environmental impact)                             YES ( )   NO X (If yes, document in PORC/SORC meeting minutes)
ENVIRONMENTAL IMPACT (Adverse environmental impact)
D. INTEGRATED SAFETY REVIEW REQUIRED (Affects response of Safety Systems, performance           YES [ ]   h0C>F of safety-related control systems or performance of control systems which may indirectly affect cafety system response.)
YES ( )
NO X (If yes, document in PORC/SORC meeting minutes)
D.
INTEGRATED SAFETY REVIEW REQUIRED (Affects response of Safety Systems, performance YES [ ]
h0C>F of safety-related control systems or performance of control systems which may indirectly affect cafety system response.)
(If yes, document in PORC/SORC meeting minutes.)
(If yes, document in PORC/SORC meeting minutes.)
E. PROCEDURE REQUIRES M SORC REVIEW                           YES PQ     NO ( ) .
E.
F. ddRC'dSORCAPPROVAL O ORC Meeting Number DOS ~ C3c'A4 G. APPROVAL AND IMPLEMENTATION The attached procedure is hereby approveel, and effective on the date below:
PROCEDURE REQUIRES M SORC REVIEW YES PQ NO ( )
W_ AWV Station /Safvice/ Unit Superintendent l.2 -/3-[S~
F.
Effective Date SF 301 Rev. 7 O                                         Page 1 of 1 3
ddRC'dSORCAPPROVAL O ORC Meeting Number DOS ~ C3c'A4 G.
g o2g0y $$o P
APPROVAL AND IMPLEMENTATION The attached procedure is hereby approveel, and effective on the date below:
W_ AWV l.2 -/3-[S~
Station /Safvice/ Unit Superintendent Effective Date SF 301 Rev. 7 O
g o2g0y $$o 3
Page 1 of 1 P


      ~
~
m--                   _ _ _ _ _ _ _ _ _ _
m--
                                              .          e E0P 35 FR-H.3                                       Page 1
e E0P 35 FR-H.3 Page 1
        ~
~
O           RESPONSE TO .il,"Q               ,,r... RATOR HIGH LEVEL Pace No.                                       Eff. Rev.
O RESPONSE TO.il,"Q,,r... RATOR HIGH LEVEL Pace No.
1-5                                               1 O
Eff. Rev.
O
1-5 1
O O


RESPONSETOSTEAMGbERATORHIGHLEVEL               E0P 35 FR-H.3   Peg 2 2 Rev. 1
RESPONSETOSTEAMGbERATORHIGHLEVEL E0P 35 FR-H.3 Peg 2 2 Rev. 1
                                                                                                  ~
~
r A. PURPOSE This procedure provides acticas to respond to a steam generator high level condition and to address the steam generator overfill concern.
r A.
B. ENTRY CONDITIONS This procedure was written for Modes 1, 2, 3, and 4. Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.
PURPOSE This procedure provides acticas to respond to a steam generator high level condition and to address the steam generator overfill concern.
This procedure entered from
B.
: 1)   E0P 35 F-0.3, HEAT SINK Critical Safety Function Status Tree on ,
ENTRY CONDITIONS This procedure was written for Modes 1, 2, 3, and 4.
a YELLOW condition, and                         .
Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.
: 2)   E0P 35 FR-H.2, RESPONSE TO STEAM GENERATOR OVERPRESSURE, Step 3 if the affected SG narrow range level f.s high.
This procedure entered from 1)
E0P 35 F-0.3, HEAT SINK Critical Safety Function Status Tree on a YELLOW condition, and 2)
E0P 35 FR-H.2, RESPONSE TO STEAM GENERATOR OVERPRESSURE, Step 3 if the affected SG narrow range level f.s high.
O O
O O


e   .
e RESPONSE TO STEAM GENERATOR HIGH LEVEL E0P 35 FR-H.3 Pcg2 3 Rev. 1
RESPONSE TO STEAM GENERATOR HIGH LEVEL           E0P 35 FR-H.3     Pcg2 3 Rev. 1
,m,
    ,m,
(
(     )                       -"-
)
    'Ad                         -    STEP           ACTION / EXPECTED RESPONSE             RESPONSE NOT 09TAINED CAUTION If SG narrow range level has increased to greater than 32% (77% for adverse containment) an evaluation should be made for SG overfill considerations. Steam should not be released from any SG with level greater than 92% (77%
'Ad STEP ACTION / EXPECTED RESPONSE RESPONSE NOT 09TAINED CAUTION If SG narrow range level has increased to greater than 32% (77% for adverse containment) an evaluation should be made for SG overfill considerations.
for adverse containment) prior to overfill evaluation.               l NOTE Throughout this procedure "affected" refeus c})
Steam should not be released from any SG with level greater than 92% (77%
to any SG iu which narrow range level is greater than 80%.                                               1l 1   Identify Affected SG(s)
for adverse containment) prior to overfill evaluation.
: a. Narrow range level -           a. IF less than 82% in all GREATER THAN 82%                       SGs, THEN return to (7   w)                                                                                   procedure and step in effect.
l NOTE c})
2   Verify TV ! solation
Throughout this procedure "affected" refeus to any SG iu which narrow range level is 1l greater than 80%.
: a. Main FW pumps - STOPPED         a. Manually stop pumps,
1 Identify Affected SG(s) a.
: b. FW Flow control                 b. Manually close valves.
Narrow range level -
valves - CLOSED
a.
: c. Flow bypass level               c. Manually close valves.
IF less than 82% in all GREATER THAN 82%
control valves - CLOSED
SGs, THEN return to (7 w) procedure and step in effect.
: d. Feedline Isolation             d. Manually close valves, valves - CLOSED 3   Isolate AFW Flow To Affected SG(s)
2 Verify TV ! solation a.
Main FW pumps - STOPPED a.
Manually stop pumps, b.
FW Flow control b.
Manually close valves.
valves - CLOSED c.
Flow bypass level c.
Manually close valves.
control valves - CLOSED d.
Feedline Isolation d.
Manually close valves, valves - CLOSED 3
Isolate AFW Flow To Affected SG(s)
O)
O)
    \
\\s _-
s _-
OP W 8-1 3 44
OP W 8-1 3 44


e r t
e r t RESPONSE TO STEAM GENERATOR HIGH LEVEL E0P 35 FE H.3 Peas 4 Rev. 1
* RESPONSE TO STEAM GENERATOR HIGH LEVEL             E0P 35 FE H.3     Peas 4 Rev. 1                                               -
[
eTap Actiewespecteo naapones naspowes wof osTAswee 4
Check Affected SG(s) Level a.
Narrow range level -
a.
Go to Step 5.
LESS THAN 92% (77% for ADVERSE CONTAINMENT) b.
Narrow range level -
b.
Go to Step e f
DECREASING c.
Control AW flow to i
maintain narrow range 5
level between 4%
(34% for adverse j
containment) and 50%
1 I
d.
Return to procedure and j
step in effect j
i i
j 5
Close Affected SG(s) Steam r
Supply Isolation Valves To i
i l
Turbine-Driven AW Pump i
,6 Close Affected SG(s) Main i
Steamline Isolation and i
j Bypass Valves l
l 7
Cbeck Affected SG(s)
IF any E0P 35 E-3 or E0P Radiation - NORMAL 35 ECA-3 Series procedure
[
is in effect, THEN return to procedure and step in effect, i
IF NOT, THEN so to E0P 35 E.3, STEAM GENERATOR TURE RUPTL%E, Step 1.
a.
Main Steamlines b.
Steam generator blowdown radiation monitor, if not isolated.
I 8
Establish Blowdown From i
Affected SG(s)
~
j a.
In accordance with OP 3316C STEAM j
GENERATOR BLOWOW, if l
SG blowdown is isolated, j
b.
If SG blowdown and AW were in service,
[
[
                                      -  eTap          Actiewespecteo naapones                  naspowes wof osTAswee 4    Check Affected SG(s) Level    '
OPEN SG Blowdown Ctat t
: a. Narrow range level -            a.      Go to Step 5.                                  !
4 h Isolation Valve (s) to
LESS THAN 92% (77% for
,                                                        ADVERSE CONTAINMENT)
: b. Narrow range level -          b.      Go to Step e                                  f DECREASING                                                                              '
: c. Control AW flow to                                                                    i maintain narrow range                                                                  5 level between 4%
:                                                        (34% for adverse j                                                        containment) and 50%                                                                  !
1                                                                                                                                                I
  ,                                                d. Return to procedure and                                                                !
j                                                        step in effect                                                                .        j i
* i j                                            5    Close Affected SG(s) Steam                                                                  r i
Supply Isolation Valves To                                                                  i l                                                  Turbine-Driven AW Pump                                                                      i
                                              ,6    Close Affected SG(s) Main                                                                    i
;                                                  Steamline Isolation and                                                                    i j                                                  Bypass Valves
* l                                                                                                                                              !
l                                              7    Cbeck Affected SG(s)                  IF any E0P 35 E-3 or E0P                              !
Radiation - NORMAL                  35 ECA-3 Series procedure                              [
is in effect, THEN return to
,                                                                                        procedure and step in effect,                          i IF NOT, THEN so to E0P 35 E.3,                        ;
STEAM GENERATOR TURE RUPTL%E, Step 1.
: a. Main Steamlines
!                                                  b. Steam generator blowdown
!                                                        radiation monitor, if not isolated.
I
                                        ~
8    Establish Blowdown From i                                                  Affected SG(s) j                                                  a. In accordance with
!                                                        OP 3316C STEAM j                                                        GENERATOR BLOWOW, if SG blowdown is isolated,                                                              l
,                                                                                                                                              j
: b. If SG blowdown and AW were in service,                                                                  [
4                                                        OPEN SG Blowdown Ctat                                                                 t i
h v Isolation Valve (s) to affected SG(s).
[
[
i v
affected SG(s).
t i
t i
: i.                                                                                                                                             !-
i.
oes m m i
oes m m i
i                                                                                                                                               !
i l
l


e   .
e RESPONSE TO STEAM GENERATOR HIGli LFXEL E0P 35 FR-H.3 Pcg? $
RESPONSE TO STEAM GENERATOR HIGli LFXEL       E0P 35 FR-H.3         Pcg? $
Rev. 1
Rev. 1
  ,a
,a
(     )
(
  '\ /     STEP ACTION /EEPECTED RESPONSE           RESPONSE NOT OSTAINED 9 Return To Procedure And Step In Effect
)
                                                  -TINAL-S 6
'\\ /
STEP ACTION /EEPECTED RESPONSE RESPONSE NOT OSTAINED 9
Return To Procedure And Step In Effect
-TINAL-S 6
0 v
0 v
CPSC641 3 44}}
CPSC641 3 44}}

Latest revision as of 20:06, 7 December 2024

Rev 1 to Emergency Operating Procedure EOP 35 FR-H.3, Response to Steam Generator High Level
ML20205C565
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 12/13/1985
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20204H467 List: ... further results
References
EOP-35-FR-H.3, NUDOCS 8810260528
Download: ML20205C565 (6)


Text

, _ _ _ - _ _ _ _ _

E. J. Mroc2

  • 85 Form Apprav;d by Station supsrintendent Effactive Date STATION PROCEDURE COVER SHEET A.

IDENTIFI5ATION Number E0P 35 FR-H.3 Rev.

1 Title RESPONSE TO STEAM GENERATOR HIGH LEVEL Prepared By J. D. Catlin B.

REVIEW I have reviewed the above procedure and have found it to be satisfactory.

TITLE SIGNATURE DATE DEPARTMENT HEAD 4 H

/2 C.

UNREVIEWEDSAFETYQUESTIONEVALUATIONDOCUMENTATIONREQUfRED:

(Significant change in procedure method or scope YES ( )

NO M as described in FSAR)

(If yes, document in PORC/SORC meeting minutes)

ENVIRONMENTAL IMPACT (Adverse environmental impact)

YES ( )

NO X (If yes, document in PORC/SORC meeting minutes)

D.

INTEGRATED SAFETY REVIEW REQUIRED (Affects response of Safety Systems, performance YES [ ]

h0C>F of safety-related control systems or performance of control systems which may indirectly affect cafety system response.)

(If yes, document in PORC/SORC meeting minutes.)

E.

PROCEDURE REQUIRES M SORC REVIEW YES PQ NO ( )

F.

ddRC'dSORCAPPROVAL O ORC Meeting Number DOS ~ C3c'A4 G.

APPROVAL AND IMPLEMENTATION The attached procedure is hereby approveel, and effective on the date below:

W_ AWV l.2 -/3-[S~

Station /Safvice/ Unit Superintendent Effective Date SF 301 Rev. 7 O

g o2g0y $$o 3

Page 1 of 1 P

~

m--

e E0P 35 FR-H.3 Page 1

~

O RESPONSE TO.il,"Q,,r... RATOR HIGH LEVEL Pace No.

Eff. Rev.

1-5 1

O O

RESPONSETOSTEAMGbERATORHIGHLEVEL E0P 35 FR-H.3 Peg 2 2 Rev. 1

~

r A.

PURPOSE This procedure provides acticas to respond to a steam generator high level condition and to address the steam generator overfill concern.

B.

ENTRY CONDITIONS This procedure was written for Modes 1, 2, 3, and 4.

Using this procedure when not in these modes requires a step by step evaluation to determine if the required action is still applicable to current plant conditions.

This procedure entered from 1)

E0P 35 F-0.3, HEAT SINK Critical Safety Function Status Tree on a YELLOW condition, and 2)

E0P 35 FR-H.2, RESPONSE TO STEAM GENERATOR OVERPRESSURE, Step 3 if the affected SG narrow range level f.s high.

O O

e RESPONSE TO STEAM GENERATOR HIGH LEVEL E0P 35 FR-H.3 Pcg2 3 Rev. 1

,m,

(

)

'Ad STEP ACTION / EXPECTED RESPONSE RESPONSE NOT 09TAINED CAUTION If SG narrow range level has increased to greater than 32% (77% for adverse containment) an evaluation should be made for SG overfill considerations.

Steam should not be released from any SG with level greater than 92% (77%

for adverse containment) prior to overfill evaluation.

l NOTE c})

Throughout this procedure "affected" refeus to any SG iu which narrow range level is 1l greater than 80%.

1 Identify Affected SG(s) a.

Narrow range level -

a.

IF less than 82% in all GREATER THAN 82%

SGs, THEN return to (7 w) procedure and step in effect.

2 Verify TV ! solation a.

Main FW pumps - STOPPED a.

Manually stop pumps, b.

FW Flow control b.

Manually close valves.

valves - CLOSED c.

Flow bypass level c.

Manually close valves.

control valves - CLOSED d.

Feedline Isolation d.

Manually close valves, valves - CLOSED 3

Isolate AFW Flow To Affected SG(s)

O)

\\s _-

OP W 8-1 3 44

e r t RESPONSE TO STEAM GENERATOR HIGH LEVEL E0P 35 FE H.3 Peas 4 Rev. 1

[

eTap Actiewespecteo naapones naspowes wof osTAswee 4

Check Affected SG(s) Level a.

Narrow range level -

a.

Go to Step 5.

LESS THAN 92% (77% for ADVERSE CONTAINMENT) b.

Narrow range level -

b.

Go to Step e f

DECREASING c.

Control AW flow to i

maintain narrow range 5

level between 4%

(34% for adverse j

containment) and 50%

1 I

d.

Return to procedure and j

step in effect j

i i

j 5

Close Affected SG(s) Steam r

Supply Isolation Valves To i

i l

Turbine-Driven AW Pump i

,6 Close Affected SG(s) Main i

Steamline Isolation and i

j Bypass Valves l

l 7

Cbeck Affected SG(s)

IF any E0P 35 E-3 or E0P Radiation - NORMAL 35 ECA-3 Series procedure

[

is in effect, THEN return to procedure and step in effect, i

IF NOT, THEN so to E0P 35 E.3, STEAM GENERATOR TURE RUPTL%E, Step 1.

a.

Main Steamlines b.

Steam generator blowdown radiation monitor, if not isolated.

I 8

Establish Blowdown From i

Affected SG(s)

~

j a.

In accordance with OP 3316C STEAM j

GENERATOR BLOWOW, if l

SG blowdown is isolated, j

b.

If SG blowdown and AW were in service,

[

OPEN SG Blowdown Ctat t

4 h Isolation Valve (s) to

[

i v

affected SG(s).

t i

i.

oes m m i

i l

e RESPONSE TO STEAM GENERATOR HIGli LFXEL E0P 35 FR-H.3 Pcg? $

Rev. 1

,a

(

)

'\\ /

STEP ACTION /EEPECTED RESPONSE RESPONSE NOT OSTAINED 9

Return To Procedure And Step In Effect

-TINAL-S 6

0 v

CPSC641 3 44