| {{#Wiki_filter:August 25, 2021 | | {{#Wiki_filter:August 25, 2021 |
|
| |
|
| ==SUBJECT:==
| | Ernest J. Kapopoulos, Jr. |
| UPDATED INSPECTION PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NUMBER 2 (Report 05000261/2021005)
| |
|
| |
|
| ==Dear Mr. Kapopoulos:== | | Site Vice President H. B. Robinson Steam Electric Plant Duke Energy Progress, LLC 3581 West Entrance Road, RNPA01 Hartsville, SC 29550 |
| | |
| | SUBJECT: UPDATED INSPECTION PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NUMBER 2 (Report 05000261 /2021005) |
| | |
| | ==Dear M Kapopoulos :== |
| The enclosed inspection plan lists the inspections scheduled through June 30, 2023 for the H. | | The enclosed inspection plan lists the inspections scheduled through June 30, 2023 for the H. |
|
| |
|
| B. Robinson Steam Electric Plant, Unit 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | | B. Robinson Steam Electric Plant, Unit 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change In response to the COVID - 19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the RO Each planned inspection is being carefully reviewed in or der to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if neede This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID - 19 Telework Restriction s (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NR C guidance and frequently asked questions for security and emergency preparedness can be found here: |
| | https://www.nrc.gov/about - nrc/covid - 19/security - ep/. Similarly, the NRC has developed guidance if force - on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID - 19 PH These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID - 19 PH The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID - 19 PH NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and schedulin The NRC will also be performing baseline inspections of licensee cyber security program The specific schedule and procedure to be used for these inspections is being developed by the NRC staf The staff expects to communicate the schedule for these inspections to each utility separatel E. Kapopoulos, J In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC s Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
| | Please contact me at 404-997-4628 with any questions you have regarding this lette |
| https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
| |
|
| |
|
| The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.
| | Sincerely, |
| | /RA/ |
|
| |
|
| E. Kapopoulos, Jr. -2-In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects |
|
| |
|
| Please contact me at 404-997-4628 with any questions you have regarding this letter.
| | Docket No.: 05000261 License No.: DPR-23 |
|
| |
|
| Sincerely,
| | Enclosure: |
| /RA/
| |
| David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 05000261 License No.: DPR-23 Enclosure:
| |
| Robinson Inspection/Activity Plan (09/01/2021 - 06/30/2023) | | Robinson Inspection/Activity Plan (09/01/2021 - 06/30/2023) |
| cc w/encl: Distribution via LISTSERV
| |
|
| |
|
| ML21237A329 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RII/DRP/RPB3 RII/DRP/RPB3 NAME J. Hamman D. Dumbacher DATE 08/25/2021 08/25/2021 | | cc w/encl : Distribution via LISTSERV Kapopoulos, J SUBJECT: UPDATED INSPECTION PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NUMBER 2 (Report 05000261/2021005) dated August 25, 2021 |
| | |
| | DISTRIBUTION: Kowal, RII Gibson, RII OE Mail RIDSNRRDRO RidsNrrPMRobinson Resource ROPassessment Resource ROPreports Resource PUBLIC |
| | |
| | ADAMS ACCESSION NUMBER: ML21237A329 X SUNSI Review X Non -Sensitive X Publicly Available Sensitive n -Publiclyvlable |
| | |
| | OFFICE I/DRP/B3 I/DRP/B3 |
| | |
| | ME Hamn Dcher TE 0 25/ 0 / |
| | |
| | O FFIAL RERD COPY IP 22b Site Inspection Activity Plan Robinson |
| | |
| | 09/01/2021 - 06/30/2023 |
| | |
| | Unit Start End Activity CAC Title Staff Count |
| | |
| | ROBINSON INITIAL LICENSE EXAM 3 |
| | |
| | 2 9/18/2021 10/1/2021 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) |
| | |
| | SECURITY BASELINE INSPECTION 1 |
| | |
| | 2 10/18/2021 10/22/2021 IP 71130.02 000734 Access Control |
| | |
| | 2 10/18/2021 10/22/2021 IP 71130.09 001656 Security Plan Changes |
| | |
| | 2 10/18/2021 10/22/2021 IP 71151 001338 Performance Indicator Verification |
| | |
| | TARGET SET INSPECTION 2 |
| | |
| | 2 10/25/2021 10/29/2021 IP 71130.14 000743 Review of Power Reactor Target Sets |
| | |
| | RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2 |
| | |
| | 2 12/6/2021 12/10/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 2 12/6/2021 12/10/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls |
| | |
| | 2 12/6/2021 12/10/2021 IP 71151 000746 Performance Indicator Verification |
| | |
| | DUKE CORPORATE AA/FFD BASELINE SECURITY INSPECTION 2 |
| | |
| | 2 1/10/2022 1/14/2022 IP 71130.01 000733 Access Authorization |
| | |
| | 2 1/10/2022 1/14/2022 IP 71130.08 000740 Fitness For Duty Program |
| | |
| | SECURITY BASELINE INSPECTION 3 |
| | |
| | 2 3/21/2022 3/25/2022 IP 71130.01 000733 Access Authorization |
| | |
| | 2 3/21/2022 3/25/2022 IP 71130.05 000737 Protective Strategy Evaluation |
| | |
| | 2 3/21/2022 3/25/2022 IP 71130.08 000740 Fitness For Duty Program |
| | |
| | 2 3/21/2022 3/25/2022 IP 71130.09 001656 Security Plan Changes |
| | |
| | EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 |
| | |
| | 2 6/6/2022 6/10/2022 IP 71114.02 000717 Alert and Notification System Testing |
| | |
| | 2 6/6/2022 6/10/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System |
| | |
| | 2 6/6/2022 6/10/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes |
| | |
| | 2 6/6/2022 6/10/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness |
| | |
| | 2 6/6/2022 6/10/2022 IP 71151 001397 Performance Indicator Verification |
| | |
| | PROBLEM IDENTIFICATION AND RESOLUTION 4 |
| | |
| | 2 6/6/2022 6/24/2022 IP 71152B 000747 Problem Identification and Resolution |
| | |
| | DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6 |
| | |
| | 2 7/25/2022 7/29/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) |
|
| |
|
| IP 22b Site Inspection Activity Plan Robinson 09/01/2021 - 06/30/2023 Unit Start End Activity CAC Title Staff Count ROBINSON INITIAL LICENSE EXAM 3 2 9/18/2021 10/1/2021 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
| |
| SECURITY BASELINE INSPECTION 1 2 10/18/2021 10/22/2021 IP 71130.02 000734 Access Control 2 10/18/2021 10/22/2021 IP 71130.09 001656 Security Plan Changes 2 10/18/2021 10/22/2021 IP 71151 001338 Performance Indicator Verification TARGET SET INSPECTION 2 2 10/25/2021 10/29/2021 IP 71130.14 000743 Review of Power Reactor Target Sets RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2 2 12/6/2021 12/10/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2 12/6/2021 12/10/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 2 12/6/2021 12/10/2021 IP 71151 000746 Performance Indicator Verification DUKE CORPORATE AA/FFD BASELINE SECURITY INSPECTION 2 2 1/10/2022 1/14/2022 IP 71130.01 000733 Access Authorization 2 1/10/2022 1/14/2022 IP 71130.08 000740 Fitness For Duty Program SECURITY BASELINE INSPECTION 3 2 3/21/2022 3/25/2022 IP 71130.01 000733 Access Authorization 2 3/21/2022 3/25/2022 IP 71130.05 000737 Protective Strategy Evaluation 2 3/21/2022 3/25/2022 IP 71130.08 000740 Fitness For Duty Program 2 3/21/2022 3/25/2022 IP 71130.09 001656 Security Plan Changes EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 2 6/6/2022 6/10/2022 IP 71114.02 000717 Alert and Notification System Testing 2 6/6/2022 6/10/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2 6/6/2022 6/10/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2 6/6/2022 6/10/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 2 6/6/2022 6/10/2022 IP 71151 001397 Performance Indicator Verification PROBLEM IDENTIFICATION AND RESOLUTION 4 2 6/6/2022 6/24/2022 IP 71152B 000747 Problem Identification and Resolution DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6 2 7/25/2022 7/29/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
| |
| 2 8/8/2022 8/12/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) | | 2 8/8/2022 8/12/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams) |
| SECURITY BASELINE INSPECTION 3 2 9/12/2022 9/16/2022 IP 71130.02 000734 Access Control Prepared on 8/25/2021 10:49:57 AM 1 of 2
| |
|
| |
|
| IP 22b Site Inspection Activity Plan 2 9/12/2022 9/16/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2 9/12/2022 9/16/2022 IP 71130.07 000739 Security Training 2 9/12/2022 9/16/2022 IP 71151 001338 Performance Indicator Verification ROBINSON INITIAL LICENSE EXAM 3 2 8/29/2022 9/2/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) | | SECURITY BASELINE INSPECTION 3 |
| | |
| | 2 9/12/2022 9/16/2022 IP 71130.02 000734 Access Control |
| | |
| | Prepared on 8/25/2021 10:49:57 AM 1 of 2 IP 22b Site Inspection Activity Plan |
| | |
| | 2 9/12/2022 9/16/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance |
| | |
| | 2 9/12/2022 9/16/2022 IP 71130.07 000739 Security Training |
| | |
| | 2 9/12/2022 9/16/2022 IP 71151 001338 Performance Indicator Verification |
| | |
| | ROBINSON INITIAL LICENSE EXAM 3 |
| | |
| | 2 8/29/2022 9/2/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) |
| | |
| 2 10/3/2022 10/14/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) | | 2 10/3/2022 10/14/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) |
| UNIT 2 IN-SERVICE INSPECTION +SG 2 2 11/21/2022 11/25/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR) | | |
| RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 4 2 11/28/2022 12/2/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2 11/28/2022 12/2/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2 11/28/2022 12/2/2022 IP 71124.04 000728 Occupational Dose Assessment 2 11/28/2022 12/2/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 2 11/28/2022 12/2/2022 IP 71151 000746 Performance Indicator Verification CYBER SECURITY INSPECTION 2 2 5/1/2023 5/5/2023 IP 71130.10P 000741 Cyber Security EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5 2 5/15/2023 5/19/2023 IP 71114.01 000716 Exercise Evaluation 2 5/15/2023 5/19/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2 5/15/2023 5/19/2023 IP 71151 001397 Performance Indicator Verification Prepared on 8/25/2021 10:49:57 AM 2 of 2 | | UNIT 2 IN-SERVICE INSPECTION +SG 2 |
| | |
| | 2 11/21/2022 11/25/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR) |
| | |
| | RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 4 |
| | |
| | 2 11/28/2022 12/2/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 2 11/28/2022 12/2/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation |
| | |
| | 2 11/28/2022 12/2/2022 IP 71124.04 000728 Occupational Dose Assessment |
| | |
| | 2 11/28/2022 12/2/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation |
| | |
| | 2 11/28/2022 12/2/2022 IP 71151 000746 Performance Indicator Verification |
| | |
| | CYBER SECURITY INSPECTION 2 |
| | |
| | 2 5/1/2023 5/5/2023 IP 71130.10P 000741 Cyber Security |
| | |
| | EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5 |
| | |
| | 2 5/15/2023 5/19/2023 IP 71114.01 000716 Exercise Evaluation |
| | |
| | 2 5/15/2023 5/19/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes |
| | |
| | 2 5/15/2023 5/19/2023 IP 71151 001397 Performance Indicator Verification |
| | |
| | Prepared on 8/25/2021 10:49:57 AM 2 of 2 |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 ML24297A2182024-10-28028 October 2024 – NRC Operator License IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML24033A0592024-02-0202 February 2024 Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) 05000261/LER-2023-002, Plant Trip During Reactor Protection System Testing2023-08-17017 August 2023 Plant Trip During Reactor Protection System Testing 05000261/LER-2023-001, Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation2023-08-10010 August 2023 Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 2024-09-11
[Table view] Category:Report
MONTHYEARRA-24-0173, Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld2024-06-28028 June 2024 Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube2023-04-0505 April 2023 Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2022-11-0101 November 2022 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)2022-08-0909 August 2022 Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary) RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2021-11-22022 November 2021 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.462019-05-30030 May 2019 Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RA-17-0040, Providing Methodology Reports DPC-NE-1008-P, Revision 0, DPC-NF-2010, Revision 3, and DPC-NE-2011-P, Revision 2. (Non-Proprietary Versions)2017-08-15015 August 2017 Providing Methodology Reports DPC-NE-1008-P, Revision 0, DPC-NF-2010, Revision 3, and DPC-NE-2011-P, Revision 2. (Non-Proprietary Versions) ML16281A5102016-12-15015 December 2016 Staff Assessment of the Reactor Vessel Internals Aging Management Program Plans RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors ML16280A2002016-10-0505 October 2016 Response to Request for Additional Information Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RA-16-0024, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P2016-10-0303 October 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P RNP-RA/16-0073, Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits2016-09-14014 September 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Reactor Coolant System Pressure and Temperature Limits RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-1742016-05-25025 May 2016 Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 RA-16-0023, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P2016-05-0404 May 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.462015-11-17017 November 2015 Annual Report of Changes Pursuant to 10 CFR 50.46 ML15280A1992015-10-19019 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)2015-08-19019 August 2015 Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel2015-02-26026 February 2015 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System2014-04-0808 April 2014 Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....2014-03-12012 March 2014 Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... RNP-RA/14-0011, Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2014-02-27027 February 2014 Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident ML13365A2912014-02-19019 February 2014 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14027A0632014-01-24024 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for H. B. Robinson Steam Electric Plant, Unit 2, TAC No.: MF0720 ML13267A2122013-09-30030 September 2013 Enclosure 1, Transition Report - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML13270A1762013-09-24024 September 2013 Redacted - Office of Nuclear Reactor Regulation (NRR) Reactor Systems Branch (Srxb) Support of Region II Inspection of H. B. Robinson Treatment of Voids in Systems That Are Important to Safety RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter2013-08-21021 August 2013 Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication2013-06-24024 June 2013 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 20122013-04-25025 April 2013 Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 ML12331A1752012-11-26026 November 2012 Draft Bypass Fiber Quantity Test Plan ML12278A3992012-08-31031 August 2012 WCAP-17077-NP, Rev 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant ML1210707162012-05-17017 May 2012 Letter Report on the Evaluation of Cables from the HEAF Fire Event at the H.B. Robinson Steam Electric Plant ML12068A1332012-02-23023 February 2012 Calculation RNP-M/MECH-1815, Revision 1, Evaluation of Emergency Diesel Generator Starting Capability at 150 PSIG RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System2011-11-23023 November 2011 Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System ML1124113592011-09-23023 September 2011 Final Precursor Analysis: Electrical Fault Causes Fire and Subsequent Reactor Trip with a Loss of Reactor Coolant Pump Seal Injection and Cooling ML1124113582011-09-23023 September 2011 Final Precursor Analysis: Concurrent Unavailabilities - EDG B Inoperable Due to Failed Output Breaker and EDG a Unavailable Due to Testing and Maintenance ML1128005282010-12-29029 December 2010 NRC 2011 Hb Robinson ML1019304172010-05-0606 May 2010 Tritium Database Report RNP-RA/09-0081, WCAP-17077-NP, Revision 0, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant.2009-07-31031 July 2009 WCAP-17077-NP, Revision 0, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals at Robinson Nuclear Plant. RNP-RA/09-0054, Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System Instrumentation2009-06-19019 June 2009 Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System Instrumentation ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 2024-06-28
[Table view] Category:Miscellaneous
MONTHYEARRA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2021-11-22022 November 2021 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.462019-05-30030 May 2019 Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) ML16281A5102016-12-15015 December 2016 Staff Assessment of the Reactor Vessel Internals Aging Management Program Plans RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RA-16-0024, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P2016-10-0303 October 2016 Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-1742016-05-25025 May 2016 Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174 ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.462015-11-17017 November 2015 Annual Report of Changes Pursuant to 10 CFR 50.46 ML15280A1992015-10-19019 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)2015-08-19019 August 2015 Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel2015-02-26026 February 2015 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System2014-04-0808 April 2014 Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....2014-03-12012 March 2014 Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3.... RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter2013-08-21021 August 2013 Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication2013-06-24024 June 2013 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 20122013-04-25025 April 2013 Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012 RNP-RA/11-0100, Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System2011-11-23023 November 2011 Annual Report of Changes to or Errors Discovered in an Acceptable Loss-of-Coolant Accident Evaluation Model Application for the Emergency Core Cooling System ML1124113582011-09-23023 September 2011 Final Precursor Analysis: Concurrent Unavailabilities - EDG B Inoperable Due to Failed Output Breaker and EDG a Unavailable Due to Testing and Maintenance ML1124113592011-09-23023 September 2011 Final Precursor Analysis: Electrical Fault Causes Fire and Subsequent Reactor Trip with a Loss of Reactor Coolant Pump Seal Injection and Cooling ML1128005282010-12-29029 December 2010 NRC 2011 Hb Robinson ML1019304172010-05-0606 May 2010 Tritium Database Report RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2008-03-0707 March 2008 Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors RNP-RA/06-0062, Groundwater Protection - Data Collection Questionnaire2006-07-24024 July 2006 Groundwater Protection - Data Collection Questionnaire RNP-RA/06-0048, Request for Technical Specifications, Change Related to Containment Peak Pressure2006-07-17017 July 2006 Request for Technical Specifications, Change Related to Containment Peak Pressure RA-05-0104, Transmittal of Core Operating Limits Report2005-10-10010 October 2005 Transmittal of Core Operating Limits Report ML0414602462004-05-19019 May 2004 Q Report for Period Ending 03/31/2004 ML0324716322003-08-22022 August 2003 Submittal of 10-Q Report ML0318909362003-07-10010 July 2003 Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Brunswick, Crys ML0317000272003-06-0606 June 2003 Submittal of 10-O Report RNP-RA/02-0028, Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval2002-03-26026 March 2002 Request for Technical Specifications Change Re One-Time Extension of Containment Type a Test Interval 2021-08-25
[Table view] |
Text
August 25, 2021
Ernest J. Kapopoulos, Jr.
Site Vice President H. B. Robinson Steam Electric Plant Duke Energy Progress, LLC 3581 West Entrance Road, RNPA01 Hartsville, SC 29550
SUBJECT: UPDATED INSPECTION PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NUMBER 2 (Report 05000261 /2021005)
Dear M Kapopoulos :
The enclosed inspection plan lists the inspections scheduled through June 30, 2023 for the H.
B. Robinson Steam Electric Plant, Unit 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change In response to the COVID - 19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the RO Each planned inspection is being carefully reviewed in or der to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if neede This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID - 19 Telework Restriction s (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NR C guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about - nrc/covid - 19/security - ep/. Similarly, the NRC has developed guidance if force - on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID - 19 PH These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID - 19 PH The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID - 19 PH NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and schedulin The NRC will also be performing baseline inspections of licensee cyber security program The specific schedule and procedure to be used for these inspections is being developed by the NRC staf The staff expects to communicate the schedule for these inspections to each utility separatel E. Kapopoulos, J In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC s Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4628 with any questions you have regarding this lette
Sincerely,
/RA/
David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects
Docket No.: 05000261 License No.: DPR-23
Enclosure:
Robinson Inspection/Activity Plan (09/01/2021 - 06/30/2023)
cc w/encl : Distribution via LISTSERV Kapopoulos, J SUBJECT: UPDATED INSPECTION PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NUMBER 2 (Report 05000261/2021005) dated August 25, 2021
DISTRIBUTION: Kowal, RII Gibson, RII OE Mail RIDSNRRDRO RidsNrrPMRobinson Resource ROPassessment Resource ROPreports Resource PUBLIC
ADAMS ACCESSION NUMBER: ML21237A329 X SUNSI Review X Non -Sensitive X Publicly Available Sensitive n -Publiclyvlable
OFFICE I/DRP/B3 I/DRP/B3
ME Hamn Dcher TE 0 25/ 0 /
O FFIAL RERD COPY IP 22b Site Inspection Activity Plan Robinson
09/01/2021 - 06/30/2023
Unit Start End Activity CAC Title Staff Count
ROBINSON INITIAL LICENSE EXAM 3
2 9/18/2021 10/1/2021 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
SECURITY BASELINE INSPECTION 1
2 10/18/2021 10/22/2021 IP 71130.02 000734 Access Control
2 10/18/2021 10/22/2021 IP 71130.09 001656 Security Plan Changes
2 10/18/2021 10/22/2021 IP 71151 001338 Performance Indicator Verification
TARGET SET INSPECTION 2
2 10/25/2021 10/29/2021 IP 71130.14 000743 Review of Power Reactor Target Sets
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2
2 12/6/2021 12/10/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2 12/6/2021 12/10/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls
2 12/6/2021 12/10/2021 IP 71151 000746 Performance Indicator Verification
DUKE CORPORATE AA/FFD BASELINE SECURITY INSPECTION 2
2 1/10/2022 1/14/2022 IP 71130.01 000733 Access Authorization
2 1/10/2022 1/14/2022 IP 71130.08 000740 Fitness For Duty Program
SECURITY BASELINE INSPECTION 3
2 3/21/2022 3/25/2022 IP 71130.01 000733 Access Authorization
2 3/21/2022 3/25/2022 IP 71130.05 000737 Protective Strategy Evaluation
2 3/21/2022 3/25/2022 IP 71130.08 000740 Fitness For Duty Program
2 3/21/2022 3/25/2022 IP 71130.09 001656 Security Plan Changes
EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2
2 6/6/2022 6/10/2022 IP 71114.02 000717 Alert and Notification System Testing
2 6/6/2022 6/10/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
2 6/6/2022 6/10/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
2 6/6/2022 6/10/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness
2 6/6/2022 6/10/2022 IP 71151 001397 Performance Indicator Verification
PROBLEM IDENTIFICATION AND RESOLUTION 4
2 6/6/2022 6/24/2022 IP 71152B 000747 Problem Identification and Resolution
DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6
2 7/25/2022 7/29/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
2 8/8/2022 8/12/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
SECURITY BASELINE INSPECTION 3
2 9/12/2022 9/16/2022 IP 71130.02 000734 Access Control
Prepared on 8/25/2021 10:49:57 AM 1 of 2 IP 22b Site Inspection Activity Plan
2 9/12/2022 9/16/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
2 9/12/2022 9/16/2022 IP 71130.07 000739 Security Training
2 9/12/2022 9/16/2022 IP 71151 001338 Performance Indicator Verification
ROBINSON INITIAL LICENSE EXAM 3
2 8/29/2022 9/2/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
2 10/3/2022 10/14/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
UNIT 2 IN-SERVICE INSPECTION +SG 2
2 11/21/2022 11/25/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 4
2 11/28/2022 12/2/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2 11/28/2022 12/2/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
2 11/28/2022 12/2/2022 IP 71124.04 000728 Occupational Dose Assessment
2 11/28/2022 12/2/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation
2 11/28/2022 12/2/2022 IP 71151 000746 Performance Indicator Verification
CYBER SECURITY INSPECTION 2
2 5/1/2023 5/5/2023 IP 71130.10P 000741 Cyber Security
EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5
2 5/15/2023 5/19/2023 IP 71114.01 000716 Exercise Evaluation
2 5/15/2023 5/19/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
2 5/15/2023 5/19/2023 IP 71151 001397 Performance Indicator Verification
Prepared on 8/25/2021 10:49:57 AM 2 of 2