IR 05000261/2021005

From kanterella
(Redirected from ML21237A329)
Jump to navigation Jump to search
Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005)
ML21237A329
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/25/2021
From: David Dumbacher
NRC/RGN-II/DRP/RPB3
To: Kapopoulos E
Duke Energy Progress
References
IR 2021005
Download: ML21237A329 (5)


Text

August 25, 2021

Ernest J. Kapopoulos, Jr.

Site Vice President H. B. Robinson Steam Electric Plant Duke Energy Progress, LLC 3581 West Entrance Road, RNPA01 Hartsville, SC 29550

SUBJECT: UPDATED INSPECTION PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NUMBER 2 (Report 05000261 /2021005)

Dear M Kapopoulos :

The enclosed inspection plan lists the inspections scheduled through June 30, 2023 for the H.

B. Robinson Steam Electric Plant, Unit 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change In response to the COVID - 19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the RO Each planned inspection is being carefully reviewed in or der to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if neede This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID - 19 Telework Restriction s (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NR C guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about - nrc/covid - 19/security - ep/. Similarly, the NRC has developed guidance if force - on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID - 19 PH These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID - 19 PH The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID - 19 PH NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and schedulin The NRC will also be performing baseline inspections of licensee cyber security program The specific schedule and procedure to be used for these inspections is being developed by the NRC staf The staff expects to communicate the schedule for these inspections to each utility separatel E. Kapopoulos, J In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC s Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4628 with any questions you have regarding this lette

Sincerely,

/RA/

David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects

Docket No.: 05000261 License No.: DPR-23

Enclosure:

Robinson Inspection/Activity Plan (09/01/2021 - 06/30/2023)

cc w/encl : Distribution via LISTSERV Kapopoulos, J SUBJECT: UPDATED INSPECTION PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NUMBER 2 (Report 05000261/2021005) dated August 25, 2021

DISTRIBUTION: Kowal, RII Gibson, RII OE Mail RIDSNRRDRO RidsNrrPMRobinson Resource ROPassessment Resource ROPreports Resource PUBLIC

ADAMS ACCESSION NUMBER: ML21237A329 X SUNSI Review X Non -Sensitive X Publicly Available Sensitive n -Publiclyvlable

OFFICE I/DRP/B3 I/DRP/B3

ME Hamn Dcher TE 0 25/ 0 /

O FFIAL RERD COPY IP 22b Site Inspection Activity Plan Robinson

09/01/2021 - 06/30/2023

Unit Start End Activity CAC Title Staff Count

ROBINSON INITIAL LICENSE EXAM 3

2 9/18/2021 10/1/2021 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

SECURITY BASELINE INSPECTION 1

2 10/18/2021 10/22/2021 IP 71130.02 000734 Access Control

2 10/18/2021 10/22/2021 IP 71130.09 001656 Security Plan Changes

2 10/18/2021 10/22/2021 IP 71151 001338 Performance Indicator Verification

TARGET SET INSPECTION 2

2 10/25/2021 10/29/2021 IP 71130.14 000743 Review of Power Reactor Target Sets

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2

2 12/6/2021 12/10/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2 12/6/2021 12/10/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls

2 12/6/2021 12/10/2021 IP 71151 000746 Performance Indicator Verification

DUKE CORPORATE AA/FFD BASELINE SECURITY INSPECTION 2

2 1/10/2022 1/14/2022 IP 71130.01 000733 Access Authorization

2 1/10/2022 1/14/2022 IP 71130.08 000740 Fitness For Duty Program

SECURITY BASELINE INSPECTION 3

2 3/21/2022 3/25/2022 IP 71130.01 000733 Access Authorization

2 3/21/2022 3/25/2022 IP 71130.05 000737 Protective Strategy Evaluation

2 3/21/2022 3/25/2022 IP 71130.08 000740 Fitness For Duty Program

2 3/21/2022 3/25/2022 IP 71130.09 001656 Security Plan Changes

EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2

2 6/6/2022 6/10/2022 IP 71114.02 000717 Alert and Notification System Testing

2 6/6/2022 6/10/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

2 6/6/2022 6/10/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

2 6/6/2022 6/10/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness

2 6/6/2022 6/10/2022 IP 71151 001397 Performance Indicator Verification

PROBLEM IDENTIFICATION AND RESOLUTION 4

2 6/6/2022 6/24/2022 IP 71152B 000747 Problem Identification and Resolution

DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6

2 7/25/2022 7/29/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

2 8/8/2022 8/12/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

SECURITY BASELINE INSPECTION 3

2 9/12/2022 9/16/2022 IP 71130.02 000734 Access Control

Prepared on 8/25/2021 10:49:57 AM 1 of 2 IP 22b Site Inspection Activity Plan

2 9/12/2022 9/16/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

2 9/12/2022 9/16/2022 IP 71130.07 000739 Security Training

2 9/12/2022 9/16/2022 IP 71151 001338 Performance Indicator Verification

ROBINSON INITIAL LICENSE EXAM 3

2 8/29/2022 9/2/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 10/3/2022 10/14/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

UNIT 2 IN-SERVICE INSPECTION +SG 2

2 11/21/2022 11/25/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 4

2 11/28/2022 12/2/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2 11/28/2022 12/2/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

2 11/28/2022 12/2/2022 IP 71124.04 000728 Occupational Dose Assessment

2 11/28/2022 12/2/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation

2 11/28/2022 12/2/2022 IP 71151 000746 Performance Indicator Verification

CYBER SECURITY INSPECTION 2

2 5/1/2023 5/5/2023 IP 71130.10P 000741 Cyber Security

EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5

2 5/15/2023 5/19/2023 IP 71114.01 000716 Exercise Evaluation

2 5/15/2023 5/19/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

2 5/15/2023 5/19/2023 IP 71151 001397 Performance Indicator Verification

Prepared on 8/25/2021 10:49:57 AM 2 of 2