Similar Documents at Perry |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARPY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F3901999-10-14014 October 1999 Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20212K9271999-09-30030 September 1999 Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J1451999-09-30030 September 1999 Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed ML20217E7111999-09-30030 September 1999 Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained ML20212G4161999-09-24024 September 1999 Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED ML20212A8371999-09-13013 September 1999 Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions ML20217A8971999-09-0909 September 1999 Forwards Insp Rept 50-440/99-09 on 990709-0825.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages ML20211Q6911999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Perry Operator License Applicants During Wks of 010108 & 15.Validation of Exam Will Occur at Station During Wk of 001218 IR 05000440/19990011999-08-31031 August 1999 Requests That Page Number 4, P2 Status of EP Facilities, Equipment & Resources, of Insp Rept 50-440/99-01 Be Replaced with Encl Rev PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20210Q8421999-08-13013 August 1999 First Final Response to FOIA Request for Documents.Records Listed in App a Being Released in Entirety & Records Listed in App B Being Withheld in Part (Ref FOIA Exempt 5) ML20210R7861999-08-12012 August 1999 Forwards Insp Rept 50-440/99-12 on 990712-16.No Violations Noted.New Emergency Preparedness Program Staff & Mgt Personnel Were Professional & Proactive ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 ML20210Q7981999-08-10010 August 1999 Informs That Intention to Utilize Sulfuric Acid in Pnpp Circulating Water Sys to Lower Ph Is Anticipated to Be Completed in Nov ML20210Q5831999-08-10010 August 1999 Requests Permission to Chemically Treat CWS for Algae Due to Cooling Water Basin Becoming Infected with Algae of Various Types PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 ML20210K6331999-08-0404 August 1999 Submits Response to Requests for Addl Info to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, for Perry Nuclear Plant,Unit 1 PY-CEI-NRR-2417, Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-60001999-08-0202 August 1999 Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 ML20210G8411999-07-28028 July 1999 Informs That Based on Determination That Rev 14 Changes to Various Portions of Perry Nuclear Power Plant Emergency Plan Does Not Decrease Effectiveness of Licensee Emergency Plan & Meets Standard of 10CFR50.47(b),no NRC Approval Required ML20210E0661999-07-22022 July 1999 Forwards Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted.Overall Conduct of Activities at Perry Facility, Conservative & Professional with Continuing Focus on Safety PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld1999-07-21021 July 1999 Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-19019 July 1999 Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210A6441999-07-15015 July 1999 Advises That Listed Operator Licenses for Company Personnel Have Expired,As of 990715,per 10CFR50.74(a) & 10CFR55.5. Individuals Listed Have Assumed Responsibilities at Pnpp That Do Not Require Operator Licenses ML20209E5951999-07-0909 July 1999 Ltr Contract:Task Order 46, Perry Engineering & Technical Support (E&Ts) Insp, Under Contract NRC-03-98-021 ML20209D5931999-07-0101 July 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Investigation Rept 3-98-005 Issued on 990510.Corrective Actions Will Be Examined During Future Inspections ML20211A3881999-06-30030 June 1999 Supplements Re NRC Incomprehensible Enforcement Inactions.Understands That NRC Claiming Hands Tied in Matter Re Discrimination Violation at Perry Npp.Requests That NRC Take Listed Two Actions PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant1999-06-29029 June 1999 Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 9907061999-06-29029 June 1999 Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706 PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant1999-06-29029 June 1999 Submits Response to RAI Re GL 96-05 Program at Plant ML20196H9641999-06-29029 June 1999 Confirms 990615 Telcon Request with J Lieberman for Addl Time to Respond to Enforcement Action 99-012.FirstEnergy Has 60 Days to Respond to EA PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-19991999-06-28028 June 1999 Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999 ML20211A3991999-06-28028 June 1999 Submits Concerns Re Proposed Changes to Enforcement Policy. Believes That NRC Existing Regulations & Policies Provide Adequate Controls & That NRC Not Administering Consistent Enforcement Policies in Response to Discriminatory Actions ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 PY-CEI-NRR-2405, Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt1999-06-14014 June 1999 Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt ML20195H9051999-06-10010 June 1999 Forwards Two License Renewal Applications Consisting of NRC Form 398 & NRC Form 396 for Bk Carrier,License OP-30997 & Jt Steward,License OP-30564-1 ML20212H5841999-06-10010 June 1999 Responds to NRC Notice of Level III Violation Received by K Wierman.Corrective Actions:K Wierman Has Been Dismissed from Position at Perry NPP PY-CEI-NRR-2408, Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval1999-06-10010 June 1999 Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval ML20195G6741999-06-10010 June 1999 Forwards Insp Rept 50-440/99-03 on 990407-0517.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy PY-CEI-NRR-2407, Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records1999-06-0909 June 1999 Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARPY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect1999-10-13013 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect ML20212G5811999-09-23023 September 1999 Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55 PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-21021 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions1999-09-16016 September 1999 Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions ML20212D0151999-09-14014 September 1999 Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED PY-CEI-NRR-2431, Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages1999-09-0909 September 1999 Forwards Revised Emergency Plan for Perry NPP, IAW 10CFR50.54(q).Changes Constitute Revs,Temporary Changes or Reissued Pages PY-CEI-NRR-2425, Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.21999-08-26026 August 1999 Forwards Copy of Oh EPA Approval for Use of Nalco 7348 & Nalco 7468 at Pnpp,Iaw License NPF-58,App B,Epp,Section 3.2 PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20210S3961999-08-11011 August 1999 Requests That Ten Listed Individuals Be Registered to Take 991006 BWR Gfes of Written Operating Licensing Exam.Two Listed Personnel Will Have Access to Exams Before Exams Are Administered PY-CEI-NRR-2423, Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready1999-08-10010 August 1999 Provides Final Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Npps. Remediation of Meteorological Monitoring Sys Has Been Completed & Ppnp Facility Is Now Y2K Ready PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 9808261999-08-10010 August 1999 Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826 PY-CEI-NRR-2421, Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-9906301999-08-10010 August 1999 Forwards Semiannual fitness-for-duty Rept,Iaw 10CFR26.71(d) for Pnpp Covering Period of 990101-990630 PY-CEI-NRR-2417, Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-60001999-08-0202 August 1999 Forwards NP0059-007, Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval, IAW ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,Article IWA-6000 PY-CEI-NRR-2419, Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld1999-07-21021 July 1999 Forwards Four Copies of Rev 27 to Pnpp Security Plan,Per 10CFR50.54(p)(2).Changes Have Been Determined Not to Decrease Effectiveness of Security Plan.Rev Withheld PY-CEI-NRR-2415, Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-19019 July 1999 Submits Estimate of Number of Licensing Submittal for FY00 & 01,for Pnpp,Per Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210A6441999-07-15015 July 1999 Advises That Listed Operator Licenses for Company Personnel Have Expired,As of 990715,per 10CFR50.74(a) & 10CFR55.5. Individuals Listed Have Assumed Responsibilities at Pnpp That Do Not Require Operator Licenses ML20211A3881999-06-30030 June 1999 Supplements Re NRC Incomprehensible Enforcement Inactions.Understands That NRC Claiming Hands Tied in Matter Re Discrimination Violation at Perry Npp.Requests That NRC Take Listed Two Actions PY-CEI-NRR-2410, Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant1999-06-29029 June 1999 Submits Response to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Attachment 1 Provides Y2K Readiness Disclosure for Plant PY-CEI-NRR-2403, Submits Response to RAI Re GL 96-05 Program at Plant1999-06-29029 June 1999 Submits Response to RAI Re GL 96-05 Program at Plant PY-CEI-NRR-2413, Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 9907061999-06-29029 June 1999 Advises That Jk Wood Will Replace Lw Myers as Pnpp,Vice President - Nuclear,Effective 990706 PY-CEI-NRR-2412, Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-19991999-06-28028 June 1999 Forwards Perry Nuclear Plant Simulator Four Yr Test Rept & NRC Form 474, Simulation Facility Certification, Which Describes Tests Conducted from June 1995-1999 ML20211A3991999-06-28028 June 1999 Submits Concerns Re Proposed Changes to Enforcement Policy. Believes That NRC Existing Regulations & Policies Provide Adequate Controls & That NRC Not Administering Consistent Enforcement Policies in Response to Discriminatory Actions ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 PY-CEI-NRR-2405, Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt1999-06-14014 June 1999 Informs NRC That Pnpp Staff Has Implemented Formal Industry Position on Severe Accident Mgt ML20195H9051999-06-10010 June 1999 Forwards Two License Renewal Applications Consisting of NRC Form 398 & NRC Form 396 for Bk Carrier,License OP-30997 & Jt Steward,License OP-30564-1 ML20212H5841999-06-10010 June 1999 Responds to NRC Notice of Level III Violation Received by K Wierman.Corrective Actions:K Wierman Has Been Dismissed from Position at Perry NPP PY-CEI-NRR-2408, Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval1999-06-10010 June 1999 Forwards Rev 4 to Pump & Valve Inservice Testing Program Plan, Incorporating Changes to Program to Implement Second Ten Yr Insp Interval PY-CEI-NRR-2407, Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records1999-06-0909 June 1999 Responds to NRC Re Violations Noted in Investigations Rept 3-98-005.Corrective Actions:Initiated Internal Investigation Into Matter to Discover Party Responsible for Falsification of Training Records PY-CEI-NRR-2404, Submits Rept of Reduction in PCT Greater than 50 F Due to Implementation of Ge,Safr/Gestr LOCA Methodology for Fuel Cycle 8.Methodology Replaces Original LOCA Methodology1999-06-0707 June 1999 Submits Rept of Reduction in PCT Greater than 50 F Due to Implementation of Ge,Safr/Gestr LOCA Methodology for Fuel Cycle 8.Methodology Replaces Original LOCA Methodology ML20195E4561999-05-25025 May 1999 Submits Petition Per Other Actions Provision of 10CFR2.206,requesting That Radiation Protection Manager at Perry NPP Be Banned by NRC from Participation in Licensed Activities at & for Any NPP for at Least Five Yrs PY-CEI-NRR-2401, Forwards Changes to ERDS Data Point Library & Communication Survey for Perry Nuclear Power Plant.Changes Are Identified by Margin Rev Bars1999-05-20020 May 1999 Forwards Changes to ERDS Data Point Library & Communication Survey for Perry Nuclear Power Plant.Changes Are Identified by Margin Rev Bars PY-CEI-NRR-2402, Notifies of Completion of Plant Core Shroud Insp in Accordance with GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs,1999-05-18018 May 1999 Notifies of Completion of Plant Core Shroud Insp in Accordance with GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, PY-CEI-NRR-2394, Forwards Application for Order & Conforming License Amend for Transfer of Interest in OL NPF-58 for Pnpp.Authorization of Ceic to Possess Dl 13.74% Undivided Ownership in Pnpp, Requested1999-05-0505 May 1999 Forwards Application for Order & Conforming License Amend for Transfer of Interest in OL NPF-58 for Pnpp.Authorization of Ceic to Possess Dl 13.74% Undivided Ownership in Pnpp, Requested PY-CEI-NRR-2397, Forwards Revised COLR Cycle 8, & Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7,Cycle 8, IAW TS Section 5.6.51999-04-30030 April 1999 Forwards Revised COLR Cycle 8, & Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7,Cycle 8, IAW TS Section 5.6.5 PY-CEI-NRR-2396, Provides post-examination Results of Weld Overlay Repair for FW Nozzle to safe-end Weld at Pnpp.Info Supplements Licensee 990325 & 0401 Ltrs Submitted to NRC That Requested Approval of Repair Plan for 1B13-N1C-KB FW Nozzle to safe-en1999-04-28028 April 1999 Provides post-examination Results of Weld Overlay Repair for FW Nozzle to safe-end Weld at Pnpp.Info Supplements Licensee 990325 & 0401 Ltrs Submitted to NRC That Requested Approval of Repair Plan for 1B13-N1C-KB FW Nozzle to safe-end Weld 05000440/LER-1999-002, Forwards LER 99-002-00, LCO 3.0.3 Entered Due to TS Bases Statement Interpretation. Action Occurred After RHR Pump Failed to Start.Plant at No Time Was in Condition Where Required Decay Heat Removal System Were Not Available1999-04-26026 April 1999 Forwards LER 99-002-00, LCO 3.0.3 Entered Due to TS Bases Statement Interpretation. Action Occurred After RHR Pump Failed to Start.Plant at No Time Was in Condition Where Required Decay Heat Removal System Were Not Available PY-CEI-NRR-2388, Forwards Annual Environ & Effluent Release Rept for Pnnp Unit 1 for 1998. Pnpp Had No Liquid Effluent Discharges in 1998 & All Other Release Points Were Well Below Applicable Limits1999-04-22022 April 1999 Forwards Annual Environ & Effluent Release Rept for Pnnp Unit 1 for 1998. Pnpp Had No Liquid Effluent Discharges in 1998 & All Other Release Points Were Well Below Applicable Limits PY-CEI-NRR-2382, Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl1999-04-21021 April 1999 Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl PY-CEI-NRR-2371, Provides Suppl Response to Violations Noted in Insp Rept 50-440/98-18.Corrective Actions:Two Condition Rept Investigations Were Performed to Evaluate Issues Re Fire Protection Program & Addl Training Was Conducted1999-04-21021 April 1999 Provides Suppl Response to Violations Noted in Insp Rept 50-440/98-18.Corrective Actions:Two Condition Rept Investigations Were Performed to Evaluate Issues Re Fire Protection Program & Addl Training Was Conducted PY-CEI-NRR-2392, Forwards Diskette Containing Pnpp Thermoluminescent Dosimeter Doses in Format Requested by Reg Guide 8.7.Without Diskette1999-04-19019 April 1999 Forwards Diskette Containing Pnpp Thermoluminescent Dosimeter Doses in Format Requested by Reg Guide 8.7.Without Diskette PY-CEI-NRR-2387, Documents Telcon Held Between NRC Staff & Members of Perry Nuclear Power Plant Staff on 990406,re Safety Evaluation for License Amend 1051999-04-14014 April 1999 Documents Telcon Held Between NRC Staff & Members of Perry Nuclear Power Plant Staff on 990406,re Safety Evaluation for License Amend 105 PY-CEI-NRR-2386, Forwards Copy of Application Submitted to FERC Proposing Transfer of Jurisdictional Transmission Facilities of Firstenergy Corp Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing1999-04-0606 April 1999 Forwards Copy of Application Submitted to FERC Proposing Transfer of Jurisdictional Transmission Facilities of Firstenergy Corp Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing ML20206N3361999-04-0505 April 1999 Informs NRR of Continued Events Re Transfer of Generation Assets Between Duquesne Light Co & Firstenergy.No Negotiated Settlement Between Firstenergy & Local 270 Pertaining to Generation Asset Swap Has Been Reached PY-CEI-NRR-2383, Withdraws Inservice Exam Relief Requests IR-036 & IR-041, Submitted in Licensee to Nrc.Relief Request IR-041 Is Being Clarified with Respect to Alternative Proposed1999-04-0101 April 1999 Withdraws Inservice Exam Relief Requests IR-036 & IR-041, Submitted in Licensee to Nrc.Relief Request IR-041 Is Being Clarified with Respect to Alternative Proposed PY-CEI-NRR-2384, Provides Supplemental Info Re 990325 Request for Approval of Repair Plan for Feedwater Nozzle to safe-end Weld. Clarification Provided on Listed Three Items,Per 990329 Telcon with NRC1999-04-0101 April 1999 Provides Supplemental Info Re 990325 Request for Approval of Repair Plan for Feedwater Nozzle to safe-end Weld. Clarification Provided on Listed Three Items,Per 990329 Telcon with NRC L-99-052, Forwards Info Concerning Dls Decommissioning Planning for Bvps,Units 1 & 2 & Pnpp Unit 1.DL Is Continuing to Utilize External Sinking Funds to Provide Financial Assurance for Nuclear Decommissioning Funding1999-03-30030 March 1999 Forwards Info Concerning Dls Decommissioning Planning for Bvps,Units 1 & 2 & Pnpp Unit 1.DL Is Continuing to Utilize External Sinking Funds to Provide Financial Assurance for Nuclear Decommissioning Funding PY-CEI-NRR-2377, Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1)1999-03-29029 March 1999 Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1) ML20205H6171999-03-29029 March 1999 Forwards Util Consolidated Financial Statements for Twelve Month Period Ending 981231 & Internal Cash Flow Projection, Including Actual 1998 Data & Projections for 1999 PY-CEI-NRR-2380, Requests Approval of Attached Repair Plan for Feedwater Nozzle to safe-end Weld N4C-KB.Proposed Weld Overlay Design & Installation Plan Details Included in Attachment 1. Attachment 2 Provides Applicable Preliminary Weld Procedure1999-03-25025 March 1999 Requests Approval of Attached Repair Plan for Feedwater Nozzle to safe-end Weld N4C-KB.Proposed Weld Overlay Design & Installation Plan Details Included in Attachment 1. Attachment 2 Provides Applicable Preliminary Weld Procedure 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARPY-CEI-NRR-1226, Forwards LERs 90-018-00 & 90-019-00 for Plant1990-09-14014 September 1990 Forwards LERs 90-018-00 & 90-019-00 for Plant PY-CEI-NRR-1218, Responds to Generic Ltr 90-07 Re Proposed OL Exam Schedule, Operator Requalification Schedule & Generic Fundamental Exam Schedule for Plant.Licensee Will Continue to Train & Requalify Operators on Annual Basis1990-09-10010 September 1990 Responds to Generic Ltr 90-07 Re Proposed OL Exam Schedule, Operator Requalification Schedule & Generic Fundamental Exam Schedule for Plant.Licensee Will Continue to Train & Requalify Operators on Annual Basis ML20059E8741990-09-0505 September 1990 Forwards Fourteenth Quarterly Rept Cleveland Electric Illuminating Co Seismic Monitoring Network Jan-June 1990. Five Microevents Originating within Network & Three Other Events Originating Outside of Network Recorded PY-CEI-NRR-1216, Forwards Perry Nuclear Power Plant Unit 1 Semiannual Radioactive Effluent Release Rept,1990 Quarters 1 & 2. Response to Recommendations from NRC Re Range of Dilution Flows Will Be Submitted W/Next Effluent Rept1990-08-29029 August 1990 Forwards Perry Nuclear Power Plant Unit 1 Semiannual Radioactive Effluent Release Rept,1990 Quarters 1 & 2. Response to Recommendations from NRC Re Range of Dilution Flows Will Be Submitted W/Next Effluent Rept PY-CEI-NRR-1201, Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements1990-08-28028 August 1990 Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements PY-CEI-NRR-1211, Responds to NRC Re Violations Noted in Insp Rept 50-440/89-26.Corrective Actions Noted:Necessary Engineering Design Mods Which Evaluation Found Necessary Contained in DCP 90-00861990-08-23023 August 1990 Responds to NRC Re Violations Noted in Insp Rept 50-440/89-26.Corrective Actions Noted:Necessary Engineering Design Mods Which Evaluation Found Necessary Contained in DCP 90-0086 PY-CEI-NRR-1210, Proposes Date of 901207 to Provide Updated Status & Schedules,Per 900604 Request for Addl Info on Disposition of Bulletin 88-005 Product Forms Other than Pipe Fittings & Flanges Received at Plant1990-08-17017 August 1990 Proposes Date of 901207 to Provide Updated Status & Schedules,Per 900604 Request for Addl Info on Disposition of Bulletin 88-005 Product Forms Other than Pipe Fittings & Flanges Received at Plant PY-CEI-NRR-1208, Responds to NRC 900613 Request for Addl Info Re Inservice Insp Relief Requests.Util Revised Relief Requests PT-001 & PT-003 to Provide More Detailed Info & Has Withdrawn Relief Request IR-017.Revised Relief Requests & Summary Encl1990-08-10010 August 1990 Responds to NRC 900613 Request for Addl Info Re Inservice Insp Relief Requests.Util Revised Relief Requests PT-001 & PT-003 to Provide More Detailed Info & Has Withdrawn Relief Request IR-017.Revised Relief Requests & Summary Encl PY-CEI-NRR-1203, Provides Estimate Duration Schedule Re Installation of post-LOCA Neutron Monitoring Sys.Util Will Evaluate Effect of Resolution on Schedule & Confirm or Revise Installation Date as Needed,When Appeal & Criteria Questions Resolved1990-07-27027 July 1990 Provides Estimate Duration Schedule Re Installation of post-LOCA Neutron Monitoring Sys.Util Will Evaluate Effect of Resolution on Schedule & Confirm or Revise Installation Date as Needed,When Appeal & Criteria Questions Resolved PY-CEI-NRR-1200, Forwards Decommissioning Repts on Financial Assurance for Plant1990-07-25025 July 1990 Forwards Decommissioning Repts on Financial Assurance for Plant PY-CEI-NRR-1196, Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan1990-07-24024 July 1990 Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan PY-CEI-NRR-1205, Forwards LERs 90-014-00 & 90-015-00 for Plant1990-07-20020 July 1990 Forwards LERs 90-014-00 & 90-015-00 for Plant PY-CEI-NRR-1193, Responds to Generic Ltr 90-04 Re Implementation Status of Generic Safety Issues1990-06-29029 June 1990 Responds to Generic Ltr 90-04 Re Implementation Status of Generic Safety Issues ML20043H7371990-06-19019 June 1990 Forwards Individual Plant Exam Project Milestones.Milestones Subj to Change from Project or External Causes & Will Not Be Docketed Again Unless Significant Impact on Final Rept Contents or Submittal Date Exists ML20043H1711990-06-14014 June 1990 Discusses Util Radiological Safety Board of Ohio 900614 Comments on Notice of Opportunity for Hearing Re Rev to Previously Submitted License Amend Application.Licensees Would Welcome Opportunity to Consult W/State of Oh ML20043E5771990-06-0808 June 1990 Provides Info Re Implementation of Administrative Controls & Training Related to Use of Tech Spec 3.0.4.Util Intends to Implement Amend 30 Changes by 900618.All Licensed Operators Would Receive Training to Generic Ltr 87-09 ML20043B6981990-05-21021 May 1990 Forwards Info Re Activation Energy Values Utilized for Brand-Rex Co Cable at Facility.Encl Includes Rept, Qualification Tests of Electric Cables for Class 1E Svc in Nuclear Power Plants. ML20043A7041990-05-18018 May 1990 Forwards LERs 90-007-00 & 90-008-00 ML20043A4771990-05-16016 May 1990 Provides Justification Re Events Leading to Declaration of Alert on 900403 Due to Loss of Emergency Svc Water When Manway Flange Gasket Leak Developed at Pump a Discharge Strainer,In Response to Ocre 900406 Petition ML20042F4931990-05-0404 May 1990 Forwards Response to Generic Ltr 89-19 Re Reactor Vessel Overfill Protection ML20042F1961990-04-27027 April 1990 Informs of Adoption of Reorganization Plan Re Plants on 900424.Reorganization Will Make No Changes in Technical or Financial Qualifications for Plants.Application for Amends to Licenses Adding Company as Licensee Will Be Submitted ML20042F8051990-04-19019 April 1990 Forwards 1989 Financial Repts for Centerior Energy Corp, Cleveland Electric Illuminating Co & Toledo Edison Co & Supplemental Sec Form 10-K ML20012F3521990-04-0202 April 1990 Suppls Response to NRC 891215 Ltr Re Deviations Noted in Insp Rept 50-440/89-26.Corrective Actions:Profile of Heat Generation from Stored Fuel Vs Time for First Four Fuel Load Discharges Calculated & Design Changes Implemented ML20012E7811990-03-30030 March 1990 Confirms Basis for 890417 Submittal Re Station Blackout ML20012E9431990-03-26026 March 1990 Forwards Correction Pages to Semiannual Radioactive Effluent Release Rept 1989:Quarters 3 & 4. Changes Affect Liquid Effluent Data Only.Corrections Made Due to High Contribution of Sr-89 to Liquid Effluent Dose ML20012B9851990-03-0909 March 1990 Responds to Generic Ltr 90-01 Re Regulatory Impact Survey ML20012B5931990-03-0808 March 1990 Responds to Open Item Noted in Insp Rept 50-440/89-29. Corrective Actions:Plant Health Physicist & Operations Superintendent Met W/Health Physics & Operations Crews to Discuss Better Methods of Access Control ML20012A1561990-03-0202 March 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 & Addl Info in Response to NRC 890605 Ltr Re Offsite Dose Calculation Manual ML20012B9801990-03-0202 March 1990 Responds to 890810 Request for Addl Info on Util 890306 Tech Spec Change Request Re MSIV Leakage Limits.Change Does Not Request Increase in MSIV Leakage Beyond Currently Assumed in Updated SAR Chapter 15 ML20006E5131990-02-12012 February 1990 Lists Suggestions on Subj Areas to Be Addressed During Proposed 1990 Licensee Info Conference,In Response to 900117 Ltr ML20006E3211990-02-0909 February 1990 Discusses Implementation of Facility Revised Inservice Testing Program,Per Generic Ltr 89-04.Improvements Listed, Including sign-off Matrix Deletion at End of Instruction & Movement of Comments Section ML20006D0971990-02-0202 February 1990 Provides Update to 880721 Ltr Re Performance of Seismic Margin Evaluation.Util Awaiting Issuance of Individual Plant Exams of External Events Generic Ltr Prior to Proceeding W/ Seismic Margins Study ML20011E1841990-02-0202 February 1990 Forwards LERs 90-001 & 90-002 ML20006D5731990-01-30030 January 1990 Forwards Response to NRC 900112 Request for Addl Info Re 891121 Request for Exemption from Filing Requirements of 10CFR55.45(b)(2)(iii).Qualification Plan for Certification of Existing Simulator Approved in Aug 1987 ML20006B5131990-01-26026 January 1990 Responds to NRC Bulletin 89-002 Re Stress Corrosion Cracking of Type 410 Stainless Preloaded Bolting in Swing Check Valves.No Bolts Subj to Bulletin in Use at Facility ML20006B5571990-01-26026 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Procedures in Place for Underwater Insp of Intake Structures in Lake as Well as on-shore Pump Houses Annually ML20006A0781990-01-16016 January 1990 Responds to NRC 891215 Ltr Re Deviations Noted in Insp Rept 50-440/89-26.Corrective Actions:Profile of Heat Generation from Stored Fuel Vs Time for First Four Fuel Discharges Calculated & Updated SAR Change Request Will Be Submitted ML20005F9331990-01-0909 January 1990 Provides Inadvertently Omitted Inequality Signs from Util 891213 Response to NRC Bulletin 88-004 Re RCIC Pump Min Flow Limitations from Operating Instructions ML20042D5051990-01-0303 January 1990 Informs That Licensee Implemented fitness-for-duty Program at Plant on 900103,per 10CFR26.More Stringent cut-off Levels Imposed by Util than Required by 10CFR26 ML20005E1391989-12-28028 December 1989 Forwards Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance.Each motor- Operated Valve Will Be Stroke Tested to Verify Valve Operability at no-pressure & no-flow Conditions ML19332F7941989-12-13013 December 1989 Responds to NRC 890531 Request for Addl Info Re NRC Bulletin 88-004, Safety-Related Pump Loss. Info Covers pump-to-pump Interaction That Could Result in Deadheading & Adequacy of Min Flow Bypass Lines Against Pump Damage ML19332E6921989-12-0707 December 1989 Responds to Violations Noted in Insp Rept 50-440/89-12 on 890627 & 1023.Corrective Actions:Flange Leakage of Relief Valve Repaired During First Refueling Outage & Design Mods to Enhance Testability of Gasketed Flanges Being Developed ML19332F3851989-12-0606 December 1989 Forwards Twelfth Quarterly Rept Cleveland Electric Illuminating Seismic Monitoring Network,Jul-Sept 1989. Rept Describes Area in Vicinity of Two Waste Injection Wells Located 3 Miles South of Plant Site ML19332E7971989-12-0101 December 1989 Responds to Generic Ltr 89-21 Re Implementation Status of USIs ML19332E3611989-11-28028 November 1989 Submits Supplemental Info Re Tech Spec Change Request Proposing Addition of Requirement to Verify Trip Setpoint of Intermediate Range Monitor Control Rod Block Instrumentation During Performance of Weekly Channel Functional Testing ML19332D5771989-11-27027 November 1989 Submits Supplementary Info to 880520 Tech Spec Change Request,Changing Setpoints for Turbine First Stage Pressure to Reflect Values Actually Measured During Startup Test Program at 40% of Rated Reactor Power.Table Encl ML19332C7341989-11-22022 November 1989 Forwards Executed Amend 3 to Indemnity Agreement B-98 ML19332C4041989-11-22022 November 1989 Responds to NRC 891025 Ltr Re Violations Noted in Insp Rept 50-440/89-23.Corrective Actions:Work Stopped on Div III & Restoration Began to Return to Operation & All Actions Required by Tech Spec 3.0.3 Completed ML19332C8321989-11-21021 November 1989 Forwards Inservice Insp Summary Rept NP0059-0001, Results for Outage 1 (1989),First Period,First Interval, Vols I & Ii,Covering Insp Period 871118-890805 ML19332C4531989-11-21021 November 1989 Requests Exemption from Requirements of 10CFR45.(b)(2)(iii), to Allow for Submittal of NRC Form 474, Simulation Facility Certification, After 910326 Deadline 1990-09-05
[Table view] |
Text
- _
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY
~
P.O. BOX 97 5 PERRY, OHIO 44001 5 TELEPHONE (216) 259 3737 8 ADDRESS-10 CENTER ROAD FROM CLEVELAND: 241-1650 Serving The Best location in the Nation j Al Kaplan PERRY NUCLEAR POWER PLANT '
VICE PRESIDENT 94UCLEAR GROUP l
August 10, 1989 L PY-CE1/NRR-1049 L 1
l p
V l-l Director, Office of Enforcement l U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Reply to a Notice of Violation l Gentlemen:
Attachment 1 provides the Cleveland Electric Illuminating Company's (CEI) l _. reply to the Notice of Violation pursuant to 10CFR2.201 as required by the NRC l' Notice of Violation and Proposed Imposition ot Civil Penalty dated July 11, 1989.
Also enclosed is a check made payable to the Treasurer of the United States for payment of the civil penalty. Please feel free to contact us should you have any additional questions.
Very trul ur ,
g 4*
Al Kaplan Vice PreLident Nuclear Group Attachment AK:njc j cc: Regional Administrator, Region III Sr. Resident Inspector T. Colburn ,
fif 8908230256 6908.1O 'fl i
. ._f K0500fO yCf((f f,5 J
. m
, Attachm:nt l PY-CEI/NRR-1049 L Page 1 of 6 Reply to a Notice of Violation Restatement of Violation During an NRC inspection conducted during the period March 20 through April 19, 1989, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C, 53 Fed. Reg. 40019 (October 13, 1988) (Enforcement Policy), the Nuclear Regulatory Commission proposes to impose a civil penalty pursuant to Section 234 of the Atomic Energy Act of 1954, as amended (ACT), 42 U.S.C. 2282, and 10 CFR 2.205. The particular violation and the associated civil penalty are set forth talow:
10 CFR Part 50, Appendix B, Criterion XVI, " Corrective Action," requires that measures be established to assure that conditions adverse to quality, such as nonconformances, are identified and corrected. In the case of significant conditions adverse to quality, the measures shall assure that the cause of the condition is determined and corrective action taken to preclude repetition. The corrective action taken shall be documented and reported to appropriate levels of management.
A Notice of Violation and Proposed Imposition of Civil Penalty (hotice) (EA 87-206) was issued on February 11, 1988 which, in part, identified the following significant conditions adverse to quality:
- 1. Unqualified terminal blocks installed in Limitorque valve motor operators.
- 2. Target Rock solenoid operated valves with covers not installed in the environmentally qualified test configuration.
- 3. Limitorque valve motor operators with "T" drains improperly located to assure proper moisture drainage.
Contrary to the above, the licensee failed to assure that the above significant conditions adverse to quality were promptly identified and corrected in that further examples of-these problems were identified that had not been corrected as a result of actions taken in response to the Notice.
This is a Severity Level III violation (Supplement I).
---..____ i
. ,w Attachment PY-CEI/NRR-1049 L Page 2 of 6 Admission or Denial of the Alleged Violation The Cleveland Electric Illuminating Company (CEI) admits that the violation occurred as stated.
Reasons for (pe Violation As previously discussed with ,nembers of the NRC staff during the inspection and at the enforcement conference on May 11, 1989, the reason for the violation was a lack of sufficient detail and follow through with inspections /
checklists, and reliance upon inaccurate data in correcting the problems identified in the NRC Inspection Report 87-013. Each of the three examples is discussed in more detail below:
Unqualified terminal blocks in Limitorque valve motor operators The July, 1987 NRC Environmental Qualification (EO) Audit determined that the only terminal blocks the NRC considered qualified by the Perry documentation files for use in Limitorque motor operators were Marathon 300s. Later after discussions with the NRC this was expanded to also include General Electric (GE) model EB-5 terminal blocks. In response to this issue, CEI restated the position that certain other models were also considered qualified by CEI, but that all terminal blocks other than the Marathon 300 and GE EB-5 vould be replaced by Marathon 300s.
During the March 1989 NRC EO Inspection an EB-25 terminal block was discovered in a Limitorque motor operator where ve thought an EB-5 terminal block existed. Shortly after the inspection a KULKA 622 terminal block was found in a Limitorque motor operator where we thought a Marathon 300 terminal block vas installed.
In response to the 1987 inspection instead of performing a field inspection to determine what terminal blocks existed in the Limitorque valve motor operators, a list of terminal blocks was generated by the E0 element personnel reviewing data from a Limitorque rework program done in 1983 and 1984.
However, the data used was from earlier phases of the rework program which did not give true indication of the terminal blocks which existed in the plant.
The 1983/84 rework program was done as a result of a large number of industry problems with Limitorque valves. The program at Perry was divided into three separate phases.
Phase 1 of the program was a field inspection of all Limitorques in the program to identify the existing configuration of the Limitorques including the terminal blocks installed.
Phase 2 of the program took the results from the Phase 1 inspections and developed a valve specific list of what to modify / change out for each valve.
The final phase then removed the valve operators from the plant and reworked the operators in the maintenance shop per the procedures developed in Phase 2, and then reinstalled the valve operators back into the field.
L L
L Attechm:nt PY-CEI/NRR-1049 L Page 3 of 6 As stated above, when formulating the Limitorque valve operator terminal block l
list as part of the follovup to the 1987 EO Audit, that data was taken from Phase 1 and 2 which provided erroneous information. Using this incorrect input data, it was determined that there vere eleven Limitorque motor operators which had to be inspected due either to missing data points, or an indication of other than Marathon 300, GE EB-5 or Raychem splices. This resulted in two terminal blocks being changed to Marathon 300 blocks. In hindsight, although the other nine blocks were qualified, ve should have questioned the validity of the generated lists at that time since four of the terminal blocks found were different than indicated by the list. Ilovever, discrepancies were not evaluated as significant, and no further inspections were felt necessary in response to the 1987 NRC E0 Report Limitorque terminal block issue. These items cauced inaccurate information to be transmitted to the NRC and prevented CEI f. a taking proper corrective actions at that time.
Subsequent to the 1987 NRC EO Inspection we decided to establish a detailed inspection of Limitorque motor operators, due to continued industry issues being raised. Specification 2701 was written and approved in December 1988.
The inspections using the specification had begun prior to the March 1989 NRC EO Inspection.
Af ter finding the discrepancies in March 1989, we concluded that the corrective actions taken after the 1987 EQ Inspection vere not comprehensive enough to correct the deficiency.
Additionally, although not the root cause of the violation, several contributing factors also led to incorrect terminal blocks. These factors vere discussed in more detail at 'he enforcement conference and included:
- 1) failure to specifically address vendor information for KULKA terminal blocks 2) inadequate training of rework program personnel for the identification of terminal block types; and 3) inadequate control of terminal blocks in phase III of the rework program.
Target rock solenoid operated valves with covers not installed in the environmentally qualified test configuration During the 1987 NRC EQ Inspection, solenoid cover bolts were found missing en Target Rock solenoid valve covers. At that time we completed two separate actions. First, an analysis was performed to evaluate the environmental qualification effect of having up to three of the eight covers bolts missing.
This evaluation justified continued operation with this condition. Secondly, a 100% field inspection was performed of all Target Rock. solenoids covers.
Any bolts found missing during this inspection were replaced.
During the March 1989 inspection the NRC identified a Target Rock solenoid with two loose fasteners. Since the evaluation discussed above encompassed this condition operability was not a question. However, it was apparent that the corrective actions taken following the 1987 EQ Inspections did not verify tightness.
Ve have determined that there vere two areas that led to the loose cover bolts. First it as determined that the vendor had never supplied us with any torque instructi c.s for the bolts. Discussions with Target Rock identified detailed torque instructions for reassembly of the covers.
Attachm:nt PY-CEI/NRR-1049 L 1 Page 4 of 6 Secondly, during the 100% field inspection, the guidance given to the inspectors was to visually inspect for bolts, without giving any guidance to check for bolt tightness. Since the inspectors were not required to check for tightness, this was not performed.
Limitorque valve motor operators with "T" drains improperly located to assure proper moisture drainage. l l
During the 1987 E0 inspection a discrepancy was determined to exist in that i "T" drains on Limitorque motor operated valves were not properly located on d the low points of the Limitorque motor operator due to valve orientation.
The corrective action for this discrepancy was to perform a 100% field I inspection of Limitorque motor operators in a harsh environment to verify proper "T" drain location, and to install "T" drains if not properly installed. However, the maintenance personnel who performed the inspections were not provided with detailed training nor required to document their inspections, or findings. As such we can not determine whether all 166 Limitorque motor operators were actually inspected, nor the as found status of the valves at that time. It now appears that all of the Limitorque motor operators were not inspected. As part of the corrective action for finding the wrong terminal blocks in Limitorque motor operators, a detailed inspection of all 166 Limitorque motor operators was performed. This inspection identified thirteen Limitorque motor operaters without "T" orains that were required to have them.
Corrective Actions That Have Been Taken and the Results Achieved The corrective actions which have been taken for each of the items is discussed below:
Unqualified terminal blocks installed in Limitorque valve motor operators When the KULKA 622 te minal block was discovered the following action occurred:
- 1. The valve was declared inoperable since ve had no qualification data on the terminal block at that time.
- 2. . A decision was made to inspect all 1E Limitorque motor operators located in a E0 harsh environment not only for term.'nal blocks, but for all Limitorque Specification 2701 EQ requirements. To perform these inspections a small group of EQ element and Quality Assurance (OA) personnel vere given specific training on Limitorque EQ requirements, including proper terminal block identification.
- 3. The inspections were done during the first refueling outage. Besides the 24 KULKA 622 terminal blocks the following terminal blocks were also discovered:
1 Curtis L 15 Buchanan 211 1 Marathon 1600 2 Harathon 6004
p .g m Attachmznt
~ ' '
PY-CEI/NRR-1049 L Page 5 of 6
- 4. All'Limitorque= terminal blocks'which-were not Harathon 300s were replaced with either a Marathon 300 terminal block or a qualified Raychem splice.
This action vas completed by June 28, 1989.
- 5. Evaluations were completed on all~ terminal blocks found which provided justification for determining the terminal blocks were operable during the first fuel cycle. Those justifications were submitted to the NRC on
~ April 14,.1989 (PY-CEI/0IE-0246L) and June 5, 1989 (P7-CEI/01E-0351L).
- 6. The location and qualification of all other terminal blocks located in circuits for class lE devices in a harsh environment was verified by review of design / installation records, and confirmed by field walkdowns/ inspections.
- 7. The Limitorque motor operators configuration was captured on design output drawings. The data obtained from the Limitorque inspections was utilized in the development of these design output drawings. This vill prevent replacing Limitorque components such as the terminal blocks with a different.model without going through a formal design change process,
-and thus a formal evaluation of the change. This action was completed on August 4, 1989.
-As a result of the actions 'aken, all lE Limitorque motor operators located in an E0 harsh environment now have either a Marathon 300 terminal block, or a qualified Raychem splice installed.
.Tarcet Rock solenoid operated valves with covers not installed in the environmentally qualified test condition When the loose covered bolts were discovered the following corrective actions vere _ performed:
- 1. The vendor was contacted, and specific torquing requirements were
-obtained.
- 2. 100% of the Target. Rock solenoids were inspected and all bolts properly torqued. (a total of seven vere found with loose fasteners, one with a missing nut).
- 3. Repetitive tasks were written to inspect the bolts for proper torquing every refueling outage.
- 4. A review of similar applications was performed to see if specific torque requirements were identified. Vendors were contacted when specific requirements were not given and any specific torquing requirements
-received have'been incorporated into our specifications.
- 5. A decision was made to expand 0A surveillance during the refueling outage to cover other accessible E0 equipment. E0 element personnel aided in developing enhanced inspection checklists for these inspections.
These inspection vere performed from March 23 to June 6, 1989. This l
L _ __ - -_
l L
~
Attachm:nt PY-CEI/NRR-1049 L Page 6 of 6 inspection covered 24 man-veeks of work, and included inspection of 773 components. It should be noted that this was independent of the 221 inspections performed by the E0 element themselves (the Limitorque inspections, electrical penetration, etc). These combined inspections resulted in 994 E0 components of the total 1166 being inspected during
.the first refueling outage. The only components not inspected were components that were incessible due to plant configuration and radiation levels. Numerous discrepancies were identified during the QA surveillance, but Engineering evaluations determined that none of the conditions found impaired the operability or safety functions of the affected components'during the first operating cycle. All discrepancies found vere corrected by June 30, 1989 or determined to be acceptable as found.
As a result of the action taken the Target Rock solenoid cover bolts have been properly torqued with a repetitive task to verify proper torquing on a refueling outage basis. In addition, inspections verified the condition of over 85% of the plant's E0 components.
Limitorque valve motor operators with "T" drains improperly located to assure proper moisture drainage.
As discussed above it was determined that 100% of the lE Limitorque motor operators in an E0 harsh environment would be inspected. During these detailed inspeelions thirteen Limitorque motor operators that require "T" drains were foun3 vithout "T" drains. Two actions were taken to correct this deficiency. Fir st "T" drains were installed in all 13 Limitorque motor operators. This action was completed on June 28, 1989. Secondly, evaluations vere performed which justified the operability of the 13 valves for the first fuel cycle. Thia justification was submitted to the NRC on June 23, 1989 (PY-CEI/0IE-0352L).
As a result of these corrective actions, all Limitorque motor operators in a harsh environment that require "T" drains have them properly installed.
The Corrective Actions That Vill be Taken to Avoid Further Violations Although not an action to prevent recurrence, one generic enhancement vill be to establish a program within the E0 Element to increase awareness of field conditions and to increase communications. The program vill require E0 personnel's presence in the plant on a periodic basis to observe E0-related work in progress, to review specific plant concerns, and to conduct general plant valkdowns. Communications between the E0 element, the work groups, and 0A/0C will be improved not only through increased awareness and informal communications but also through a series of joint meetings to identify perceptions, problems, and resultant solutions. This program has already been established, and is administrative in nature requiring no procedure changes.
Date When Full Compliance Vill be Achieved Full compliance was achieved with the completion of all actions to restore the E0 components to a qualified condition on June 30, 1989.