| | . O U.S. NUCLEAR REGULATORY COMMISSION REGION I Report No. 85-09 Docket No. 70-371 License No. SNM-368 Priority 1 Category UHFF Licensee: UNC Naval Products Division, UNC Resources, Inc. |
| | 67 Sandy Desert Road Uncasville, Connecticut 06382 Facility Name: UNC Naval Products Inspection At: Montville, Connecticut Inspection Conducted- June 3-7, 1985 f |
| | Inspector: / AM(AE b - /m / 6D ' |
| | N W.'JT flicehouse,piation %eciaTist Approved by: |
| | OON 44) A A.M - |
| | 0 ti bl D 1 |
| | EI |
| | . Pasdfak, Chief " |
| | BWR Radiological Protection Section Inspection Summary: Inspection on June 3-7, 1985 (Report No. 70-371/85-09) |
| | Areas Inspected: Routine, unannounced inspection of the licensee's radiation protection program including: Previously Identified Items; Management Controls; Instruments and Equipment; Surveys; External Exposure Control; Internal Exposure Control; Bioassay; and Respiratory Protection. The inspection involved 34 hours onsite by one regionally-based inspector. |
| | Results: Of the areas inspected, one violation was identified, i.e. failure to make suitable measurements of airborne activity, Detail 8.2. However, the violation met the tests for a licensee identified item under 10 CFR 2, Appendix C, Section IV.A. No Notice of Violation is issued. |
| | 8507090057 850703 PDR ADOCK 07000371 C PDR |
| | |
| | g_ |
| | DETAILS |
| | : 1. Persons Contacted During the' course of this routine inspection, the following personnel were contacted or interviewed: |
| | * Mr.G. O. Amy, President and General Manager |
| | * Mr. R. J. Gregg, Director, Technical Services |
| | * Mr. W. Kirk, Manager, Nuclear and Industrial Safety |
| | * Mr. D. Luster, Health Physics Specialist |
| | * Denotes those present at the exit interview on June 7, 1985 Other licensee personnel were also contacted or interviewed during this inspection. |
| | : 2. Purpose The purpose of this routine inspection was to review the licensee's ongoing radiation protection program with respect to the following elements: |
| | Previously Identified Items Management Controls Instruments and Equipment Survey Program External Exposure Control Internal Exposure Control Bioassay Program Respiratory Protection Program |
| | -3. Previously Identified Items 3.1 (0 pen) Inspector Followup Item (70-371/82-08-01) Obtain information on the quantity of special nuclear materials (SNM) released from the septic tank system into the leach field. The licensee has set up 10 meter grids in both leach fields. Each grid will be surveyed with a gamma scintillation survey meter to select locations for soil samp-ling. Soil sampling is expected to be completed by mid-July 1985. |
| | Soil samples will be submitted for laboratory analysis of special nuclear material (SNM) content at that time.. |
| | 3.2 (0 pen) Inspector Followup Item (70-371/83-04-03) Removal of Dog Pen 2 from East End of Building M. The facility was approximately 50% empty. Further removal of stored drums was suspended pending licensee efforts to upgrade the shipping program.' Drums are examined for contamination whenever entries are made into the area. However, no routine contamination measurements are made at other times. |
| | |
| | 3 3.3 (0 pen) Inspector Followup Item (70-371/83-04-05) Issue of approved internal HP p'rocedures to techs. Approved internal health physics procedures have not been issued to the health physics technicians. |
| | The licensee has deferred action on this item pending completion of actions considered to be higher priority. |
| | 3.4 (0 pen) Violation (70-371/84-08-01) Licensee review of corrective action program regarding contamination surveys to assure that personnel are surveying when and as required. The licensee's contamination monitoring work stations were on schedule to meet a mid-July 1985 commitment. The June 1985 Monthly Awareness Session, (i.e. in-house training session), discussed the new system. The licensee completed re-indoctrination of all employees in May 1985. |
| | : 4. Management Controls The following aspects of the licensee's management controls in radiation protection were reviewed against conditions and specifications in the licensee's application for SNM License Number 368 (SNM-368) and criteria in 10 CFR Parts 19 and 20. |
| | 4.1 Audits and Inspections Thelicensek'sprogramfordailychecks,monthlyinspectionsand periodic audits of radiation protection activities was reviewed against criteria provided in Section 2.7, (" Inspections and Audits"), of the licensee's application for SNM-368. The licensee's performance relative to these criteria was determined by: |
| | discussions and. interviews of the Health Physics Specialist and members of his staff; review of monthly inspection reports by the Health Physics Specialist from January 1984 through April 1985; and review of an audit report t3 Ao rican Nuclear Insurers (Revision dated 1/7/85). |
| | Within the scope of this revsew, nu daviations from commitments made in the licensee's application were noted. |
| | 4.2 Health Physics Procedures Task Instructions, (i.e. health physics procedures) for various radiation protection activities were reviewed against criteria provided in 10 CFR 20 and commitments contained in Chapter 4, |
| | (" Health Physics Standards") and Subsection 2.5.2.4, (" Radiation Protection Instruction") of the licensee's application. The licensee's performance relative to these criteria and commitments |
| | .f , |
| | |
| | 4 was determined by interviews and discussions with health physics technicians and review of the Health Physics Manual (containing task instructions for various radiation protection activities). |
| | Within the scope of this review, no violations or deviations were noted. The inspector noted that the health physics technicians were knowledgeable in the task instructions although they did not have a controlled copy of the Health Physics Manual available for ready reference in their work area. |
| | 4.3 Instructions T_o Workers The licensee's program-for instruction of workers in radiation protection was reviewed against criteria in 10 CFR 19.12 and commitments in Section 2.8, (" Training") of the licensee's application. The licensee's performance relative to these criteria and commitments was determined by discussions with workers and review of a training program given on June 4,1985 to 5 newly hired employees. |
| | Within the scope of this review, no violations or deviations were noted. |
| | 4.4 Special Work Permits The issuance, adherence to and adequacy of the licensee's special work permits (SWPs) were reviewed against commitments provided in Subsection 4.6.3 ("Special Operations") of the licensee's application. The SWP process was reviewed by examination of the SWP Log, selected SWPs and associated radiation protection surveys and during discussions with health physics technicians. |
| | Within the scope of this review, no violations or deviations were noted. |
| | : 5. Instruments And Equipment The licensee's radiation protection instruments and equipment were reviewed for operability, proper alarm settings (as appropriate), |
| | functional testing and calibration relative to criteria and guidance provided in: |
| | ( - |
| | 10 CFR 70.24, (related to the criticality alarm system); |
| | l Section 4.5, (" Instrumentation"), of the licensee's application; J |
| | ANSI N 323-1978, "American National Standard Radiation Protection Instrumentation Test And Calibration;" |
| | Regulatory Guide 8.12, " Criticality Accident Alarm Systems;" and Regulatory Guide 8.25, " Calibration And Error Limits Of Air Sampling Instruments For Total Volume of Air Sampled." |
| | k n us - u . - u u. |
| | |
| | 5 The licensee's performance relative to these criteria and recommendations |
| | .was determined by interviews and discussions with cognizant health physics and maintenance personnel, review of testing and calibration procedures and records and direct observations during plant hours. |
| | Within the scope of this review, the following item was noted: |
| | The licensee used fixed air sampling stations to evaluate airborne radioactivity within the controlled area in Building "B" South. |
| | Each station consisted of a filter to collect potential radioactive contaminants and an air flow metering device to determine the total volume of air passing through the filter. Accurate determinations of the quantity of radioactive contaminant collected and the volume of air sampled were needed to evaluate airborne radioactivity within the controlled area. Although the licensee adequately calibrated laboratory counting instruments used to determine the quantity of radioactive contaminant collected on the filter, the licensee failed to calibrate the air flow metering devices used to determine total volume of air sampled. Regulatory Guide 8.25 recommends performance of an acceptable calibration of all air flow metering devices at least once every six months. |
| | Special calibrations are recommended whenever there is reason to believe that the operating characteristics of the metering device have changed (such as after repair or alteration or following observation.of changes in system performances). The calibration of the air flow metering devices in Building "B" South was discussed with the licensee and will be reviewed in a subsequent inspection. |
| | 371/85-09-01 |
| | : 6. Surveys |
| | -The licensee's program to measure and evaluate potential radiation and contamination hazards during routine and special plant activities was reviewed-against criteria established in: |
| | 10 CFR 20.201, " Surveys;" |
| | 10 CFR 20 @l, " Records of Surveys, Radiation Monitoring, And Disposal;" and Section 4.6, (" Plant Surveillance") of the licensee's application. |
| | 'The licensee's performance relative to these criteria was determined by discussions with health physics personnel, review of selected routine and L 'special surveillance records and leak tests of sealed sources and direct i observations and measurements by the inspector. |
| | Within the scope of this review, no violations were noted. |
| | |
| | 6 |
| | : 7. External Exposure Control The licensee's external. exposure control program was reviewed against criteria established in: |
| | 10 CFR 20.101, " Radiation Dose Standards For Individuals In Areas;" |
| | 10 CFR 20.102, " Determination of Prior Dose;" |
| | 10.CFR 20.104, " Exposure of Minces;" |
| | 10 CFR 20.202, " Personnel Monitoring;" |
| | 10 CFR 20.203, " Caution Signs, Labels, Signals And Controls;" |
| | 10 CFR 20.401, " Records of Surveys, Radiation Monitoring, And Disposal;" |
| | 10 CFR 70.24, " Criticality Accident Requirements;" and' Section 4.2, (" Personnel Monitoring") of the licensee's application. |
| | Performance relative to these criteria was determined by interviews of the Health Physics Specialist and members of his staff, review of external exposure records and direct observations and measurements. |
| | Within the scope of this review, no violations were noted. |
| | : 8. Internal Exposure Control TheLlicensee's internal exposure control program was reviewed against criteria provided in 10 CFR 20.103 and 10 CFR 20.203 and commitments in the following portions of the licensee's application: |
| | Subsection 4.1.1, " Surface Contamination;" |
| | Subsection 4.1.3, "In-Plant Action / Control Concentrations;" |
| | Subsection 4.2.2, " Maximum Permissible Exposure To Internal Radiation;" |
| | Subsection 4.4.1, " Zoning;" and Subsection 4.4.2, " Ventilation." |
| | 8.1 Contamination Control |
| | -The following aspects of the licensee's contamination control program were reviewed: |
| | contamination control work techniques including use of protective clothing, ventilation balancing and prompt correction and cleanup of contamination; timely dissemination of survey data on plant conditions for use in work planning and control; and evaluation of personal contamination at control points. |
| | The licensee's performance in these areas was determined by interviews of |
| | -selected workers in the controlled areas of Building "B" South; discussions with health physics technicians, observations at control points and review of selected records. |
| | Within the scope of this review, no violations were noted. |
| | |
| | 7 8.2 Air Sampling The following aspects of the licensee's air sampling program were reviewed: |
| | placement, representativeness and adequacy of the licensee's fixed air sampling locations; adequacy of procedures for collection and analysis of air samples; provisions for review and evaluation of air sampling data including investigation of abnormal results and the determination of trends; and maintenance of reports and records of airborne activity. |
| | The licensee's performance in these areas was determined by: |
| | interviews and discussions with Health Physics and Nuclear Materials Control personnel; review of selected procedures and air sampling data for selected areas in Building "B" South; and observations of air sampling locations and equipment during plant tours. |
| | Within the scope of this review, the following violation was noted: |
| | 10 CFR 20.103 (a)(3) requires, in part, that the licensee use suitable measurements of the concentrations of radioactive materials in air for detecting and evaluating airborne radioactivity in restricted areas. |
| | Contrary to this requirement, the licensee failed to make suitable measurements of the concentration of enriched uranium in air in the Scrap Retention Vault in Building "B" South on December 12-14, 1984, January 16-18, 1985, January 29-30, 1985 and February 8-11, 1985. The licensee used a fixed air sampler (No. I-848)'to determine concentrations of enriched uranium in air in the work area within the vault. The air sampler operated at a nominal flow rate of 20 liters per minute for 24 or more hours to sample the air in the work area. However, work activities in the area were 12 or less hours per day. The air samples taken did not constitute suitable measurements of the concentrations of enriched uranium in air since the samples averaged air concentrations during periods of inactivity as well as work activity and thus did not record peak concentrations during work activities. Calculations made by the inspector indicated that those peak concentrations were potentially in excess of the concentrations in 10 CFR 20, Appendix B, Table 1, Column 1. In calculating concentrations of airborne enriched uranium, the licensee used the entire sampling volume and, thus underestimated the concentrations during actual work activities. |
| | Prior to the inspection, the licensee had identified that concentrations of enriched uranium were potentially above 25% of concentrations in 10 CFR 20, Appendix B, Table 1, Column 1 during scrap sample sorting and |
| | |
| | . w 8 |
| | packaging in the Scrap Retention Vault. The licensee instituted an investigation and corrective action program to determine the causes of the increased activity noted on Air Sampler No. I-848 and to provide appropriate controls to minimize airborne exposures to workers. The inspector noted that: |
| | the apparent violation had been identified by the licensee prior to the inspection; the apparent-violation did not result in exposures to airborne enriched uranium in excess of 10 CFR 20.103 (a)(1); |
| | the apparent violation did not require reporting under NRC requirements; corrective actions including investigation, examination of engineering and procedural controls and administrative actions were underway; and the apparent violation was not a violation that could reasonably be expected to have been prevented by the licensee's corrective action for a previous violation. |
| | At the exit interview on June 7, 1985, the licensee stated that actions to identify and correct the causes for the increased airborne activity during scrap sample sorting and packaging would be completed by August 15, 1985. The inspector stated that those actions would be reviewed during a subsequent inspection. 70-371/85-09-02 |
| | : 9. Bioassay Program The licensee's bioassay program was reviewed relative to criteria, commitments and guidance provided in: |
| | 10 CFR 20.103, " Exposure Of Individuals To Concentrations Of Radioactive Materials In Air In Restricted Areas;" |
| | 10 CFR 20.401, " Records Of Surveys, Radiation Monitoring, And Disposal:" |
| | Subsection 4.2.3, (" Bioassay Program"), of the licensee's application; Regulatory Guide 8.11, " Applications of Bioassay For Uranium;" and WASH-1251, " Applications of Bioassay For Uranium." |
| | The following aspects of the licensee's bioassay program were reviewed: |
| | the extent of the bioassay program performed; the frequency and' type of biosssay employed; the selection of participants; 4 - |
| | the action levels for positive bioassay results exceeding administrative action levels; and the maintenance of records relating to the bioassay. |
| | The licensee's performance relative to the criteria, commitments and guidance in the areas examined was determined by interviews of the Health 7 Physics Specialist and members of his staff and examination of bioassay |
| | ; records for selected, potentially-exposed workers in Building "B" South. |
| | Within the scope of this review, no violations or deviations were noted. |
| | |
| | 9 |
| | - 10. Respiratory Protection The licensee's respiratory protection program was reviewed against criteria, commitments and guidance provided in: |
| | 10CFR 20.103, " Exposure Of Individuals To Concentrations Of Radioactive Materials In Air In Restricted Areas;" |
| | Section 4.3, (" Respiratory Protection Program"), of the licensee's application; and Regulatory Guide 8.15, " Acceptable Programs For Respiratory Protection." |
| | The licensee's performance relative to the criteria, commitments and guidance above was determined by discussions with health physics technicians, review of procedures.and Special Work Permits, examination of respiratory protective equipment and review of air sample survey data. The inspector noted that the licensee had not made allowance for the use of respiratory protective equipment in estimating exposures to airborne radioactivity during any of the work activities examined. |
| | Within the scope of this review, no violations or deviations were noted. |
| | : 11. Exit Interview The inspector met with the licensee's representatives (denoted in Paragraph 1) at the conclusion of the inspection on June 7, 1985. The inspector summarized the purpose and scope of the inspection and findings as described in this report. |
| | At no time during this inspection was written material provided to the |
| | ~ |
| | licensee by the inspector. No information exempt from disclosure under 10 CFR 2.790 was discussed in this report. |
| | i f |
| | i |
| | ~ |
| | i |
| | ., . . - _ _ _ ._ .-- -}} |
|
---|
Category:INSPECTION REPORT
MONTHYEARML20134M4881997-02-12012 February 1997 Insp Rept 70-0371/97-01 on 960916-17.No Violations Noted. Major Areas Inspected:Orise Radiological Scoping Survey ML20055H8441990-07-26026 July 1990 Insp Rept 70-0371/90-203 on 900710-13.No Violations or Deviations Noted.Details Withheld (Ref 10CFR2.790) ML20055G0461990-07-0505 July 1990 Insp Rept 70-0371/90-04 on 900618-21.Violation Noted.Major Areas Inspected:Records & Repts,Testing,Maint,Locks Keys & Combinations,Physical Barriers & Matl Access Areas ML20247Q9911989-09-21021 September 1989 Insp Rept 70-0371/89-03 on 890814-18.No Violations & Deviations Noted.Major Areas Inspected:Radiation Protection Program Including Status of Previously Identified Items & Implementation of Radiation Protection Program ML20245B0171989-06-14014 June 1989 Insp Rept 70-0371/89-202 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Mc&A Organization & Mgt,Measurements,Physical Inventories & Measurement Control & Statistics.Rept Details Withheld (Ref 10CFR2.790) ML20244D6811989-06-0606 June 1989 Partially Withheld SSNM Matl Control & Accounting Insp Rept 70-0371/89-201 (Ref 10CFR2.790).Major Areas Inspected: Facility Organization & Mgt Controls,Facility Operations & Internal Controls & Physical Inventory & Records & Repts ML20246K5591989-05-0202 May 1989 Partially Withheld Insp Rept 70-0371/88-200 on 881205-09 (Ref 10CFR2.790).Violations Noted.Major Areas Inspected: Facility Organization & Mgt,Operations & Internal Control & Records & Repts ML20246K7981989-05-0202 May 1989 Partially Withheld Insp Rept 70-0371/89-200 on 890410-14 (Ref 10CFR2.790(d)).Violation Noted Re Use of Measurement for SNM Which Exceeded Control Limit.Major Areas Inspected: Facility Organization & Mgt & Records & Repts ML20245D1681989-04-0707 April 1989 Insp Rept 70-0371/89-02 on 890313-16.No Violations or Deviations Noted.Major Areas Inspected:Operations,Nuclear Criticality Safety,Organization & Licensing Activities ML20236B6981989-01-27027 January 1989 Insp Rept 70-0371/88-12 on 881205-09.Violations Noted.Major Areas Inspected:Measurement Control & Statistics & Followup on inspector-identified Items ML20205R2141988-10-31031 October 1988 Physical Security Insp Rept 70-0371/88-08 on 880912-16.Major Areas Inspected:Plan & Implementing Procedures,Mgt Effectiveness,Organization,Records & Repts,Testing & Maint, Locks,Keys & Combinations & Security Sys Power Supply ML20195D0291988-10-0505 October 1988 Insp Rept 70-0371/88-09 on 880912-14.No Violations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Organization & Mgt Controls,Facility Operation & Internal Controls ML20151Y3331988-08-0909 August 1988 Matl Control & Accounting Insp Rept 70-0371/88-07 on 880712- 15.Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Operations & Internal Controls & Records & Repts ML20151Q4371988-07-0101 July 1988 Insp Rept 70-0371/88-06 on 880608-09.No Violations Noted. Major Areas Inspected:Measurement Control Program for SNM ML20154J9261988-05-17017 May 1988 Insp Rept 70-0371/88-03 on 880314-18.Violations Noted.Major Areas Inspected:Plan Implementing Procedures,Mgt Effectiveness,Organization.Program Audit,Records & Repts, Testing & Maint & Security Sys Power Supply ML20151N1081988-04-15015 April 1988 Insp Rept 70-0371/88-05 on 880321-25.No Violations Noted. Major Areas Inspected:Facility Operations,Internal Controls & Physical Inventory ML20151W7261988-04-14014 April 1988 Insp Rept 70-0371/88-04 on 880321-25.No Violations Noted Major Areas Inspected:Measurement Control Program for SNM ML20151C2441988-04-0505 April 1988 Insp Rept 70-0371/88-02 on 880229-0318.Violations & Unresolved Items Noted.Major Areas Inspected:Radiation Protection Program,Status of Previously Identified Items, Radwaste Mgt,Training & Implementation ML20151R2541988-03-31031 March 1988 Insp Rept 70-0371/88-01 on 880201-05 & 16-19.No Violations Noted.Major Areas Inspected:Measurement Sys for SNM & Soil Sampling of Contaminated Area ML20149D8151987-12-28028 December 1987 Physical Security Insp Rept 70-0371/87-09 on 871116 & 17.No Noncompliance Noted.Major Areas Inspected:Night Firearms Qualification,Personnel & Package Searches & Matl Access Area Control ML20237E5911987-12-11011 December 1987 Insp Rept 70-0371/87-08 on 871102-06.Violation Noted.Major Areas Inspected:Internal Exposure Controls & Implementation of Radiation Program ML20237E3691987-12-0404 December 1987 Insp Rept 70-0371/87-06 on 870824-26.No Violations or Deviations Noted.Major Areas Inspected:Operations,Nuclear Criticality Safety,Organization,Environ Protection & Nonroutine Events ML20236X8641987-11-13013 November 1987 Insp Rept 70-0371/87-07 on 870921-25.No Violations & Deviations Noted.Major Areas Inspected:Organization & Mgt Controls,Operations & Internal Controls,Measurement Sys & Records & Repts ML20236G3821987-10-19019 October 1987 Matl Control & Accounting Insp Rept 70-0371/87-04 on 870609- 12.No Violation Noted.Major Areas Inspected:Facility Organization & Mgt Controls,Operations & Internal Controls & Licensee Action on Previously Identified Enforcement Item ML20236K7311987-07-27027 July 1987 Physical Security Insp Rept 70-0371/87-05 on 870615-18. No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts & Locks,Keys & Combinations ML20216H6931987-06-19019 June 1987 Insp Repts 70-0371/87-03 & 70-0820/87-01 on 870518-22.No Violations Noted.Major Areas Inspected:Licensee Radiation Program,Including Status of Previously Identified Items,Mgt Oversight & Controls & Training of Personnel ML20209D3911987-04-20020 April 1987 Insp Rept 70-0371/87-02 on 870316-20.No Noncompliance Noted. Major Areas Inspected:Physical Inventory,Facility Operations & Internal Controls ML20211F9431987-02-17017 February 1987 Matl Control & Accounting Insp Rept 70-0371/87-01 on 870112-16.No Noncompliance Noted.Major Areas Inspected: Physical Inventory of SNM ML20206D5391987-02-0606 February 1987 Insp Rept 70-0371/86-11 on 860929-1003.No Violations or Deviations Noted.Major Areas Inspected:Safety Review of Operational Conditions to Determine Potential Safety Hazards That Could Impact Public Health & Safety ML20212B0201987-01-22022 January 1987 Insp Rept 70-0371/86-13 on 861208-12.No Violations Noted. Major Areas Inspected:Measurement Control Program for SNM ML20210U5581987-01-0909 January 1987 Matl Control & Accounting Insp Rept 70-0371/86-12 on 861201-05.No Noncompliance Noted.Major Areas Inspected: Nuclear Matl Control & Accounting,Including Facility Organization & Mgt Controls & Records & Repts ML20212K9571986-12-31031 December 1986 Insp Rept 70-0371/86-07 on 860721-25.Violation Noted:Failure to Maintain Record of Nuclear Criticality Safety Insp Conducted During Months of Jan,Mar & May 1986 ML20214X2321986-11-0505 November 1986 Matl Control & Accounting Insp Rept 70-0371/86-08 on 860908-12.No Noncompliance Noted.Major Areas Inspected: Measurement Control Program for SNM ML20214F4281986-11-0505 November 1986 Insp Rept 70-0371/86-10 on 860915-19.Violation Noted:Failure to Perform Mgt Review & Audit of Nuclear Matl Control, Accounting Procedures,Records & Ongoing SNM Measurements Control Program within Required 12 Months ML20211F8491986-10-20020 October 1986 Insp Rept 70-0371/86-09 on 860915-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Officer Program,Including Status of Previously Identified Items & Mgt Oversight & Controls ML20207E3991986-07-0909 July 1986 Matl Control & Accounting Insp Rept 70-0371/86-06 on 860602- 06.No Noncompliance Noted.Major Areas Inspected:Facility Operations & Internal Controls & Records & Repts ML20203A3341986-07-0909 July 1986 Matl Control & Accounting Insp Rept 70-0371/86-05 on 860519- 23.No Noncompliance Noted.Major Areas Inspected:Physical Inventory,Facility Operations & Internal Controls ML20198R5361986-05-30030 May 1986 Physical Security Insp Rept 70-0371/86-04 on 860428-0502.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts,Locks,Keys & Combinations ML20211C1461986-05-21021 May 1986 Insp Rept 70-0371/86-02 on 860303-07.Violations Noted: Failure to Post Table in Electron Beam Welding Room W/ Nuclear Safety Limits,Use of Unauthorized Locations for Storage or Processing of SNM & Inadequate Sampling ML20203P3221986-04-22022 April 1986 Partially Withheld Matl Control & Accounting Insp Rept 70-0371/86-03 on 860317-21 (Ref 10CFR2.790).Violation Noted: Failure to Affix tamper-safe Seals Described in Fundamental Nuclear Matl Control Plan ML20154M9581986-03-0707 March 1986 Safeguards Insp Rept 70-0371/85-15 on 850716-19.Major Areas Inspected:Site Security Program Exercise,Including Safeguards Contingency Plan & Procedures.Exercise Comprehensive & Objectives Accomplished ML20154A3211986-02-12012 February 1986 Insp Rept 70-0371/86-01 on 860114-17.No Noncompliance Noted. Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Organization & Mgt Controls,Operations & Internal Controls & Records & Repts IR 05000930/20100041985-11-25025 November 1985 Matl Control & Accounting Insp Rept 70-0371/85-14 on 850930-1004.No Noncompliance Noted.Major Areas Inspected: Measurement Control & Statistics ML20198J0941985-10-22022 October 1985 Insp Rept 70-0371/85-12 on 850819-21.No Violations or Deviations Noted.Major Areas Inspected:Operations,Radwaste Mgt,Transportation Activities & Licensing Action on Previous Enforcement Items ML20138L1951985-10-17017 October 1985 Insp Rept 70-0371/85-13 on 850903-06.No Noncompliance Noted. Major Areas Inspected:Facility Operations,Internal Controls & Physical Inventory ML20133F3751985-09-0606 September 1985 Matl Control & Accounting Insp Rept 70-0371/85-11 on 850722-26.No Noncompliance Noted.Major Areas Inspected: Facility Organization & Mgt Controls,Operation & Internal Controls & Measurement Sys ML20136B5321985-09-0606 September 1985 Physical Security Insp Rept 70-0371/85-10 on 850716-19.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Locks,Keys & Combinations & Physical Barriers ML20135H6931985-08-23023 August 1985 Matl Control & Accounting Insp Rept 70-0371/85-08 on 850610-14.No Noncompliance Noted.Major Areas Inspected: Measurement Sys & Measurement Control & Statistics ML20137X5861985-07-15015 July 1985 Insp Rept 70-0371/85-06 on 850429-0503.Violations Noted: Failure to Post & Follow Requirements of Nuclear Safety Authorizations in Two Areas of Plant & Failure to Maintain Facility Organization ML20128G1261985-06-27027 June 1985 Insp Rept 70-0371/85-09 on 850603-07.Violation Noted:Failure to Make Suitable Measurements of Airborne Activity 1997-02-12
[Table view] Category:MANUFACTURER/VENDOR/ENGINEER
MONTHYEARML20055H8441990-07-26026 July 1990 Insp Rept 70-0371/90-203 on 900710-13.No Violations or Deviations Noted.Details Withheld (Ref 10CFR2.790) ML20055G0461990-07-0505 July 1990 Insp Rept 70-0371/90-04 on 900618-21.Violation Noted.Major Areas Inspected:Records & Repts,Testing,Maint,Locks Keys & Combinations,Physical Barriers & Matl Access Areas ML20247Q9911989-09-21021 September 1989 Insp Rept 70-0371/89-03 on 890814-18.No Violations & Deviations Noted.Major Areas Inspected:Radiation Protection Program Including Status of Previously Identified Items & Implementation of Radiation Protection Program ML20245B0171989-06-14014 June 1989 Insp Rept 70-0371/89-202 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Mc&A Organization & Mgt,Measurements,Physical Inventories & Measurement Control & Statistics.Rept Details Withheld (Ref 10CFR2.790) ML20246K7981989-05-0202 May 1989 Partially Withheld Insp Rept 70-0371/89-200 on 890410-14 (Ref 10CFR2.790(d)).Violation Noted Re Use of Measurement for SNM Which Exceeded Control Limit.Major Areas Inspected: Facility Organization & Mgt & Records & Repts ML20245D1681989-04-0707 April 1989 Insp Rept 70-0371/89-02 on 890313-16.No Violations or Deviations Noted.Major Areas Inspected:Operations,Nuclear Criticality Safety,Organization & Licensing Activities ML20236B6981989-01-27027 January 1989 Insp Rept 70-0371/88-12 on 881205-09.Violations Noted.Major Areas Inspected:Measurement Control & Statistics & Followup on inspector-identified Items ML20205R2141988-10-31031 October 1988 Physical Security Insp Rept 70-0371/88-08 on 880912-16.Major Areas Inspected:Plan & Implementing Procedures,Mgt Effectiveness,Organization,Records & Repts,Testing & Maint, Locks,Keys & Combinations & Security Sys Power Supply ML20151Q4371988-07-0101 July 1988 Insp Rept 70-0371/88-06 on 880608-09.No Violations Noted. Major Areas Inspected:Measurement Control Program for SNM ML20154J9261988-05-17017 May 1988 Insp Rept 70-0371/88-03 on 880314-18.Violations Noted.Major Areas Inspected:Plan Implementing Procedures,Mgt Effectiveness,Organization.Program Audit,Records & Repts, Testing & Maint & Security Sys Power Supply ML20151N1081988-04-15015 April 1988 Insp Rept 70-0371/88-05 on 880321-25.No Violations Noted. Major Areas Inspected:Facility Operations,Internal Controls & Physical Inventory ML20151W7261988-04-14014 April 1988 Insp Rept 70-0371/88-04 on 880321-25.No Violations Noted Major Areas Inspected:Measurement Control Program for SNM ML20151C2441988-04-0505 April 1988 Insp Rept 70-0371/88-02 on 880229-0318.Violations & Unresolved Items Noted.Major Areas Inspected:Radiation Protection Program,Status of Previously Identified Items, Radwaste Mgt,Training & Implementation ML20151R2541988-03-31031 March 1988 Insp Rept 70-0371/88-01 on 880201-05 & 16-19.No Violations Noted.Major Areas Inspected:Measurement Sys for SNM & Soil Sampling of Contaminated Area ML20149D8151987-12-28028 December 1987 Physical Security Insp Rept 70-0371/87-09 on 871116 & 17.No Noncompliance Noted.Major Areas Inspected:Night Firearms Qualification,Personnel & Package Searches & Matl Access Area Control ML20237E5911987-12-11011 December 1987 Insp Rept 70-0371/87-08 on 871102-06.Violation Noted.Major Areas Inspected:Internal Exposure Controls & Implementation of Radiation Program ML20237E3691987-12-0404 December 1987 Insp Rept 70-0371/87-06 on 870824-26.No Violations or Deviations Noted.Major Areas Inspected:Operations,Nuclear Criticality Safety,Organization,Environ Protection & Nonroutine Events ML20236X8641987-11-13013 November 1987 Insp Rept 70-0371/87-07 on 870921-25.No Violations & Deviations Noted.Major Areas Inspected:Organization & Mgt Controls,Operations & Internal Controls,Measurement Sys & Records & Repts ML20236K7311987-07-27027 July 1987 Physical Security Insp Rept 70-0371/87-05 on 870615-18. No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts & Locks,Keys & Combinations ML20216H6931987-06-19019 June 1987 Insp Repts 70-0371/87-03 & 70-0820/87-01 on 870518-22.No Violations Noted.Major Areas Inspected:Licensee Radiation Program,Including Status of Previously Identified Items,Mgt Oversight & Controls & Training of Personnel ML20209D3911987-04-20020 April 1987 Insp Rept 70-0371/87-02 on 870316-20.No Noncompliance Noted. Major Areas Inspected:Physical Inventory,Facility Operations & Internal Controls ML20206D5391987-02-0606 February 1987 Insp Rept 70-0371/86-11 on 860929-1003.No Violations or Deviations Noted.Major Areas Inspected:Safety Review of Operational Conditions to Determine Potential Safety Hazards That Could Impact Public Health & Safety ML20212B0201987-01-22022 January 1987 Insp Rept 70-0371/86-13 on 861208-12.No Violations Noted. Major Areas Inspected:Measurement Control Program for SNM ML20210U5581987-01-0909 January 1987 Matl Control & Accounting Insp Rept 70-0371/86-12 on 861201-05.No Noncompliance Noted.Major Areas Inspected: Nuclear Matl Control & Accounting,Including Facility Organization & Mgt Controls & Records & Repts ML20212K9571986-12-31031 December 1986 Insp Rept 70-0371/86-07 on 860721-25.Violation Noted:Failure to Maintain Record of Nuclear Criticality Safety Insp Conducted During Months of Jan,Mar & May 1986 ML20214F4281986-11-0505 November 1986 Insp Rept 70-0371/86-10 on 860915-19.Violation Noted:Failure to Perform Mgt Review & Audit of Nuclear Matl Control, Accounting Procedures,Records & Ongoing SNM Measurements Control Program within Required 12 Months ML20214X2321986-11-0505 November 1986 Matl Control & Accounting Insp Rept 70-0371/86-08 on 860908-12.No Noncompliance Noted.Major Areas Inspected: Measurement Control Program for SNM ML20211F8491986-10-20020 October 1986 Insp Rept 70-0371/86-09 on 860915-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Officer Program,Including Status of Previously Identified Items & Mgt Oversight & Controls ML20203A3341986-07-0909 July 1986 Matl Control & Accounting Insp Rept 70-0371/86-05 on 860519- 23.No Noncompliance Noted.Major Areas Inspected:Physical Inventory,Facility Operations & Internal Controls ML20207E3991986-07-0909 July 1986 Matl Control & Accounting Insp Rept 70-0371/86-06 on 860602- 06.No Noncompliance Noted.Major Areas Inspected:Facility Operations & Internal Controls & Records & Repts ML20198R5361986-05-30030 May 1986 Physical Security Insp Rept 70-0371/86-04 on 860428-0502.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts,Locks,Keys & Combinations ML20211C1461986-05-21021 May 1986 Insp Rept 70-0371/86-02 on 860303-07.Violations Noted: Failure to Post Table in Electron Beam Welding Room W/ Nuclear Safety Limits,Use of Unauthorized Locations for Storage or Processing of SNM & Inadequate Sampling ML20203P3221986-04-22022 April 1986 Partially Withheld Matl Control & Accounting Insp Rept 70-0371/86-03 on 860317-21 (Ref 10CFR2.790).Violation Noted: Failure to Affix tamper-safe Seals Described in Fundamental Nuclear Matl Control Plan ML20154M9581986-03-0707 March 1986 Safeguards Insp Rept 70-0371/85-15 on 850716-19.Major Areas Inspected:Site Security Program Exercise,Including Safeguards Contingency Plan & Procedures.Exercise Comprehensive & Objectives Accomplished ML20154A3211986-02-12012 February 1986 Insp Rept 70-0371/86-01 on 860114-17.No Noncompliance Noted. Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Organization & Mgt Controls,Operations & Internal Controls & Records & Repts IR 05000930/20100041985-11-25025 November 1985 Matl Control & Accounting Insp Rept 70-0371/85-14 on 850930-1004.No Noncompliance Noted.Major Areas Inspected: Measurement Control & Statistics ML20198J0941985-10-22022 October 1985 Insp Rept 70-0371/85-12 on 850819-21.No Violations or Deviations Noted.Major Areas Inspected:Operations,Radwaste Mgt,Transportation Activities & Licensing Action on Previous Enforcement Items ML20138L1951985-10-17017 October 1985 Insp Rept 70-0371/85-13 on 850903-06.No Noncompliance Noted. Major Areas Inspected:Facility Operations,Internal Controls & Physical Inventory ML20133F3751985-09-0606 September 1985 Matl Control & Accounting Insp Rept 70-0371/85-11 on 850722-26.No Noncompliance Noted.Major Areas Inspected: Facility Organization & Mgt Controls,Operation & Internal Controls & Measurement Sys ML20136B5321985-09-0606 September 1985 Physical Security Insp Rept 70-0371/85-10 on 850716-19.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Locks,Keys & Combinations & Physical Barriers ML20135H6931985-08-23023 August 1985 Matl Control & Accounting Insp Rept 70-0371/85-08 on 850610-14.No Noncompliance Noted.Major Areas Inspected: Measurement Sys & Measurement Control & Statistics ML20137X5861985-07-15015 July 1985 Insp Rept 70-0371/85-06 on 850429-0503.Violations Noted: Failure to Post & Follow Requirements of Nuclear Safety Authorizations in Two Areas of Plant & Failure to Maintain Facility Organization ML20128G1261985-06-27027 June 1985 Insp Rept 70-0371/85-09 on 850603-07.Violation Noted:Failure to Make Suitable Measurements of Airborne Activity ML20133D3371985-06-25025 June 1985 Insp Rept 70-0371/85-07 on 850506-10.No Noncompliance Noted. Major Areas Inspected:Measurement Sys,Records & Repts ML20129E3181985-05-10010 May 1985 Insp Rept 70-0371/85-05 on 850226.Violation Noted:Hole in Bottom of Drum 1-13 Containing Shipment of SNM Which Violated Requirement That Matls Should Be Packaged in Strong,Tight Packages ML20055C1191982-07-22022 July 1982 IE Insp Rept 70-0371/82-08 on 820713-16.No Noncompliance Noted.Major Areas Inspected:Organization,Facility Changes & Mods,Review of Operations & Transportation Activities ML20055B4241982-06-24024 June 1982 IE Safeguards Insp Rept 70-0371/82-05 on 820525-28.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accounting.Details Withheld (Ref 10CFR2.790) ML20148U2441978-11-18018 November 1978 IE Inspec Rept 70-371/78-15 on 780925-28 During Which 1 Item of Noncompliance Was Noted:Failure to Follow Procedures: Attaching Safety Instructions to Work Permit & Improper Parking of Fuel Storage Carts ML20054L2651975-05-30030 May 1975 IE Insp Rept 70-0371/75-06 on 750516.No Noncompliance Noted. Major Areas Inspected:General Plant Tour,Independent Measurements,General Gamma Levels & Removeable Contamination 1990-07-05
[Table view] Category:INSPECTION REPORT
MONTHYEARML20134M4881997-02-12012 February 1997 Insp Rept 70-0371/97-01 on 960916-17.No Violations Noted. Major Areas Inspected:Orise Radiological Scoping Survey ML20055H8441990-07-26026 July 1990 Insp Rept 70-0371/90-203 on 900710-13.No Violations or Deviations Noted.Details Withheld (Ref 10CFR2.790) ML20055G0461990-07-0505 July 1990 Insp Rept 70-0371/90-04 on 900618-21.Violation Noted.Major Areas Inspected:Records & Repts,Testing,Maint,Locks Keys & Combinations,Physical Barriers & Matl Access Areas ML20247Q9911989-09-21021 September 1989 Insp Rept 70-0371/89-03 on 890814-18.No Violations & Deviations Noted.Major Areas Inspected:Radiation Protection Program Including Status of Previously Identified Items & Implementation of Radiation Protection Program ML20245B0171989-06-14014 June 1989 Insp Rept 70-0371/89-202 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Mc&A Organization & Mgt,Measurements,Physical Inventories & Measurement Control & Statistics.Rept Details Withheld (Ref 10CFR2.790) ML20244D6811989-06-0606 June 1989 Partially Withheld SSNM Matl Control & Accounting Insp Rept 70-0371/89-201 (Ref 10CFR2.790).Major Areas Inspected: Facility Organization & Mgt Controls,Facility Operations & Internal Controls & Physical Inventory & Records & Repts ML20246K5591989-05-0202 May 1989 Partially Withheld Insp Rept 70-0371/88-200 on 881205-09 (Ref 10CFR2.790).Violations Noted.Major Areas Inspected: Facility Organization & Mgt,Operations & Internal Control & Records & Repts ML20246K7981989-05-0202 May 1989 Partially Withheld Insp Rept 70-0371/89-200 on 890410-14 (Ref 10CFR2.790(d)).Violation Noted Re Use of Measurement for SNM Which Exceeded Control Limit.Major Areas Inspected: Facility Organization & Mgt & Records & Repts ML20245D1681989-04-0707 April 1989 Insp Rept 70-0371/89-02 on 890313-16.No Violations or Deviations Noted.Major Areas Inspected:Operations,Nuclear Criticality Safety,Organization & Licensing Activities ML20236B6981989-01-27027 January 1989 Insp Rept 70-0371/88-12 on 881205-09.Violations Noted.Major Areas Inspected:Measurement Control & Statistics & Followup on inspector-identified Items ML20205R2141988-10-31031 October 1988 Physical Security Insp Rept 70-0371/88-08 on 880912-16.Major Areas Inspected:Plan & Implementing Procedures,Mgt Effectiveness,Organization,Records & Repts,Testing & Maint, Locks,Keys & Combinations & Security Sys Power Supply ML20195D0291988-10-0505 October 1988 Insp Rept 70-0371/88-09 on 880912-14.No Violations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Organization & Mgt Controls,Facility Operation & Internal Controls ML20151Y3331988-08-0909 August 1988 Matl Control & Accounting Insp Rept 70-0371/88-07 on 880712- 15.Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Operations & Internal Controls & Records & Repts ML20151Q4371988-07-0101 July 1988 Insp Rept 70-0371/88-06 on 880608-09.No Violations Noted. Major Areas Inspected:Measurement Control Program for SNM ML20154J9261988-05-17017 May 1988 Insp Rept 70-0371/88-03 on 880314-18.Violations Noted.Major Areas Inspected:Plan Implementing Procedures,Mgt Effectiveness,Organization.Program Audit,Records & Repts, Testing & Maint & Security Sys Power Supply ML20151N1081988-04-15015 April 1988 Insp Rept 70-0371/88-05 on 880321-25.No Violations Noted. Major Areas Inspected:Facility Operations,Internal Controls & Physical Inventory ML20151W7261988-04-14014 April 1988 Insp Rept 70-0371/88-04 on 880321-25.No Violations Noted Major Areas Inspected:Measurement Control Program for SNM ML20151C2441988-04-0505 April 1988 Insp Rept 70-0371/88-02 on 880229-0318.Violations & Unresolved Items Noted.Major Areas Inspected:Radiation Protection Program,Status of Previously Identified Items, Radwaste Mgt,Training & Implementation ML20151R2541988-03-31031 March 1988 Insp Rept 70-0371/88-01 on 880201-05 & 16-19.No Violations Noted.Major Areas Inspected:Measurement Sys for SNM & Soil Sampling of Contaminated Area ML20149D8151987-12-28028 December 1987 Physical Security Insp Rept 70-0371/87-09 on 871116 & 17.No Noncompliance Noted.Major Areas Inspected:Night Firearms Qualification,Personnel & Package Searches & Matl Access Area Control ML20237E5911987-12-11011 December 1987 Insp Rept 70-0371/87-08 on 871102-06.Violation Noted.Major Areas Inspected:Internal Exposure Controls & Implementation of Radiation Program ML20237E3691987-12-0404 December 1987 Insp Rept 70-0371/87-06 on 870824-26.No Violations or Deviations Noted.Major Areas Inspected:Operations,Nuclear Criticality Safety,Organization,Environ Protection & Nonroutine Events ML20236X8641987-11-13013 November 1987 Insp Rept 70-0371/87-07 on 870921-25.No Violations & Deviations Noted.Major Areas Inspected:Organization & Mgt Controls,Operations & Internal Controls,Measurement Sys & Records & Repts ML20236G3821987-10-19019 October 1987 Matl Control & Accounting Insp Rept 70-0371/87-04 on 870609- 12.No Violation Noted.Major Areas Inspected:Facility Organization & Mgt Controls,Operations & Internal Controls & Licensee Action on Previously Identified Enforcement Item ML20236K7311987-07-27027 July 1987 Physical Security Insp Rept 70-0371/87-05 on 870615-18. No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts & Locks,Keys & Combinations ML20216H6931987-06-19019 June 1987 Insp Repts 70-0371/87-03 & 70-0820/87-01 on 870518-22.No Violations Noted.Major Areas Inspected:Licensee Radiation Program,Including Status of Previously Identified Items,Mgt Oversight & Controls & Training of Personnel ML20209D3911987-04-20020 April 1987 Insp Rept 70-0371/87-02 on 870316-20.No Noncompliance Noted. Major Areas Inspected:Physical Inventory,Facility Operations & Internal Controls ML20211F9431987-02-17017 February 1987 Matl Control & Accounting Insp Rept 70-0371/87-01 on 870112-16.No Noncompliance Noted.Major Areas Inspected: Physical Inventory of SNM ML20206D5391987-02-0606 February 1987 Insp Rept 70-0371/86-11 on 860929-1003.No Violations or Deviations Noted.Major Areas Inspected:Safety Review of Operational Conditions to Determine Potential Safety Hazards That Could Impact Public Health & Safety ML20212B0201987-01-22022 January 1987 Insp Rept 70-0371/86-13 on 861208-12.No Violations Noted. Major Areas Inspected:Measurement Control Program for SNM ML20210U5581987-01-0909 January 1987 Matl Control & Accounting Insp Rept 70-0371/86-12 on 861201-05.No Noncompliance Noted.Major Areas Inspected: Nuclear Matl Control & Accounting,Including Facility Organization & Mgt Controls & Records & Repts ML20212K9571986-12-31031 December 1986 Insp Rept 70-0371/86-07 on 860721-25.Violation Noted:Failure to Maintain Record of Nuclear Criticality Safety Insp Conducted During Months of Jan,Mar & May 1986 ML20214X2321986-11-0505 November 1986 Matl Control & Accounting Insp Rept 70-0371/86-08 on 860908-12.No Noncompliance Noted.Major Areas Inspected: Measurement Control Program for SNM ML20214F4281986-11-0505 November 1986 Insp Rept 70-0371/86-10 on 860915-19.Violation Noted:Failure to Perform Mgt Review & Audit of Nuclear Matl Control, Accounting Procedures,Records & Ongoing SNM Measurements Control Program within Required 12 Months ML20211F8491986-10-20020 October 1986 Insp Rept 70-0371/86-09 on 860915-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Officer Program,Including Status of Previously Identified Items & Mgt Oversight & Controls ML20207E3991986-07-0909 July 1986 Matl Control & Accounting Insp Rept 70-0371/86-06 on 860602- 06.No Noncompliance Noted.Major Areas Inspected:Facility Operations & Internal Controls & Records & Repts ML20203A3341986-07-0909 July 1986 Matl Control & Accounting Insp Rept 70-0371/86-05 on 860519- 23.No Noncompliance Noted.Major Areas Inspected:Physical Inventory,Facility Operations & Internal Controls ML20198R5361986-05-30030 May 1986 Physical Security Insp Rept 70-0371/86-04 on 860428-0502.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts,Locks,Keys & Combinations ML20211C1461986-05-21021 May 1986 Insp Rept 70-0371/86-02 on 860303-07.Violations Noted: Failure to Post Table in Electron Beam Welding Room W/ Nuclear Safety Limits,Use of Unauthorized Locations for Storage or Processing of SNM & Inadequate Sampling ML20203P3221986-04-22022 April 1986 Partially Withheld Matl Control & Accounting Insp Rept 70-0371/86-03 on 860317-21 (Ref 10CFR2.790).Violation Noted: Failure to Affix tamper-safe Seals Described in Fundamental Nuclear Matl Control Plan ML20154M9581986-03-0707 March 1986 Safeguards Insp Rept 70-0371/85-15 on 850716-19.Major Areas Inspected:Site Security Program Exercise,Including Safeguards Contingency Plan & Procedures.Exercise Comprehensive & Objectives Accomplished ML20154A3211986-02-12012 February 1986 Insp Rept 70-0371/86-01 on 860114-17.No Noncompliance Noted. Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Organization & Mgt Controls,Operations & Internal Controls & Records & Repts IR 05000930/20100041985-11-25025 November 1985 Matl Control & Accounting Insp Rept 70-0371/85-14 on 850930-1004.No Noncompliance Noted.Major Areas Inspected: Measurement Control & Statistics ML20198J0941985-10-22022 October 1985 Insp Rept 70-0371/85-12 on 850819-21.No Violations or Deviations Noted.Major Areas Inspected:Operations,Radwaste Mgt,Transportation Activities & Licensing Action on Previous Enforcement Items ML20138L1951985-10-17017 October 1985 Insp Rept 70-0371/85-13 on 850903-06.No Noncompliance Noted. Major Areas Inspected:Facility Operations,Internal Controls & Physical Inventory ML20133F3751985-09-0606 September 1985 Matl Control & Accounting Insp Rept 70-0371/85-11 on 850722-26.No Noncompliance Noted.Major Areas Inspected: Facility Organization & Mgt Controls,Operation & Internal Controls & Measurement Sys ML20136B5321985-09-0606 September 1985 Physical Security Insp Rept 70-0371/85-10 on 850716-19.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Locks,Keys & Combinations & Physical Barriers ML20135H6931985-08-23023 August 1985 Matl Control & Accounting Insp Rept 70-0371/85-08 on 850610-14.No Noncompliance Noted.Major Areas Inspected: Measurement Sys & Measurement Control & Statistics ML20137X5861985-07-15015 July 1985 Insp Rept 70-0371/85-06 on 850429-0503.Violations Noted: Failure to Post & Follow Requirements of Nuclear Safety Authorizations in Two Areas of Plant & Failure to Maintain Facility Organization ML20128G1261985-06-27027 June 1985 Insp Rept 70-0371/85-09 on 850603-07.Violation Noted:Failure to Make Suitable Measurements of Airborne Activity 1997-02-12
[Table view] Category:NRC-GENERATED
MONTHYEARML20134M4881997-02-12012 February 1997 Insp Rept 70-0371/97-01 on 960916-17.No Violations Noted. Major Areas Inspected:Orise Radiological Scoping Survey ML20055H8441990-07-26026 July 1990 Insp Rept 70-0371/90-203 on 900710-13.No Violations or Deviations Noted.Details Withheld (Ref 10CFR2.790) ML20055G0461990-07-0505 July 1990 Insp Rept 70-0371/90-04 on 900618-21.Violation Noted.Major Areas Inspected:Records & Repts,Testing,Maint,Locks Keys & Combinations,Physical Barriers & Matl Access Areas ML20247Q9911989-09-21021 September 1989 Insp Rept 70-0371/89-03 on 890814-18.No Violations & Deviations Noted.Major Areas Inspected:Radiation Protection Program Including Status of Previously Identified Items & Implementation of Radiation Protection Program ML20245B0171989-06-14014 June 1989 Insp Rept 70-0371/89-202 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Mc&A Organization & Mgt,Measurements,Physical Inventories & Measurement Control & Statistics.Rept Details Withheld (Ref 10CFR2.790) ML20244D6811989-06-0606 June 1989 Partially Withheld SSNM Matl Control & Accounting Insp Rept 70-0371/89-201 (Ref 10CFR2.790).Major Areas Inspected: Facility Organization & Mgt Controls,Facility Operations & Internal Controls & Physical Inventory & Records & Repts ML20246K5591989-05-0202 May 1989 Partially Withheld Insp Rept 70-0371/88-200 on 881205-09 (Ref 10CFR2.790).Violations Noted.Major Areas Inspected: Facility Organization & Mgt,Operations & Internal Control & Records & Repts ML20246K7981989-05-0202 May 1989 Partially Withheld Insp Rept 70-0371/89-200 on 890410-14 (Ref 10CFR2.790(d)).Violation Noted Re Use of Measurement for SNM Which Exceeded Control Limit.Major Areas Inspected: Facility Organization & Mgt & Records & Repts ML20245D1681989-04-0707 April 1989 Insp Rept 70-0371/89-02 on 890313-16.No Violations or Deviations Noted.Major Areas Inspected:Operations,Nuclear Criticality Safety,Organization & Licensing Activities ML20236B6981989-01-27027 January 1989 Insp Rept 70-0371/88-12 on 881205-09.Violations Noted.Major Areas Inspected:Measurement Control & Statistics & Followup on inspector-identified Items ML20205R2141988-10-31031 October 1988 Physical Security Insp Rept 70-0371/88-08 on 880912-16.Major Areas Inspected:Plan & Implementing Procedures,Mgt Effectiveness,Organization,Records & Repts,Testing & Maint, Locks,Keys & Combinations & Security Sys Power Supply ML20195D0291988-10-0505 October 1988 Insp Rept 70-0371/88-09 on 880912-14.No Violations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Organization & Mgt Controls,Facility Operation & Internal Controls ML20151Y3331988-08-0909 August 1988 Matl Control & Accounting Insp Rept 70-0371/88-07 on 880712- 15.Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Operations & Internal Controls & Records & Repts ML20151Q4371988-07-0101 July 1988 Insp Rept 70-0371/88-06 on 880608-09.No Violations Noted. Major Areas Inspected:Measurement Control Program for SNM ML20154J9261988-05-17017 May 1988 Insp Rept 70-0371/88-03 on 880314-18.Violations Noted.Major Areas Inspected:Plan Implementing Procedures,Mgt Effectiveness,Organization.Program Audit,Records & Repts, Testing & Maint & Security Sys Power Supply ML20151N1081988-04-15015 April 1988 Insp Rept 70-0371/88-05 on 880321-25.No Violations Noted. Major Areas Inspected:Facility Operations,Internal Controls & Physical Inventory ML20151W7261988-04-14014 April 1988 Insp Rept 70-0371/88-04 on 880321-25.No Violations Noted Major Areas Inspected:Measurement Control Program for SNM ML20151C2441988-04-0505 April 1988 Insp Rept 70-0371/88-02 on 880229-0318.Violations & Unresolved Items Noted.Major Areas Inspected:Radiation Protection Program,Status of Previously Identified Items, Radwaste Mgt,Training & Implementation ML20151R2541988-03-31031 March 1988 Insp Rept 70-0371/88-01 on 880201-05 & 16-19.No Violations Noted.Major Areas Inspected:Measurement Sys for SNM & Soil Sampling of Contaminated Area ML20149D8151987-12-28028 December 1987 Physical Security Insp Rept 70-0371/87-09 on 871116 & 17.No Noncompliance Noted.Major Areas Inspected:Night Firearms Qualification,Personnel & Package Searches & Matl Access Area Control ML20237E5911987-12-11011 December 1987 Insp Rept 70-0371/87-08 on 871102-06.Violation Noted.Major Areas Inspected:Internal Exposure Controls & Implementation of Radiation Program ML20237E3691987-12-0404 December 1987 Insp Rept 70-0371/87-06 on 870824-26.No Violations or Deviations Noted.Major Areas Inspected:Operations,Nuclear Criticality Safety,Organization,Environ Protection & Nonroutine Events ML20236X8641987-11-13013 November 1987 Insp Rept 70-0371/87-07 on 870921-25.No Violations & Deviations Noted.Major Areas Inspected:Organization & Mgt Controls,Operations & Internal Controls,Measurement Sys & Records & Repts ML20236G3821987-10-19019 October 1987 Matl Control & Accounting Insp Rept 70-0371/87-04 on 870609- 12.No Violation Noted.Major Areas Inspected:Facility Organization & Mgt Controls,Operations & Internal Controls & Licensee Action on Previously Identified Enforcement Item ML20236K7311987-07-27027 July 1987 Physical Security Insp Rept 70-0371/87-05 on 870615-18. No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts & Locks,Keys & Combinations ML20216H6931987-06-19019 June 1987 Insp Repts 70-0371/87-03 & 70-0820/87-01 on 870518-22.No Violations Noted.Major Areas Inspected:Licensee Radiation Program,Including Status of Previously Identified Items,Mgt Oversight & Controls & Training of Personnel ML20209D3911987-04-20020 April 1987 Insp Rept 70-0371/87-02 on 870316-20.No Noncompliance Noted. Major Areas Inspected:Physical Inventory,Facility Operations & Internal Controls ML20211F9431987-02-17017 February 1987 Matl Control & Accounting Insp Rept 70-0371/87-01 on 870112-16.No Noncompliance Noted.Major Areas Inspected: Physical Inventory of SNM ML20206D5391987-02-0606 February 1987 Insp Rept 70-0371/86-11 on 860929-1003.No Violations or Deviations Noted.Major Areas Inspected:Safety Review of Operational Conditions to Determine Potential Safety Hazards That Could Impact Public Health & Safety ML20212B0201987-01-22022 January 1987 Insp Rept 70-0371/86-13 on 861208-12.No Violations Noted. Major Areas Inspected:Measurement Control Program for SNM ML20210U5581987-01-0909 January 1987 Matl Control & Accounting Insp Rept 70-0371/86-12 on 861201-05.No Noncompliance Noted.Major Areas Inspected: Nuclear Matl Control & Accounting,Including Facility Organization & Mgt Controls & Records & Repts ML20212K9571986-12-31031 December 1986 Insp Rept 70-0371/86-07 on 860721-25.Violation Noted:Failure to Maintain Record of Nuclear Criticality Safety Insp Conducted During Months of Jan,Mar & May 1986 ML20214X2321986-11-0505 November 1986 Matl Control & Accounting Insp Rept 70-0371/86-08 on 860908-12.No Noncompliance Noted.Major Areas Inspected: Measurement Control Program for SNM ML20214F4281986-11-0505 November 1986 Insp Rept 70-0371/86-10 on 860915-19.Violation Noted:Failure to Perform Mgt Review & Audit of Nuclear Matl Control, Accounting Procedures,Records & Ongoing SNM Measurements Control Program within Required 12 Months ML20211F8491986-10-20020 October 1986 Insp Rept 70-0371/86-09 on 860915-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Officer Program,Including Status of Previously Identified Items & Mgt Oversight & Controls ML20207E3991986-07-0909 July 1986 Matl Control & Accounting Insp Rept 70-0371/86-06 on 860602- 06.No Noncompliance Noted.Major Areas Inspected:Facility Operations & Internal Controls & Records & Repts ML20203A3341986-07-0909 July 1986 Matl Control & Accounting Insp Rept 70-0371/86-05 on 860519- 23.No Noncompliance Noted.Major Areas Inspected:Physical Inventory,Facility Operations & Internal Controls ML20198R5361986-05-30030 May 1986 Physical Security Insp Rept 70-0371/86-04 on 860428-0502.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts,Locks,Keys & Combinations ML20211C1461986-05-21021 May 1986 Insp Rept 70-0371/86-02 on 860303-07.Violations Noted: Failure to Post Table in Electron Beam Welding Room W/ Nuclear Safety Limits,Use of Unauthorized Locations for Storage or Processing of SNM & Inadequate Sampling ML20203P3221986-04-22022 April 1986 Partially Withheld Matl Control & Accounting Insp Rept 70-0371/86-03 on 860317-21 (Ref 10CFR2.790).Violation Noted: Failure to Affix tamper-safe Seals Described in Fundamental Nuclear Matl Control Plan ML20154M9581986-03-0707 March 1986 Safeguards Insp Rept 70-0371/85-15 on 850716-19.Major Areas Inspected:Site Security Program Exercise,Including Safeguards Contingency Plan & Procedures.Exercise Comprehensive & Objectives Accomplished ML20154A3211986-02-12012 February 1986 Insp Rept 70-0371/86-01 on 860114-17.No Noncompliance Noted. Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Organization & Mgt Controls,Operations & Internal Controls & Records & Repts IR 05000930/20100041985-11-25025 November 1985 Matl Control & Accounting Insp Rept 70-0371/85-14 on 850930-1004.No Noncompliance Noted.Major Areas Inspected: Measurement Control & Statistics ML20198J0941985-10-22022 October 1985 Insp Rept 70-0371/85-12 on 850819-21.No Violations or Deviations Noted.Major Areas Inspected:Operations,Radwaste Mgt,Transportation Activities & Licensing Action on Previous Enforcement Items ML20138L1951985-10-17017 October 1985 Insp Rept 70-0371/85-13 on 850903-06.No Noncompliance Noted. Major Areas Inspected:Facility Operations,Internal Controls & Physical Inventory ML20133F3751985-09-0606 September 1985 Matl Control & Accounting Insp Rept 70-0371/85-11 on 850722-26.No Noncompliance Noted.Major Areas Inspected: Facility Organization & Mgt Controls,Operation & Internal Controls & Measurement Sys ML20136B5321985-09-0606 September 1985 Physical Security Insp Rept 70-0371/85-10 on 850716-19.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Locks,Keys & Combinations & Physical Barriers ML20135H6931985-08-23023 August 1985 Matl Control & Accounting Insp Rept 70-0371/85-08 on 850610-14.No Noncompliance Noted.Major Areas Inspected: Measurement Sys & Measurement Control & Statistics ML20137X5861985-07-15015 July 1985 Insp Rept 70-0371/85-06 on 850429-0503.Violations Noted: Failure to Post & Follow Requirements of Nuclear Safety Authorizations in Two Areas of Plant & Failure to Maintain Facility Organization ML20128G1261985-06-27027 June 1985 Insp Rept 70-0371/85-09 on 850603-07.Violation Noted:Failure to Make Suitable Measurements of Airborne Activity 1997-02-12
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20134M4881997-02-12012 February 1997 Insp Rept 70-0371/97-01 on 960916-17.No Violations Noted. Major Areas Inspected:Orise Radiological Scoping Survey ML20055H8441990-07-26026 July 1990 Insp Rept 70-0371/90-203 on 900710-13.No Violations or Deviations Noted.Details Withheld (Ref 10CFR2.790) ML20055G0451990-07-0505 July 1990 Notice of Violation from Insp on 900618-21.Violation Noted: Determined That Tactical Response Team Members Not Qualified W/Weapon Assigned ML20055G0461990-07-0505 July 1990 Insp Rept 70-0371/90-04 on 900618-21.Violation Noted.Major Areas Inspected:Records & Repts,Testing,Maint,Locks Keys & Combinations,Physical Barriers & Matl Access Areas ML20247Q9911989-09-21021 September 1989 Insp Rept 70-0371/89-03 on 890814-18.No Violations & Deviations Noted.Major Areas Inspected:Radiation Protection Program Including Status of Previously Identified Items & Implementation of Radiation Protection Program ML20245B0171989-06-14014 June 1989 Insp Rept 70-0371/89-202 on 890522-26.No Violations or Deviations Noted.Major Areas Inspected:Mc&A Organization & Mgt,Measurements,Physical Inventories & Measurement Control & Statistics.Rept Details Withheld (Ref 10CFR2.790) ML20244D6811989-06-0606 June 1989 Partially Withheld SSNM Matl Control & Accounting Insp Rept 70-0371/89-201 (Ref 10CFR2.790).Major Areas Inspected: Facility Organization & Mgt Controls,Facility Operations & Internal Controls & Physical Inventory & Records & Repts ML20247P6581989-06-0101 June 1989 PNS-I-89-008:on 890530,Globe Security Sys,Inc Filed for Bankruptcy Under Chapter 11 of Federal Bankruptcy Code. Neither Licensee Nor Globe Expect Any Adverse Impact on Onsite Security Operations ML20246K5591989-05-0202 May 1989 Partially Withheld Insp Rept 70-0371/88-200 on 881205-09 (Ref 10CFR2.790).Violations Noted.Major Areas Inspected: Facility Organization & Mgt,Operations & Internal Control & Records & Repts ML20246K7981989-05-0202 May 1989 Partially Withheld Insp Rept 70-0371/89-200 on 890410-14 (Ref 10CFR2.790(d)).Violation Noted Re Use of Measurement for SNM Which Exceeded Control Limit.Major Areas Inspected: Facility Organization & Mgt & Records & Repts ML20245D1681989-04-0707 April 1989 Insp Rept 70-0371/89-02 on 890313-16.No Violations or Deviations Noted.Major Areas Inspected:Operations,Nuclear Criticality Safety,Organization & Licensing Activities ML20236B6931989-01-29029 January 1989 Notice of Violation from Insp on 881205-09.Violations Noted: Failure to Establish Written Procedures for Calculating Additions to & Removals from Matls in Process & Establish Measurement Control Program SNM Control ML20236B6981989-01-27027 January 1989 Insp Rept 70-0371/88-12 on 881205-09.Violations Noted.Major Areas Inspected:Measurement Control & Statistics & Followup on inspector-identified Items ML20205R2141988-10-31031 October 1988 Physical Security Insp Rept 70-0371/88-08 on 880912-16.Major Areas Inspected:Plan & Implementing Procedures,Mgt Effectiveness,Organization,Records & Repts,Testing & Maint, Locks,Keys & Combinations & Security Sys Power Supply ML20195D0291988-10-0505 October 1988 Insp Rept 70-0371/88-09 on 880912-14.No Violations Noted. Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Organization & Mgt Controls,Facility Operation & Internal Controls ML20151Y3331988-08-0909 August 1988 Matl Control & Accounting Insp Rept 70-0371/88-07 on 880712- 15.Major Areas Inspected:Nuclear Matl Control & Accounting, Including Facility Operations & Internal Controls & Records & Repts ML20151Q4371988-07-0101 July 1988 Insp Rept 70-0371/88-06 on 880608-09.No Violations Noted. Major Areas Inspected:Measurement Control Program for SNM ML20195J8221988-06-13013 June 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $12,500.Noncompliance Noted:Individual Received Intake of Radioactive Matl Exceeding 40 H Control Measure & Record of Occurrence Inadequate ML20155F5861988-06-0808 June 1988 EN-88-049:notifies of Intent to Issue Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $12,500 on 880613 to Licensee.Action Based on Violations,Including Failure to Adequately Control Ventilation Flow ML20154J9161988-05-18018 May 1988 Notice of Violation from Insp on 880314-18.Violation Noted: Topics Identified in Section 5.1,J. of Training & Qualification Plan Not Addressed in Annual Requalification Tests & Guards/Watchmen Not Retrained in Subj Topics ML20154J9261988-05-17017 May 1988 Insp Rept 70-0371/88-03 on 880314-18.Violations Noted.Major Areas Inspected:Plan Implementing Procedures,Mgt Effectiveness,Organization.Program Audit,Records & Repts, Testing & Maint & Security Sys Power Supply ML20151N1081988-04-15015 April 1988 Insp Rept 70-0371/88-05 on 880321-25.No Violations Noted. Major Areas Inspected:Facility Operations,Internal Controls & Physical Inventory ML20151W7261988-04-14014 April 1988 Insp Rept 70-0371/88-04 on 880321-25.No Violations Noted Major Areas Inspected:Measurement Control Program for SNM ML20151C2441988-04-0505 April 1988 Insp Rept 70-0371/88-02 on 880229-0318.Violations & Unresolved Items Noted.Major Areas Inspected:Radiation Protection Program,Status of Previously Identified Items, Radwaste Mgt,Training & Implementation ML20151R2541988-03-31031 March 1988 Insp Rept 70-0371/88-01 on 880201-05 & 16-19.No Violations Noted.Major Areas Inspected:Measurement Sys for SNM & Soil Sampling of Contaminated Area PNO-I-88-022, on 880217,approx 2,400 Gallons of Slightly Contaminated Shower & Process Water Released to Restricted Area.Caused by 4-inch Plastic Pipe from Final Treatment Tank Breaking During Excavation to Obtain Fill Dirt1988-02-18018 February 1988 PNO-I-88-022:on 880217,approx 2,400 Gallons of Slightly Contaminated Shower & Process Water Released to Restricted Area.Caused by 4-inch Plastic Pipe from Final Treatment Tank Breaking During Excavation to Obtain Fill Dirt ML20149D8151987-12-28028 December 1987 Physical Security Insp Rept 70-0371/87-09 on 871116 & 17.No Noncompliance Noted.Major Areas Inspected:Night Firearms Qualification,Personnel & Package Searches & Matl Access Area Control ML20237E5871987-12-18018 December 1987 Notice of Violation from Insp on 871102-06.Violation Noted: No Health Physics Procedures for Performing & Documenting Compliance w/10CFR20 Were Approved by Manager of Nuclear & Industrial Safety Development ML20237E5911987-12-11011 December 1987 Insp Rept 70-0371/87-08 on 871102-06.Violation Noted.Major Areas Inspected:Internal Exposure Controls & Implementation of Radiation Program ML20237E3691987-12-0404 December 1987 Insp Rept 70-0371/87-06 on 870824-26.No Violations or Deviations Noted.Major Areas Inspected:Operations,Nuclear Criticality Safety,Organization,Environ Protection & Nonroutine Events PNO-I-87-111, on 871125,fire Occurred in Contaminated Area of Facility.Caused by Spontaneous Combustion of Slightly Contaminated Zircalloy in Vacuum Cleaner.Region I Will Review Incident During Next Insp1987-11-25025 November 1987 PNO-I-87-111:on 871125,fire Occurred in Contaminated Area of Facility.Caused by Spontaneous Combustion of Slightly Contaminated Zircalloy in Vacuum Cleaner.Region I Will Review Incident During Next Insp ML20236X8641987-11-13013 November 1987 Insp Rept 70-0371/87-07 on 870921-25.No Violations & Deviations Noted.Major Areas Inspected:Organization & Mgt Controls,Operations & Internal Controls,Measurement Sys & Records & Repts ML20236G3821987-10-19019 October 1987 Matl Control & Accounting Insp Rept 70-0371/87-04 on 870609- 12.No Violation Noted.Major Areas Inspected:Facility Organization & Mgt Controls,Operations & Internal Controls & Licensee Action on Previously Identified Enforcement Item ML20236K7311987-07-27027 July 1987 Physical Security Insp Rept 70-0371/87-05 on 870615-18. No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts & Locks,Keys & Combinations ML20216H6931987-06-19019 June 1987 Insp Repts 70-0371/87-03 & 70-0820/87-01 on 870518-22.No Violations Noted.Major Areas Inspected:Licensee Radiation Program,Including Status of Previously Identified Items,Mgt Oversight & Controls & Training of Personnel ML20209D3911987-04-20020 April 1987 Insp Rept 70-0371/87-02 on 870316-20.No Noncompliance Noted. Major Areas Inspected:Physical Inventory,Facility Operations & Internal Controls ML20211F9431987-02-17017 February 1987 Matl Control & Accounting Insp Rept 70-0371/87-01 on 870112-16.No Noncompliance Noted.Major Areas Inspected: Physical Inventory of SNM ML20206D5391987-02-0606 February 1987 Insp Rept 70-0371/86-11 on 860929-1003.No Violations or Deviations Noted.Major Areas Inspected:Safety Review of Operational Conditions to Determine Potential Safety Hazards That Could Impact Public Health & Safety ML20212B0201987-01-22022 January 1987 Insp Rept 70-0371/86-13 on 861208-12.No Violations Noted. Major Areas Inspected:Measurement Control Program for SNM ML20210U5581987-01-0909 January 1987 Matl Control & Accounting Insp Rept 70-0371/86-12 on 861201-05.No Noncompliance Noted.Major Areas Inspected: Nuclear Matl Control & Accounting,Including Facility Organization & Mgt Controls & Records & Repts ML20212K9441987-01-0707 January 1987 Notice of Violation from Insp on 860721-25 ML20212K9571986-12-31031 December 1986 Insp Rept 70-0371/86-07 on 860721-25.Violation Noted:Failure to Maintain Record of Nuclear Criticality Safety Insp Conducted During Months of Jan,Mar & May 1986 ML20214F3971986-11-18018 November 1986 Notice of Violation from Insp on 860915-19 ML20214F4281986-11-0505 November 1986 Insp Rept 70-0371/86-10 on 860915-19.Violation Noted:Failure to Perform Mgt Review & Audit of Nuclear Matl Control, Accounting Procedures,Records & Ongoing SNM Measurements Control Program within Required 12 Months ML20214X2321986-11-0505 November 1986 Matl Control & Accounting Insp Rept 70-0371/86-08 on 860908-12.No Noncompliance Noted.Major Areas Inspected: Measurement Control Program for SNM ML20211F8491986-10-20020 October 1986 Insp Rept 70-0371/86-09 on 860915-19.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Officer Program,Including Status of Previously Identified Items & Mgt Oversight & Controls ML20207E3991986-07-0909 July 1986 Matl Control & Accounting Insp Rept 70-0371/86-06 on 860602- 06.No Noncompliance Noted.Major Areas Inspected:Facility Operations & Internal Controls & Records & Repts ML20203A3341986-07-0909 July 1986 Matl Control & Accounting Insp Rept 70-0371/86-05 on 860519- 23.No Noncompliance Noted.Major Areas Inspected:Physical Inventory,Facility Operations & Internal Controls ML20211C1061986-06-0202 June 1986 Notice of Violation from Insp on 860303-07 ML20198R5361986-05-30030 May 1986 Physical Security Insp Rept 70-0371/86-04 on 860428-0502.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Organization,Records & Repts,Locks,Keys & Combinations 1997-02-12
[Table view] |
Text
_
. O U.S. NUCLEAR REGULATORY COMMISSION REGION I Report No. 85-09 Docket No.70-371 License No. SNM-368 Priority 1 Category UHFF Licensee: UNC Naval Products Division, UNC Resources, Inc.
67 Sandy Desert Road Uncasville, Connecticut 06382 Facility Name: UNC Naval Products Inspection At: Montville, Connecticut Inspection Conducted- June 3-7, 1985 f
Inspector: / AM(AE b - /m / 6D '
N W.'JT flicehouse,piation %eciaTist Approved by:
OON 44) A A.M -
0 ti bl D 1
EI
. Pasdfak, Chief "
BWR Radiological Protection Section Inspection Summary: Inspection on June 3-7, 1985 (Report No. 70-371/85-09)
Areas Inspected: Routine, unannounced inspection of the licensee's radiation protection program including: Previously Identified Items; Management Controls; Instruments and Equipment; Surveys; External Exposure Control; Internal Exposure Control; Bioassay; and Respiratory Protection. The inspection involved 34 hours3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> onsite by one regionally-based inspector.
Results: Of the areas inspected, one violation was identified, i.e. failure to make suitable measurements of airborne activity, Detail 8.2. However, the violation met the tests for a licensee identified item under 10 CFR 2, Appendix C, Section IV.A. No Notice of Violation is issued.
8507090057 850703 PDR ADOCK 07000371 C PDR
g_
DETAILS
- 1. Persons Contacted During the' course of this routine inspection, the following personnel were contacted or interviewed:
- Mr.G. O. Amy, President and General Manager
- Mr. R. J. Gregg, Director, Technical Services
- Mr. W. Kirk, Manager, Nuclear and Industrial Safety
- Mr. D. Luster, Health Physics Specialist
- Denotes those present at the exit interview on June 7, 1985 Other licensee personnel were also contacted or interviewed during this inspection.
- 2. Purpose The purpose of this routine inspection was to review the licensee's ongoing radiation protection program with respect to the following elements:
Previously Identified Items Management Controls Instruments and Equipment Survey Program External Exposure Control Internal Exposure Control Bioassay Program Respiratory Protection Program
-3. Previously Identified Items 3.1 (0 pen) Inspector Followup Item (70-371/82-08-01) Obtain information on the quantity of special nuclear materials (SNM) released from the septic tank system into the leach field. The licensee has set up 10 meter grids in both leach fields. Each grid will be surveyed with a gamma scintillation survey meter to select locations for soil samp-ling. Soil sampling is expected to be completed by mid-July 1985.
Soil samples will be submitted for laboratory analysis of special nuclear material (SNM) content at that time..
3.2 (0 pen) Inspector Followup Item (70-371/83-04-03) Removal of Dog Pen 2 from East End of Building M. The facility was approximately 50% empty. Further removal of stored drums was suspended pending licensee efforts to upgrade the shipping program.' Drums are examined for contamination whenever entries are made into the area. However, no routine contamination measurements are made at other times.
3 3.3 (0 pen) Inspector Followup Item (70-371/83-04-05) Issue of approved internal HP p'rocedures to techs. Approved internal health physics procedures have not been issued to the health physics technicians.
The licensee has deferred action on this item pending completion of actions considered to be higher priority.
3.4 (0 pen) Violation (70-371/84-08-01) Licensee review of corrective action program regarding contamination surveys to assure that personnel are surveying when and as required. The licensee's contamination monitoring work stations were on schedule to meet a mid-July 1985 commitment. The June 1985 Monthly Awareness Session, (i.e. in-house training session), discussed the new system. The licensee completed re-indoctrination of all employees in May 1985.
- 4. Management Controls The following aspects of the licensee's management controls in radiation protection were reviewed against conditions and specifications in the licensee's application for SNM License Number 368 (SNM-368) and criteria in 10 CFR Parts 19 and 20.
4.1 Audits and Inspections Thelicensek'sprogramfordailychecks,monthlyinspectionsand periodic audits of radiation protection activities was reviewed against criteria provided in Section 2.7, (" Inspections and Audits"), of the licensee's application for SNM-368. The licensee's performance relative to these criteria was determined by:
discussions and. interviews of the Health Physics Specialist and members of his staff; review of monthly inspection reports by the Health Physics Specialist from January 1984 through April 1985; and review of an audit report t3 Ao rican Nuclear Insurers (Revision dated 1/7/85).
Within the scope of this revsew, nu daviations from commitments made in the licensee's application were noted.
4.2 Health Physics Procedures Task Instructions, (i.e. health physics procedures) for various radiation protection activities were reviewed against criteria provided in 10 CFR 20 and commitments contained in Chapter 4,
(" Health Physics Standards") and Subsection 2.5.2.4, (" Radiation Protection Instruction") of the licensee's application. The licensee's performance relative to these criteria and commitments
.f ,
4 was determined by interviews and discussions with health physics technicians and review of the Health Physics Manual (containing task instructions for various radiation protection activities).
Within the scope of this review, no violations or deviations were noted. The inspector noted that the health physics technicians were knowledgeable in the task instructions although they did not have a controlled copy of the Health Physics Manual available for ready reference in their work area.
4.3 Instructions T_o Workers The licensee's program-for instruction of workers in radiation protection was reviewed against criteria in 10 CFR 19.12 and commitments in Section 2.8, (" Training") of the licensee's application. The licensee's performance relative to these criteria and commitments was determined by discussions with workers and review of a training program given on June 4,1985 to 5 newly hired employees.
Within the scope of this review, no violations or deviations were noted.
4.4 Special Work Permits The issuance, adherence to and adequacy of the licensee's special work permits (SWPs) were reviewed against commitments provided in Subsection 4.6.3 ("Special Operations") of the licensee's application. The SWP process was reviewed by examination of the SWP Log, selected SWPs and associated radiation protection surveys and during discussions with health physics technicians.
Within the scope of this review, no violations or deviations were noted.
- 5. Instruments And Equipment The licensee's radiation protection instruments and equipment were reviewed for operability, proper alarm settings (as appropriate),
functional testing and calibration relative to criteria and guidance provided in:
( -
10 CFR 70.24, (related to the criticality alarm system);
l Section 4.5, (" Instrumentation"), of the licensee's application; J
ANSI N 323-1978, "American National Standard Radiation Protection Instrumentation Test And Calibration;"
Regulatory Guide 8.12, " Criticality Accident Alarm Systems;" and Regulatory Guide 8.25, " Calibration And Error Limits Of Air Sampling Instruments For Total Volume of Air Sampled."
k n us - u . - u u.
5 The licensee's performance relative to these criteria and recommendations
.was determined by interviews and discussions with cognizant health physics and maintenance personnel, review of testing and calibration procedures and records and direct observations during plant hours.
Within the scope of this review, the following item was noted:
The licensee used fixed air sampling stations to evaluate airborne radioactivity within the controlled area in Building "B" South.
Each station consisted of a filter to collect potential radioactive contaminants and an air flow metering device to determine the total volume of air passing through the filter. Accurate determinations of the quantity of radioactive contaminant collected and the volume of air sampled were needed to evaluate airborne radioactivity within the controlled area. Although the licensee adequately calibrated laboratory counting instruments used to determine the quantity of radioactive contaminant collected on the filter, the licensee failed to calibrate the air flow metering devices used to determine total volume of air sampled. Regulatory Guide 8.25 recommends performance of an acceptable calibration of all air flow metering devices at least once every six months.
Special calibrations are recommended whenever there is reason to believe that the operating characteristics of the metering device have changed (such as after repair or alteration or following observation.of changes in system performances). The calibration of the air flow metering devices in Building "B" South was discussed with the licensee and will be reviewed in a subsequent inspection.
371/85-09-01
- 6. Surveys
-The licensee's program to measure and evaluate potential radiation and contamination hazards during routine and special plant activities was reviewed-against criteria established in:
10 CFR 20.201, " Surveys;"
10 CFR 20 @l, " Records of Surveys, Radiation Monitoring, And Disposal;" and Section 4.6, (" Plant Surveillance") of the licensee's application.
'The licensee's performance relative to these criteria was determined by discussions with health physics personnel, review of selected routine and L 'special surveillance records and leak tests of sealed sources and direct i observations and measurements by the inspector.
Within the scope of this review, no violations were noted.
6
- 7. External Exposure Control The licensee's external. exposure control program was reviewed against criteria established in:
10 CFR 20.101, " Radiation Dose Standards For Individuals In Areas;"
10 CFR 20.102, " Determination of Prior Dose;"
10.CFR 20.104, " Exposure of Minces;"
10 CFR 20.202, " Personnel Monitoring;"
10 CFR 20.203, " Caution Signs, Labels, Signals And Controls;"
10 CFR 20.401, " Records of Surveys, Radiation Monitoring, And Disposal;"
10 CFR 70.24, " Criticality Accident Requirements;" and' Section 4.2, (" Personnel Monitoring") of the licensee's application.
Performance relative to these criteria was determined by interviews of the Health Physics Specialist and members of his staff, review of external exposure records and direct observations and measurements.
Within the scope of this review, no violations were noted.
- 8. Internal Exposure Control TheLlicensee's internal exposure control program was reviewed against criteria provided in 10 CFR 20.103 and 10 CFR 20.203 and commitments in the following portions of the licensee's application:
Subsection 4.1.1, " Surface Contamination;"
Subsection 4.1.3, "In-Plant Action / Control Concentrations;"
Subsection 4.2.2, " Maximum Permissible Exposure To Internal Radiation;"
Subsection 4.4.1, " Zoning;" and Subsection 4.4.2, " Ventilation."
8.1 Contamination Control
-The following aspects of the licensee's contamination control program were reviewed:
contamination control work techniques including use of protective clothing, ventilation balancing and prompt correction and cleanup of contamination; timely dissemination of survey data on plant conditions for use in work planning and control; and evaluation of personal contamination at control points.
The licensee's performance in these areas was determined by interviews of
-selected workers in the controlled areas of Building "B" South; discussions with health physics technicians, observations at control points and review of selected records.
Within the scope of this review, no violations were noted.
7 8.2 Air Sampling The following aspects of the licensee's air sampling program were reviewed:
placement, representativeness and adequacy of the licensee's fixed air sampling locations; adequacy of procedures for collection and analysis of air samples; provisions for review and evaluation of air sampling data including investigation of abnormal results and the determination of trends; and maintenance of reports and records of airborne activity.
The licensee's performance in these areas was determined by:
interviews and discussions with Health Physics and Nuclear Materials Control personnel; review of selected procedures and air sampling data for selected areas in Building "B" South; and observations of air sampling locations and equipment during plant tours.
Within the scope of this review, the following violation was noted:
10 CFR 20.103 (a)(3) requires, in part, that the licensee use suitable measurements of the concentrations of radioactive materials in air for detecting and evaluating airborne radioactivity in restricted areas.
Contrary to this requirement, the licensee failed to make suitable measurements of the concentration of enriched uranium in air in the Scrap Retention Vault in Building "B" South on December 12-14, 1984, January 16-18, 1985, January 29-30, 1985 and February 8-11, 1985. The licensee used a fixed air sampler (No. I-848)'to determine concentrations of enriched uranium in air in the work area within the vault. The air sampler operated at a nominal flow rate of 20 liters per minute for 24 or more hours to sample the air in the work area. However, work activities in the area were 12 or less hours per day. The air samples taken did not constitute suitable measurements of the concentrations of enriched uranium in air since the samples averaged air concentrations during periods of inactivity as well as work activity and thus did not record peak concentrations during work activities. Calculations made by the inspector indicated that those peak concentrations were potentially in excess of the concentrations in 10 CFR 20, Appendix B, Table 1, Column 1. In calculating concentrations of airborne enriched uranium, the licensee used the entire sampling volume and, thus underestimated the concentrations during actual work activities.
Prior to the inspection, the licensee had identified that concentrations of enriched uranium were potentially above 25% of concentrations in 10 CFR 20, Appendix B, Table 1, Column 1 during scrap sample sorting and
. w 8
packaging in the Scrap Retention Vault. The licensee instituted an investigation and corrective action program to determine the causes of the increased activity noted on Air Sampler No. I-848 and to provide appropriate controls to minimize airborne exposures to workers. The inspector noted that:
the apparent violation had been identified by the licensee prior to the inspection; the apparent-violation did not result in exposures to airborne enriched uranium in excess of 10 CFR 20.103 (a)(1);
the apparent violation did not require reporting under NRC requirements; corrective actions including investigation, examination of engineering and procedural controls and administrative actions were underway; and the apparent violation was not a violation that could reasonably be expected to have been prevented by the licensee's corrective action for a previous violation.
At the exit interview on June 7, 1985, the licensee stated that actions to identify and correct the causes for the increased airborne activity during scrap sample sorting and packaging would be completed by August 15, 1985. The inspector stated that those actions would be reviewed during a subsequent inspection. 70-371/85-09-02
- 9. Bioassay Program The licensee's bioassay program was reviewed relative to criteria, commitments and guidance provided in:
10 CFR 20.103, " Exposure Of Individuals To Concentrations Of Radioactive Materials In Air In Restricted Areas;"
10 CFR 20.401, " Records Of Surveys, Radiation Monitoring, And Disposal:"
Subsection 4.2.3, (" Bioassay Program"), of the licensee's application; Regulatory Guide 8.11, " Applications of Bioassay For Uranium;" and WASH-1251, " Applications of Bioassay For Uranium."
The following aspects of the licensee's bioassay program were reviewed:
the extent of the bioassay program performed; the frequency and' type of biosssay employed; the selection of participants; 4 -
the action levels for positive bioassay results exceeding administrative action levels; and the maintenance of records relating to the bioassay.
The licensee's performance relative to the criteria, commitments and guidance in the areas examined was determined by interviews of the Health 7 Physics Specialist and members of his staff and examination of bioassay
- records for selected, potentially-exposed workers in Building "B" South.
Within the scope of this review, no violations or deviations were noted.
9
- 10. Respiratory Protection The licensee's respiratory protection program was reviewed against criteria, commitments and guidance provided in:
10CFR 20.103, " Exposure Of Individuals To Concentrations Of Radioactive Materials In Air In Restricted Areas;"
Section 4.3, (" Respiratory Protection Program"), of the licensee's application; and Regulatory Guide 8.15, " Acceptable Programs For Respiratory Protection."
The licensee's performance relative to the criteria, commitments and guidance above was determined by discussions with health physics technicians, review of procedures.and Special Work Permits, examination of respiratory protective equipment and review of air sample survey data. The inspector noted that the licensee had not made allowance for the use of respiratory protective equipment in estimating exposures to airborne radioactivity during any of the work activities examined.
Within the scope of this review, no violations or deviations were noted.
- 11. Exit Interview The inspector met with the licensee's representatives (denoted in Paragraph 1) at the conclusion of the inspection on June 7, 1985. The inspector summarized the purpose and scope of the inspection and findings as described in this report.
At no time during this inspection was written material provided to the
~
licensee by the inspector. No information exempt from disclosure under 10 CFR 2.790 was discussed in this report.