Notice of Violation from Insp on 860915-19
ML20214F397
Person / Time
Site: 07000371
Issue date: 11/18/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20214F371 List:
References
70-0371-86-10, 70-371-86-10, NUDOCS 8611250290
Download: ML20214F397 (1)


Text

. ____ - __________ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ __-_ - - _-_-_ ---- -----

APPENDIX A NOTICE OF VIOLATION UNC Naval Products Docket No.70-371 Montville, Connecticut License No. SNM-368 As a result of the inspection conducted on September 15-19, 1986, and in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy 1986), the (

following violation was identified:

Section 8.2 of the UNC Haval Products Fundamental Nuclear Material Control Plan (FNMCP) requires that the nuclear material control and accounting procedures and management of the overall system of special nuclear material control will be reviewed and audited by individuals independent of the Nuclear Material Manager every twelve months. [

L Section 4.1.3 of the UNC Naval Products FNMCP requires that the Manager of Quality Control Engineering conducts a review and audit of the ongoing Special Nuclear Material (SNM) Measurement Control Program every twelve months. This audit is included with the overall management systems audit and both audits are scheduled by the Quality Steering Committee. The results of these reviews and audits, with recommendatiens, are furnished to the President UNC Naval Products and the Nuclear Material Control Manager.

Contrary to the above, the inspector determined on September 17, 1986 that the review and audit of the licensee's nuclear material control and accounting procedures and management of the overall system of SNM, including the ongoing SNM Measurement Control Program, was not conducted within twelve months of the previous review and audit. The previous review and audit was during the months of March and April,1985 and the results were documented on April 19, 1985. The next review and audit was not until July 10, 1986, and the results were still in the process of review by the Quality Steering Comittee.

This is a Severity Level V Violation (Supplement III.E).

Pursuant to the provisions of 10 CFR 2.201, UNC Naval Products is hereby required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.