ML20151Q437
| ML20151Q437 | |
| Person / Time | |
|---|---|
| Site: | 07000371 |
| Issue date: | 07/01/1988 |
| From: | Jang J, Pasciak W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20151Q435 | List: |
| References | |
| 70-0371-88-06, 70-371-88-6, NUDOCS 8808110160 | |
| Download: ML20151Q437 (2) | |
Text
--
4
..=
U.S. NUCLEAR REGULATOR'r COMMISSION REGION I Report No.
70-371/88-06 Docket No.70-371 License No. 'SNM-368 Safeguards Group 1
L'censee:
UNC Naval Products i
Division of UNC Resources, Inc.
67 Sandy Desert Road Uncasville, Connecticut 06382 Facility Name: UNC Naval Products Inspection At: Uncasville, Connecticut Inspection Conducted: June 8-9, 1988 Inspector:
L d%
._ h ~ ! ~
J. '. Jang, Sr. Radiation Spe ist date Approved by:
Od-42L M/Lf--
h/ ~
W.
. Pasciak, Chief, Effluen date diation Protection Secti FRSS8, DRSS Inspection Summary:
Routine, Announced Material Control and. Accounting Inspection on June 8-9, 1988 (Report No. 70-371/88-06)
Areas Inspected: Measurement control program for special nuclear material.
Results:
The licensee was in compliance in the area examined during this inspection.
$c $&{, ' '
PNU
c l*J l
Details 1.
Individuals Contacted
- T. Callopy, Manager, Nuclear Material Control l
- N. Grenon, Supervisor, Nuclear Material Control
- J. L'Heureux, Nuclear Material Control M. Hine, MBA7 Custodian & Fuel The inspector also interviewed other licensee personnel involved in the control ar.d accounting of special nuclear material and chemistry.
l-l
'present at exit interview.
l 2.
Measurement Systems As a verification of the licensee's measurement capabi'lities on actual l
finished material, fifty one samples were taken for analysis.
These l
samples will be sent to New Brunswick Laboratory for analyses to l
independently determine the licensee's measurement capabilities. On l'
completion of the analysis, a statistical evaluation will be performed j
by the inspector (Followup item 70-371/88-06-01).
1 L
3.
Exit Interview The inspector met with the licensee representatives (denoted ir. paragraph 1) at the conclusion of the inspection on June 9,1988 and summarized the l
scope of the 1nspection.
l l
i i
__m
.